14
MAXTON STRONG SCHOOL CONCEPT - PERSPECTIVE DEC 2014 ISSUE DATE: C H E C K E D : REVISION : D A T E : DATE : PROJECT NO. : DRAWN BY : GOOD SHEPHERD AGRICULTURAL MISSION IN-0238 BANBASA, UTTARAKHAND, INDIA india.emiworld.org R1 ('6 MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE #%-

MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

MAXTON STRONG SCHOOL CONCEPT - PERSPECTIVE

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

R1

MA

XT

ON

ST

RO

NG

SC

HO

OL

CO

NC

EP

TP

ER

SP

EC

TIV

E

Page 2: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

FISH

PO

ND

(E) E

NT

RY

RO

AD

TO

MIS

SIO

N

1

32

6

11

FISH

PO

ND7

NATIONAL HIGHWAY

MANGOORCHARD

NATIONAL HIGHWAY

1

2

3

4

5

6

7

8

10

11

12

13

18

15

14

17

9

1610

ENTRANCEGATE

8 9

4

5

88

hwy m

rkhw

y mrk

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

1 1" = 200' SITE AREA: 74.02 ACRES

FET

R1 04.01.16

ACK 02.12.14

NORTH

400'

1" =

200

'

020

010

020

DAIRYSWIMMING POOLGUEST HOUSE + KULLA 1KITCHEN/DINING/LAUNDRYBIG GIRLS HOSTELNEW GIRLS HOSTELSMALL GIRLS HOSTELNURSERYDIRECTOR'S RESIDENCESMALL BOYS HOSTEL

23

1

BUILDING KEY

456789

10

1213

11 OLD KINDERGARTEN SCHOOLCARPENTRY (TO BE DEMOLISHED)

RESIDENTIAL AREABIG BOYS HOSTELVEHICLE STORAGE (TO BE DEMOLISHED)

KULLA 2WORKSHOP AREAMAXTON STRONG SCHOOL(MSS) - PRIMARY SCHOOL BLOCKEXISTING BUILDINGSPROPOSED BUILDINGS

1415161718

##

MSS - PRIMARY SCHOOL BLOCK EXTENSIONMSS - LEARNING RESOURCE CENTREMSS - SECONDARY SCHOOL BLOCKMSS - KINDERGARTENMSS - AUDITORIUM/GYMNASIUMMSS - CENTRAL ASSEMBLY AREAMSS - PLAY-FIELDSTAFF HOUSINGOFFICEGUEST HOUSEFAMILY PAVILION + PLAY AREA11

10987654321

LEGEND

OVERHEAD ELECTRICAL LINE

EXISTING/PROPOSED ROADS

WALL

PROPERTY CORNER

BOUNDARY LINE

T-FENCEPOSTS, PRESUMEDUNMAINTAINED FENCE LINE

EXISTING BUILDINGS

PROPOSED BUILDINGS

EXISTING UTILITY POLE

EXISTING TREE

PROPOSED TREE

EXISTING BUILDINGSTO BE DEMOLISHED

Page 3: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

1000

1000

1000

1001

1001

1002

1001

1002

1003

998

999

999

999

1002

999

1001

1003

1002

1000

1002

1002

1001

1000

1000

1002

998

999 998

1001

FISH

PO

ND

CR

ICK

ET

PIT

CH

DRAINAGE

WAY

(E) E

NT

RY

RO

AD

TO

MIS

SIO

N

GAR

DENAR

EA

1

32

6

11

FISH

PO

ND

7

MANGOORCHARD

1

2

3

4

5

6

7

8

10

11

12

13

18

15

14

17

9

16

(E)CULVERT

UNDER

ROAD

10

GATE TO

MISSIO

N

ENTRANCE GATE

PLAY AREA

89

4

5

PARKING

PARKING

PARKING

8

8

GE

NE

-

RA

TO

RG

UA

RD

RO

OM

GATE TO

MISSION

hwy m

rkhw

y mrk

1 1" = 100' SITE AREA: 74.02 ACRES

NORTH

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

FET

R1 04.01.16

ACK 02.12.14

200'

1" =

100

'

010

050

10

DAIRYSWIMMING POOLGUEST HOUSE + KULLA 1KITCHEN/DINING/LAUNDRYBIG GIRLS HOSTELNEW GIRLS HOSTELSMALL GIRLS HOSTELNURSERYDIRECTOR'S RESIDENCESMALL BOYS HOSTEL

23

1

BUILDING KEY

45678910

1213

11 OLD KINDERGARTEN SCHOOLCARPENTRY (TO BE DEMOLISHED)

RESIDENTIAL AREABIG BOYS HOSTELVEHICLE STORAGE (TO BE DEMOLISHED)

