All Info Received. Date when vendor supplied BRR with all details required to complete project (SKU #s, component types, etc.). Dieline supplied? Displayed as a ratio: number of components dieline has been supplied for / total number of components of a given SKU. Copy supplied? Displayed as a ratio: number of components copy has been supplied for / total number of components of a given SKU. Component Status. Status of each component of the SKU, including component type, revision number, and production stage. Multiple components of a single SKU are separated by commas. Next Round to THD. Date when THD can expect the next round of revised artwork to be submitted by BRR. Dashboard Notes. Status of the project, along with any reasons why it is on hold, late, etc. 1 Click MASTER PROJECT REPORT under Dashboard Click on Generate Report, which will save an Excel file in selected folder. 3 2 Select criteria Master Projects Report is broken up into 4 sections as outlined below: Project Information, coming from Project Detail form & Component List from FLOW. Milestone Dates/Timeline. Dates highlighted in green are milestones completed on time. Dates highlighted in red are milestones completed but late. Non-highligted dates are milestones not completed yet and are showing target date when the milestone should be completed. See B1 for legend details. See B2 for milestone descriptions. Status columns show the status of any given SKU (within the Master Project). X/Y indicates that there are Y components on a given SKU, and X have been completed. Approvals section shows the status of PDFs routing on APPROVALS tab along with the team member(s) remaining to review the PDF. Changes column will list the name of team members who have already requested changes on the routing PDF. See D1 for approval status descriptions. Report shows MASTER PROJECTS and Stand-Alone Master Projects in the rows with bold text, with SKUs listed underneath in non-bold text. A B C D A B C D Critical fields: B1 B2 D1 EXPLANATION - MASTER PROJECT REPORT

Master Project Report Explanation v3 - What is WBD? · 2013-01-09 · 1 Click MASTER PROJECT REPORT under Dashboard 3 Click on Generate Report, which will save an Excel ˜le in selected

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Master Project Report Explanation v3 - What is WBD? · 2013-01-09 · 1 Click MASTER PROJECT REPORT under Dashboard 3 Click on Generate Report, which will save an Excel ˜le in selected

All Info Received. Date when vendor supplied BRR with all details required to complete project (SKU #s, component types, etc.).

Dieline supplied? Displayed as a ratio: number of components dieline has been supplied for / total number of components of a given SKU.

Copy supplied? Displayed as a ratio: number of components copy has been supplied for / total number of components of a given SKU.

Component Status. Status of each component of the SKU, including component type, revision number, and production stage. Multiple components of a single SKU are separated by commas.

Next Round to THD. Date when THD can expect the next round of revised artwork to be submitted by BRR.

Dashboard Notes. Status of the project, along with any reasons why it is on hold, late, etc.

1 Click MASTER PROJECT REPORT under Dashboard

Click on Generate Report, which will save an Excel �le in selected folder.3

2Select criteria

Master Projects Report is broken up into 4 sections as outlined below:

Project Information, coming from Project Detail form & Component List from FLOW.

Milestone Dates/Timeline. Dates highlighted in green are milestones completed on time. Dates highlighted in red are milestones completed but late. Non-highligted dates are milestones not completed yet and are showing target date when the milestone should be completed. See B1 for legend details. See B2 for milestone descriptions.

Status columns show the status of any given SKU (within the Master Project). X/Y indicates that there are Y components on a given SKU, and X have been completed.

Approvals section shows the status of PDFs routing on APPROVALS tab along with the team member(s) remaining to review the PDF. Changes column will list the name of team members who have already requested changes on the routing PDF. See D1 for approval status descriptions.

Report shows MASTER PROJECTS and Stand-Alone Master Projects in the rows with bold text, with SKUs listed underneath in non-bold text.

A

B

C

D

AB

C

D

Critical �elds:

B1

B2

D1

EXPLANATION - MASTER PROJECT REPORT