3
Mathematical Analysis for Managers MBAMS 600 ue Thursday, February 13 th

Mathematical Analysis for Managers MBAMS 600 Due Thursday, February 13 th

Embed Size (px)

Citation preview

Page 1: Mathematical Analysis for Managers MBAMS 600 Due Thursday, February 13 th

MathematicalAnalysis

forManagers

MBAMS 600

Due Thursday, February 13th

Page 2: Mathematical Analysis for Managers MBAMS 600 Due Thursday, February 13 th

Problem Statement

A jewelry store makes necklaces and bracelets from gold and platinum.The store has eighteen (18) ounces of gold and twenty (20) ounces ofplatinum.Each necklace requires three (3) ounces of gold and two (2) ounces ofplatinum, while each bracelet requires two (2) ounces of gold and four(4) ounces of platinum.The demand for bracelets cannot be more than four (4). A necklace earns $300.00 in profit and a bracelet earns $400.00 in pro-fit.The store wants to determine the number of necklaces and bracelets tomake in order to maximize profit.

The Jewelry Store

Page 3: Mathematical Analysis for Managers MBAMS 600 Due Thursday, February 13 th

Problem Statement

Requirement:

1. Compute the 1st and 2nd feasible solutions manually.

2. Solve the entire problem using either QM for WINDOWS or Excel QM.

The Jewelry Store