Some  Thoughts  on  “Maturing  Project  Management  at  a  

Na6onal  R&D  Laboratory”  Keith  Motyl,  Ph.D.,  CQE,  PMP  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   1  

Today’s  Presenta6on  

•  Assump6ons,  Defini6ons,  Technical  Basis  •  PMSO  Customer  Profile  –  R&D,  WFO,  TPA  •  Project  Management  (PM)  Maturity  Model    •  Maturing  Project  Management  –  An  Approach  •  Features:  People,  Processes,  Values,  Tools,  Templates,  Collabora6on,  Prac6ce  

•  Sustaining  Innova6on  in  PM  Environment  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   2  

Basis  &  Assump6ons  •  Maturing  suggests  growing,  standardizing,  cul6va6ng,  and  con6nuously  improving  

•  PM  for  WFO/TPA/R&D  projects  differs  from  CAPEX,  conven6onal  PM  –  exploratory  and  experimental  focus  

•  Variable  maturity  of  current  Lab  PM  processes  •  DOE  Order  413;  Tailored  approach;  not  “one  size  fits  all”  

•  Recommend  plan  for  maturing  using  industry-­‐standard  tools  and  techniques  (e.g.,  PMI)    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   3  

Basis  &  Assump6ons  •  Include  maturing  of  both  Project  and  mul6-­‐Project  (Porbolio)  Management    

•  Include  a  ‘mentoring  and  support’  role  •  Collabora6ve  (win-­‐win)  approach  and  not  Dilber6an  dystopia  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   4  

Search  PMI  for  “Maturing  PM”  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   5  

N.b.,  Yields  21,000+  results  and  2000+  results  for  PMI.org  alone.  

PM  Maturity  Model  -­‐  Levels  

–  Source:  projectsmart.co.uk/project-­‐management-­‐maturity-­‐model.php    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   6  

PM  Office  Maturity  Cube  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   7  

–  A.  Pinto  et  al.,  “The  PMO  Maturity  Cube:  A  PMO  Maturity  Model,”  PMI  Research  and  Educ.  Congress  2010  

Evalua6ng  PM  Maturity  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   8  

By    

KNOWLEDGE  

AREAS  (10)  

and/or  by  PROCESSES:    Ini6ate,  Plan,  

Execute,  Monitor  &  Control,  Closure  

–  Source:  pmsolu6ons.com/images/uploads/PMMM_Graphic_2013.jpg  

Current  PM  Prac6ces  

•  Periodic  status  reviews  •  Conduc6ng  regular  evalua6ons  of  projects  •  Developing  Lab-­‐wide  policies,  procedures  and  tools  

•  Focus  on  high-­‐risk,  high-­‐impact  projects  •  Process  and  system  improvements  being  developed  and  implemented    

–  Inferred  from  the  Job  Descrip6on  for  PMSO  PM  M&S  Lead  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   9  

Lab  Projects  Environment  •  Innova6on  –  Renewables,  Energy  Efficiency  •  R&D  projects  –  Experimental  plans,  evolving  technology,  prototypes,  knowledge  work  

•  WFOs,  TPAs,  collabora6ons  •  Working  with  Senior  Management  to  Priori6ze  •  Uncertainty  and  Risk  Management  •  EV,  CV,  and  SV  metrics  •  Projects  Porbolio  Management  •  Safety  and  Compliance  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   10  

Summary  Approach  to  Maturing  PM  

•  DMAIC:  What’s  working;  what’s  not  –  “gaps”    •  Flexible  matura6on  plan  •  Facilita6on:  PMI  tools  &  techniques  •  Training  on  elements  of  PMI    Methodology  

•  Aim  for  early  successes,  buy-­‐in  •  Demonstrate  effec6veness,  value  •  Changing,  evolving  toolkit  to  meet  challenges  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   11  

Elements  of  PM  Maturity  Method  

–  A.  Ganatra,  “Maturing  Project  Management  with  the  Use  of  Methodology,”  PMI  Virtual  Library,  2011  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   12  

•  Tools  •  Structures/Roles  •  Procedures  •  Organiza6onal  Standards  •  Collabora6ve  Channels  •  Templates  &  Checklists  

Examples  –  Maturing  PM  Prac6ces  

•  Safety,  Hazard  Analysis  tools;  FMEA  templates  •  Managing  IP  and  patentable  informa6on  •  Understanding  Contracts,  Agreements    •  Sot  Skills:  Tools  for  Conflict  Mgmt,  Team  Bldg  •  PM  tools  (XLS,  DOC)  for  execu6ng  –  monitoring  &  controlling  –  progress,  cost,  and  quality  mgmt  

•  Quick  starts;  PM  tools,  6ps  &  tricks  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   13  

One-­‐Stop  Shop  

Collabora6ng  to  Mature  PM  Prac6ces  

•  Inves6gators  and  PMs  may  be  innova6on  experts,  but  business  and  sot  skills?  

