Upload
jayraya
View
104
Download
2
Embed Size (px)
DESCRIPTION
Global ATPMethod:Multi-Level Available To Promise
Citation preview
mySAP SCMGlobal Available To Promise
Method: Multi-Level Available To Promise
Patti KimlerProduct Manager PTU ApplicationsSAP Labs, LLC
SAP AG 2003, Title of Presentation, Speaker Name / 2
Multi-Level ATP: Process
Delivery Proposal /
Order Conf.
Execution of ATP methods according tocheck instructions
Order entry viaSAP R/3, SAP CRM, Internet, other systems
DeliveryGroup
Global ATP on Component
level
Bill of Material explosion
Planning (dependent on
horizon)
Inquiry / Sales Order entry
Transportation & Shipment
Scheduling
Creation of receipt elements (planned orders,purchase requ.)
Iterative loop
Result explanation with display of „constraining item(s)“
Global ATP on Finished
Good level
Execution of ATP methods according tocheck instructions
SAP AG 2003, Title of Presentation, Speaker Name / 3
Multi-Level-ATP: Checking Sequence
R/3, CRM, Internet etcR/3, CRM, Internet etc APO 3.1APO 3.1
ATP PP/DS
Order entry Check of Finished Good(s)
Bill Of Material ExplosionCheck of Components
Display (optional)
Transfer of ResultsDisplay of Results (optional)
Saving of Results Creation of ATP-Trees
Aggregation of qunatity reservations.
AT
P-B
AP
Is
Planning (optional –
dependent on Horizon)
SAP AG 2003, Title of Presentation, Speaker Name / 4
Multi-Level ATP: Functionality
Multi-level BOM explosion
ATP-Check on component level
Rules based ATP on component level and with stock transfer orders
Possibility to exclude components from the check
Capacity check on daily buckets (capacity allocation)
Receipts can be created at a later point of time with a planning run or immediately if the order is within a certain horizon
Delivery Groups supported
Presentation of „constraining“ items/characteristics
SAP AG 2003, Title of Presentation, Speaker Name / 5
BOM Explosion / Rules / ATP Tree Structure
Bill of Material(PPM, iPPE, RTO)
Rules Based ATP
BOM Explosion
BOM ExplosionC2
2
1 3
Alternative
Component Change of Source Location
Customer Order End Item
2
1 3
Alternative
Component Change of Source Location
ATP Tree Structure
2
1 3
Alternative
Component Change of Source Location
C1
SAP AG 2003, Title of Presentation, Speaker Name / 6
Planning
The ATP Tree Structure is created in the APO-DB during the saving of the sales order and represents the BOM Structure, enhanced with Material/Location substitutions
Every node of the ATP Tree Structure will be translated into an order (receipt element) dependent on the horizon
Configuration and delivery priorities are taken over from the sales order The confirmed quantities of the dependent demands are equal to the
requested quantities for unchecked components
SAP AG 2003, Title of Presentation, Speaker Name / 7
Effectivity Interval / Confirmation
The Multi-Level ATP-Check is a „two step check“. The second check is responsible for solving eventually effectivity date problems.
Configuration possibilities:
Confirmation of possible quantities at the requested date
Confirmation of quantities at the earliest possible date
Confirmation of full quantities
In case there are still remaining requirements, the system can be configured to either create the demand on end-item level or on component level:
End-item level:
Without rules: one unconfirmed sales order item
With rules: depending on settings of remaining requirements
Component-level: sales order fully confirmed, Alert situation on component
SAP AG 2003, Title of Presentation, Speaker Name / 8
Capacities
Daily capacities per product, location and configuration characteristics
Realization with allocations (capacity allocations) possible on every BOM level
Creation of capacity allocations by ... ... DP (CBF) ... SNP-Planning
Capacity allocation reservation is assigned to sales order items (also in case of multi-level BOMs)
Scheduling based on average duration of activity relationships
SAP AG 2003, Title of Presentation, Speaker Name / 9
Change of Sales Documents / Backorder Processing
Multi-level ATP before translation into receipt elements The existing ATP Tree Structure will be replaced by a new one
Multi-level ATP after translation into receipt elements The exisiting order network for the sales order itme is internally
deleted (only for make to order production)
Enhanced Filter for Backorder Processing: Selection of sales order items by a component (reading of ATP-Tree
Structures)
Item by Item or mass ATP check during Backorder Processing
SAP AG 2003, Title of Presentation, Speaker Name / 10
Restrictions
The configuration has to be passed on by the calling system.
Configuration model and RBA substitutions have to be consistent
Material substitution on component level does not lead to a new product or to a new configuration on finished good level
Determination of characteristic values which are leading to a delay is not always possible
Multi-level configuration is possible only with iBase but not with CDP
Only exact lot sizes are supported by Mulit-level ATP
Phantom levels are not known by the ATP check
SAP AG 2003, Title of Presentation, Speaker Name / 11
Restrictions
No automatic synchronization of capacity allocations and resource reservations
Location substitution with cross system stock transfers is not possible
References between Sales Documents which have ATP Tree Structures are not possible
Mixing of CTP and Multi-level ATP for one product is not supported
Sales document changes with new explosion of BOMs can only be used for „make to order production“
Only planned orders with specific statuses can be deleted during change of sales documents