49
PRAGATI POWER CORPORATION LIMITED NEW DELHI 1500MW(N) Pragati – III CCPP M M A A S S T T E E R R D D R R A A W W I I N N G G L L I I S S T T DOCUMENT NO. PWR/TSX/PRAGATI/D02/08 Rev01 Bharat Heavy Electricals Limited Power Sector – Technical Services (HQ) NOIDA

Master Drawing List Rev01

Embed Size (px)

Citation preview

Page 1: Master Drawing List Rev01

PWR/TSX/TGS/07/142/00/08TECHNICAL INSTRUCTION Document No

PRAGATI POWER CORPORATION LIMITED

NEW DELHI

11550000MMWW((NN))  PPrraaggaattii  ––  IIIIII  CCCCPPPP 

MMAASSTTEERR  DDRRAAWWIINNGG  LLIISSTT  

DOCUMENT NO. PWR/TSX/PRAGATI/D02/08 Rev01 

Bharat Heavy Electricals Limited Power Sector – Technical Services (HQ)

NOIDA

Page 2: Master Drawing List Rev01

BHEL BPLID Area Title Drg_No Purpose Sch. Sub

166 RE JOINTS GA Of RE Joint for Condenser Inlet/Outlet. 1800 NB (Pressure Balance Type)

BP-DG-314-133-0001 A 26/11/2008

167 RE JOINTS Gen. Arrgt. Of RE Joint for CW Pump Discharge 1800 NB (Conventional Type)

BP-DG-314-133-0002 A 26/11/2008

168 RE JOINTS Gen. Arrgt. Of RE Joint for ACW Pump Discharge 600 NB (Conventional Type)

BP-DG-314-133-0003 A 26/11/2008

169 RE JOINTS Gen. Arrgt. Of RE Joint for RW Pump Discharge 600 NB (Conventional Type)

BP-DG-314-133-0004 A 26/11/2008

170 FLASH TANKS General Arragt. of Cond. Expansion Tank BP-DG-314-147-0001 A 26/11/2008

171 FLASH TANKS General Arragt. of Cond. Recovery Tank BP-DG-314-147-0002 A 26/11/2008

172 MISC TANKS General Arrgt.of ECW Tank BP-DG-314-167-0001 A 26/11/2008

173 MISC TANKS General Arrgt.of Clean Oil Tank BP-DG-314-167-0002 A 26/11/2008

174 MISC TANKS General Arrgt.of Dirty oil Tank BP-DG-314-167-0003 A 26/11/2008

175 MISC TANKS General Arrgt.of Oil Unloading Vessel BP-DG-314-167-0004 A 26/11/2008

176 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (CW Pump Discharge)

BP-DG-314-165-0001 A 26/11/2008

177 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (CW Pump Discharge Header)

BP-DG-314-165-0002 A 26/11/2008

178 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (Condenser Inlet)

BP-DG-314-165-0003 A 26/11/2008

179 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (Condenser Outlet)

