PT BANYU BIRU SEJATI
Water and Waste Water Treatment Contractor
Bumi Satria Kencana, Block C No. 9
Jln. KH Noer Ali, Bekasi 17144
Tel. 021-8841762 Fax. 021-8856176
BANYU URIP EPC 5
PROJECT NAME INFRASTRUCTURE FACILITY PROJECT
BOJONEGORO
A. Design Data
01. Primary influent flow rate (Q0) = 24 m3/day
02. Volume Collection Pit = 95.94 m3/day
03. TSSin concentration (X0) = 200 mg/L
04. Waste activated sludge SS concentration (Xw) = 3000 mg/L
05. Effluent SS concentration (Xe) = 50 mg/L
Laundry WWTU Flow Diagram & Paramaters
PROCESS FLOW DIAGRAM WITH MATERIAL BALANCE
FOR LAUNDRY WASTEWATER TREATMENT UNIT
DOCUMENT NO. PURCHASE ORDER NO. CLIENT / END USER NAME
IDBC-BS-VDPRC-C00003 IDBC-RH-MXXEP-C00975-090 MOBIL CEPU LTD.
IDBC-BS-VDPRC-C00003 Process Flow Diagram with Material Balance for Laundry WWTU_Rev.C Page 1
BANYU URIP EPC 5
PROJECT NAME INFRASTRUCTURE FACILITY PROJECT
BOJONEGORO
PROCESS FLOW DIAGRAM WITH MATERIAL BALANCE
FOR LAUNDRY WASTEWATER TREATMENT UNIT
DOCUMENT NO. PURCHASE ORDER NO. CLIENT / END USER NAME
IDBC-BS-VDPRC-C00003 IDBC-RH-MXXEP-C00975-090 MOBIL CEPU LTD.
B. Design Calculation of Material Balance for Laundry WWTU
V = 24 m3
01. Waste activated sludge flow rate (Qw) = 0.11 m3/day
02. Sludge retention time (also called sludge age), SRT = 15 days
03. Effluent Flow Rate (Qe) = 23.89 m3/day
Qw = 0.11 m3/day
Where:
Qe = 23.89 m3/day
= 1.51 kg/daySolidOut
Prepared by :
PT BANYU BIRU SEJATI
Qw = (V*X0)/(SRT*Xw)
SolidsOut = (Qe*Xe)+(Qw*Xw)
Qe = Q0-Qw