•  Individualized  mentoring  and  support  •  PM  Help  Forum  for  recurring  PM  issues  affec6ng  Lab  Inves6gators  and  PMs  

•  Lab  PM  Discussion  Board  (online)  to  elicit  PM  problems  and  solicit  feedback  

•  PM  Roundtables  for  exchange  of  best  prac6ces  •  Inter-­‐Laboratory  exchange  of  Best  Prac6ces  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   14  

Ins6lling  PM  Prac6ces,  Culture  •  Strategic  planning  tools  and  techniques  •  Online  training  and  exchanges  to  ‘sharpen  the  saw’  (Covey)  

•  Online  ‘How-­‐To’  resources  tailored  to  the  PMI  Process  and  Knowledge  Areas  

•  Resource  (people,  facili6es,    equipment)  planning  tools  for    innova6ve  projects    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   15  

Summary:  Maturing  PM  at  the  Lab  •  Turning  technology  tools  and  prac6ces  into  PM  values  

•  Standardizing,  cascading  methodology  through  training  and  mentoring  

•  Conver6ng  PM  Prac6ces  &  Processes  -­‐>  Values,  then  into  a  PM  Culture  

•  Leadership  support,  par6cipa6on  •  Con6nuous  improvement  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   16  

Managing  Innova6on  Projects  •  Establish  R&D  objec6ves  and  protocols  •  Managing  experimental  plan,  direc6on  •  Stakeholder  planning  and  management  •  Managing  Project  Risks*  •  Developing,  managing  agile  6melines    •  Managing  the  Project  Budget*  •  Managing  the  Project  Progress  •  Maintaining  Innova6ve  Environment*  

–  R.  Henderson,  “Research  Project  Management  –  Key  Concepts,”  white  paper  (2010)  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   17  

Exemplary  R&D  Project  Risks  •  One  of  the  research  team  departs  mid  project  •  Key  facili6es  become  unavailable,  equipment  failure  

•  Electronic  data  loss  or  collec6on  of  poor  quality  data  

•  �Compe6tor  publishes  work  very  similar  to  yours.  Another  is  first  to  submit  patent  app.  

Risk  Ranking;  Mi7ga7on  Plan  for  high  P*C  risks  

–  R.  Henderson,  “Research  Project  Management  –  Key  Concepts,”  white  paper  (2010)  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   18  

Managing  the  Project  Budget  

•  Open  internal  communica6on  and  review  of  progress  on  experimental  plan  (EP)  

•  Review  evolving  EP  results;  recalibrate  team  •  Regular  external  project  and  progress  reviews    •  Regular  review  of  risk  and  mi6ga6on  plans  •  Diligent  monitoring/controlling  of  spending  •  Budgets  mazer  –  Reali6es  of  funding  •  Mi6ga6ng  measures/correc6ve  ac6on  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   19  

Maintaining  Innova6ve  Environment  •  Innova6ve  environment  oten  requires  tailored  PM  processes  –  explora6on  vs.  exploita6on  

•  Early  innova6on  depends  on  Key  People,  Resources,  not  established  processes  

•  Key  Innova6on  ac6vi6es:  interac6on,  coordina6on,  communica6on,  and  decision  making  

•  Benchmarking  similar  innova6ve  ventures  for  BMPs  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   20  

–  C.  M.  Christensen  and  M.  E.  Raynor,  “The  Innovator’s  Solu6on,”  ch.7  

Maintaining  Innova6on  Environment  •  Sustaining  capability  to  innovate  easier  when  converted  into  Processes  and  Values,  eventually,  becoming  Culture  

•  Incumbent  leaders  successful  in  sustaining  technology,  but  lose  bazle  for  disrup6ve  innova6on  

•  Focus  on  market  research,  financial  projec6ons,  planning  &  budge6ng  –  experience  with  ‘strategic  planning’  process  

–  C.  M.  Christensen  and  M.  E.  Raynor,  “The  Innovator’s  Solu6on,”  ch.7  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   21  

Mul6-­‐Project  Porbolio?      How  to  maintain  an  innova6ve  environment  mul6-­‐project  (Porbolio)  environment?  •  Most  common  scenario  •  Mul6-­‐team  environment  (compe66on?)  •  Resource  and  funding  limita6ons  •  Alignment  with  corporate  (strategic)  goals  •  Maximize  “bang  for  the  buck”  •  Write  the  marke6ng  brochure  first?  