BP-DG-314-165-0004 A 26/11/2008

180 BF VALV Arrgt. Of F1400 B.F.Valve With Elect. Actuator (CW System)

BP-DG-314-165-0005 A 26/11/2008

181 BF VALV Arrgt. Of F1000 B.F.Valve With Elect. Actuator (CW System)

BP-DG-314-165-0006 A 26/11/2008

182 BF VALV Arrgt. Of F1000 B.F.Valve With Manual Operator (CW System)

BP-DG-314-165-0007 A 26/11/2008

183 BF VALV Arrgt. Of F600 B.F.Valve With Electrical Actuator (ACW/ECW/PW System)

BP-DG-314-165-0008 A 26/11/2008

184 BF VALV Arrgt. Of F600 B.F.Valve With Manual Operator & Limit Switch (ACW System)

BP-DG-314-165-0009 A 26/11/2008

185 BF VALV Arrgt. Of F600 B.F.Valve With Manual Operator (ACW/ECW System)

BP-DG-314-165-0010 A 26/11/2008

186 BF VALV Arrgt. Of F500 B.F.Valve With Electrical Actuator (CW/ECW/PW System)

BP-DG-314-165-0011 A 26/11/2008

187 BF VALV Arrgt. Of F500 B.F.Valve With Manual Operator (ECW System)

BP-DG-314-165-0012 A 26/11/2008

188 BF VALV Arrgt. Of F450 B.F.Valve With Electrical Actuator (Acw System)

BP-DG-314-165-0013 A 26/11/2008

189 BF VALV Arrgt. Of F400 B.F.Valve With Electrical Actuator (ECW/PW System)

BP-DG-314-165-0014 A 26/11/2008

190 BF VALV Arrgt. Of F400 B.F.Valve With Manual Operator (ECW System)

BP-DG-314-165-0015 A 26/11/2008

05 December 2008 Page 2 of 49

Page 3: Master Drawing List Rev01

191 BF VALV Data Sheet & living diagram for Electrical Actuator BP-DG-314-165-0016 A 26/11/2008

192 BF VALV Painting Scheme for Butterfly Valves BP-DG-314-165-0017 A 26/11/2008

193 XFR GTG Outline General Arrangement BP-DG-314-301-0001 A 26/11/2008

194 XFR GTG OGA Part list BP-DG-314-301-0002 A 26/11/2008

195 XFR GTG Foundation Plan BP-DG-314-301-0003 A 26/11/2008

196 XFR GTG HV Bushing BP-DG-314-301-0004 A 26/11/2008

197 XFR GTG LV Bushing BP-DG-314-301-0005 A 26/11/2008

198 XFR GTG Neutral Bushing BP-DG-314-301-0006 A 26/11/2008

199 XFR GTG Roller Arrangement BP-DG-314-301-0007 A 26/11/2008

200 XFR GTG LV Busduct Mtg. Arrangement BP-DG-314-301-0008 A 26/11/2008

201 XFR GTG Shipping Diagram BP-DG-314-301-0009 A 26/11/2008

202 XFR GTG Rating and Diagram Plate BP-DG-314-301-0010 A 26/11/2008

203 XFR GTG Valve Schedule Plate BP-DG-314-301-0011 A 26/11/2008

204 XFR GTG GA of Cooler Control Cabinet BP-DG-314-301-0012 A 26/11/2008

205 XFR GTG Cooler control scheme BP-DG-314-301-0013 A 26/11/2008

206 XFR GTG Transformer Technical Data Sheet BP-DG-314-301-0014 A 26/11/2008

207 XFR GTG Customer’s Inspection Test Schedule BP-DG-314-301-0015 A 26/11/2008

208 XFR STG Outline General Arrangement BP-DG-314-301-0021 A 26/11/2008

209 XFR STG OGA Part list BP-DG-314-301-0022 A 26/11/2008

210 XFR STG Foundation Plan BP-DG-314-301-0023 A 26/11/2008

211 XFR STG HV Bushing BP-DG-314-301-0024 A 26/11/2008

212 XFR STG 36kV, 12500A LV Bushing BP-DG-314-301-0025 A 26/11/2008

213 XFR STG 36kV, 630A HV Neutral Bushing BP-DG-314-301-0026 A 26/11/2008

214 XFR STG Roller Arrangement BP-DG-314-301-0027 A 26/11/2008

215 XFR STG LV Busduct Mtg. Arrangement BP-DG-314-301-0028 A 26/11/2008

216 XFR STG Shipping Diagram BP-DG-314-301-0029 A 26/11/2008

217 XFR STG Rating and Diagram Plate BP-DG-314-301-0030 A 26/11/2008

218 XFR STG Valve Schedule Plate BP-DG-314-301-0031 A 26/11/2008

219 XFR STG GA of Cooler Control Cabinet BP-DG-314-301-0032 A 26/11/2008

220 XFR STG Cooler control scheme BP-DG-314-301-0033 A 26/11/2008

221 XFR STG Transformer Technical Data Sheet BP-DG-314-301-0034 A 26/11/2008

222 XFR STG Customer’s Inspection Test Schedule BP-DG-314-301-0035 A 26/11/2008

223 BFP MOTOR BFP Motor GA Drawing BP-DG-314-139-0001 A 26/08/2009

224 BFP MOTOR Motor Data Sheet / Curve BP-DG-314-139-0002 A 26/08/2009

225 BFP MOTOR Main Terminal Box Drawing BP-DG-314-139-0003 A 26/08/2009

226 BFP MOTOR Neutral TB Drawing BP-DG-314-139-0004 A 26/08/2009

227 BFP MOTOR RTD/BTD TB Drawing BP-DG-314-139-0005 A 26/08/2009

228 BFP MOTOR CT Secondary TB BP-DG-314-139-0006 A 26/08/2009

229 BFP MOTOR Heater TB Drawing BP-DG-314-139-0007 A 26/08/2009

05 December 2008 Page 3 of 49

Page 4: Master Drawing List Rev01

230 BFP MOTOR Test procedure for Type Test BP-DG-314-139-0008 A 26/08/2009

231 BFP MOTOR Type Test Certificate BP-DG-314-139-0009 A 26/08/2009

232 CEP MOTOR CEP Motor GA Drawing BP-DG-314-143-0001 A 26/08/2009

233 CEP MOTOR Motor Data Sheet / Curves BP-DG-314-143-0002 A 26/08/2009

234 CEP MOTOR Main Terminal Box Drawing BP-DG-314-143-0003 A 26/08/2009

235 CEP MOTOR Heater TB Drawing BP-DG-314-143-0004 A 26/08/2009

236 CEP MOTOR RTD/BTD TB Drawing BP-DG-314-143-0005 A 26/08/2009

237 CEP MOTOR Neutral TB Drawing BP-DG-314-143- 0006 A 26/08/2009

238 CEP MOTOR Test Procedure for Medium Range Motors BP-DG-314-143-0007 A 26/08/2009

239 CEP MOTOR Painting Specification for HT Motors BP-DG-314-143-0008 A 26/08/2009

240 CEP MOTOR Type Test Certificate BP-DG-314-143-0009 A 26/08/2009

241 CWP MOTOR Motor GA Drawing BP-DG-314-165-0001 A 26/08/2009

242 CWP MOTOR Motor Data Sheet / Curve BP-DG-314-165-0002 A 26/08/2009

243 CWP MOTOR Main Terminal Box Drawing BP-DG-314-165-0003 A 26/08/2009

244 CWP MOTOR Neutral TB Drawing BP-DG-314-165-0004 A 26/08/2009

245 CWP MOTOR Heater TB Drawing BP-DG-314-165-0005 A 26/08/2009

246 CWP MOTOR RTD / BTD TB Drawing BP-DG-314-165-0006 A 26/08/2009

247 CWP MOTOR CT Secondary TB BP-DG-314-165-0007 A 26/08/2009

248 CWP MOTOR Type Test Certificate BP-DG-314-165-0008 A 26/08/2009

249 CPHRC MTR Motor GA Drawing BP-DG-314-165-0010 A 26/08/2009

250 CPHRC MTR Motor Data Sheet / Curve BP-DG-314-165-0011 A 26/08/2009

251 CPHRC MTR Main Terminal Box Drawing BP-DG-314-165-0012 A 26/08/2009

252 CPHRC MTR Neutral TB Drawing BP-DG-314-165-0013 A 26/08/2009

253 CPHRC MTR Heater TB Drawing BP-DG-314-165-0014 A 26/08/2009

254 CPHRC MTR RTD / BTD TB Drawing BP-DG-314-165-0015 A 26/08/2009

255 CPHRC MTR CT Secondary TB BP-DG-314-165-0016 A 26/08/2009

256 CPHRC MTR Type Test Certificate BP-DG-314-165-0017 A 26/08/2009

257 ECW MOTOR Motor GA Drawing BP-DG-314-165-0020 A 26/08/2009

258 ECW MOTOR Motor Data Sheet / Curve BP-DG-314-165-0021 A 26/08/2009

259 ECW MOTOR Main Terminal Box Drawing BP-DG-314-165-0022 A 26/08/2009

260 ECW MOTOR Neutral TB Drawing BP-DG-314-165-0023 A 26/08/2009

261 ECW MOTOR Heater TB Drawing BP-DG-314-165-0024 A 26/08/2009

262 ECW MOTOR RTD / BTD TB Drawing BP-DG-314-165-0025 A 26/08/2009

263 ECW MOTOR CT Secondary TB BP-DG-314-165-0026 A 26/08/2009

264 ECW MOTOR Type Test Certificate BP-DG-314-165-0027 A 26/08/2009

265 ACW MOTOR Motor GA Drawing BP-DG-314-165-0030 A 27/05/2009

266 ACW MOTOR Motor Data Sheet / Curve BP-DG-314-165-0031 A 27/05/2009

267 ACW MOTOR Main Terminal Box Drawing BP-DG-314-165-0032 A 27/05/2009

268 ACW MOTOR Neutral TB Drawing BP-DG-314-165-0033 A 27/05/2009

05 December 2008 Page 4 of 49

Page 5: Master Drawing List Rev01

269 ACW MOTOR Heater TB Drawing BP-DG-314-165-0034 A 27/05/2009

270 ACW MOTOR RTD / BTD TB Drawing BP-DG-314-165-0035 A 27/05/2009

271 ACW MOTOR CT Secondary TB BP-DG-314-165-0036 A 27/05/2009

272 ACW MOTOR Type Test Certificate BP-DG-314-165-0037 A 27/05/2009

273 SWP MOTOR Motor GA Drawing BP-DG-314-165-0050 A 27/05/2009

274 SWP MOTOR Motor Data Sheet / Curve BP-DG-314-165-0051 A 27/05/2009

275 SWP MOTOR Main Terminal Box Drawing BP-DG-314-165-0052 A 27/05/2009

276 SWP MOTOR Neutral TB Drawing BP-DG-314-165-0053 A 27/05/2009

277 SWP MOTOR Heater TB Drawing BP-DG-314-165-0054 A 27/05/2009

278 SWP MOTOR RTD / BTD TB Drawing BP-DG-314-165-0055 A 27/05/2009

279 SWP MOTOR CT Secondary TB BP-DG-314-165-0056 A 27/05/2009

280 SWP MOTOR Type Test Certificate BP-DG-314-165-0057 A 27/05/2009

281 PRT. PANEL OGA Drawing of Generator, GT and UAT Protection Panel

BP-DG-314-305-0001 A 25/02/2009

282 PRT. PANEL Schematic Drawing of Generator, GT and UAT Protection Panel

BP-DG-314-305-0002 A 25/02/2009

283 SW GEAR FOUNDATION DRAWING BP-DG-314-505-001 A 31/12/2008

284 SW GEAR LAYOUT DRAWING FOR 52 panels BP-DG-314-505-003 A 31/12/2008

285 SW GEAR LAYOUT DRAWING FOR 52 panels BP-DG-314-505-004 A 31/12/2008

286 SW GEAR KEYDIAGRAM FOR 52 panels BP-DG-314-505-005 A 31/12/2008

287 SW GEAR KEYDIAGRAM FOR 52 panels BP-DG-314-505-006 A 31/12/2008

288 SW GEAR SCHEMATIC DIAGRAM,INCOMER-1 BP-DG-314-505-007 A 28/02/2009

289 SW GEAR SCHEMATIC DIAGRAM,FPT BP-DG-314-505-008 A 28/02/2009

290 SW GEAR SCHEMATIC DIAGRAM,TRANSFORMER FEEDER-1 BP-DG-314-505-009 A 28/02/2009

291 SW GEAR SCHEMATIC DIAGRAM,TIE BP-DG-314-505-010 A 28/02/2009

292 SW GEAR SCHEMATIC DIAGRAM,BUSCOUPLER BP-DG-314-505-011 A 28/02/2009

293 SW GEAR SCHEMATIC DIAGRAM,BUSPT BP-DG-314-505-012 A 28/02/2009

294 SW GEAR SCHEMATIC DIAGRAM, MF BP-DG-314-505-013 A 28/02/2009

295 SW GEAR SCHEMATIC DIAGRAM, MFD BP-DG-314-505-014 A 28/02/2009

296 SW GEAR SCHEMATIC DIAGRAM,TRUNKING CUM BUSPT BP-DG-314-505-015 A 28/02/2009

297 SW GEAR FEEDER EARTHING TRUCK BP-DG-314-505-016 A 28/02/2009

298 SW GEAR BREAKER EARTHING TRUCK BP-DG-314-505-017 A 28/02/2009

299 SW GEAR DATASHEET BP-DG-314-505-018 A 28/02/2009

300 SW GEAR LEGEND OF DEVICES BP-DG-314-505-019 A 28/02/2009

05 December 2008 Page 5 of 49

Page 6: Master Drawing List Rev01

BHEL EDNID Area Title Drg_No Purpose Sch. Sub

118 GT CONTROLS OGA, QP, TP OF MARKVI SYSTEM A 18/02/2009

119 GT CONTROLS WRITE-UP ON MARKVI SYSTEM I 18/02/2009

120 GT CONTROLS O&M MANUALS OF MARKVI SYSTEM I 28/04/2010

121 GTG & STG EXCITATION

OGA, QP, TP OF STATIC EXCITATION SYSTEM A 18/02/2009

122 GTG & STG EXCITATION

SCHEMATIC DRGS OF STATIC EXCITATION SYSTEM I 28/04/2010

123 GTG & STG EXCITATION

O&M MANUALS OF STATIC EXCITATION SYSTEM I 28/04/2010

124 STN C&I CONFIGURATION DIAGRAM DCS & HMIPIS A 03/06/2009

125 STN C&I OVEALL GENERAL ARRANGEMENT DCS (TG & STATION)

A 25/03/2009

126 STN C&I PARTITIONING DIAGRAM (FUNCTION GROUPING) DCS (TG & STATION)

A 03/06/2009

127 STN C&I POWER SUPPLY GROUNDING AND EARTHING FOR maxDNA SYSTEM

I 25/03/2009

128 STN C&I SYSTEM DESIGN PHILOSOPHY DCS (TG & STATION) A 03/06/2009

129 STN C&I QUALITY PLAN & TP OF DCS (TG & STATION) A 25/03/2009

130 STN C&I O & M MANUALS FOR TG CONTROLS I 07/07/2010

131 STN C&I O & M MANUALS FOR STATION C&I CONTROLS I 07/07/2010

132 STN C&I SYSTEM DESCRIPTION HMIPIS I 03/06/2009

133 STN C&I QUALITY PLAN & TEST PROTOCOL HMIPIS A 25/03/2009

134 STN C&I BILL OF MATERIALS HMIPIS A 03/06/2009

135 STN C&I DATA SHEET OF LVS I 08/07/2009

136 STN C&I OVEALL GENERAL ARRANGEMENT HMIPIS - CRT DESK

A 25/03/2009

137 STN C&I POWER DISTRIBUTION SCHEME OF HMIPIS I 03/06/2009

138 STN C&I NETWORK CONNECTION DIAGRAM OF HMIPIS I 03/06/2009

139 STN C&I DATA SHEET & INSTRUMENT LIST TEMPERATURE ELEMENTS

A 03/06/2009

140 STN C&I DATA SHEET & INSTRUMENT LIST E/P CONVERTERS A 03/06/2009

141 STN C&I IMPULSE AND SAMPLE PIPE - BOM A 03/06/2009

142 STN C&I TRANSMITTER RACKS / ENCLOSURES DRGS (GA ,LAYOUT, WIRING /TUBING ETC) & COMPONENT DATA SHEET.

A 03/06/2009

143 STN C&I INSTALLATION SCHEME FOR INSTRUMENTS A 03/06/2009

144 STN C&I DRG AND DATA SHEET FOR ANALYTICAL INSTRUMENTS

A 03/06/2009

145 STN C&I DATA SHEET & INSTRUMENT LIST PRESSURE/DIFF. PRESSURE GAUGE

A 03/06/2009

146 STN C&I DATA SHEET & INSTRUMENT LIST PRESSURE/DIFF. PRESSURE SWITCH

A 03/06/2009

05 December 2008 Page 6 of 49

Page 7: Master Drawing List Rev01

147 STN C&I DATA SHEET & INSTRUMENT LIST LEVEL SWITCH A 03/06/2009

148 STN C&I DATA SHEET & INSTRUMENT LIST TEMP. GAUGE A 03/06/2009

149 STN C&I DATA SHEET FOR AIR FILTER REGULATOR I 03/06/2009

150 STN C&I DATA SHEET FOR VIBRATION MONITORING SYSTEM A 03/06/2009

151 STN C&I DATA SHEET & DRG.FOR LVL TRANSMITTER A 03/06/2009

152 STN C&I UPS & BATTERIES - DRG. AND DATA SHEETS + LOAD DATA & SIZING CALCULATION

A 08/07/2009

153 STN C&I DATA SHEET FOR INSTRUMENTAION CABLE A 03/06/2009

154 STN C&I DATA SHEET FOR THERMOCOUPLE EXTN. CABLE A 03/06/2009

155 STN C&I MASTER CLOCK DRAWING AND DATA SHEET A 03/06/2009

156 STN C&I DATA SHEET AND DRAWING FOR JUNCTION BOX I 08/07/2009

157 STN C&I DATA SHEET AND DRAWING FOR CJC BOX A 08/07/2009

158 STN C&I DATA SHEET & DRG FOR HART MANAGEMENT SYSTEM

A 08/07/2009

159 STN C&I DATA SHEET &DRG.FOR HYDROSTATIC TYPE LVL TRANSMITTER

A 03/06/2009

160 STN C&I DATA SHEETS FOR LABORATORY INSTRUMENTS I 18/08/2010

161 STN C&I O & M MANUALS-BOUGHT OUT ITEMS I 18/08/2010

162 STN C&I OGA OF UNIT CONTROL PANEL A 08/07/2009

163 STN C&I SCHEMATIC DIAGRAM OF UNIT CONTROL PANEL I 08/07/2009

164 STN C&I OGA OF ECP A 08/07/2009

165 STN C&I SCHEMATIC DIAGRAM OF ECP I 08/07/2009

05 December 2008 Page 7 of 49

Page 8: Master Drawing List Rev01

BHEL HWRID Area Title Drg_No Purpose Sch. Sub

1 PED Foundation Plan 013100B1153 I 20/08/2008

2 PED Load on Foundation 013100B1151 I 20/08/2008

3 PED List of Embedded parts 213100B1152 I 20/08/2008

4 PED Laydown Space for major components of steam turbine with loading data

113100B1016 I 23/07/2008

5 PED Turbine lube oil system schemes 113100B1101 A 17/09/2008

6 PED Write up lub oil system scheme NA I 17/09/2008

7 PED Turbine gland seal steam system scheme 113100B1121 A 17/09/2008

8 PED Write up on gland seal steam system scheme NA I 17/09/2008

9 PED Turbine drain system scheme 1-13100-B1131 A 17/09/2008

10 PED Write up on drain system scheme NA I 17/09/2008

11 PED Condensate spray scheme for HP,IP & LP bypass system

213100B1141 A 15/10/2008

12 PED Write up on condensate spray scheme NA I 15/10/2008

13 PED HP,IP,LP Turbine system scheme (return/drain/vent)

013100B1142 A 17/09/2008

14 PED Write up on HP,IP,LP turbine system scheme NA I 17/09/2008

15 PED Control Oil system scheme (ESV & IV) 213100B1111 A 01/10/2008

16 PED Oil Room arrangement 113100B1004 I 03/09/2008

17 ST IP/LP Bypass valve Data sheets A 30/04/2008

18 PED Data sheet of lube oil pumps A 30/04/2008

19 PED Turbine drainage piping layout 013126B1001 A 04/02/2009

20 PED Condensate spray piping layout (IP & LP Bypass valve)

013109B1001 A 07/01/2009

21 PED Lube Oil Piping layout drgs 013111B1001 A 04/02/2009

22 PED Turbine Gland seal steam piping layout drawings 013105B1001 A 18/03/2009

23 PED Control oil piping Layout (IP & LP bypass valve) 213155B1001 A 15/04/2009

24 PED GA drg & PID of Lube Oil centrifuge unit A 30/04/2008

25 ST Influence factor of shafting due to misalignment 3-13100-B1008 I 25/06/2008

26 ST W-Up on Load cases , reqd stiffness & dynamic reqmts for turbine foundation

STE-TM-004 I 25/06/2008

27 ST O & M manual for turbine I 31/03/2010

28 PED Oil canal details 113100B1001 I 03/09/2008

29 PED Major connection location 013100B1003 I 10/09/2008

30 PED List of terminal details 413100B1001 I 31/12/2008

31 PED Foundation details of HPSU for LPBP valve 313100B1104 I 26/11/2008

32 PED Foundation details of HPSU for ESV & IV 313100B1105 I 26/11/2008

33 CIE List of feeder loads 4-18000-63-151 I 23/07/2008

05 December 2008 Page 8 of 49

Page 9: Master Drawing List Rev01

34 CIE Turbine supervisory write up 4-18000-63-448 A 20/08/2008

35 CIE Write up on TSC (analog control) 4-18000-63-427 I 15/10/2008

36 CIE Write up on DTC 4-18000-63-442 I 15/10/2008

37 CIE Write up on IP/LP Bypass system (Analog control) I 12/11/2008

38 CIE Write up on gland seal steam pressure control (analog control)

4-18000-63-057 I 12/11/2008

39 CIE Turbine valve sensor arrangement 4-18000-63-022 I 11/03/2009

40 CIE Measuring points on TG bearings 4-18000-63-021 I 12/11/2008

41 CIE Turbine protection & Trip system 4-18000-63-116 A 26/11/2008

42 CIE Instrument List 4-18000-63-001 A 18/02/2009

43 CIE Temperature & Pressure tappings (beyond turbine integral systems)

4-18000-63-171 I 26/11/2008

44 CIE List of Recorders 4-18000-63-003 A 18/02/2009

45 CIE List of Indicators 4-18000-63-004 A 18/02/2009

46 CIE Write up on AVT 4-18000-63-446 I 12/11/2008

47 CIE Cabling diagram 4-18000-63-222 A 10/12/2008

48 CIE Logic Diagram (SGC) for Oil System 4-18000-63-071 A 04/02/2009

49 CIE Logic diagram (SGC) for Steam Turbine 4-18000-63-072 A 04/02/2009

50 CIE Fire Protection logics for Turbine 4-18000-63-111 A 04/02/2009

51 CIE Logic diagram (SGC) for condenser Air Evacuation system

4-18000-63-073 A 11/03/2009

52 CIE List of Annunciations 4-18000-63-002 A 18/02/2009

53 CIE Logic Diagram for AVT 4-18000-63-103 A 07/01/2009

54 CIE List & Layout of Junction Boxes 4-18000-63-020 I 04/02/2009

55 CIE Expansion, vibration scheme 4-18000-63-023 A 04/02/2009

56 CIE INST LIST FOR GTG GENERATOR C&I 4-18000-63G-011 I 26/11/2008

57 CIE SCH.DIAGRAM FOR DC EOP MOTOR STARTER PANEL 4-18000-63S-278 I 17/09/2008

58 CIE SCH.DIAG. FOR CONTROL CABINET FOR DC SEAL OIL MOTOR FOR GTG

4-18000-63G-279 I 17/09/2008

59 CIE SCH.DIAGRAM FOR GENERATOR C&I CABINET 4-18000-63S-280 I 17/09/2008

60 CIE LOGIC DIAG. FOR GENERATOR GAS DRYING 4-18000-63-094 A 12/11/2008

61 CIE OGA DRG FOR GENERATOR C & I CABINETS 4-18000-63-276 I 01/10/2008

62 CIE SCH.DIAGRAM FOR GAS ANALYSER CABINTES 4-18000-63-275 I 12/11/2008

63 CIE WRITE - UP ON LOGICS FOR GENERATOR AUX. C&I 4-18000-63-418 I 12/11/2008

64 CIE LIST AND LOGIC DIAGRAM FOR ALARMS AND ATRS OF GENERATOR & AUX.

4-18000-63G-100 A 12/11/2008

65 CIE SCH. DIAGRAM FOR DC JOP MOTOR STARTER PANEL 4-18000-63S-277 I 17/09/2008

66 CIE O&M MANUALS FOR GENERATOR C&I. I 27/10/2010

67 CIE WRITE - UP FOR GENERATOR C&I 4-18000-63-417 I 12/11/2008

68 CIE LOGIC DIAG. FOR GENERATOR BEARING EXHAUST 4-18000-63-095 A 12/11/2008

69 CIE LOGIC DIAG. FOR GENERATOR SEAL OIL 4-18000-63-096 A 12/11/2008

05 December 2008 Page 9 of 49

Page 10: Master Drawing List Rev01

70 CIE INST LIST FOR STG GENERATOR C&I 4-18000-63S-011 I 18/02/2009

71 CIE HPSU LOGIC FOR MAIN GOVERNING 4-18000-63-262 I 24/06/2009

72 CIE HPSU LOGIC FOR LP & IP BYPASS 4-18000-63-261 I 24/06/2009

73 CIE W'UP & LOGIC LP & IP BYPASS PROTECTION 4-18000-63-440 I 24/06/2009

74 HXE GA of condenser 01601070054C146 A 06/08/2008

75 HXE Design memorandum & sizing calculation of condenser

HE-10738-16010-C146 A 23/07/2008

77 HXE GA of turbine Oil Coolers 01650170016C146 A 06/08/2008

78 HXE Condenser Data sheets HE-DS-10738-16010-C I 06/08/2008

79 HXE Turbine Oil Cooler data sheet HE-10738-16501-D I 23/07/2008

80 HXE Gland Steam Condenser 01620570008C146 I 06/08/2008

81 HXE GSC data sheet HE-10739-16205-D I 06/08/2008

82 HXE GA of fan exhauster for gland steam condenser and data sheet

I 30/04/2008

83 HXE GA of vacuum pumps I 30/04/2008

84 HXE Vacuum pump data sheet A 30/04/2008

85 GTG Generator Instrumentation Scheme 01390001315 A 25/06/2008

86 GTG Generator Seal oil System 11490001161 A 25/06/2008

87 GTG Generator Gas System scheme 01490001258 A 25/06/2008

88 GTG Generator waste Gas System 11490001162 A 25/06/2008

89 GTG Generator waste fluid system 21490001112 A 25/06/2008

90 GTG List of designations fopr auxiliary System Scheme TGE-2617 I 25/06/2008

91 GTG Slip ring Shaft instrumentation scheme 31430001010 A 25/06/2008

92 GTG Generator O/L 01390001314 I 25/06/2008

93 GTG GA of Slip ring Shaft assy. 01430001008 I 25/06/2008

94 GTG Foundation details of Generator Aux. Equipmt. 11500001075 I 25/06/2008

95 GTG Laydown space requirement for generator components

31390001051 I 25/06/2008

96 GTG List of Valves for generator systems TGE-2630 I 17/09/2008

97 GTG Terminal point list for generator pipe connections TGE-2628 I 17/09/2008

98 GTG Data Sheet for Generator, Exciter and Auxiliary systems

4033-0439 I 15/10/2008

99 GTG H2 Cooler Piping 0-150-00-01461 I 29/04/2009

100 GTG Generator piping plan 0-150-00-01459 I 29/04/2009

101 GTG O & M manual for Generator I 28/04/2010

102 STG Generator Instrumentation Scheme 01390001316 A 25/06/2008

103 STG Generator Seal oil System 11490001163 A 25/06/2008

104 STG Generator Gas System scheme 01490001261 A 25/06/2008

105 STG Generator waste Gas System 11490001164 A 25/06/2008

106 STG Generator waste fluid system 21490001113 A 25/06/2008

05 December 2008 Page 10 of 49

Page 11: Master Drawing List Rev01

107 STG List of designations fopr auxiliary System Scheme TGE-2618 I 25/06/2008

108 STG Slip ring Shaft instrumentation scheme 31430001009 A 25/06/2008

109 STG Generator O/L 1390001313 I 25/06/2008

110 STG GA of Slip ring Shaft assy. 01430001007 I 25/06/2008

111 STG Foundation details of Generator Aux. Equipmt. 11500001076 I 25/06/2008

112 STG List of Valves for generator systems TGE-2631 I 17/09/2008

113 STG Terminal point list for generator pipe connections TGE-2629 I 17/09/2008

114 STG Data Sheet for Generator, Exciter and Auxiliary systems

4033-0440 I 15/10/2008

115 STG H2 Cooler Piping 0-150-00-01462 I 29/04/2009

116 STG Generator piping plan 0-150-00-01460 I 29/04/2009

117 STG O & M manual for Generator I 28/04/2010

1259 STG Laydown Space requirement for Generator Components

31390001051 I 25/06/2008

1260 PED Foundation Plan 013100B1154 I 20/08/2008

1261 PED Turbine lube oil system schemes 113100B1102 A 17/09/2008

1262 PED Turbine lube oil system schemes 113100B1103 A 17/09/2008

1263 PED Control Oil system scheme (IP & LP Bypass Valve) 313100B1112 A 01/10/2008

1264 PED Condensate spray piping layout (LPT exhaust) 013109B1002 A 07/01/2009

1265 PED Lube Oil Piping layout drgs 013111B1002 A 04/02/2009

1266 PED Lube Oil Piping layout drgs 013111B1003 A 04/02/2009

1267 PED Lube Oil Piping layout drgs 013111B1004 A 04/02/2009

1268 PED Lube Oil Piping layout drgs 013111B1005 A 04/02/2009

1269 PED Turbine Gland seal steam piping layout drawings 013105B1002 A 18/03/2009

1270 PED Turbine Gland seal steam piping layout drawings 013105B1003 A 18/03/2009

1271 PED Turbine Gland seal steam piping layout drawings 013105B1004 A 18/03/2009

1272 PED Turbine Gland seal steam piping layout drawings 013105B1005 A 18/03/2009

1273 PED Turbine Gland seal steam piping layout drawings 013105B1006 A 18/03/2009

1274 PED Turbine Gland seal steam piping layout drawings 013105B1007 A 18/03/2009

1276 PED Control oil piping Layout (ESV & IV) 013112B1001 A 15/04/2009

1277 PED Legend 21310001000 I 17/09/2008

1278 PED Valve details (Turbine integral systems) 313137B1000 I 31/12/2008

1279 PED GA Waste oil tank 213100B1017 I 12/11/2008

1280 PED GA Leakage/dirty oil tank and pump 213100B1015 I 12/11/2008

1281 CIE SCH.DIAG. FOR CONTROL CABINET FOR DC SEAL OIL MOTOR FOR STG

4-18000-63S-279 I 17/09/2008

1282 CIE LIST AND LOGIC DIAGRAM FOR ALARMS AND ATRS OF GENERATOR & AUX. FOR STG

4-18000-63S-100 A 12/11/2008

05 December 2008 Page 11 of 49

Page 12: Master Drawing List Rev01

BHEL HYDID Area Title Drg_No Purpose Sch. Sub

301 Gas Turbine Description of Design Features of Gas Turbine I 15/10/2008

302 Gas Turbine General Arrangement and Sectional Drawing of Gas Turbine at different levels and different positions(BHEL Desc GA of GTG and Auxiliaries)

1-366-09-89007 I 06/08/2008

303 Gas Turbine Lay Down Areas of Gas Turbine Plan View & Sections 2-36609-89001 A 11/06/2008

304 Gas Turbine Foundation Plan & Elevation with Loading of Gas Turbine & Generator

A 30/04/2008

305 Gas Turbine Foundation Plan & Elevation with Loading of Air intake system

A 30/04/2008

306 Gas Turbine Layout & Loading of Gas Conditioning Skid A 30/04/2008

307 Gas Turbine Assembly drawing of Gas Turbine ( part of O&M manual)

I 29/04/2009

308 Gas Turbine Part List and drawing of Gas Turbine ( part of O&M manual)

I 29/04/2009

309 Gas Turbine Detailed Data Sheet of Gas Turbine I 26/11/2008

310 Gas Turbine Materials of Construction of Gas Turbine I 26/11/2008

311 Gas Turbine Gas Turbine Performance curves (correction curves) I 10/12/2008

312 Gas Turbine Gas Turbine Stratup characteristics (indicating ignition point, main flame ON, selfsustaining speed, synchronization, Loading and variation in Exhaust Temperature)