KULLA 2WORKSHOP AREAMAXTON STRONG SCHOOL(MSS) - PRIMARY SCHOOL BLOCKEXISTING BUILDINGSPROPOSED BUILDINGS

1415161718

##

MSS - PRIMARY SCHOOL BLOCK EXTENSIONMSS - LEARNING RESOURCE CENTREMSS - SECONDARY SCHOOL BLOCKMSS - KINDERGARTENMSS - AUDITORIUM/GYMNASIUMMSS - CENTRAL ASSEMBLY AREAMSS - PLAY-FIELDSTAFF HOUSINGOFFICEGUEST HOUSEFAMILY PAVILION + PLAY AREA11

10987654321

EXISTING BUILDINGS

PROPOSED BUILDINGS

LEGEND

EXISTING UTILITY POLE

OVERHEAD ELECTRICAL LINE

T-FENCEPOSTS, PRESUMEDUNMAINTAINED FENCE LINE

EXISTING TREE

PROPOSED TREE

EXISTING BUILDINGSTO BE DEMOLISHED

Page 4: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

FISH

PO

ND

PLAYAREA

-3'-6"

-1'-0"

-2'-0"

MO

TOR

CY

CLE

PA

RK

ING

BUS PARKING

CR

ICK

ET

PIT

CH

DRAINAGE WAY

CAR PARKING

CULVERT

UNDER

ROAD

1

3

2

6

FISH

PO

ND

7

BICYCLE PARKING

18

17

GATE TO

MISSIO

N

ENTRANCEGATE

PLAYAREA

SWIMMING POOL

4

5

WAI

TIN

GAR

EA

WAITINGAREA

+0'-0"

+0'-0"

+0'-0"

+0'-0"

+0'-0"

-2'-0"

-3'-0"BENCH

BE

NC

H

BE

NC

H

hwy m

rkhw

y mrk

1 1" = 50' SITE AREA: 6 ACRES APPROX.

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

FET

R1 04.01.16

ACK 02.12.14

NORTH

100'

1" =

50'

050

255

NOTE:BUILDING FLOOR LEVEL +0'-0" CORRESPONDSTO CONTOUR HEIGHT 1000.0' ON DWG. NO. C0

BUILDING KEYWORKSHOP AREAMAXTON STRONG SCHOOL(MSS) - PRIMARY SCHOOL BLOCK

EXISTING BUILDINGSPROPOSED BUILDINGS

1718

##

MSS - PRIMARY SCHOOL BLOCK EXTENSIONMSS - LEARNING RESOURCE CENTREMSS - SECONDARY SCHOOL BLOCKMSS - KINDERGARTENMSS - AUDITORIUM/GYMNASIUMMSS - CENTRAL ASSEMBLY AREAMSS - PLAY-FIELDSTAFF HOUSINGOFFICEGUEST HOUSEFAMILY PAVILION + PLAY AREA11

10987654321

EXISTING BUILDINGS

PROPOSED BUILDINGS

LEGEND

EXISTING UTILITY POLE

OVERHEAD ELECTRICAL LINE

T-FENCEPOSTS, PRESUMEDUNMAINTAINED FENCE LINE

EXISTING BUILDINGSTO BE DEMOLISHED

Page 5: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

MAXTON STRONG SCHOOL - SECONDARY SCHOOL CONCEPT - PERSPECTIVE

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

R2

MA

XT

ON

ST

RO

NG

SC

HO

OL

- S

EC

ON

DA

RY

SC

HO

OL

CO

NC

EP

TP

ER

SP

EC

TIV

E

Page 6: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

ADMIN.