–  M.  Tren6m,  “Secrets  to  Managing  an  Innova6on  Porbolio,”  Voices  on  Project  Mgmt,  August,  2013  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   22  

Innova6on  Porbolio      Sustainability:  steady  innova6on  flux  or  a  constant  pipeline  of  new  ideas.  Balancing  short-­‐  and  long-­‐term  benefits  and  costs  of  the  following:  •  Incremental  innova6on:  Developing  new  products,  processes  or  services  (improvement)  

•  Basis  innova6on:  Researching  low-­‐maturity  technology  (sustaining)  

•  Radical  innova6on:  Suppor6ng  efforts  to  create  breakthrough  innova6on  (disrup6ve)  –  M.  Tren6m,  “Secrets  to  Managing  an  Innova6on  Porbolio,”  Voices  on  Project  Mgmt,  August,  2013  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   23  

Innova6on  Porbolio  Enterprise-­‐wide  scale  for  grading  each  project's  poten6al  to  generate  innova6on:  •  High:  There  are  many  poten6al  ways  and  areas  to  apply  this  innova6on  

•  Medium:  There  is  a  specific  use  for  this  innova6on;  we  are  somewhat  sure  about  market  demand  

•  Low:  We  are  not  sure  how  it  will  work  

–  M.  Tren6m,  “Secrets  to  Managing  an  Innova6on  Porbolio,”  Voices  on  Project  Mgmt,  August,  2013  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   24  

Innova6on  Porbolio  Selec6on  consistent  with  a  long-­‐term  "technology  roadmap”  -­‐  different  selec6on  and  priori6za6on  criteria  •  Strategic  alignment  •  Poten6al  to  generate  innova6on    •  Level  of  risk  •  Technological  maturity  •  Use  of  resources  •  Degree  of  complexity  •  Level  of  interdependence  with  other  projects  

–  M.  Tren6m,  “Secrets  to  Managing  an  Innova6on  Porbolio,”  PMI  Voices  on  Project  Mgmt,  August,  2013  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   25  

Porbolio  Management  

Porbolio  steering  decisions  consider:  •  resource  availability    •  impact  on  projects    •  systems  integrity  implica6ons    •  strategic  alignment  of  decisions,  and  •  priori6es  against  other  alterna6ves    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   26  

–  M.  Tren6m,  “Secrets  to  Managing  an  Innova6on  Porbolio,”  Voices  on  Project  Mgmt,  August,  2013  

PM  Tools  for  Porbolios  Mechanisms  commonly  observed  when  projects  are  managed  in  dynamic  environments:    •  Environment  manipula6on:  Making  dynamic  sta6c    

•  Emergent  planning  approaches    •  Scope  control    •  Controlled  experimenta6on  –  Probing  the  future    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   27  

–  Y.  Pe6t  and  B.  Hobbs.,  “Project  Porbolios  in  Dynamic  Environments,”  PMI  Book  Services  2012,  p.198    

PM  Tools  for  Porbolios  (cont’d)  Mechanisms  commonly  observed  when  projects  are  managed  in  dynamic  environments:    •  Lifecycle  strategies    •  Management  coordina6on  and  control    •  Sot  approaches  (Leadership  styles,  communica6on)    

•  Planned  flexibility:  Flexibility  in  product  and  process    

•  Boundary-­‐spanning  ac6vi6es    

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   28  

–  Y.  Pe6t  and  B.  Hobbs.,  “Project  Porbolios  in  Dynamic  Environments,”  PMI  Book  Services  2012,  p.198    

Porbolio  Funnel  

–  R  M  Wideman,  “A  Management  Framework  for  Project,  Program  and  Porbolio  Integra6on  ,”  2004,  p.169  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   29  

Ques6ons  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   30  

End  of  Presenta6on  Thank  you!  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   31  

Speaker’s  Assignments  Chemist  –  Process  Engineer  –  Quality  Engineer  –  Inventor    

Environmental  Engineer  –  Engineering  Manager      Opera6ons  Manager  –  Facility  Manager    

 Compliance  Manager    Lean/Six  Sigma  Process  Improver    

Business  Development  Manager  –  B2B  Sales  Manager      Product  Manager  –  Compliance  Assurance  

Performance  Analyst    Construc6on  Project  Manager  

Book  &  eBook  Publisher  &  Promoter  

Keith  Motyl,  Ph.D.,  CQE,  PMP   Maturing  Project  Mgmt  at  a  Nat’l  R&D  Lab   32  

Short  Speaker  Bio  •  Academic  research:  models  for  catalysis,  molten  salt  

electrochemistry,  semiconductor  chemical  vapor  deposi6on,  chemical  synthesis,  inorganic  laboratory,  teaching  

•  DOE  research:  surface  analysis  using  electron  spectroscopy,  invented  SCF  CO2  cleaning,  high-­‐temp  electrochem  recovery  and  reprocessing  of  ac6nide  metals,  product  quality  analysis  

•  Environmental  projects:  emergency  water  treatment,  mobile  spill  treatment,  water  quality  monitoring,  earthen  dam  upgrades,  ac6nide  source  iden6fica6on,  soil  washing  treatment  study,  ac6nide  migra6on  study,  pollutant  control,  PM/group  leader  