I 26/11/2008

313 Gas Turbine Gas Turbine - Operation Philosophy ( part O&M manual)

I 29/04/2009

314 Gas Turbine Gas Turbine - Maintenance Philosophy ( part of O&M manual)

I 29/04/2009

315 Gas Turbine Gas Turbine - Gaseous Fuel quality requirements (GT Fuel gas recommendations)

GT10197 I 23/07/2008

316 Gas Turbine Gas Turbine - Intake Air quality requirements I 20/08/2008

317 Gas Turbine Writeup on Integral Fuel Gas System 2-366-33-89004 I 15/10/2008

318 Gas Turbine Writeup on Scheme of Control Devices 2-366-26-89004 I 15/10/2008

319 Gas Turbine Writeup on Lubricating oil & Jacking Oil system 2-366-27-89004 A 15/10/2008

320 Gas Turbine Writeup on Gas Turbine Equipment Cooling water system

2-366-31-89004 A 15/10/2008

321 Gas Turbine Writeup on Control (Hydraulic) oil system and Trip oil system

2-366-38-89004 I 15/10/2008

322 Gas Turbine Writeup on Ventillation and Heating system 2-366-41-89004 I 15/10/2008

323 Gas Turbine Writeup on Gas Turbine Instrumentation diagram (sensor locations) (part of O&M manual)

I 29/04/2009

324 Gas Turbine Writeup on Gas Turbine cooling and sealing air system

2-366-28-89004 I 15/10/2008

325 Gas Turbine Writeup on Atomising air and Purge Air system I 15/10/2008

326 Gas Turbine Writeup on Ignition Gas system I 30/04/2008

327 Gas Turbine Writeup on Blow-off system I 30/04/2008

05 December 2008 Page 12 of 49

Page 13: Master Drawing List Rev01

328 Gas Turbine Writeup on Seal Air System 2-366-28-89004 I 15/10/2008

329 Gas Turbine Writeup on Cooling Air system 2-366-28-89004 I 15/10/2008

330 Gas Turbine Writeup on Gas Detection system 2-366-63-89004 I 15/10/2008

331 Gas Turbine Writeup on Gas Turbine fire protection and CO2 release system

2-366-36-89004 I 15/10/2008

332 Gas Turbine Writeup on Compressor online & offline wash system

2-366-58-89004 I 15/10/2008

333 Gas Turbine Writeup on Generator water cooling system (part of 22 e)

I 30/04/2008

334 Gas Turbine Writeup on Scheme for field interconnection I 10/12/2008

335 Gas Turbine Writeup on Scheme for starting means 2-366-32-89004 I 15/10/2008

336 Gas Turbine Writeup on Scheme for air flow Inlet and Exhaust system

2-366-47-89004 I 15/10/2008

337 Gas Turbine Writeup on Scheme for IGV 2-366-46-89004 I 15/10/2008

338 Gas Turbine Writeup on Device Summary GT15071 I 29/10/2008

339 Gas Turbine a. Design Memorendum I 15/10/2008

340 Gas Turbine b. Sizing calculation of Air Intake System I 15/10/2008

341 Gas Turbine c. General Arrangement of Air Intake system I 15/10/2008

342 Gas Turbine d. Data Sheet of Air Intake Filtration House and Intake Duct

A 15/10/2008

343 Gas Turbine e. Data Sheet of Air Intake Filters A 15/10/2008

344 Gas Turbine f. Diagram (Schematic) of Air Intake system including Pulse cleaning system

I 15/10/2008

345 PED a. Design Memorendum I 23/07/2008

346 PED b. P&ID of Off base Fuel Gas Supply and Conditioning system

I 23/07/2008

347 PED c. Piping Layout drawing for Fuel Gas supply system A 15/10/2008

348 PED d. Equipment Layout drawing for Fuel Gas conditioning system

A 15/10/2008

349 PED e. Sizing calculation for Knockout Drum, Filter/ separators and Pressure Control Station

A 20/08/2008

350 PED e. General Arrangement Drawing for following equipment: Knockout Drum, Filter/ separators and Pressure Control Station

