15
EUG Create Master Recipe for a Material This document has been created to describe the different scenarios regarding creation of Master Recipes. When creating a Master Recipe for a new material two different scenarios exist: 1. New Master Recipe has to be created 2. Material has to be assigned to existing Master Recipe No matter which scenario is relevant, it's a 3-step procedure, where the last 2 steps are the same in both cases. The procedure involves the following transactions: Scenario 1 Scenario 2 Step 1 Step 2 Step 3 Finally, a third scenario could occur. A Master Recipe already exists for an existing material, but this material can also be produced using another Master Recipe. This scenario is almost like scenario 2, except that it has to be done in a slightly different way. Scenario 3 Step 1 Step 2 Page 1 of 15 C201 C202 CS01 C223 C202 Create Production

Master Recipe Scenarios

Embed Size (px)

Citation preview

Page 1: Master Recipe Scenarios

EUG

Create Master Recipe for a Material

This document has been created to describe the different scenarios regarding creation of Master Recipes.

When creating a Master Recipe for a new material two different scenarios exist:

1. New Master Recipe has to be created

2. Material has to be assigned to existing Master Recipe

No matter which scenario is relevant, it's a 3-step procedure, where the last 2 steps are the same in both cases. The procedure involves the following transactions:

Scenario 1 Scenario 2

Step 1

Step 2

Step 3

Finally, a third scenario could occur. A Master Recipe already exists for an existing material, but this material can also be produced using another Master Recipe. This scenario is almost like scenario 2, except that it has to be done in a slightly different way.

Scenario 3

Step 1

Step 2

Step 3

Step 4

Page 1 of 13

C201 C202

CS01

C223

C202

Create Production version (via C202)

Create Bill of Material (via C202)

Validate Prod. Version (C223)

Page 2: Master Recipe Scenarios

EUG

For detailed description of transaction C201, C202 and CS01 and how to created the Production version, see EUG C201_Maintain_Master_Recipe.

Scenario 1 – Create Master Recipe for new material

In the following Scenario 1 is described.

Step 1: Transaction C201 – Create Master Recipe

There is a little difference in the first screen depending on the Master Recipe should be created in a new or an existing Recipe group. After the first screen is filled out the procedure is the same. The example illustrated is for a new Recipe Group. The first step, if the recipe is created in an existing Recipe group is shown afterwards.

New Recipe Group

If it's a new Recipe Group the Recipe group field must be left blank.

Press <Enter> and fill out the recipe header screen

Page 2 of 13

Page 3: Master Recipe Scenarios

EUG

Press <Enter> and fill out the Operation screen

Save the Master Recipe.

Page 3 of 13

Page 4: Master Recipe Scenarios

EUG

Step 2: Transaction CS01 – Create Bill of Material

It is possible to create Bill of Materials (BoM) used for either production or costing. If only a production BoM is created this is automatically used for costing, whereas a costing BoM can only be used for costing. The BoM Usage controls whether it's a costing or production BoM (1 = Production, 6 = costing).

Press <Enter> and fill out the components

Press to go to the header data and fill out the base quantity.

Page 4 of 13

Page 5: Master Recipe Scenarios

EUG

Save the Bill of Material.

Step 3: C223 – Create Production version

To connect the Master Recipe and Bill of Material the Production version need to be created. The numbering for the first production version used for a production BoM for a specific material must be 0001, if a second is created it must be 0002 etc. If a production version is created for a costing BoM it must always have the number 0999.

Page 5 of 13

Page 6: Master Recipe Scenarios

EUG

After pressing <Enter> press the button to create the production version.

Press to save the production version

Select the production version and do a consistency check by pressing to get a green light

Page 6 of 13

Page 7: Master Recipe Scenarios

EUG

Save the production version. The Master Recipe is ready for use.

Existing Recipe Group

If it's an existing Recipe Group the Recipe group field must be filled out with the group number. Hereafter the procedure is as described above.

Note: The Recipe number defaulted in the next screen is now 2, since number 1 already exists.

Scenario 2 - Create Master Recipe for a new material using material assignment

In the following Scenario 2 is described. Only the first step is described. For step 2 and 3 see description for scenario 1.

Step 1: C202 – Assign material to existing Master Recipe

Enter Recipe Group and press <Enter>.

Page 7 of 13

Page 8: Master Recipe Scenarios

EUG

Go to the Recipe header by pressing from the Operations screen.

Page 8 of 13

Page 9: Master Recipe Scenarios

EUG

Press the button and enter the material to be assigned.

Save the Master Recipe.

Continue with step 2 and step 3 described under scenario 1.

Scenario 3 - Create Master Recipe for an existing material using material assignment

In the following scenario 3 is described.

A Master Recipe and Bill of Material already exists for the material, but now the material can also be produced in another way by use of another Master Recipe. In this case CS01 can't be used. Instead the Bill of Material and Production version are created by use of C202.

Step 1: C202 – Assign material to existing Master Recipe

Enter Recipe Group and press <Enter>.

Page 9 of 13

Page 10: Master Recipe Scenarios

EUG

Go to the Recipe header by pressing from the Operations screen.

Press the button and enter the material to be assigned.

Page 10 of 13

Page 11: Master Recipe Scenarios

EUG

Step 2: C202 – Create Production version

Press <Enter> and double-click on the material entered to create the Production version.

Production version number 0005 is created, and the production version points to Bill of Material number 5 (which is not yet created). This action corresponds to what is normally done in C223.

Step 3: C202 – Create Bill of Material

Press .

Page 11 of 13

Page 12: Master Recipe Scenarios

EUG

Then press and double click on the Recipe.

Press and double click on the relevant material to create the Bill of Material.

Press <Enter> and fill out the component screen. When done, press to return to the Master Recipe.

Save the Master Recipe.

Page 12 of 13

Page 13: Master Recipe Scenarios

EUG

Step 4: C223 – Validate Production version

Select the relevant production version and press .

Save the production version.

Page 13 of 13