PR

INC

IPA

L'S

OF

FIC

E

AS

ST

.P. O

FF

ICE

TE

AC

HE

RS

RO

OM

TEACHERS LOUNGE

KITCHENETTE

GIRL'S TOILET

S.TOILET

CLASSROOM CLASSROOMART ROOM

CLASSROOM

CLASSROOM

CLASSROOM

BOY'S T

OILET

TE

AC

HE

RS

RO

OM

SCIENCE L

AB

LOBBY

STORE

JANITOR'SROOM

S.TOIL

ET

CO

RR

IDO

R

CORRIDOR

CORRIDOR

MAIN ENTRY

CENTRAL ASSEMBLY AREA

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

WALL LEGEND

GROUND FLOOR PLAN

A1

MA

XT

ON

ST

RO

NG

SC

HO

OL

- S

EC

ON

DA

RY

SC

HO

OL

CO

NC

EP

TG

RO

UN

D F

LO

OR

PL

AN

Page 7: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM CLASSROOM

MATHS LAB

CLASSROOM

CLASSROOM

CLASSROOM

SCIENCE L

AB

CLASSROOM

SCIENCE L

AB

LAB ASSIS

TANTSTORE

CO

RR

IDO

R

CORRIDOR

CORRIDOR

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

WALL LEGEND

FIRST FLOOR PLAN

A2

MA

XT

ON

ST

RO

NG

SC

HO

OL

- S

EC

ON

DA

RY

SC

HO

OL

CO

NC

EP

TF

IRS

T F

LO

OR

PL

AN

Page 8: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

MAXTON STRONG SCHOOL - LEARNING RESOURCE CENTRE CONCEPT - PERSPECTIVE

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

R3

MA

XT

ON

ST

RO

NG

SC

HO

OL

- L

EA

RN

ING

RE

SO

UR

CE

CE

NT

RE

CO

NC

EP

TP

ER

SP

EC

TIV

E

Page 9: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

VESTIBULE76 S .FT.

MAGAZINES75 S .FT.

CIRCULATION275 S .FT.

STACKS456 S .FT.

CO

MP

UT

ER

LA

B58

9 S

.FT

.

PRIMARY READING ROOM395 S .FT.

UPS STORE74 S .FT.

MAIN ENTRY

-2'-0"

+0'-0"

SECONDARYREADING ROOM

608 S .FT.

OUTDOOR AREA315 S .FT.

ISSUE/RETURN82 S .FT.DIGITAL

53 S .FT.

WALKWAY

UPUP

-1'-0"

WALL LEGENDEXTERIOR WALL WITH 9 DOUBLE BRICK WALLINTERIOR WALL WITH 4.5 SINGLE BRICK WALLLOW / PARTIAL HEIGHT WALL

NORTHGROUND FLOOR PLAN1 1/16"=1'-0" FLOOR AREA: 3009 S UARE FEET

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

A3

FET

MA

XT

ON

ST

RO

NG

SC

HO

OL

- L

EA

RN

ING

RE

SO

UR

CE

CE

NT

ER

CO

NC

EP

TG

RO

UN

D F

LO

OR

PL

AN

ACK 02.12.14

40'

1/16

" =

1'-0

"

05'

10'

20'

Page 10: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

MAXTON STRONG SCHOOL - KINDERGARTEN CONCEPT - PERSPECTIVE

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

R4

MA

XT

ON

ST

RO

NG

SC

HO

OL

- K

IND

ER

GA

RT

EN

CO

NC

EP

TP

ER

SP

EC

TIV

E

Page 11: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

UKG CLASSROOM LKG CLASSROOM LKG CLASSROOM CLASSROOM

NURSERY

PLAYSCHOOL

OF

FIC

E A

RE

A

STAFF AREA

STORAGE

CO

VE

RE

D O

UT

DO

OR

PL

AY

AR

EA

OUTDOOR PLAY AREA

ENTRY

NURSERY

UKG CLASSROOM TOILET

STAFFTOILET

TOILET

VICE PRIN.OFFICE

SW

IMM

ING

PO

OL

AR

EA

MAIN ENTRY

CORRIDORSTORAGE STORAGE

J.C.

J.C.

CENTRAL ASSEMBLY AREA

WALKW

AY

WALL LEGEND

GROUND FLOOR PLAN

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

A4

MA

XT

ON

ST

RO

NG

SC

HO

OL

- K

IND

ER

GA

RT

EN

CO

NC

EP

TG

RO

UN

D F

LO

OR

PL

AN

Page 12: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

CP-15

CP-13

CP-3

CP-14

PT

CP-5

CP-11

NATIONAL HIGHWAY

MANGOORCHARD

CP-4

CP-6

CP-2

CP-12

CP-9

CP-7

CP-8

CP-10

CP-1

PROPERTYCORNER

RESIDENTIALAREA

PT

PROPERTYCORNER

PROPERTYCORNER

PROPERTYCORNER

PROPERTYCORNER

PROPERTYCORNER

PROPERTYCORNER

PROPERTYCORNER

ADJACENTVILLAGEPROPERTY

ADJACENTVILLAGEPROPERTY

ADJACENTVILLAGEPROPERTY

NATIONAL HIGHWAY

WORKSHOPPUMP

RESIDENTIALAREA

RESIDENTIALAREA

RESIDENTIALAREA FISH

PONDFISH

POND FISHPONDPUMP

ORCHARDPUMP

GE

NE

RA

TO

R

SH

ED

1

3

4

5

6

7

8

9

11

12

13

18

15

14

17

16

102

1 1" = 200' SITE AREA: 74.02 ACRES

SAB

ACK 23.11.15

ACK 02.12.14

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

NORTH

NOTES:

1. TOPOGRAPHIC SURVEY WAS PERFORMED FOR THE PURPOSE OF PREPARING AMASTER PLAN. DETAIL OF THE FEATURES SURVEYED MEETS THE REQUIREMENTSFOR THIS PURPOSE. ELEVATIONS WERE MEASURED TO OBTAIN A GENERAL IDEA OFTHE TERRAIN OF THE PROPERTY TO PREPARE THE MASTER PLAN.