I 15/10/2008

351 PED f. Data sheet for following equipment: Knockout Drum, Filter/ separators and Pressure Control Station

I 20/08/2008

352 PED g. Data Sheet / GA drawing of Gas Flow meter / Chromatograph

I 20/08/2008

353 PED h. Data Sheet of various valves in Gas line (Isolating valves, control valves and safety valves)

I 15/10/2008

354 Gas Turbine b. Lube Oil Pumps (MOP, AOP, EOP, JOP),Control Oil Pump, Oil Vapor Exhausters, Filters/ strainers

I 04/02/2009

355 Gas Turbine c. Lube oil coolers A 04/02/2009

05 December 2008 Page 13 of 49

Page 14: Master Drawing List Rev01

356 Gas Turbine g. GT Ventillation fans / motors, Exhaust frame cooling fans/ motors

I 04/02/2009

357 Gas Turbine h. Atomizing air compressor and motor I 04/02/2009

358 Gas Turbine i. Gas Turbine Turning gear with motor I 04/02/2009

359 Gas Turbine j. Fuel Gas and Fuel oil Stop valve and Control valve

I 04/02/2009

360 Gas Turbine l. Portable Lube oil purification system A 04/02/2009

361 Gas Turbine Gas Turbine PG Test Scheme and Procedue (in Simple cycle)

A 04/02/2009

362 Gas Turbine Factory run test procedure for GT A 15/10/2008

363 Gas Turbine O&M Manual for Gas Turbine I 29/04/2009

364 Gas Turbine Outline, FDN interface GT & GEN 1-366-15-89003 S01-S0 I 25/06/2008

365 Gas Turbine WT &CG of gas turbine I 15/10/2008

366 Gas Turbine Foundation interface, exhaust system I 30/04/2008

367 Gas Turbine Foundation interface, inlet system I 30/04/2008

368 Gas Turbine Foundation interface, off-base eqpt I 10/12/2008

369 Gas Turbine GT package connections, piping I 04/02/2009

370 Gas Turbine Shipping weights & dimensions GTEK/W7/30/2008/PP I 23/07/2008

371 Gas Turbine Lube oil recommendations GT10198 I 23/07/2008

372 Gas Turbine Cooling water recommendations GT10507 I 23/07/2008

373 Gas Turbine Symbols piping GT10374 I 23/07/2008

374 Gas Turbine Utility consumption details GTEF/UTILITY/ PPCLB/ I 23/07/2008

375 Gas Turbine Gas turbine and accessory equipment preservation GT10371 I 23/07/2008

376 Gas Turbine Painting schedule GTEG/PPCL/FR9FA/001 I 23/07/2008

377 Gas Turbine Lubricants schedule I 23/07/2008

378 Gas Turbine Control Write up and Operational Philospy of GT I 30/04/2008

379 Gas Turbine MOD write up on HOD Scheme for GT (IGV) I 30/04/2008

380 Gas Turbine Drive List I 30/04/2008

381 EDN-B'LRE List of SOE Signals A 30/04/2008

382 Gas Turbine Cabinet Details for Gas Turbine C&I I 30/04/2008

383 Gas Turbine Power Measuremt & Synchronising Scheme I 30/04/2008

384 Gas Turbine List of Control Panels I 30/04/2008

385 Gas Turbine Instrument installation drawings I 30/04/2008

386 EDN-B'LRE Details GT MMI (for operation & Control Functions and Engg. Function)

I 30/04/2008

387 PEM Bus Utilisation calculation details I 30/04/2008

388 Gas Turbine Data sheet of various C&I items I 30/04/2008

389 EDN-B'LRE Power supply Arrangement for Computer & Peripherials

I 30/04/2008

390 EDN-B'LRE List of Indicators & Recorders I 30/04/2008

391 EDN-B'LRE List of Annunciations I 30/04/2008

05 December 2008 Page 14 of 49

Page 15: Master Drawing List Rev01

392 EDN-B'LRE Functional Diagram of GT & Auxs & OPN Logic A 30/04/2008

393 Gas Turbine Cable Schedule & Interconnection I 29/04/2009

394 Gas Turbine GT Auxiliary Load List GTEI/PPCL/1526 A 23/07/2008

395 Gas Turbine Single Line Diagram for GT MCC I 13/08/2008

396 Gas Turbine Scheme and GA of GT MCC I 04/02/2009

397 Gas Turbine List of panels GTEI/PPCL/1522 I 23/07/2008

398 Gas Turbine Cable schedule I 29/04/2009

399 Gas Turbine Scheme for Battery & Charger I 04/02/2009

400 Gas Turbine Battery & Charger sizing calculation I 20/08/2008

401 Gas Turbine Cable Data Sheet I 04/02/2009

402 BFP ESTIMATED PERFORMANCE CURVE OF BP A 14/05/2008

403 BFP ESTIMATED PERFORMANCE CURVE OF BFP A 14/05/2008

404 BFP GENERAL ARRANGEMENT OF BFP SET A 28/05/2008

405 BFP GA OF R.C. VALVE FOR BFP(FOR LAYOUT PURPOSE) I 25/06/2008

406 BFP GA OF SUCTION STRAINER FOR BFP&CEP (FOR LAYOUT PURPOSE)

I 25/06/2008

407 BFP INSTRUMENT SCHEDULE OF BFP SET A 25/06/2008

408 BFP P&I DIAGRAM OF FEED WATER SYSTEM FOR BFP SET A 25/06/2008

409 BFP P&I DIAGRAM OF SEALING & COOLING WATER SYSTEM FOR BFP SET

A 25/06/2008

410 BFP P&I DIAGRAM OF LUBE OIL & WORKING OIL SYSTEM FOR BFP SET

A 25/06/2008

411 BFP SEQUENTIAL INTERLOCKING CONDITIONS OF BFP SET

A 25/06/2008

412 BFP TECHNICAL DATA SHEET OF BFP & IT'S AUXILIARIES A 23/07/2008

413 BFP ACW & INSTRUMENT AIR REQUIREMENT FOR BFP & CEP

I 25/06/2008

414 BFP ELECTRICAL LOAD LIST OF BFP & CEP I 14/05/2008

415 BFP CROSS SECTIONAL DRAWING OF BP I 11/06/2008

416 BFP CROSS SECTIONAL DRAWING OF BFP I 11/06/2008

417 BFP LUBRICATION SCHEDULE FOR BFP, BP & CEP I 25/06/2008

418 CEP ESTIMATED PERFORMANCE CURVE OF CEP A 14/05/2008

419 CEP GENERAL ARRANGEMENT & FOUNDATION DETAILS OF CEP

A 28/05/2008

420 CEP GA OF SUCTION STRAINER FOR CEP(LAYOUT PURPOSE)

I 25/06/2008

421 CEP INSTRUMENTATION SCHEDULE OF CEP A 25/06/2008

422 CEP INSTRUMENTATION SCHEME OF CEP A 25/06/2008

423 CEP SEALING AND COOLING WATER SCHEME OF CEP I 25/06/2008

424 CEP SEQUENTIAL INTERLOCKING CONDITIONS OF CEP A 11/06/2008

425 CEP TECHNICAL DATA SHEET OF CEP A 11/06/2008

05 December 2008 Page 15 of 49

Page 16: Master Drawing List Rev01

426 CEP CROSS SECTIONAL DRAWING OF CEP I 11/06/2008

427 CWP EST. PERFORMANCE CURVE OF CWP A 28/05/2008

428 CWP GA & FOUNDATION DETAILS OF CWP A 25/06/2008

429 CWP SECTIONAL ASSEMBLY OF CWP I 23/07/2008

430 CWP TECHNICAL DATA OF CWP I 23/07/2008

431 CWP SCHEDULE OF INSTRUMENTS OF CWP I 20/08/2008

432 CWP INSTRUMENT SCHEME OF CWP I 20/08/2008

433 CWP REPORT ON SUMP MODEL STUDIES I 20/08/2008

434 HXE GA OF SPRAY CUM TRAY DEAERATOR 1-163-10-11314 A 20/06/2008

435 HXE STAND PIPE ASSLY FOR DEARATOR 2-163-19-11XXX I 30/06/2008

436 HXE PLATFORM ASSLY FOR DEAERATOR 2-163-35-11XXX I 30/06/2008

437 HXE GA OF PERFORMANCE GAS HEATER 2-166-80-00484 I 30/06/2008

1283 Gas Turbine 125V DC Battery & Charger sizing calculation GTEI/PPCL/1523 I 29/10/2008

1327 HXE DATA SHEET FOR DEAERATOR CW-CM-9472-C-O-M-0 A

05 December 2008 Page 16 of 49

Page 17: Master Drawing List Rev01

BHEL ISGID Area Title Drg_No Purpose Sch. Sub

700 DG Technical data sheet for Engine IS – 4 – DS – 588 – 800 A 18/02/2009

701 DG Technical data sheet for Alternator IS – 4 – DS – 588 – 800 A 18/02/2009

702 DG Technical data sheet for DG set IS – 4 – DS – 588 – 800 A 18/02/2009

703 DG Technical data sheet for Acoustic IS – 4 – DS – 588 – 800 A 18/02/2009

704 DG Technical data sheet for Battery IS – 4 – DS – 588 – 800 A 18/02/2009

705 DG Technical data sheet for Battery charger IS – 4 – DS – 588 – 800 A 18/02/2009

706 DG GA of Engine IS – 3 – DG – 588 – 800 I 18/02/2009

707 DG GA of Alternator (Standard drg.) IS – 3 – DG – 588 – 800 I 18/02/2009

708 DG GA drawing for DG set IS – 3 – DG – 588 – 800 I 18/02/2009

709 DG GA of DG set with Acoustic enclosure IS – 3 – DG – 588 – 800 I 18/02/2009

710 DG GA drawing for fuel tank (990 ltrs) IS – 3 – DG – 588 – 800 I 18/02/2009

711 DG Layout Plan for DG set IS – 3 – DG – 588 – 800 A 18/03/2009

712 DG Foundation plan for Acoustic enclosure IS – 3 – DG – 588 – 800 I 18/03/2009

713 DG DG set Base frame drawing IS – 3 – DG – 588 – 800 I 18/03/2009

714 DG Insert plate details for Exhaust pipe supports IS – 3 – DG – 588 – 800 I 18/03/2009

715 DG QAP for DG set IS – 4 – QP – 588 – 800 A 18/03/2009

716 DG Generator Control Panel scheme IS – 3 – DG – 588 – 800 A 29/04/2009

717 DG Auxiliary distribution board drawing. IS – 3 – DG – 588 – 800 I 29/04/2009

718 DG QAP for control panel & Aux. dist. board IS – 4 – QP – 588 – 800 A 10/06/2009

719 DG O &M Manual IS – 4 – OM – 588 – 80 I 09/12/2009

05 December 2008 Page 17 of 49

Page 18: Master Drawing List Rev01

BHEL JHSID Area Title Drg_No Purpose Sch. Sub

747 Aux Trfr Outline General Arrangement A 28/01/2009

748 Aux Trfr Table of fittings for OGA A 28/01/2009

749 Aux Trfr Foundation Plan of Transformer A 28/01/2009

750 Aux Trfr Foundation Plan for 320 Dia. Roller A 28/01/2009

751 Aux Trfr Rating & Diagram plate A 28/01/2009

752 Aux Trfr Valve Schedule plate A 28/01/2009

753 Aux Trfr Oil filling instruction plate A 28/01/2009

754 Aux Trfr HV Bushing Assembly A 28/01/2009

755 Aux Trfr LV & LVN Bushing Assembly A 28/01/2009

756 Aux Trfr Schematic diagram of OLTC A 28/01/2009

757 Aux Trfr G A of Marshalling Box A 28/01/2009

758 Aux Trfr Diagram of Cooler control gear A 28/01/2009

05 December 2008 Page 18 of 49

Page 19: Master Drawing List Rev01

BHEL PEMID Area Title Drg_No Purpose Sch. Sub

461 C&I DRIVE CONTROL PHILOSOPHY(Station C&I) PE-DM-314-145-I002 A 03/09/2008

462 C&I SCHEDULE OF INSTRUMENTS(Station C&I) PE-SC-314-145-I102 I 04/02/2009

463 C&I CONTROL VALVES DATA SHEETS PE-TS-314-145-I104 A 24/09/2008

464 C&I FLOW ELEMENTS DATA SHEETS PE-TS-314-145-I105 A 24/09/2008

465 C&I SENSOR/TRANSMITTER GROUPING(Station C&I) PE-SC-314-145-I106 I 10/06/2009

466 C&I SWAS SCHEME PE-DG-314-145-I110 A 29/10/2008

467 C&I BINARY DRIVE LIST(Station C&I) PE-SC-314-145-I200 I 10/12/2008

468 C&I BINARY I/O LIST(Station C&I) PE-SC-314-145-I201 I 20/05/2009

469 C&I ALARM SCHEDULE PE-DG-314-145-I202 A 24/06/2009

470 C&I CONTROL SCHEME FOR DM MAKEUP PUMPS & HRSG FILL PUMPS

PE-DG-314-145-I216 A 11/03/2009

471 C&I CONTROL SCHEME FOR DMCW PUMPS PE-DG-314-145-I218 A 29/04/2009

472 C&I CONTROL SCHEME FOR ACWP PE-DG-314-145-I222 A 20/05/2009

473 C&I BINARY DRIVE CONTROL SCHEME FOR MISC. DRIVE(Station C&I)

PE-DG-314-145-I223 A 13/05/2009

474 C&I CONTROL SCHEME FOR CWP. PE-DG-314-145-I224 A 20/05/2009

475 C&I AUTOMATIC PLANT STARTUP/SHUTDOWN LOGICS PE-DG-314-145-I250 A 05/08/2009

476 C&I CONTROL SCHEME FOR WATER SYSTEM MISC. PUMPS

PE-DG-314-145-I271 A 08/04/2009

477 C&I CONTROL SCHEME FOR HP DOSING PUMPS PE-DG-314-145-I272 A 03/06/2009

478 C&I CONTROL SCHEME FOR LP DOSING PUMPS PE-DG-314-145-I273 A 10/06/2009

479 C&I CONTROL SCHEME FOR COLTCS PE-DG-314-145-I314 A 29/07/2009

480 C&I CONTROL SCHEME FOR SELF CLEANING STRAINER PE-DG-314-145-I275 A 05/08/2009

481 C&I CONTROL SCHEME FOR COOLING TOWERS PE-DG-314-145-I276 A 22/07/2009

482 C&I ANALOG DRIVE LIST(Station C&I) PE-SC-314-145-I300 I 26/11/2008

483 C&I ANALOG I/O LIST(Station C&I) PE-SC-314-145-I301 I 06/05/2009

484 C&I ANALOG CONTROL SCHEME PE-DG-314-145-I302 A 25/02/2009

485 C&I HP BYPASS CONTROL SCHEME PE-DG-314-145-I303 A 25/11/2009

486 C&I CCR/EER/COMPUTER ROOM LAYOUT PE-DG-314-145-I401 A 15/04/2009

487 C&I SWAS ROOM LAYOUT PE-DG-314-145-I403 A 16/09/2009

488 C&I PLANT SCHEMATICS PE-DG-314-145-I501 A 22/07/2009

489 C&I DISPLAYS (GROUP,BAR,TREND,PROFILE,CHARACT) PE-SC-314-145-I502 I 16/09/2009

490 C&I LOGS (TREND,POST TRIP,HOURLY,SHIFT,DAILY) PE-SC-314-145-I511 I 02/09/2009

491 C&I LTS POINTS LIST PE-SC-314-145-I516 I 07/10/2009

492 C&I PERFORMANCE CALCULATION WRITE-UP PE-DM-314-145-I550 A 28/10/2009

493 C&I CABLE INTERCONNECTION FOR BINARY DRIVES PE-DG-314-145-I611 I 16/12/2009

494 C&I CABLE INTERCONNECTION FOR BINARY SIGNALS PE-DG-314-145-I621 I 13/01/2010

495 C&I CABLE INTERCONNECTION FOR ANALOG DRIVES PE-DG-314-145-I631 I 16/12/2009

05 December 2008 Page 19 of 49

Page 20: Master Drawing List Rev01

496 C&I CABLE INTERCONNECTION FOR ANALOG SIGNALS PE-DG-314-145-I641 I 13/01/2010

497 C&I SEQ. CONTROL SCHEME FOR HP BFPS PE-DG-314-145-I231 A 08/04/2009

498 C&I SEQ. CONTROL SCHEME FOR LP BFPS PE-DG-314-145-I232 A 01/04/2009

499 C&I SEQ. CONTROL SCHEME FOR CPH RECIRCULATION PUMPS

PE-DG-314-145-I233 A 13/05/2009

500 MAIN MECH LEGEND SHEET PE-DC-314-100-D001 A 06/08/2008

501 MAIN MECH P & ID - STEAM SYSTEM PE-DC-314-100-D002 A 06/08/2008

502 MAIN MECH P & ID - FEED WATER SYSTEM PE-DC-314-100-D003 A 06/08/2008

503 MAIN MECH P & ID - CONDENSATE SYSTEM PE-DC-314-100-D004 A 06/08/2008

504 MAIN MECH P & ID - DM WATER SYSTEM PE-DG-314-100-D005 A 06/08/2008

505 MAIN MECH P & ID - CENTRAL LUBE OIL PURIFICATION SYSTEM PE-DG-314-100-D006 A 06/08/2008

506 MAIN MECH BASE LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS

PE-DC-314-100-D101 I 25/06/2008

507 MAIN MECH 80% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS

PE-DC-314-100-D102 I 25/06/2008

508 MAIN MECH 60% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS

PE-DC-314-100-D103 I 25/06/2008

509 MAIN MECH BASE LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D104 I 25/06/2008

510 MAIN MECH 80% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D105 I 25/06/2008

511 MAIN MECH 60% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D106 I 25/06/2008

512 MAIN MECH BASE LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D107 I 25/06/2008

513 MAIN MECH 80% LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D108 I 25/06/2008

514 MAIN MECH 60% LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D109 I 25/06/2008

515 MAIN MECH BASE LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D110 I 25/06/2008

516 MAIN MECH 80% LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D111 I 25/06/2008

517 MAIN MECH 60% LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN

PE-DC-314-100-D112 I 25/06/2008

518 MAIN MECH COMBINED CYCLE CORRECTION CURVE - AMBIENT TEMPERATURE

PE-DG-314-100-D301 I 09/12/2009

519 MAIN MECH COMBINED CYCLE CORRECTION CURVE - AMBIENT PRESSURE

PE-DG-314-100-D302 I 09/12/2009

520 MAIN MECH COMBINED CYCLE CORRECTION CURVE - RELATIVE HIMIDITY

PE-DG-314-100-D303 I 09/12/2009

521 MAIN MECH COMBINED CYCLE CORRECTION CURVE - FUEL LHV PE-DG-314-100-D304 I 09/12/2009

522 MAIN MECH COMBINED CYCLE CORRECTION CURVE - FREQUENCY

PE-DG-314-100-D305 I 09/12/2009

523 MAIN MECH COMBINED CYCLE CORRECTION CURVE- GT PERF DEGRADATION

PE-DG-314-100-D306 I 09/12/2009

05 December 2008 Page 20 of 49

Page 21: Master Drawing List Rev01

524 MAIN MECH COMBINED CYCLE CORRECTION CURVE- POWER FACTOR

PE-DG-314-100-D307 I 09/12/2009

525 MAIN MECH HOT START-UP CURVE OF COMBINED CYCLE PLANT PE-DG-314-100-D311 I 09/12/2009

526 MAIN MECH WARM START-UP CURVE OF COMBINED CYCLE PLANT

PE-DG-314-100-D312 I 09/12/2009

527 MAIN MECH COLD START-UP CURVE OF COMBINED CYCLE PLANT

PE-DG-314-100-D313 I 09/12/2009

528 MAIN MECH PIPE SCHEDULE PE-DC-314-100-D401 A 25/06/2008

529 MAIN MECH VALVE SCHEDULE PE-DC-314-100-D402 A 25/06/2008

530 MAIN MECH CEP SIZING CALCULATION PE-DC-314-100-D601 A 09/07/2008

531 MAIN MECH HP/IP BFP SIZING CALCULATION PE-DC-314-100-D602 A 09/07/2008

532 MAIN MECH LP BFP SIZING CALCULATION PE-DC-314-100-D603 A 09/07/2008

533 MAIN MECH CPHRCP SIZING CALCULATION PE-DC-314-100-D604 A 09/07/2008

534 MAIN MECH NPSH CALCULATION FOR HP/IP BFP / BOOSTER PUMP

PE-DC-314-100-D605 A 20/08/2008

535 MAIN MECH NPSH CALCULATION FOR LP BFP PE-DC-314-100-D606 A 20/08/2008

536 MAIN MECH NPSH CALCULATION FOR CEP PE-DC-314-100-D607 A 20/08/2008

537 MAIN MECH DESIGN BASIS DOCUMENT PE-DC-314-100-D701 I 11/06/2008

538 MAIN MECH FUNCTIONAL WRITEUP FOR BOTTOMING CYCLE PE-DC-314-100-D702 I 06/08/2008

539 MAIN MECH PLANT OPERATION PHILOSOPHY PE-DC-314-100-D703 I 30/07/2008

540 MAIN MECH PG TEST WRITEUP PE-DC-314-100-D704 I 11/11/2009

541 ELE LAYOUT DESIGN PHILOSOPHY FOR ELECTRICAL EQUIPMENT LAYOUT

PE-DC-314-100-E999 A 16/07/2008

542 ELE LAYOUT CABLING LAYOUT BELOW DC BATTERY ROOM PE-DG-314-100-E016 A 20/08/2008

543 ELE LAYOUT LAYOUT OF TRANSFORMER YARD PE-DG-314-100-E001 A 25/06/2008

544 ELE LAYOUT LAYOUT OF MAIN SWITCHGEAR ROOM PE-DG-314-100-E006 A 09/07/2008

545 ELE LAYOUT LAYOUT OF DC BATTERY ROOM PE-DG-314-100-E009 A 06/08/2008

546 ELE LAYOUT CABLING LAYOUT BELOW MAIN SWITCHGEAR ROOM

PE-DG-314-100-E013 A 06/08/2008

547 ELE LAYOUT CABLE TRAY LAYOUT ON HRSG PLATFORMS PE-DG-314-100-E038 A 31/12/2008

548 ELE LAYOUT LAYOUT OF CABLING INTERCONNECTIONS BTW MAIN PLANT & AUX PLANT AREAS

PE-DG-314-100-E042 A 24/12/2008

549 ELE LAYOUT CABLING LAYOUT IN 0.0M AB BAY PE-DG-314-100-E112 A 03/09/2008

550 MV SWGR SLD FOR UNIT SWITCHBOARD PE-DC-314-505-E001 A 03/09/2008

551 MV SWGR LOGIC DIAGRAM FOR 6.6KV SWITCHGEAR PE-DG-314-505-E002 A 24/09/2008

552 MV SWGR CT/VT SIZING CALCULATIONS FOR MV SWITCHBOARDS

PE-DG-314-505-E004 I 17/09/2008

553 MV SWGR LOGIC DIAGRAM FOR BTS PANEL PE-DG-314-505-E005 A 01/10/2008

554 LV SWGR ELECTRICAL LOAD DATA (BOARD WISE) PE-DC-314-506-E004 I 05/11/2008

555 LV SWGR CONTROL LOGIC FOR 415V SWGR PE-DG-314-506-E003 A 24/09/2008

556 CABLES & CABLING

DESIGN CALCULATIONS FOR MV CABLES SELECTION & SIZING

PE-DC-314-507-E001 A 30/07/2008

05 December 2008 Page 21 of 49

Page 22: Master Drawing List Rev01

557 CABLES & CABLING

DESIGN CALCULATIONS FOR LV CABLES SELECTION & SIZING

PE-DC-314-507-E002 A 03/09/2008

558 CABLES & CABLING

CABLING PHILOSOPHY PE-DC-314-507-E004 A 23/07/2008

559 CABLES & CABLING

TYPICAL DETAILS OF CABLE TRAYS AND ACCESSORIES

PE-DG-314-507-E005 A 03/09/2008

560 CABLES & CABLING

TYPICAL INSTALLATION DETAILS FOR CABLE TRAY SUPPORT SYSTEM

PE-DG-314-507-E006 A 16/07/2008

561 DC SYSTEM DESIGN MEMORANDUM FOR 220V DC SYSTEM PE-DC-314-508-E001 A 30/07/2008

563 GROUNDING & LIGHTNING PROTECTION

DESIGN MEMORANDUM FOR LIGHTNING PROTECTION SYSTEM

PE-DC-314-509-E002 A 20/08/2008

564 GROUNDING & LIGHTNING PROTECTION

TYPICAL BELOW GROUND EARTHING DETAILS PE-DG-314-509-E003 A 09/07/2008

565 GROUNDING & LIGHTNING PROTECTION

TYPICAL ABOVE GROUND EARTHING DETAILS PE-DG-314-509-E004 I 16/07/2008

566 GROUNDING & LIGHTNING PROTECTION

BELOW GRADE GROUNDING SYSTEM LAYOUT FOR MAIN POWER PLANT AREA

PE-DG-314-509-E005 A 23/07/2008

567 GROUNDING & LIGHTNING PROTECTION

LIGHTNING PROTECTION ARRANGEMENT FOR MAIN PH BUILDING

PE-DG-314-509-E006 I 17/09/2008

568 PROTECTION & CONTROL SYSTEM

CT & VT CALCULATIONS FOR GENERATOR CIRCUIT METERING & PROTECTION [STG]

PE-DC-314-510-E003 I 24/09/2008

569 PROTECTION & CONTROL SYSTEM

RELAY SETTINGS CHART FOR GENERATOR CIRCUIT PROTECTION [STG]

PE-DC-314-510-E004 I 06/05/2009

570 PROTECTION & CONTROL SYSTEM

LIST OF CIRCUIT BREAKERS FOR ELECTRICAL SYSTEM AND THEIR CONTROL LOCATION

PE-DC-314-510-E014 A 20/08/2008

571 PROTECTION & CONTROL SYSTEM

ANALOG INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM

PE-DC-314-510-E015 A 29/10/2008

572 PROTECTION & CONTROL SYSTEM

BINARY INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM

PE-DC-314-510-E016 A 05/11/2008

573 PROTECTION & CONTROL SYSTEM

CT & VT CALCULATIONS FOR GENERATOR CIRCUIT METERING & PROTECTION [GTG]

PE-DC-314-510-E053 I 27/08/2008

574 PROTECTION & CONTROL SYSTEM

RELAY SETTINGS CHART FOR GENERATOR CIRCUIT PROTECTION [GTG]

PE-DC-314-510-E054 I 15/04/2009

575 PROTECTION & CONTROL SYSTEM

SLD FOR GENERATOR CIRCUIT METERING & PROTECTION [STG]

PE-DG-314-510-E001 A 10/09/2008

576 PROTECTION & CONTROL SYSTEM

LOGIC DIAGRAM FOR GENERATOR CIRCUIT PROTECTION & ANNUNCIATION [STG]

PE-DG-314-510-E002 A 17/09/2008

05 December 2008 Page 22 of 49

Page 23: Master Drawing List Rev01

577 PROTECTION & CONTROL SYSTEM

SYNCHRONISING SCHEME PE-DG-314-510-E011 A 24/09/2008

578 PROTECTION & CONTROL SYSTEM

FRONT VIEW OF ELECTRICAL CONTROL PANEL (ECP)

PE-DG-314-510-E012 A 15/10/2008

579 PROTECTION & CONTROL SYSTEM

INTERFACE SCHEME FOR ELECTRICAL CONTROL PANEL (ECP)

PE-DG-314-510-E013 I 22/10/2008

580 PROTECTION & CONTROL SYSTEM

LOGIC DIAGRAM FOR ELECTRICAL CONTROL PANEL AND ASSOCIATED DDCMIS

PE-DG-314-510-E017 A 26/11/2008

581 PROTECTION & CONTROL SYSTEM

ALARM SCHEDULE FOR ELECTRICAL CONTROL PANEL (ECP)

PE-DG-314-510-E019 I 19/11/2008

582 PROTECTION & CONTROL SYSTEM

PLANT ELECTRICAL SCHEMATICS FOR DDCMIS PE-DG-314-510-E021 A 26/11/2008

583 PROTECTION & CONTROL SYSTEM

SLD FOR GENERATOR CIRCUIT METERING & PROTECTION [GTG]

PE-DG-314-510-E051 A 20/08/2008

584 PROTECTION & CONTROL SYSTEM

LOGIC DIAGRAM FOR GENERATOR CIRCUIT PROTECTION & ANNUNCIATION [GTG]

PE-DG-314-510-E052 A 03/09/2008

585 PUBLIC ADDRESS SYSTEM

DESIGN MEMORANDUM FOR PUBLIC ADDRESS SYSTEM

PE-DC-314-557-E001 A 10/09/2008

586 LIGHTING & LOW VOLTAGE SERVICES

DESIGN MEMORANDUM FOR LIGHTING & LV POWER SERVICES

PE-DC-314-558-E001 A 13/08/2008

587 EMERGENCY DG DESIGN CALCULATION FOR EMERGENCY SUPPLY DG SIZING

PE-DC-314-561-E001 A 20/08/2008

588 ELECTRICAL SYSTEM DESIGN

RELAY SETTINGS CHART FOR MV SYSTEM (OTHER THAN MOTORS)

PE-DC-314-565-E004 I 15/04/2009

589 ELECTRICAL SYSTEM DESIGN

RELAY SETTINGS CHART FOR LV AC AUXILIARY SYSTEM

PE-DC-314-565-E005 I 29/04/2009

590 ELECTRICAL SYSTEM DESIGN

DESIGN CALCULATION FOR GENERATOR AND MV SYSTEM

PE-DC-314-565-E002 A 16/07/2008

591 ELECTRICAL SYSTEM DESIGN

ELECTRICAL SINGLE LINE DIAGRAM FOR AUXILIARY POWER DISTRIBUTION

PE-DG-314-565-E001 A 09/07/2008

592 CHEMICAL DOSING SYSTEM

DESIGN MEMORANDUM FOR HP/LP CHEMICAL DOSING SYSTEM ALONG WITH P&ID

PE-DC-314-154-A001 A 25/06/2008

593 EFFLUENT TREATMENT PLANT.

DESIGN MEMORANDUM FOR EFFLUENT TREATMENT PLANT.

