7/26/2019 Materials Inventory
1/2
MATERIALS MONITORING REPORT
Concrete/Structural works
CHB #4
CHB #6
16mm RSB x 6m 16 pcs. 16 pcs.
12mm RSB x 6m
10mm RSB x 6m 4 pcs. 4 pcs.
G.I. Tie Wire #16
Formworks
3/4 "thk Marine Plywood
CWN No. 4
CWN No. 3
Plumbing and Sanitary Works
A. C.R and Kitchen Sink
Faucet
PVC Pipe, 100 x 3mts. 8 pcs. 8 pcs.
PVC Pipe, 50 8 pcs. 8 pcs.
PVC Elbow, 50 26 pcs. 26 pcs.
Tee, 100 x 100 10 pcs. 10 pcs.
Tee, 100 x 50 10 pcs. 10 pcs.
Cleanout 100
P-Trap 50
Neltex 400 cc 1 Can 1 Can
B. Waterline
uPVC Pipe, 20 mm 20 pcs. 20 pcs.
20 mm elbow 42 pcs. 42 pcs.
20 mm elbow w/ Thread
20 mm Tee elbow w/ thread 12 pcs. 12 pcs.
Electrical Works
20mm dia. Rigid PVC Pipe
2" x 4" Utility Box
4" Octagonal Junction Box
4 Branches Panel Box
TINSMITHRY WORKS
Metal Roofing, pre-painted long span Ga. 26 G.I. roofing 32 pcs. 32 pcs.
Center Capping 12 pcs. 12 pcs.
Ridge Roll
2 x 6 x 2mm cold formed light steel C-purlins 32 pcs. 32 pcs.
Welding Rod 1 Box 1 Box
PAINTING (including patching and sealing, etc.)
Concrete Surfaces (Exterior)
Red Oxide Primer
Paint Thinner
DOORS
Door Jamb 210 x 90
Door Jamb 210 x 70
WINDOWS
W/4, Louver Blocks including mortar112 pcs. 112 pcs.
Prepared by: Attested by:
Raymond De Vero / Arthur Bihasa
Documentation/ Timekeeper Leadman/Checker
Checked by: Noted by:
DESCRIPTION
HOUSING
LAND DEV T. Total Qty.
Norwin L. Garcia
7/26/2019 Materials Inventory
2/2
Site Engineer
Teofi James Valdez Fortunato Jesus G. Daigan
Construction Manager