2. ALL FEATURES LOCATED OUTSIDE OF THE PROPERTY BOUNDARY WERE LOCATEDUSING LOW RESOLUTION UN-RECTIFIED AERIAL IMAGES, AND THEIR LOCATION ASSHOWN ON THIS SURVEY IS APPROXIMATE IN NATURE.

.

3. CONTOUR INTERVAL IS 0.3 FEET.

4. AREA OF THE SURVEYED PARCEL IS APPROXIMATELY 29.96 HECTARES (74.02 ACRES).

5. MEASUREMENTS ARE IN FEET.

HORIZONTAL CONTROL POINTS:

POINT NORTHING EASTING ELEVATION DESCRIPTION1 10000.00 20000.00 1000.00 2.5 INCH NAIL2 9714.85 20005.88 999.77 2.5 INCH NAIL3 8878.23 20217.05 1001.02 2.5 INCH NAIL4 9158.45 21063.84 1003.68 2.5 INCH NAIL5 9853.07 20629.22 1002.66 2.5 INCH NAIL6 10220.79 20780.57 1001.82 2.5 INCH NAIL7 10426.05 19999.89 1002.67 2.5 INCH NAIL8 9802.74 20274.89 1001.59 2.5 INCH NAIL9 9896.50 20513.35 1001.68 2.5 INCH NAIL10 9786.78 20495.95 1001.67 2.5 INCH NAIL11 9763.63 20597.16 1002.34 CONC. MARK12 9760.23 20467.68 1001.67 2.5 INCH NAIL13 9594.44 20548.91 1001.95 CONC. MARK14 10426.01 20000.00 1002.49 2.5 INCH NAIL15 9856.44 19791.07 998.43 2.5 INCH NAIL

BASIS OF DIRECTIONS:

DIRECTIONS ARE MAGNETIC BASED UPON A COMPASS READING BETWEENCONTROL POINTS.

SURVEY EQUIPMENT & DATE:

SITE WAS SURVEYED SEPTEMBER 9 - 13, 2014. A TOPCON GPT-3005 TOTALSTATION WAS USED TO COLLECT SITE INFORMATION.

400'

1" =

200

'

020

010

020

PT

LEGEND

PERCOLATION TEST HOLE

HORIZONTAL CONTROL POINT

EXISTING UTILITY POLE

EXISTING TREE

EXISTING STRUCTURE

PROPERTY CORNER

CP1

BOUNDARY LINE

WALL

EXISTING ROAD

OVERHEAD ELECTRICAL LINE

RESIDENTIAL AREA(NOT SURVEYED)

DAIRYSWIMMING POOLGUEST HOUSE + KULLA 1KITCHEN/DINING/LAUNDRYBIG GIRLS HOSTELNEW GIRLS HOSTELSMALL GIRLS HOSTELNURSERYDIRECTOR'S RESIDENCESMALL BOYS HOSTEL

23

1

BUILDING KEY

45678910

1213

11 OLD KINDERGARTEN SCHOOLCARPENTRY (TO BE DEMOLISHED)

RESIDENTIAL AREABIG BOYS HOSTELVEHICLE STORAGE (TO BE DEMOLISHED)

KULLA 2WORKSHOP AREAMAXTON STRONG SCHOOL(MSS) - PRIMARY SCHOOL BLOCK

1415161718

Page 13: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

hwy m

rkhw

y mrk

EXISTING BOREWELLTO BE USED FOR

CAMPUS WATER SUPPLY

10,000 LITERWATER TANK

4,500 LITERWATER TANK

EXISTINGBORE WELL(NON-POTABLE USE)

SCOUR VALVE(SYSTEM FLUSH)

EXISTING BOREWELL(AGRICULTURAL USE)

SCOUR VALVE(SYSTEM FLUSH)

FLOW DIRECTION(SYSTEM FLUSH)

FLOW DIRECTION(SYSTEM FLUSH)

PUMPHOUSE / PRESSURETANK STORAGE AREA

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

NORTH1 1"=100'