PE-DC-314-164-A001 A 16/07/2008

594 PRE TREATMENT PLANT.

DESIGN MEMORANDUM FOR PRETREATMENT PLANT ALONG WITH P&ID

PE-DC-314-158-A001 A 09/07/2008

595 SIDE STREAM FILTRATION PLANT

DESIGN MEMORANDUM FOR SIDE STREAM FILTRATION PLANT

PE-DC-314-156B-A001 A 30/07/2008

05 December 2008 Page 23 of 49

Page 24: Master Drawing List Rev01

596 CHLORINATION DESIGN MEMORANDUM FOR CHLORINATION (CW SYSTEM) & CHLORINE DIOXIDE SYSTEM(FOR PTP & CW SYSTEM)

PE-DC-314-174-A001 A 30/07/2008

597 CHEMICAL LAB. DESIGN MEMORANDUM FOR CHEMICAL LAB. PE-DC-314-175-A006 A 17/09/2008

598 ELEVATORS DESIGN MEMORANDUM FOR ELEVATORS PE-DC-314-502-A001 A 23/07/2008

599 CW TREATMENT SYSTEM

DESIGN MEMORANDUM FOR CW TREATMENT SYSTEM

PE-DC-314-154-A001 A 16/07/2008

600 FIRE PROTECTION SYSTEM

DESIGN MEMORANDUM FOR FIRE PROTECTION SYSTEM

PE-DC-314-552-A010 A 03/09/2008

601 AIR CONDITIONING SYSTEM

DESIGN MEMORANDUM FOR AIR CONDITIONING SYSTEM

PE-DC-314-553-A001 A 06/08/2008

602 VENTILATION SYSTEM

DESIGN MEMORANDUM FOR VENTILATION SYSTEM

PE-DG-314-554-A001 A 06/08/2008

603 COMPRESSED AIR SYSTEM

DESIGN MEMORANDUM FOR COMPRESSED AIR SYSTEM

PE-DC-314-555-A001 A 03/09/2008

604 COMPRESSED AIR SYSTEM

IA DISTRIBUTION SCHEME PE-DC-314-555-A002 A 03/09/2008

605 COMPRESSED AIR SYSTEM

SA DISTRIBUTION SCHEME PE-DC-314-555-A003 A 03/09/2008

606 EOT CRANE DESIGN MEMORANDUM FOR GT/ST HALL EOT CRANE

PE-DC-314-501-A001 A 25/06/2008

607 EOT CRANE,MISC CRANES & LIFTING DEVICES

DESIGN MEMORANDUM FOR CW PUMPHOUSE EOT CRANE, SINGLE GIRDER MISC. CRANES & HOISTS

PE-DC-314-563-A001 A 06/08/2008

608 GENERAL PAINTING SCHEDULE PE-DC-314-999-A001 I 27/08/2008

609 MECH LAYOUT THERMAL INSULATION DESIGN CRITERIA PE-DC-314-100-M033 A 03/09/2008

610 MECH LAYOUT THERMAL INSULATION APPLICATION PROCEDURE PE-DC-314-100-M034 I 09/07/2008

611 MECH LAYOUT PLOT PLAN PE-DG-314-100-M001 A 16/07/2008

612 MECH LAYOUT MAIN EQUIPMENT PLAN AT EL 0.0M PE-DG-314-100-M002 A 16/07/2008

613 MECH LAYOUT EQUIPMENT LAYOUT OF GT BUILDING PE-DG-314-100-M003 A 16/07/2008

614 MECH LAYOUT GAS TURBINE BUILDING CROSS SECTION PE-DG-314-100-M004 A 16/07/2008

615 MECH LAYOUT LAYDOWN OF GAS TURBINE COMPONENTS PE-DG-314-100-M005 A 30/07/2008

616 MECH LAYOUT GENERAL ARRANGEMENT AND X-SECTON OF BFP BUILDING

PE-DG-314-100-M006 A 29/10/2008

617 MECH LAYOUT COMPOSITE PIPING PLAN (STG BUILDING) PE-DG-314-100-M020 A 29/10/2008

618 MECH LAYOUT COMPOSITE PIPING PLAN AT 0.0M EL (BFP BUILDING)

PE-DG-314-100-M021 A 29/10/2008

619 MECH LAYOUT COMPOSITE PIPING PLAN AT 9.5M EL (BFP BUILDING)

PE-DG-314-100-M022 A 29/10/2008

620 MECH LAYOUT COMPOSITE PIPING PLAN AT 14.0M EL (BFP BUILDING)

PE-DG-314-100-M023 A 03/12/2008

621 MECH LAYOUT COMPOSITE PIPING- PIPE RACK AREA (LOWER TIER)

PE-DG-314-100-M031 A 07/01/2009

622 MECH LAYOUT COMPOSITE PIPING- PIPE RACK AREA (UPPER TIER) PE-DG-314-100-M032 A 07/01/2009

05 December 2008 Page 24 of 49

Page 25: Master Drawing List Rev01

623 WATER SYSTEM CW/ACW SYSTEM WRITE UP PE-DC-314-165-N002 A 03/09/2008

624 WATER SYSTEM EQPT SIZING CALCULATION FOR CW ACW DMCW AND PLANT WATER SYSTEM

PE-DC-314-172-N003 A 22/10/2008

625 WATER SYSTEM CW PUMP SIZING CALCULATION PE-DC-314-165-N112 A 01/10/2008

626 WATER SYSTEM P&ID FOR CW/ACW SYSTEM PE-DG-314-165-N001 A 20/08/2008

627 WATER SYSTEM CW PUMP HOUSE GA PE-DG-314-165-N101 A 29/10/2008

628 WATER SYSTEM PLANT WATER SYSTEM WRITE UP PE-DC-314-172-N002 A 15/10/2008

629 WATER SYSTEM SUMP PUMPS WRITE UP PE-DC-314-172-N005 A 28/01/2009

630 WATER SYSTEM P&ID FOR PLANT WATER SYSTEM PE-DG-314-172-N001 A 15/10/2008

631 WATER SYSTEM DM COOLING WATER SYSTEM WRITE UP PE-DC-314-179-N002 A 03/09/2008

632 WATER SYSTEM P&ID FOR DM COOLING WATER SYSTEM PE-DG-314-179-N001 A 03/09/2008

1253 COMPRESSED AIR SYSTEM

P&ID FOR IA & SA SYSTEM WITH CONVENTIONAL HOC AIR DRYER AND ROTARY DRYER

PE-DG-314-555-A501 A 03/09/2008

1254 CW SYSTEM DESIGN MEMORANDUM FOR CW SYSTEM PE-DC-314-156A-A001 A 30/04/2008

1255 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 8.5M

PE-DG-314-100-M007 A 29/10/2008

1256 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 13.5M

PE-DG-314-100-M008 A 29/10/2008

1257 MECH LAYOUT STEAM TURBINE BUILDING – CROSS SECTION PE-DG-314-100-M009 A 29/10/2008

1258 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 0.0M

PE-DG-314-100-M006 A 29/10/2008

1294 MAIN MECH DM WATER STORAGE TANK SIZING CALCULATION PE-DC-314-100-D611 A 30/04/2008

1295 MAIN MECH RESERVE FEED WATER TANK SIZING CALCULATION PE-DC-314-100-D612 A 30/04/2008

1296 C&I CABLE BLOCK DIAGRAM PE-DG-314-145-I003 A 30/04/2008

1297 C&I UPS SINGLE LINE DIAGRAM & WRITEUP PE-DG-314-145-I004 A 30/04/2008

1299 C&I INSTRUMENT STUB DETAILS(PRESSURE/TEMPERATURE)

PE-DG-314-145-I101 A 30/04/2008

1300 CHEMICAL LAB. DESIGN MEMORANDUM FOR CHEMICAL LAB EQUIPMENT

PE-DC-314-175-A001 A 30/04/2008

1303 CHEMICAL DOSING SYSTEM

P&ID FOR AMMONIA DOSING SYSTEM (PART OF DESIGN MEMORANDUM)

PE-DG-314-154-A002 A 25/06/2008

1304 CHEMICAL DOSING SYSTEM

P&ID FOR NAOH DOSING SYSTEM (PART OF DESIGN MEMORANDUM)

PE-DG-314-154-A003 A 25/06/2008

1305 CHEMICAL DOSING SYSTEM

P&ID FOR HYDRAZINE DOSING SYSTEM (PART OF DESIGN MEMORANDUM)

PE-DC-314-154-A003 A 25/06/2008

1306 CHEMICAL DOSING SYSTEM

P&ID FOR PHOSPHATE DOSING SYSTEM (PART OF DESIGN MEMORANDUM)

PE-DC-314-154-A004 A 25/06/2008

1310 GROUNDING & LIGHTNING PROTECTION

DESIGN MEMORANDUM FOR EARTHING SYSTEM PE-DG-314-509-E001 A 02/07/2008

1322 MECH LAYOUT GENERAL ARRANGEMENT & X-SECTION OF BFP BUILDING

PE-DG-314-100-M010 A 30/04/2008

1323 MECH LAYOUT DESIGN MEMORANDUM OF THERMAL INSULATION PE-DM-314-169-M001 A 30/04/2008

1324 CABLES & CABLING

TYPICAL INSTALLATION DETAILS FOR CABLE TRAY SUPPORT SYSTEM

PE-DC-314-507-E007 A

05 December 2008 Page 25 of 49

Page 26: Master Drawing List Rev01

12/12/20081754 CIVIL DESIGN CRITERION FOR CIVIL ,STRUCTURAL AND ARCHITECTURAL WORK

PE‐DC‐314‐600‐C001 I 11TH DEC '08

1755 CIVIL ARCHITECTURAL STANDARD DETAIL ‐ GENERAL FINISHES & MISC DETAIL

PE‐DG‐314‐600‐C001 I 15TH MAY '09

1756 CIVIL STANDARD DETAILS OF CHAIN LINK FENCING AND GATES PE‐DG‐314‐600‐C002 I 17TH SEPTEMBER '09

1757 CIVIL STANDARD DETAILS OF M.S. GATE PE‐DG‐314‐600‐C003 I 17TH SEPTEMBER '09

1758 CIVIL DESIGN OF ROADS AND DRAINS PE‐DC‐314‐603‐C001 A 31 ST JAN '09

1759 CIVIL LAYOUT OF ROADS  AND DRAINS PE‐DG‐314‐603‐C001 A 31 ST JAN '09

1760 CIVIL DETAIL OF ROADS  AND DRAINS PE‐DG‐314‐603‐C002 A 31 ST JAN '09

1761 CIVIL TOPOGRAPHICAL SURVEY DRAWING PE‐DG‐314‐601‐C001 I 22 ND  MAY '08

1762 CIVIL GRADING PLAN PE‐DG‐314‐601‐C002 A 19 TH NOV '08

1763 CIVIL GEO‐TECH INVESTIGATING LAYOUT PE‐DG‐314‐602‐C001 A 17 TH JUNE '08

1764 CIVIL ARCHITECHTURAL PLAN , SECTIONS, ELEVATIONS OF BOUNDARY WALL

PE‐DG‐314‐606‐C002 SH 1 OF 2

A 18TH SEPTEMBER '08

1765 CIVIL ARCHITECHTURAL PLAN , SECTIONS, ELEVATIONS OF BOUNDARY WALL

PE‐DG‐314‐606‐C002 SH 2 OF 2

A 18TH SEPTEMBER '08

1766 CIVIL PLANT BOUNDARY WALL ‐ G.A. AND FOUNDATION DETAILS PE‐DG‐314‐606‐C001  A 18TH SEPTEMBER '08

1767 CIVIL DESIGN OF TEST PILE PE‐DC‐314‐607‐C001 A 31 ST OCT '08

1768 CIVIL REINFORCEMENT DRAWING OF TEST PILE PE‐DG‐314‐607‐C001 A 31 ST OCT '08

1769 CIVIL DESIGN OF JOB PILE PE‐DC‐314‐607‐C002 A 4TH NOV '09

1770 CIVIL REINFORCEMENT DRAWING OF JOB PILE PE‐DG‐314‐607‐C002 A 4TH NOV '09

1771 CIVIL CANTEEN BLDG ‐ ANALYSIS AND DESIGN  PE‐DC‐314‐610‐C001 I 15TH SEPT '09

1772 CIVIL CANTEEN BLDG ‐ ARCHITECTURAL PLAN AND SECTION PE‐DG‐314‐610‐C001 I 4TH SEPT '09

1773 CIVIL CANTEEN BLDG ‐ ARCHITECTURAL ELEVATIONS AND MISC DETAILS  PE‐DG‐314‐610‐C002 I 15TH SEPT '09

1774 CIVIL CANTEEN BLDG ‐ LAYOUT & RC DETAILS OF COLUMNS AND FOUNDATIONS

PE‐DG‐314‐610‐C003 I 10TH SEPT '09

1775 CIVIL CANTEEN BLDG ‐ LAYOUT & RC DETAILS OF  BEAM AND SLAB PE‐DG‐314‐610‐C004 I 25TH SEPT '09

1776 CIVIL GTG BUILDING ‐ DESIGN OF COLUMN FOUNDATIONS AND PLINTH BEAMS

PE‐DC‐314‐611‐C001 A 25TH DEC '08

1777 CIVIL GTG BUILDING ‐ DESIGN OF  FLOOR SLAB  PE‐DC‐314‐611‐C002 A 9 TH APRIL '09

1778 CIVIL GTG BUILDING ‐ DESIGN OF ROOF SLAB PE‐DC‐314‐611‐C003 A 19TH APRIL'09

1779 CIVIL GTG BUILDING‐MISC RCC DESIGN  PE‐DC‐314‐611‐C004  I 1 ST MAY '09

1780 CIVIL GCB ROOM ‐ ANALYSIS AND DESIGN  PE‐DC‐314‐611‐C005 I 9 TH MARCH '09

Page 26 of 49

Page 27: Master Drawing List Rev01

12/12/20081781 CIVIL GCB ROOM ‐ DESIGN OF FLOOR AND ROOF SLABS PE‐DC‐314‐611‐C006 I 25TH MARCH '09

1782 CIVIL GGS ROOM ‐ ANALYSIS AND DESIGN PE‐DC‐314‐611‐C007 I 14 TH APRIL '09

1783 CIVIL GTG BUILDING ‐ 3D ANALYSIS OF STEEL FRAMING MODEL PE‐DC‐314‐612‐C001 A 11TH DEC '08

1784 CIVIL GTG BUILDING ‐ DESIGN OF  CRANE GIRDER(95 T) PE‐DC‐314‐612‐C002 A 30TH DEC '08

1785 CIVIL GTG BUILDING ‐ DESIGN OF  CRANE GIRDER(50 T) PE‐DC‐314‐612‐C003 A 7TH JAN '09

1786 CIVIL GTG BUILDING ‐ DESIGN OF SUPERSTRUCTURE COLUMN & BASE PLATE,BOLT

PE‐DC‐314‐612‐C004 A 18TH FEB '09

1787 CIVIL GTG BUILDING ‐ DESIGN OF BRACINGS, WALL BEAMS,MAIN GIRDERS

PE‐DC‐314‐612‐C005 A 23RD JAN '09

1788 CIVIL GTG BUILDING ‐ DESIGN OF SECONDARY BEAMS AT MISCELLANEOUS FLOOR  LEVEL

PE‐DC‐314‐612‐C006 A 17TH FEB '08

1789 CIVIL GTG BUILDING ‐ DESIGN OF PURLIN AND ROOF TRUSS PE‐DC‐314‐612‐C007 A 5 TH JAN '08

1790 CIVIL GTG BUILDING ‐ DESIGN OF STAIRCASE PE‐DC‐314‐612‐C008 A 11TH MARCH '09

1791 CIVIL GTG BUILDING ‐ DESIGN OF MISC STEEL STRUCTURES  PE‐DC‐314‐612‐C009 A 7TH MAY '09

1792 CIVIL GTG BUILDING ‐ DESIGN OF GABLE END COLUMNS ,BASE PLATE AND BEAMS 

PE‐DC‐314‐612‐C010 A 24TH APRIL '09

1793 CIVIL GTG BUILDING ‐ DESIGN OF SIDE GIRTS AND CLADDING RUNNER DETAILS

PE‐DC‐314‐612‐C011 I 29th APRIL '09

1794 CIVIL RCC WORKS ‐ NOTES AND STANDARD DETAILS  PE‐DG‐314‐611‐C001 I 15TH FEB '09

1795 CIVIL GTG BUILDING ‐ GROUND FLOOR PLAN PE‐DG‐314‐611‐C002 A 5 TH MARCH '09

1796 CIVIL GTG BUILDING ‐ PLAN AT INTERMEDIATE FLOOR LEVEL PE‐DG‐314‐611‐C003 I 10 TH MARCH '09

1797 CIVIL GTG BUILDING ‐ ROOF PLAN & DETAILS PE‐DG‐314‐611‐C004 I 17 TH MARCH '09

1798 CIVIL GTG BUILDING ‐ NORTH & SOUTH ELEVATION PE‐DG‐314‐611‐C005 A 15 TH MAY '09

1799 CIVIL GTG BUILDING ‐ EAST & WEST ELEVATION PE‐DG‐314‐611‐C006 A 18 TH MAY '09

1800 CIVIL GTG BUILDING ‐ GENERAL SECTION,WALL SECTION AND DETAIL PE‐DG‐314‐611‐C007 A 8TH MAY '09

1801 CIVIL GTG BUILDING ‐ DOOR & WINDOW AND FINISH SCHEDULE PE‐DG‐314‐611‐C008 I 15TH MAY'09

1802 CIVIL GTG BUILDING ‐ GA OF COLUMN FOUNDATIONS (PILING) PE‐DG‐314‐611‐C009 A 25TH DEC '08

1803 CIVIL GTG BUILDING ‐ GA OF COLUMN FOUNDATIONS (PILE CAP) PE‐DG‐314‐611‐C010 A 2ND JAN '09

1804 CIVIL GTG BUILDING ‐ RC DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐611‐C011 A 10TH JAN '09

1805 CIVIL GTG BUILDING ‐ GA OF GROUND FLOOR /INTERMEDIATE FLOOR PE‐DG‐314‐611‐C012 A 24th MARCH '09

1806 CIVIL GTG BUILDING ‐ RC DETAILS OF GROUND FLOOR INTERMEDIATE FLOOR

PE‐DG‐314‐611‐C013 A 9 TH APRIL '09

1807 CIVIL GTG BUILDING ‐ GA OF  ROOF SLAB PE‐DG‐314‐611‐C014 A 11TH APRIL '09

Page 27 of 49

Page 28: Master Drawing List Rev01

12/12/20081808 CIVIL GTG BUILDING ‐ RC DETAIL OF  ROOF SLAB PE‐DG‐314‐611‐C015 A 19TH APRIL'09

1809 CIVIL GTG BUILDING  ‐ GA  & RC DETAIL OF MISC RCC WORKS PE‐DG‐314‐611‐C016 I 1ST MAY '09

1810 CIVIL GCB ROOM ‐ GENARAL ARRANGEMENT PE‐DG‐314‐611‐C019 A 9TH MARCH '09

1811 CIVIL GCB ROOM ‐ RC DETAILS  PE‐DG‐314‐611‐C020 I 25 TH MARCH '09

1812 CIVIL GGS ROOM ‐ GA OF GGS ROOM PE‐DG‐314‐611‐C023 I 14 TH APRIL '09

1813 CIVIL GGS ROOM ‐ RC DETAIL OF GGS ROOM PE‐DG‐314‐611‐C024 I 24 TH APRIL '09

1814 CIVIL STRUCTURAL STEEL WORK ‐ NOTES AND STANDARD DETAILS  PE‐DG‐314‐612‐C001 I 13TH JAN '09

1815 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT ROOF LEVEL( TRUSS & PURLIN DETAIL)

PE‐DG‐314‐612‐C002 A 5 TH  JAN '09

1816 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT CRANE GIRDER LEVEL( GANTRY GIRDER DETAIL‐ 50 T)

PE‐DG‐314‐612‐C003 A 30TH DEC '08

1817 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT CRANE GIRDER LEVEL( GANTRY GIRDER DETAIL‐ 95 T)

PE‐DG‐314‐612‐C004 A 7TH JAN '08

1818 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT MISC. PLATFORM LEVELS

PE‐DG‐314‐612‐C005 A 23RD JUNE '09

1819 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (A ROW)

PE‐DG‐314‐612‐C006 A 18TH FEB '09

1820 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (B ROW)

PE‐DG‐314‐612‐C007 A 10TH FEB '09

1821 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (C ROW)

PE‐DG‐314‐612‐C008 A 23RD JAN '09

1822 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS COLUMN SCHEDULE & BASE PLATE

PE‐DG‐314‐612‐C009 A 18TH FEB '09

1823 CIVIL GTG BUILDING ‐ STEEL FRAMING STAIR AND MISC. DETAILS PE‐DG‐314‐612‐C010 A 17 TH MARCH '09

1824 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS OF SIDE GIRTS AND CLADDING RUNNERS DETAIL

PE‐DG‐314‐612‐C011 I 29 TH APRIL '09

1825 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS OF GABLE END  PE‐DG‐314‐612‐C012 A 24TH APRIL '09

1826 CIVIL GTG BUILDING ‐ MISC STEEL WORK  PE‐DG‐314‐612‐C013 A 7TH MAY '09

1827 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF MAIN COLUMN FOUNDATIONS AND PLINTH BEAMS

PE‐DC‐314‐611‐C015 A 14TH JAN '09

1828 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  ROOF SLAB PE‐DC‐314‐611‐C016 A 9TH MARCH '09

1829 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF CEP PIT  PE‐DC‐314‐611‐C017 A 25TH MAY '09

1830 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  FLOOR SLABS AT 13.5M PE‐DC‐314‐611‐C018  A 13TH APRIL '09

1831 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  FLOOR SLABS AT 8.5M PE‐DC‐314‐611‐C019 A 25TH MARCH '09

1832 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  FLOOR SLABS IN BC BAY PE‐DC‐314‐611‐C020 A 8TH MAY '09

1833 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF AUX COLUMNS FOUNDATION

PE‐DC‐314‐611‐C021 A 24TH FEB '09

1834 CIVIL STG & CONTROL BUILDING ‐ 3D ANALYSIS OF STEEL FRAMING MODEL

PE‐DC‐314‐612‐C020 A 12TH JAN '09

Page 28 of 49

Page 29: Master Drawing List Rev01

12/12/20081835 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  CRANE GIRDER(130 T) PE‐DC‐314‐612‐C021 A 28TH JAN '09

1836 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SUPERSTRUCTURE COLUMN & BASE PLATE ,BOLTS

PE‐DC‐314‐612‐C022 A 17TH FEB '09

1837 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF BRACINGS,WALL BEAMS &  GIRDERS

PE‐DC‐314‐612‐C023 A 25TH FEB '09

1838 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF  TRUSS PE‐DC‐314‐612‐C024 A 10TH FEB '09

1839 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 4M AND 9.5M FLOOR LEVELS (BC BAY)

PE‐DC‐314‐612‐C025 A 29TH APRIL '09

1840 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 13.5M AND 19M  FLOOR LEVELS(BC BAY)

PE‐DC‐314‐612‐C026 A 13TH JUNE '09

1841 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 8.5 M AND 13.5M  FLOOR LEVELS AND ROOF (AB BAY)

PE‐DC‐314‐612‐C027 A 26TH MARCH '09

1842 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF PURLIN PE‐DC‐314‐612‐C028 A 10TH FEB '09

1843 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF STAIRCASE PE‐DC‐314‐612‐C029 I 20TH AUGUST '09

1844 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF AUX COLUMNS ,BASE PLATE & BOLTS

PE‐DC‐314‐612‐C030 A 24TH FEB '09

1845 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF GABLE END PE‐DC‐314‐612‐C031 A 16TH JUNE '09

1846 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF OIL CANAL FRAMING PE‐DC‐314‐612‐C032 A 28TH JULY '09

1847 CIVIL STG ‐ DESIGN OF FLOOR SLAB AT 0.0 M PE‐DC‐314‐612‐C033 A 23RD APRIL'09

1848 CIVIL STG & CONTROL BLDG. ‐ GROUND FLOOR PLAN (AB & BC BAY ) PE‐DG‐314‐611‐C030 A 23TH APRIL '09

1849 CIVIL STG & CONTROL BLDG. ‐ FLOOR PLAN AT 3.5 M,& MEZZANINE FLOOR PLAN

PE‐DG‐314‐611‐C031 A 25TH MARCH '09

1850 CIVIL STG & CONTROL BLDG. ‐  OPERATING FLOOR  PE‐DG‐314‐611‐C032 A 13TH APRIL '09

1851 CIVIL STG & CONTROL BLDG. ‐  ROOF PLAN  PE‐DG‐314‐611‐C033 I 9TH MARCH '09

1852 CIVIL STG & CONTROL BLDG. ‐ ELEVATIONS‐ NORTH, SOUTH PE‐DG‐314‐611‐C034 A 24TH MAY '09

1853 CIVIL STG & CONTROL BLDG. ‐ ELEVATIONS ‐ EAST, WEST PE‐DG‐314‐611‐C035 A 24TH MAY '09

1854 CIVIL STG & CONTROL BLDG. ‐ GENERAL SECTION,WALL SECTIONS AND MISC DETAIL

PE‐DG‐314‐611‐C036 I 29TH APRIL '09

1855 CIVIL STG & CONTROL BLDG. ‐ DOOR , WINDOW ,TOILET AND FINISH SCHEDULE

PE‐DG‐314‐611‐C037 A 29TH MAY '09

1856 CIVIL STG BLDG. ‐ STAIRCASE DETAIL PE‐DG‐314‐611‐C038 I 20TH AUGUST '09

1857 CIVIL STG & CONTROL BLDG. ‐ GA OF MAIN COLUMN FOUNDATION (PILING LAYOUT)

PE‐DG‐314‐611‐C040 SH 1

A 14TH JAN '09

1858 CIVIL STG & CONTROL BLDG. ‐ GA OF MAIN COLUMN FOUNDATION (PILE CAP )

PE‐DG‐314‐611‐C040 SH 2

A 5TH FEB '09

1859 CIVIL STG & CONTROL BLDG. ‐ RC DETAILS OF MAIN COLUMN FOUNDATION 

PE‐DG‐314‐611‐C041 A 10TH FEB '09

1860 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF CEP PIT PE‐DG‐314‐611‐C042 A 25TH MAY '09

1861 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF AUX COLUMN FOUNDATION

PE‐DG‐314‐611‐C043 A 24TH FEB '09

Page 29 of 49

Page 30: Master Drawing List Rev01

12/12/20081862 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR SLAB AT EL. 0.0 

PE‐DG‐314‐611‐C044 A 23RD APRIL '09

1863 CIVIL STG & CONTROL BLDG. ‐ GA & RC DETAIL OF MEZZ.  FLOOR AT EL.8.5 M.

PE‐DG‐314‐611‐C045 A 25TH MARCH '09

1864 CIVIL STG & CONTROL BLDG. ‐ GA AND  RC DETAILS OF OPERATING  FLOORS  AT EL. 13.5 M

PE‐DG‐314‐611‐C046 A 13TH APRIL '09

1865 CIVIL STG & CONTROL BLDG. ‐ GA & RC DETAILS OF OIL CANAL & OIL ROOM

PE‐DG‐314‐611‐C047 A 29TH JULY '09

1866 CIVIL STG & CONTROL BLDG. ‐ GA  AND RC DETAILS OF  ROOF(AB BAY) PE‐DG‐314‐611‐C048 A 9TH MARCH '09

1867 CIVIL MISC RCC DRAWINGS  PE‐DG‐314‐611‐C049 A 31ST AUG '09

1868 CIVIL STG & CONTROL BLDG. ‐ GA  AND RC DETAILS OF  FLOORS (BC BAY) PE‐DG‐314‐611‐C050 A 8TH MAY '09

1869 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT ROOF LVL( TRUSS & PURLIN DETAIL) 

PE‐DG‐314‐612‐C035 A 10TH FEB '09

1870 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT CRANE GIRDER LEVEL(GANTRY DETAIL)

PE‐DG‐314‐612‐C036 A 28TH JAN '09

1871 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR OPERATING FLOOR AT EL (+) 13.5

PE‐DG‐314‐612‐C037 A 26TH MARCH'09

1872 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AUXILLARY COLUMN,BASE PLATE AND BOLTS

PE‐DG‐314‐612‐C038 A 17TH FEB'09

1873 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR MISC PLATFORMS

PE‐DG‐314‐612‐C039 A 7TH JULY'09

1874 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR OIL CANAL

PE‐DG‐314‐612‐C040 A 28TH JULY '09

1875 CIVIL STG & CONTROL BLDG. ‐  DETAILS OF BRACINGS AND  WALL BEAMS A ROW,MAIN COLUMN AND BASE PLATE

PE‐DG‐314‐612‐C041 A 17TH FEB '09

1876 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AND  DETAILS OF BRACINGS AND  WALL BEAMS B ROW AND GIRDERS

PE‐DG‐314‐612‐C042 A 27TH FEB '09

1877 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AND  DETAILS OF BRACINGS AND  WALL BEAMS C ROW AND GIRDERS

PE‐DG‐314‐612‐C043 A 20TH MARCH '09

1878 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF MEZZ. FLOOR AT EL (+) 8.5M 

PE‐DG‐314‐612‐C044 A 20TH APRIL '09

1879 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF MAIN BEAMS

PE‐DG‐314‐612‐C045 A 9TH APRIL '09

1880 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 4M(BC BAY)

PE‐DG‐314‐612‐C046 A 29TH APRIL '09

1881 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 8.5M(BC BAY)

PE‐DG‐314‐612‐C047 A 29TH MAY '09

1882 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 13.5M(BC BAY)

PE‐DG‐314‐612‐C048 A 13TH JUNE '09

1883 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 19M(BC BAY)

PE‐DG‐314‐612‐C049 A 23RD JUNE '09

1884 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR GABLE END 

PE‐DG‐314‐612‐C050 A 16TH JUNE '09

1885 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ‐ MISC. DETAILS OF CLADDING RUNNERS ETC

PE‐DG‐314‐612‐C051 A 12TH AUGUST '09

1886 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING DETAILS OF STAIRCASE  PE‐DG‐314‐612‐C052 I 20TH AUGUST '09

1887 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING DETAILS OF WIND GIRDER PE‐DG‐314‐612‐C053 A 20TH JUNE '09

1888 CIVIL STG & CONTROL BLDG. ‐ MISC STEEL FRAMING DETAILS  PE‐DG‐314‐612‐C054 A 10TH SEPTEMBER '09

Page 30 of 49

Page 31: Master Drawing List Rev01

12/12/20081889 CIVIL STATIC ANALYSIS OF STG FOUNDATION PE‐DC‐314‐613‐C001 A 24TH JAN '09

1890 CIVIL DYNAMIC ANALYSIS OF STG FOUNDATION PE‐DC‐314‐613‐C002 A 18TH FEB '09

1891 CIVIL DESIGN OF RAFT  FOUNDATION PE‐DC‐314‐613‐C003 A 31ST MARCH '09

1892 CIVIL DESIGN OF COLUMNS AND BEAMS PE‐DC‐314‐613‐C004 A 24TH MARCH '09

1893 CIVIL DESIGN OF TOP DECK PE‐DC‐314‐613‐C005 A 7TH MAY '09

1894 CIVIL DESIGN OF PLATFORMS BEAMS PE‐DC‐314‐613‐C006 A 9TH JULY '09

1895 CIVIL GA PLAN & SECTION (PILING LAYOUT) PE‐DG‐314‐613‐C001 A 24TH JAN '09

1896 CIVIL GA AT RAFT LEVEL PE‐DG‐314‐613‐C002 A 4TH MARCH '09

1897 CIVIL RC DETAILS OF RAFT PE‐DG‐314‐613‐C003 A 17TH MARCH '09

1898 CIVIL RC DETAILS OF COLUMN PE‐DG‐314‐613‐C004 A 31ST MARCH '09

1899 CIVIL RC DETAILS OF BEAMS PE‐DG‐314‐613‐C005 A 9TH APRIL '09

1900 CIVIL STRUCTURAL DETAILS OF PLATFORMS PE‐DG‐314‐613‐C006 A 9TH JULY '09

1901 CIVIL GA OF TOP DECK PE‐DG‐314‐613‐C007 A 7TH MAY '09

1902 CIVIL RC DETAIL OF TOP DECK SH‐1 PE‐DG‐314‐613‐C008 A 15TH MAY '09

1903 CIVIL RC DETAIL OF TOP DECK SH‐2 PE‐DG‐314‐613‐C009 A 26TH MAY '09

1904 CIVIL LIST & DETAIL OF EMBEDMENTS PE‐DG‐314‐613‐C010 A 26TH AUGUST '09

1905 CIVIL BFP BLDG. ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL PE‐DC‐314‐614‐C001 A 4TH FEB '09

1906 CIVIL BFP BLDG. ‐ DESIGN OF CRANE GIRDER PE‐DC‐314‐614‐C002 I 17TH FEB '09

1907 CIVIL BFP BLDG. ‐ DESIGN OF SUPERSTRUCTURE COLUMN & MAIN BEAMS,BASE PLATE& BOLTS 

PE‐DC‐314‐614‐C003 A 17TH JAN '09

1908 CIVIL BFP BLDG. ‐ DESIGN OF BRACINGS AND WALL BEAMS PE‐DC‐314‐614‐C004 A 26TH FEB '09

1909 CIVIL BFP BLDG. ‐ DESIGN OF SECONDARY BEAMS AT MISCELLANEOUS FLOOR LEVELS AND ROOF

PE‐DC‐314‐614‐C005 A 30TH MARCH '09

1910 CIVIL BFP BLDG. ‐ DESIGN OF STAIRCASE PE‐DC‐314‐614‐C006 I 17TH JAN '09

1911 CIVIL BFP BLDG. ‐ DESIGN OF COLUMN FOUNDATIONS AND PLINTH BEAMS

PE‐DC‐314‐614‐C007 A 26TH JAN '09

1912 CIVIL BFP BLDG. ‐ DESIGN OF  SLABS PE‐DC‐314‐614‐C008 I 20TH JUNE '09

1913 CIVIL BFP BLDG. ‐ DESIGN OF HP BFP FOUNDATION PE‐DC‐314‐614‐C009 A 31ST MAY '09

1914 CIVIL BFP BLDG. ‐ DESIGN OF LP BFP FOUNDATION AND MISC. WORKS PE‐DC‐314‐614‐C010 A 5TH JUNE '09

1915 CIVIL BFP BLDG. ‐  PLANS  PE‐DG‐314‐614‐C001 A 17TH FEB '09

Page 31 of 49

Page 32: Master Drawing List Rev01

12/12/20081916 CIVIL BFP BLDG. ‐  SECTIONS PE‐DG‐314‐614‐C002 A 25TH MAY '09

1917 CIVIL BFP BLDG. ‐ ELEVATION ALONG WITH NORTH,SOUTH ,WEST & EAST VIEW 

PE‐DG‐314‐614‐C003 A 12TH MAY '09

1918 CIVIL BFP BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT  ROOF LEVEL  PE‐DG‐314‐614‐C005 A 30TH MARCH '09

1919 CIVIL BFP BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR FLOOR   PE‐DG‐314‐614‐C006 A 20TH MARCH '09

1920 CIVIL BFP BLDG. ‐ STEEL FRAMING ELEVATION AND DETAILS OF BRACING & WALL BEAM 

PE‐DG‐314‐614‐C007 A 26TH FEB '09

1921 CIVIL BFP BLDG. ‐ STEEL FRAMING DETAILS ‐ COLUMN SCHEDULE,BASE PLATE AND BOLTS 

PE‐DG‐314‐614‐C008 A 17TH JAN '09

1922 CIVIL BFP BLDG. ‐ STEEL FRAMING DETAILS OF STAIR PE‐DG‐314‐614‐C009 I 17TH JAN '09

1923 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF FOUNDATIONS PE‐DG‐314‐614‐C010 A 26TH JAN '09

1924 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR SLAB PE‐DG‐314‐614‐C011 I 25TH JUNE'09

1925 CIVIL BFP BLDG. ‐ GA OF HPBFP FOUNDATION PE‐DG‐314‐614‐C012 A 12TH MAY '09

1926 CIVIL BFP BLDG. ‐ RC DETAILS OF HPBFP FOUNDATION PE‐DG‐314‐614‐C013 A 31ST MAY '09

1927 CIVIL BFP BLDG. ‐ GA OF LPBFP FOUNDATION PE‐DG‐314‐614‐C014 A 28TH MAY '09

1928 CIVIL BFP BLDG. ‐ RC DETAILS OF LPBFP FOUNDATION PE‐DG‐314‐614‐C015 A 5TH JUNE '09

1929 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF FLOORS  PE‐DG‐314‐614‐C016 I 20TH JUNE '09

1930 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF ROOF LVL AND CRANE GIRDER PE‐DG‐314‐614‐C017 I 15TH JULY '09

1931 CIVIL HRSG AREA ‐ ANALYSIS AND DESIGN OF HRSG FOUNDATION  PE‐DC‐314‐617‐C001  A 26 TH NOV '08

1932 CIVIL HRSG AREA ‐ DESIGN OF STACK FOUNDATION PE‐DC‐314‐617‐C002 A 19 TH DEC '08

1933 CIVIL HRSG AREA ‐ DESIGN OF BYPASS STACK FOUNDATION PE‐DC‐314‐617‐C003 A 15TH JULY '09

1934 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ DESIGN OF GAS CONDITIONING SKID  PE‐DC‐314‐617‐C004 I 23RD JUNE '09

1935 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ DESIGN OF MISCELLENEOUS FOUNDATIONS

PE‐DC‐314‐617‐C005 I 15TH JULY '09

1936 CIVIL HRSG AREA ‐ GA OF HRSG FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C001 A 26 TH NOV '08

1937 CIVIL HRSG AREA ‐ RC DETAILS OF HRSG FOUNDATION  PE‐DG‐314‐617‐C002 A 16 TH DEC '08

1938 CIVIL HRSG AREA ‐ GA OF STACK FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C003 A 19 TH DEC '08

1939 CIVIL HRSG AREA ‐ RC DETAILS OF STACK FOUNDATION  PE‐DG‐314‐617‐C004 A 29 TH DEC '08

1940 CIVIL HRSG AREA ‐ GA OF BYPASS STACK FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C005 A 15TH JULY '09

1941 CIVIL HRSG AREA ‐ RC DETAILS OF BYPASS  STACK FOUNDATION  PE‐DG‐314‐617‐C006 A 23RD JULY '09

1942 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ GAAND RC DETAILS OF GAS CONDITIONING SKID 

PE‐DG‐314‐617‐C007 I 23RD JUNE '09

Page 32 of 49

Page 33: Master Drawing List Rev01

12/12/20081943 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ GA OF MISCELLENEOUS FOUNDATIONS

PE‐DG‐314‐617‐C008 I 15TH JULY '09

1944 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ R.C DETAILS  OF MISCELLENEOUS FOUNDATIONS