LEGEND

WATER TANK (4,500 LITER)

PIPE JUNCTION BOX

WATER TANK (10,000 LITER) -FUTURE

PIPE VALVE

EXISTING WATER SYSTEM

PIPE FLOW DIRECTION

SAB

ACK 02.12.14

200'

1" =

100

'

010

050

10

SCOUR VALVE

PROPOSED WATER SYSTEM

NOTES:

1. INSTALL NEW TWO-LOOP SYSTEM WITH 1 BACK-UP WATER STORAGE TANK (ROOF LEVEL) AND 1SCOUR VALVE PER LOOP.

2. WATER DISTRIBUTION PIPES SHOULD BE 50 mm (PVC CLASS 6).

3. IT IS RECOMMENDED THAT THE SCOUR VALVES BE USED EVERY 2 MONTHS (OR WHEN ANYSEDIMENTATION IS SUSPECTED) TO FLUSH THE WATER SYSTEM. THERE SHOULD BE AN OPEN DRAINAT THE SCOUR VALVE LOCATIONS TO LEAD THE WASHOUT WATER TO A SUITABLE WATER COURSE.

4. 6 MONTHS AFTER THE PIPE SYSTEM IS INSTALLED, INSPECT THE PIPELINE AT SEVERAL DIFFERENTLOCATIONS TO SEE IF THERE IS SEDIMENTATION OCCURRING IN THE PIPE SYSTEM.

SYSTEM FLUSHING PROCEDURE:

1. CLOSE ALL TAPS BEFORE FLUSHING THE WATER SYSTEM.

2. TURN ON THE PUMP TO BEGIN FLUSHING THE SYSTEM. RETAIN A MINIMUM OPERATING PRESSURE INTHE SYSTEM OF 20 PSI.

3. PARTIALLY OPEN THE SCOUR VALVE (TO ACHIEVE 50% FLOW) FOR 7 MINUTES.

4. FULLY OPEN THE SCOUR VALVE (TO ACHIEVE 100% FLOW) FOR 20 MINUTES.

5. PARTIALLY CLOSE THE SCOUR VALVE (TO ACHIEVE 50% FLOW) FOR 7 MINUTES.

6. FULLY CLOSE THE SCOUR VALVE TO COMPLETE THE SYSTEM FLUSH.

Page 14: MAXTON STRONG SCHOOL CONCEPT PERSPECTIVE · maxton strong school - learning resource centre concept - perspective dec 2014 issue date: c h e c k e d : revision : d a t e : date :

hwy m

rkhw

y mrk

BIPU 2

BIPU 2

BIPU 2

BIPU 2

BIPU 1

SOAKPIT 2

SOAKPIT 1

SOAKPIT 2

SOAKPIT 2

SOAKPIT 2

BIPU 2(EXISTING)

SOAKPIT 2

(EXISTING)

BIPU 1(EXISTING)

SOAKPIT 1(EXISTING)

BIPU 2(EXISTING)

SOAKPIT 2

(EXISTING)

BIPU 1(EXISTING)

SOAKPIT 1

(EXISTING)

1 1"=50'

LEGEND

PVC COLLECTION PIPE

SOAK PIT

BIPU SYSTEM

DEC 2014

ISSUE DATE:

C H E C K E D :

REVISION :

D A T E :

DATE :

PROJECT NO. :

DRAWN BY :

GO

OD

SH

EP

HE

RD

AG

RIC

UL

TU

RA

L M

ISS

ION

IN-0238

BA

NB

AS

A,

UT

TA

RA

KH

AN

D,

IND

IA

india.emiworld.org

SAB

ACK 02.12.14

NORTH

100'

1" =

50'

050

255

SEPTIC TANK SIZING

LABELINSIDE DIMENSIONS

OF SEPTIC TANKBIPU 1

(EXISTING)

BIPU 2

8'L x 3.8'W x 3.8'D

NEW SOAK TRENCH SIZING

LABEL DIMENSION

SOAK PIT 2 36'L x 3.5'W x 5'D

QUANTITY

4

BIPU 2(EXISTING)

BIPU 1

SOAK PIT 1 19.5'L x 2.5'W x 3.5'D

2.1'L x 2.1'W x 3.5'D

8'L x 4.0'W x 4.0'D

2.5'L x 2.5'W x 3.5'D

1

NOTES:

1. FOR MORE INFORMATION ON THE INSTALLATION OF THESEPTIC TANKS AND SOAK PITS, REFER TO THE REPORT.

BIPU SYSTEM (EXISTING)

SOAK PIT (EXISTING)