PE‐DG‐314‐617‐C009 I 23RD JULY '09

1945 CIVIL TRANSFORMER YARD ‐DESIGN OF GENERATOR TRANSFORMER FOUNDATION & FB WALL ‐GTG AREA

PE‐DC‐314‐622‐C001 A 17TH FEB '09

1946 CIVIL TRANSFORMER YARD ‐ DESIGN OF GENERATOR TRANSF. FDN AND FIRE BARRIER WALL ‐ STG AREA

PE‐DC‐314‐622‐C002 A 19TH MARCH '09

1947 CIVIL TRANSFORMER YARD ‐ DESIGN OF UNIT AUX. TRANSFORMER FOUNDATION AND FIRE BARRIER WALL

PE‐DC‐314‐622‐C003 A 9TH APRIL '09

1948 CIVIL TRANSFORMER YARD ‐ DESIGN OF AUX. SERVICE TRANSFORMER FOUNDATION

PE‐DC‐314‐622‐C004 A 23RD JUNE '09

1949 CIVIL TRANSFORMER YARD ‐ DESIGN OF TRENCHES AND BUS DUCT FOUNDATION 

PE‐DC‐314‐622‐C005 I 23RD JULY '09

1950 CIVIL TRANSFORMER YARD ‐ DESIGN OF RETENTION OIL PIT PE‐DC‐314‐622‐C006 I 17TH SEPTEMBER '09

1951 CIVIL TRANSFORMER YARD ‐ GA OF GENERATOR TRANSFORMER FOUNDATION ‐GTG AREA

PE‐DG‐314‐622‐C001 A 17TH FEB '09

1952 CIVIL TRANSFORMER YARD ‐  RC DETAIL OF GENERATOR TRANSFORMER FOUNDATION ‐GTG AREA

PE‐DG‐314‐622‐C002 A 26TH FEB '09

1953 CIVIL TRANSFORMER YARD ‐ GA  OF GENERATOR TRANSF. FDN ‐ STG AREA

PE‐DG‐314‐622‐C003 A 19TH MARCH '09

1954 CIVIL TRANSFORMER YARD ‐  RC DETAIL OF GENERATOR TRANSF. FDN ‐ STG AREA

PE‐DG‐314‐622‐C004 A 26TH MARCH '09

1955 CIVIL TRANSFORMER YARD ‐ GA  OF UNIT AUX. TRANSFORMER FOUNDATION

PE‐DG‐314‐622‐C005 A 9TH APRIL '09

1956 CIVIL TRANSFORMER YARD ‐ RC DETAIL  OF UNIT AUX. TRANSFORMER FOUNDATION

PE‐DG‐314‐622‐C006 A 22ND APRIL '09

1957 CIVIL TRANSFORMER YARD ‐ GA  OF AUX. SERVICE TRANSFORMER FOUNDATION

PE‐DG‐314‐622‐C007 A 23RD JUNE '09

1958 CIVIL TRANSFORMER YARD ‐  RC DETAIL OF AUX. SERVICE TRANSFORMER FOUNDATION

PE‐DG‐314‐622‐C008 A 29TH JUNE '09

1959 CIVIL TRANSFORMER YARD ‐ LAYOUT OF TRANSFORMER YARD & TRENCHES ‐ GTG AREA

PE‐DG‐314‐622‐C009 I 23RD JULY '09

1960 CIVIL TRANSFORMER YARD ‐ LAYOUT OF TRANSFORMER YARD & TRENCHES ‐ STG AREA

PE‐DG‐314‐622‐C010 I 6TH AUGUST '09

1961 CIVIL TRANSFORMER YARD ‐ RC DETAILS OF TRANSFORMER YARD & TRENCHES ‐ GTG AREA

PE‐DG‐314‐622‐C011 I 25TH AUGUST '09

1962 CIVIL TRANSFORMER YARD ‐ RC DETAILS OF TRANSFORMER YARD & TRENCHES ‐ STG AREA

PE‐DG‐314‐622‐C012 I 4TH SEPTEMBER '09

1963 CIVIL TRANSFORMER YARD ‐ GA  & RC DETAIL OF RETENTION OIL PIT PE‐DG‐314‐622‐C013 I 17TH SEPTEMBER '09

1964 CIVIL TRANSFORMER YARD ‐ SECTIONS AND  DETAILS OF TRNCHES PE‐DG‐314‐622‐C014 I 24TH SEPTEMBER '09

1965 CIVIL CLARIFIED WATER PH ‐ 3D ANALYSIS OF  FRAMING MODEL PE‐DC‐314‐636‐C001 A 10TH MARCH '09

1966 CIVIL CLARIFIED WATER PH ‐ DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐636‐C002 I 18TH MARCH '09

1967 CIVIL CLARIFIED WATER PH ‐ DESIGN OF COLUMS AND BEAMS PE‐DC‐314‐636‐C003 A 24TH JUNE '09

1968 CIVIL CLARIFIED WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐636‐C004 I 24TH APRIL '09

1969 CIVIL CLARIFIED WATER PH ‐ ARCHITECTURAL OPERATING FLOOR & ROOF PLAN

PE‐DG‐314‐636‐C001 A 18TH MARCH '09

Page 33 of 49

Page 34: Master Drawing List Rev01

12/12/20081970 CIVIL CLARIFIED WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS

PE‐DG‐314‐636‐C002 A 26TH MARCH '09

1971 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAILS OF RESERVOIR  PE‐DG‐314‐636‐C003 A 10TH MARCH '09

1972 CIVIL CLARIFIED WATER PH ‐ GA  DETAILS OF SUMP WALL, RAFT & COLUMN FDNS 

PE‐DG‐314‐636‐C005(SH 1)

I 18TH MARCH '09

1973 CIVIL CLARIFIED WATER PH ‐ RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS 

PE‐DG‐314‐636‐C005(SH 2)

I 26TH MARCH '09

1974 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAILS OF  OP. FLOOR SLAB PE‐DG‐314‐636‐C007 I 24TH APRIL '09

1975 CIVIL CLARIFIED WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL 

PE‐DG‐314‐636‐C008 A 24TH JUNE '09

1976 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAIL OF PUMP HOUSE ROOF PE‐DG‐314‐636‐C010 I 7TH JULY '09

1977 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI 

PE‐DG‐314‐636‐C011 A 24TH JULY '09

1978 CIVIL CLARIFIED WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐636‐C012 I 24TH JULY '09

1979 CIVIL  CHLORINATION PLANT BLDG. ‐  ANALYSIS AND DESIGN PE‐DC‐314‐637‐C001 I 4TH JUNE '09

1980 CIVIL  CHLORINATION PLANT BLDG. ‐ DESIGN OF  COLUMN FOUNDATION PE‐DC‐314‐637‐C002 I 10TH JUNE '09

1981 CIVIL  CHLORINATION PLANT BLDG ‐ DESIGN OF COLUMNS, BEAMS AND ROOF SLAB

PE‐DC‐314‐637‐C003 I 30TH JUNE '09

1982 CIVIL  CHLORINATION PLANT BLDG ‐ DESIGN OF MISCELLANEOUS EQUIPMENT FOUNDATIONS

PE‐DC‐314‐637‐C004 I 7TH AUGUST'09

1983 CIVIL  CHLORINATION PLANT BLDG. ‐ DESIGN OF  GROUND FLOOR SLAB PE‐DC‐314‐637‐C005 I 7TH AUGUST'09

1984 CIVIL  CHLORINATION PLANT BLDG.‐  PLAN  PE‐DG‐314‐637‐C001 I 10TH JUNE '09

1985 CIVIL  CHLORINATION PLANT BLDG. ‐ SECTION AND MISC DETAILS PE‐DG‐314‐637‐C002 I 30TH JUNE '09

1986 CIVIL  CHLORINATION PLANT BLDG. ‐ ELEVATIONS  PE‐DG‐314‐637‐C003 I 8TH JULY '09

1987 CIVIL  CHLORINATION PLANT BLDG. ‐ GA AND RC DETAIL OF COLUMN FOUNDATIONS

PE‐DG‐314‐637‐C007 I 10TH JUNE '09

1988 CIVIL  CHLORINATION PLANT BLDG ‐ DETAILS OF COLUMN ,BEAMS AND ROOF SLAB 

PE‐DG‐314‐637‐C008 I 30TH JUNE '09

1989 CIVIL  CHLORINATION PLANT BLDG ‐ GA AND RC DETAIL OF GROUND FLOOR

PE‐DG‐314‐637‐C009 I 7TH AUGUST'09

1990 CIVIL  CHLORINATION PLANT BLDG ‐ GA AND RC DETAIL OF  MISC. EQUIPMENT FOUNDATION

PE‐DG‐314‐637‐C013 I 7TH AUGUST'09

1991 CIVIL FACILITY BLDG. ‐  PLANS  PE‐DG‐314‐640‐C001 A 30TH MARCH '09

1992 CIVIL FACILITY BLDG. ‐ ELEVATIONS ‐ NORTH, SOUTH PE‐DG‐314‐640‐C002 A 21ST APRIL '09

1993 CIVIL FACILITY BLDG. ‐ ELEVATIONS ‐ EAST, WEST PE‐DG‐314‐640‐C004 A 21ST APRIL '09

1994 CIVIL FACILITY BLDG. ‐ SECTIONS & DETAILS PE‐DG‐314‐640‐C004 A 21ST APRIL '09

1995 CIVIL FACILITY BLDG. ‐ DETAILS OF FALSE CEILING & MISC. DETAILS PE‐DG‐314‐640‐C005 A 19ST APRIL '09

1996 CIVIL FACILITY BLDG. ‐ MISC DETAILS PE‐DG‐314‐640‐C006 I 27TH APRIL '09

Page 34 of 49

Page 35: Master Drawing List Rev01

12/12/20081997 CIVIL FACILITY BLDG. ‐ 3D ANALYSIS AND DESIGN PE‐DC‐314‐640‐C001 A 19TH MARCH '09

1998 CIVIL FACILITY BLDG. ‐ DESIGN OF SUPERSTRUCTURE COLUMNS AND BEAMS

PE‐DC‐314‐640‐C002 A 19TH MARCH '09

1999 CIVIL FACILITY BLDG. ‐ DESIGN OF FOUNDATION PE‐DC‐314‐640‐C003 A 19TH MARCH '09

2000 CIVIL FACILITY BLDG. ‐ DESIGN OF FLOOR & ROOF SLAB PE‐DC‐314‐640‐C004 I 9TH APRIL '09

2001 CIVIL FACILITY BLDG. ‐ DESIGN OF STAIRCASE PE‐DC‐314‐640‐C005 I 19TH MAY '09

2002 CIVIL FACILITY BLDG. ‐ GA & RC DETAILS OF ROOF  PE‐DG‐314‐640‐C010 I 22ND APRIL '09

2003 CIVIL FACILITY BLDG. ‐ LAYOUT AND RC DETAIL OF FOUNDATIONS  PE‐DG‐314‐640‐C012 A 19TH MARCH '09

2004 CIVIL FACILITY BLDG. ‐ LAYOUT AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐640‐C013 I 22ND APRIL'09

2005 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 3.5 M PE‐DG‐314‐640‐C014 A 9TH APRIL'09

2006 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 9.0 M PE‐DG‐314‐640‐C015 A 16TH APRIL'09

2007 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 13.5 M PE‐DG‐314‐640‐C016 A 6TH MAY'09

2008 CIVIL FACILITY BLDG. ‐ G.A AND R.C  DETAIL OF STAIRS PE‐DG‐314‐640‐C017 I 19TH MAY '09

2009 CIVIL O & M BLDG. ‐ 3D ANALYSIS OF FRAME MODEL PE‐DC‐314‐608‐C001 A 9TH APRIL '09

2010 CIVIL O & M BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS

PE‐DC‐314‐608‐C002 A 29TH APRIL '09

2011 CIVIL O & M BLDG. ‐ DESIGN OF MISC FOUNDATION PE‐DC‐314‐608‐C003 I 29TH JULY '09

2012 CIVIL O & M BLDG. ‐ DESIGN OF ROOF PE‐DC‐314‐608‐C004 I 28TH MAY '09

2013 CIVIL O & M BLDG. ‐ DESIGN OF GROUND FLOOR PE‐DC‐314‐608‐C005 A 29TH JULY '09

2014 CIVIL O & M BLDG. ‐ DESIGN OF  INTERMEDIATE FLOORS PE‐DC‐314‐608‐C006 A 10TH JUNE '09

2015 CIVIL O & M BLDG. ‐ PLAN & SECTION  PE‐DG‐314‐608‐C001 A 13TH MAY '09

2016 CIVIL O & M BLDG. ‐  ELEVATION (NORTH,SOUTH,EAST & WEST) PE‐DG‐314‐608‐C002 A 30th MAY '09

2017 CIVIL O & M BLDG. ‐ MISC DETAILS PE‐DG‐314‐608‐C003 I 29TH JULY '09

2018 CIVIL O & M BLDG. ‐ GA AND RC  DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐608‐C005 A 29TH APRIL '09

2019 CIVIL O & M BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐608‐C006 A 13TH MAY '09

2020 CIVIL O & M BLDG. ‐ GA & RC DETAILS OF  ROOF PE‐DG‐314‐608‐C007 I 28TH MAY '09

2021 CIVIL O & M BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐608‐C008 A 29TH JULY '09

2022 CIVIL O & M BLDG. ‐ GA AND RC DETAIL OF INTERMEDIATE FLOORS PE‐DG‐314‐608‐C009 A 10TH JUNE '09

2023 CIVIL ADMIN BLDG. ‐  ANALYSIS AND DESIGN PE‐DC‐314‐641‐C001 A 11TH AUGUST '09

Page 35 of 49

Page 36: Master Drawing List Rev01

12/12/20082024 CIVIL ADMIN BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS

PE‐DC‐314‐641‐C002 A 27TH AUGUST '09

2025 CIVIL ADMIN BLDG. ‐ PLANS & SECTIONS PE‐DG‐314‐641‐C001 A 27TH AUGUST '09

2026 CIVIL ADMIN BLDG. ‐  ELEVATION (NORTH,SOUTH,EAST & WEST) PE‐DG‐314‐641‐C002 A 8TH SEPTEMBER '09

2027 CIVIL ADMIN BLDG. ‐ MISC DETAILS PE‐DG‐314‐641‐C003 I 29TH SEPTEMBER '09

2028 CIVIL ADMIN BLDG. ‐ GA AND RC  DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐641‐C005 A 27TH AUGUST '09

2029 CIVIL ADMIN BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐641‐C006 A 8TH SEPTEMBER '09

2030 CIVIL ADMIN BLDG. ‐ GA & RC DETAILS OF  ROOF PE‐DG‐314‐641‐C007 I 16TH SEPTEMBER '09

2031 CIVIL ADMIN BLDG. ‐ LAYOUT AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐641‐C008 A 29TH SEPTEMBER '09

2032 CIVIL CAR PARK. ‐ PLAN , SECTION AND ELEVATION (NORTH,SOUTH,EAST & WEST)

PE‐DC‐314‐641‐C010 A 6TH NOVEMBER '09

2033 CIVIL CAR PARK. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS

PE‐DC‐314‐641‐C011 I 16TH NOVEMBER '09

2034 CIVIL CAR PARK.‐ G.A AND RC DETAIL OF COLUMNS ,BEAMS AND SLABS AND FOUNDATIONS

PE‐DG‐314‐641‐C012 I 16TH NOVEMBER '09

2035 CIVIL GATE HOUSE   ‐ ANALYSIS AND DESIGN PE‐DC‐314‐650‐C001 I 27TH OCTOBER '09

2036 CIVIL ARCH GATE HOUSE. ‐ PLAN , SECTION ,ELEVATIONS AND MISC DETAILS

PE‐DG‐314‐650‐C001 I 27TH OCTOBER '09

2037 CIVIL GATE HOUSE ‐ GA AND RC  DETAILS  PE‐DG‐314‐650‐C002 I 27TH OCTOBER '09

2038 CIVIL DG BLDG. ‐  ANALYSIS AND DESIGN PE‐DC‐314‐642‐C001 I 9TH JUNE '09

2039 CIVIL DG BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS

PE‐DC‐314‐642‐C002 I 20TH JUNE '09

2040 CIVIL DG BLDG. ‐ DESIGN OF MISC FOUNDATION PE‐DC‐314‐642‐C003 I 27TH JULY '09

2041 CIVIL DG BLDG. ‐ PLAN & SECTION  PE‐DG‐314‐642‐C001 I 17TH JULY '09

2042 CIVIL DG BLDG. ‐ELEVATIONS  AND  MISC DETAILS PE‐DG‐314‐642‐C002 I 27TH JULY '09

2043 CIVIL DG BLDG. ‐ GA AND RC DETAILS OF GROUND FLOOR AND MISC FOUNDATION DETAIL

PE‐DG‐314‐642‐C003 I 27TH JULY '09

2044 CIVIL DG BLDG. ‐ GA AND RC  DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐642‐C004 I 20TH JUNE '09

2045 CIVIL DG BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐642‐C005 I 7TH JULY '09

2046 CIVIL DG BLDG. ‐ GA & RC DETAILS OF  ROOF PE‐DG‐314‐642‐C006 I 17TH JULY '09

2047 CIVIL DESIGN OF GAS TURBINE FOUNDATION PE‐DC‐314‐643‐C001 A 9TH JAN '09

2048 CIVIL GA OF GAS TURBINE FOUNDATION (PILING LAYOUT) PE‐DG‐314‐643‐C001 A 9TH JAN '09

2049 CIVIL GA OF GAS TURBINE FOUNDATION PE‐DG‐314‐643‐C002 A 20TH JAN '09

2050 CIVIL RC DETAILS OF GAS TURBINE FOUNDATION ‐SHT 1 PE‐DG‐314‐643‐C003 A 4TH FEB '09

Page 36 of 49

Page 37: Master Drawing List Rev01

12/12/20082051 CIVIL RC DETAILS OF GAS TURBINE FOUNDATION ‐SHT 2 PE‐DG‐314‐643‐C004 A 17TH FEB '09

2052 CIVIL AIR COMPRESSOR BUILDING ‐ ANALYSIS AND DESIGN PE‐DC‐314‐647‐C001 I 18TH JULY '09

2053 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS,BEAMS AND SLAB 

PE‐DC‐314‐647‐C002 I 26th AUGUST '09

2054 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF MISC FOUNDATION OR RCC STR

PE‐DC‐314‐647‐C003 I 26TH AUGUST '09

2055 CIVIL AIR COMPRESSOR BUILDING‐ DESIGN OF ROOF  PE‐DC‐314‐647‐C004 I 12TH AUGUST '09

2056 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF GROUND FLOOR SLAB PE‐DC‐314‐647‐C005 I 26TH AUGUST '09

2057 CIVIL AIR COMPRESSOR BUILDING ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS

PE‐DG‐314‐647‐C001 I 20TH AUGUST '09

2058 CIVIL AIR COMPRESSOR BUILDING ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS

PE‐DG‐314‐647‐C002 I 26TH AUGUST '09

2059 CIVIL AIR COMPRESSOR BUILDING ‐ GA  OF BEAMS AND ROOF SLAB PE‐DG‐314‐647‐C003 I 24TH JULY '09

2060 CIVIL AIR COMPRESSOR BUILDING‐   RC DETAIL OF BEAMS AND ROOF SLAB

PE‐DG‐314‐647‐C004 I 12TH AUGUST '09

2061 CIVIL AIR COMPRESSOR BUILDING‐ G.A AND RC DETAIL OF MISC FOUNDATION AND GROUND FLOOR SLAB

PE‐DG‐314‐647‐C005 I 26TH AUGUST '09

2062 CIVIL AIR WASHER BIULDING  ‐ ANALYSIS AND DESIGN PE‐DC‐314‐648‐C001 I 3RD FEB '09

2063 CIVIL AIR WASHER BIULDING  ‐ DESIGN OF MISC FOUNDATION OR RCC STR

PE‐DC‐314‐648‐C002 I 12 TH MARCH '09

2064 CIVIL AIR WASHER BIULDING  ‐ DESIGN OF ROOF /FLOOR SLAB PE‐DC‐314‐648‐C004 I 12 TH MARCH '09

2065 CIVIL AIR WASHER BUILDING GTG ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS

PE‐DG‐314‐647‐C001 I 23RD JAN '09

2066 CIVIL AIR WASHER  BUILDING GTG ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS

PE‐DG‐314‐647‐C002 I 3RD FEB '09

2067 CIVIL AIR WASHER BUILDING  GTG‐  G.A AND RC DETAIL OF BEAMS AND ROOF SLAB

PE‐DG‐314‐647‐C003 I 27TH FEB '09

2068 CIVIL AIR WASHER BUILDING STG ‐ G.A AND RC DETAIL OF MISC FOUNDATION/STR 

PE‐DG‐314‐647‐C004 I 12 TH MARCH '09

2069 CIVIL AIR WASHER BUILDING STG ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS

PE‐DG‐314‐647‐C005 I 23RD JAN '09

2070 CIVIL AIR WASHER  BUILDING STG ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS

PE‐DG‐314‐647‐C006 I 3RD FEB '09

2071 CIVIL AIR WASHER BUILDING  STG‐  G.A AND RC DETAIL OF BEAMS AND ROOF SLAB

PE‐DG‐314‐647‐C008 I 27TH FEB '09

2072 CIVIL AIR WASHER BUILDING STG ‐ G.A AND RC DETAIL OF MISC FOUNDATION/STR 

PE‐DG‐314‐647‐C009 I 12 TH MARCH '09

2073 CIVIL CW PUMP HOUSE ‐ ANALYSIS AND DESIGN  PE‐DC‐314‐653‐C001 A 21ST JAN '09

2074 CIVIL CW PUMP HOUSE ‐ DESIGN OF CRANE GIRDER PE‐DC‐314‐653‐C002 I 10TH FEB '09

2075 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMNS AND BEAMS OF PUMP HOUSE

PE‐DC‐314‐653‐C003 A 19TH FEB '09

2076 CIVIL CW PUMP HOUSE ‐ DESIGN OF  MISC FLOORS AND ROOF SLABS OF PUMP HOUSE 

PE‐DC‐314‐653‐C004 A 15 TH MAY '09

2077 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMN FOUNDATION ,COLUMN , BEAM AND SLAB OF MAINTANANCE BAY 

PE‐DC‐314‐653‐C005 A 16TH APRIL '09

Page 37 of 49

Page 38: Master Drawing List Rev01

12/12/20082078 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMN FOUNDATION ,COLUMN , BEAM AND SLAB OF ELECTRICAL ANNEXI

PE‐DC‐314‐653‐C006 A 26TH MARCH '09

2079 CIVIL CW PUMP HOUSE ‐ DESIGN OF OPERATING FLOOR SLAB PE‐DC‐314‐653‐C007 A 5TH JUNE '09

2080 CIVIL CW PUMP HOUSE ‐ DESIGN OF THRUST BLOCK AND MANHOLES PE‐DC‐314‐653‐C008 A 7TH JULY '09

2081 CIVIL CW PUMP HOUSE ‐ DESIGN OF SUMP WALL AND RAFT PE‐DC‐314‐653‐C009 A 23 RD JAN '09

2082 CIVIL CW PUMP HOUSE ‐ DESIGN OF FOREBAY SLAB AND WALL PE‐DC‐314‐653‐C010 A 28TH MAY '09

2083 CIVIL CW PUMP HOUSE ‐ PLAN AND SECTIONS PE‐DG‐314‐653‐C001 A 19TH FEB '09

2084 CIVIL CW PUMP HOUSE ‐ ELEVATIONS  PE‐DG‐314‐653‐C002 A 19TH MARCH '09

2085 CIVIL CW PUMP HOUSE ‐ MISC DETAILS PE‐DG‐314‐653‐C003 I 27TH JULY '09

2086 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAILS OF SUMP RAFT PE‐DG‐314‐653‐C004 A 23 RD JAN '09

2087 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF  WALLS PE‐DG‐314‐653‐C005 A 19TH MARCH '09

2088 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMNS ,BEAMS ,MISC FLOOR SLAB OF PUMP HOUSE

PE‐DG‐314‐653‐C006 A 19TH FEB '09

2089 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF BEAMS AND MISC FLOOR SLABS OF MAINT BAY

PE‐DG‐314‐653‐C007 A 16TH APRIL '09

2090 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMN FOUNDATION & COLUMN OF MAINT BAY

PE‐DG‐314‐653‐C008 A 16TH APRIL '09

2091 CIVIL CW PUMP HOUSE ‐ DETAILS OF GATES AND SCREENS PE‐DG‐314‐653‐C009 I 27TH JULY '09

2092 CIVIL CW PUMP HOUSE ‐ C.W. PIPE DET. OF THRUST BLOCK AND MANHOLES

PE‐DG‐314‐653‐C010 A 7TH JULY '09

2093 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF BEAMS AND MISC FLOOR SLABS OF ELECTRICAL BAY

PE‐DG‐314‐653‐C011 A 16TH APRIL '09

2094 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMN FOUNDATION & COLUMN OF ELECTRICAL BAY

PE‐DG‐314‐653‐C012 A 26TH MARCH '09

2095 CIVIL CW PUMP HOUSE ‐ GA & RC DETAIL OF OPERATING FLOOR SLAB OF PUMP HOUSE

PE‐DG‐314‐653‐C013 A 5TH JUNE '09

2096 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF ROOF SLAB OF PUMP HOUSE 

PE‐DG‐314‐653‐C014 I 15TH MAY '09

2097 CIVIL CW PUMP HOUSE ‐ GA & RC DETAILS OF FOREBAY PE‐DG‐314‐653‐C015 A 28TH MAY '09

2098 CIVIL CW PUMP HOUSE ‐ DETAILS OF GANTRY GIRDER PE‐DG‐314‐653‐C016 I 10TH FEB '09

2099 CIVIL CW PUMP HOUSE ‐ MISC. DETAIL FOR RCC ITEMS IN CW SUMP & FOREBAY

PE‐DG‐314‐653‐C017 I 27TH JULY '09

2100 CIVIL RAW  WATER PH ‐DESIGN OF RAW WATER PUMP HOUSE PE‐DC‐314‐654‐C001 A 9TH JUNE '09

2101 CIVIL RAW WATER PH ‐ DESIGN OF SUMP RAFT AND WALL  PE‐DC‐314‐654‐C002 I 17TH JUNE '09

2102 CIVIL RAW WATER PH ‐ DESIGN OF COLUMS AND BEAMS AND CRANE PE‐DC‐314‐654‐C003 I 28TH MAY '09

2103 CIVIL RAW WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐654‐C004 I 17TH JULY '09

2104 CIVIL RAW WATER RESERVOIR ‐ DESIGN OF RESERVOIR RAFT AND WALL  PE‐DC‐314‐654‐C006 A 28TH MARCH'09

Page 38 of 49

Page 39: Master Drawing List Rev01

12/12/20082105 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF RESERVOIR  PE‐DG‐314‐654‐C001 A 28TH MAY '09

2106 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS 

PE‐DG‐314‐654‐C002 I 17TH JUNE '09

2107 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF  OPERATING  FLOOR SLAB PE‐DG‐314‐654‐C003 I 27TH JULY '09

2108 CIVIL RAW WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL 

PE‐DG‐314‐654‐C004 A 28TH MAY '09

2109 CIVIL RAW WATER PH ‐ GA & RC DETAIL OF PUMP HOUSE ROOF PE‐DG‐314‐654‐C005 I 17TH JULY '09

2110 CIVIL RAW WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI

PE‐DG‐314‐654‐C006 A 17TH JULY '09

2111 CIVIL RAW WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐654‐C007 I 27TH MAY '09

2112 CIVIL POTABLE WATER PH ‐ ANALYSIS AND DESIGN PE‐DC‐314‐671‐C001 I 22TH JULY '09

2113 CIVIL POTABLE WATER PH ‐ DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐671‐C002 I 7TH AUGUST '09

2114 CIVIL POTABLE WATER PH ‐ DESIGN OF COLUMS AND BEAMS OF PUMPHOUSE AND CRANE

PE‐DC‐314‐671‐C003 I 19TH AUGUST '09

2115 CIVIL POTABLE WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB OF PUMP HOUSE

PE‐DC‐314‐671‐C004 I 25TH AUGUST '09

2116 CIVIL POTABLE WATER PH ‐ PLAN ELEVATIONS AND SECTIONS PE‐DG‐314‐671‐C001 I 7TH AUGUST '09

2117 CIVIL POTABLE WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS

PE‐DG‐314‐671‐C002 I 8TH SEPTEMBER '09

2118 CIVIL POTABLE WATER PH ‐ GA & RC DETAILS  PE‐DG‐314‐671‐C003 I 7TH AUGUST '09

2119 CIVIL POTABLE WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI 

PE‐DG‐314‐671‐C004 I 8TH SEPTEMBER '09

2120 CIVIL POTABLE WATER PH ‐  CRANE/MONORAIL AND MISC  DETAIL PE‐DG‐314‐671‐C005 I 19TH AUGUST '09

2121 CIVIL STORM WATER PH ‐ ANALYSISI AND DESIGN  PE‐DC‐314‐672‐C001 I 25TH AUGUST '09

2122 CIVIL STORM WATER PH ‐ DESIGN OF SUMP RAFT , WALL AND SLABS PE‐DC‐314‐672‐C002 I 4TH SEPTEMBER '09

2123 CIVIL STORM WATER PH ‐ DESIGN OF COLUMS AND BEAMS AND CRANE PE‐DC‐314‐672‐C003 I 17TH SEPTEMBER '09

2124 CIVIL STORM WATER PH ‐ ARCHITECTURAL  PLANS PE‐DG‐314‐672‐C001 I 4TH SEPTEMBER '09

2125 CIVIL STORM WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS PE‐DG‐314‐672‐C002 I 30TH SEPTEMBER '09

2126 CIVIL STORM WATER PH ‐ GA & RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS 

PE‐DG‐314‐672‐C003 I 4TH SEPTEMBER '09

2127 CIVIL STORM WATER PH ‐ GA & RC DETAILS OF  OP. FLOOR /ROOF  SLAB OF PUMP HOUSE

PE‐DG‐314‐672‐C004 I 24TH SEPTEMBER '09

2128 CIVIL STORM WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL 

PE‐DG‐314‐672‐C005 I 17TH SEPTEMBER '09

2129 CIVIL STORM WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI 

PE‐DG‐314‐672‐C006 I 30TH SEPTEMBER '09

2130 CIVIL STORM WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐672‐C007 I 30TH SEPTEMBER '09

2131 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL

PE‐DC‐314‐675‐C001 A 17TH JUNE '09

Page 39 of 49

Page 40: Master Drawing List Rev01

12/12/20082132 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING

PE‐DC‐314‐675‐C002 I 25TH JUNE '09

2133 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION  PE‐DC‐314‐675‐C003 I 7TH JULY '09

2134 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL

PE‐DC‐314‐675‐C004 A 17TH SEPTEMBER '09

2135 CIVIL WATER TREATMENT  AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING

PE‐DC‐314‐675‐C005 I 24TH SEPTEMBER '09

2136 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION 

PE‐DC‐314‐675‐C006 I 8TH OCTOBER '09

2137 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL

PE‐DC‐314‐675‐C007 A 7TH AUGUST '09

2138 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING

PE‐DC‐314‐675‐C008 I 19TH AUGUST '09

2139 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION  PE‐DC‐314‐675‐C009 I 25TH AUGUST '09

2140 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1

PE‐DG‐314‐675‐C001 A 17TH JUNE '09

2141 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1 PE‐DG‐314‐675‐C002 I 25TH JUNE '09

2142 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2

PE‐DG‐314‐675‐C003 I 7TH JULY '09

2143 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2 PE‐DG‐314‐675‐C004 I 7TH JULY '09

2144 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1

PE‐DG‐314‐675‐C005 A 17TH SEPTEMBER '09

2145 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1

PE‐DG‐314‐675‐C006 I 24TH SEPTEMBER '09

2146 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2

PE‐DG‐314‐675‐C007 I 8TH OCTOBER '09

2147 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2

PE‐DG‐314‐675‐C008 I 28TH OCTOBER '09

2148 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1

PE‐DG‐314‐675‐C009 A 7TH AUGUST '09

2149 CIVIL GT AND STG   AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1

PE‐DG‐314‐675‐C010 I 19TH AUGUST '09

2150 CIVIL GT AND STG  AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2

PE‐DG‐314‐675‐C011 I 25TH AUGUST '09

2151 CIVIL GT AND STG  AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2

PE‐DG‐314‐675‐C012 I 25TH SEPTEMBER '09

2152 CIVIL DESIGN OF MISCELLENEOUS SUMPS AND PITS PE‐DC‐314‐674‐C001 I 19THOCTOBER '09

2153 CIVIL G.A OF  MISCELLENEOUS SUMPS AND PITS PE‐DG‐314‐674‐C001 I 19THOCTOBER '09

2154 CIVIL R.C DETAILS OF MISCELLENEOUS SUMPS AND PITS PE‐DG‐314‐674‐C002 I 19THOCTOBER '09

2155 CIVIL CHEMICAL ROOM‐ANALYSIS AND DESIGN PE‐DC‐314‐673‐C001 I 12TH SEPTEMBER '09

2156 CIVIL EFFLUENT TREATMENT PLANT‐DESIGN OF MISCELLENEOUS FOUNDATIONS

PE‐DC‐314‐673‐C002 I 12TH SEPTEMBER '09

2157 CIVIL EFFLUENT TREATMENT PLANT  ‐ GA & RC DETAILS OF CHEMICAL ROOM

PE‐DG‐314‐673‐C001 I 12TH SEPTEMBER '09

2158 CIVIL EFFLUENT TREATMENT PLANT  ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS SH 1

PE‐DG‐314‐673‐C002 I 12TH SEPTEMBER '09

Page 40 of 49

Page 41: Master Drawing List Rev01

12/12/20082159 CIVIL EFFLUENT TREATMENT PLANT  ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS SH 2

PE‐DG‐314‐673‐C003 I 12TH SEPTEMBER '09

2160 CIVIL EFFLUENT TREATMENT PLANT  ‐ GA & RC DETAILS OF  CMB PE‐DG‐314‐673‐C004 I 12TH SEPTEMBER '09

2161 CIVIL SEWAGE TREATMENT PLANT‐DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐673‐C003 I 19THOCTOBER '09

2162 CIVIL SEWAGE TREATMENT PLANT‐DESIGN SEWAGE PIPELINE PE‐DC‐314‐673‐C004 I 23THOCTOBER '09

2163 CIVIL SEWAGE TREATMENT PLANT‐DESIGN OF MISCELLENEOUS FOUNDATIONS

PE‐DC‐314‐673‐C005 I 23THOCTOBER '09

2164 CIVIL SEWAGE TREATMENT PLANT  ‐ GA & RC DETAILS OF SUMP SH 1 PE‐DG‐314‐673‐C005 I 23THOCTOBER '09

2165 CIVIL SEWAGE TREATMENT PLANT  ‐ GA & RC DETAILS OF SUMP SH 2 PE‐DG‐314‐673‐C006 I 23THOCTOBER '09

2166 CIVIL SEWAGE TREATMENT PLANT  ‐ GA & RC DETAILS OF SUMP SH 3 PE‐DG‐314‐673‐C007 I 23THOCTOBER '09

2167 CIVIL SEWAGE TREATMENT PLANT  ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS

PE‐DG‐314‐673‐C008 I 23THOCTOBER '09

2168 CIVIL SEWAGE TREATMENT PLANT  ‐ GA & RC DETAILS OF SEWAGE PIPE LINE

PE‐DG‐314‐673‐C009 I 23THOCTOBER '09

2169 CIVIL DESIGN OF DRAINAGE , SANITARY AND PLUMBING SYSTEM PE‐DC‐314‐673‐C002 I 23THOCTOBER '09

2170 CIVIL G.A AND R.C DETAIL OF DRAINAGE , SANITARY AND PLUMBING SYSTEM

PE‐DG‐314‐673‐C001 I 23THOCTOBER '09

2171 CIVIL CHEMICAL  HOUSE   ‐ ANALYSIS AND DESIGN PE‐DC‐314‐646‐C001 I 7TH JULY '09

2172 CIVIL CHEMICAL HOUSE. ‐ GA AND RC  DETAILS OF COLUMN FOUNDATION

PE‐DG‐314‐646‐C001 I 7TH JULY '09

2173 CIVIL CHEMICAL HOUSE. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐646‐C002 I 7TH JULY '09

2174 CIVIL CHEMICAL HOUSE. ‐ GA & RC DETAILS OF  ROOF/GROUND FLOOR PE‐DG‐314‐646‐C003 I 7TH JULY '09

2175 CIVIL DESIGN OF FILTERS , CHANNELS  PE‐DC‐314‐652‐C001 I 19TH SEPTEMBER '09

2176 CIVIL G.A OF  FILTERS AND CHANNELS PE‐DG‐314‐652‐C001 I 19TH SEPTEMBER '09

2177 CIVIL R.C DETAILS OF FILTERS AND CHANNELS PE‐DG‐314‐652‐C002 I 19TH SEPTEMBER '09

2178 CIVIL CHEMICAL LABORATORY BIULDING  ‐ ANALYSIS AND DESIGN  PE‐DC‐314‐646‐C003 I 25TH AUGUST '09

2179 CIVIL CHEMICAL LABORATORY BUILDING  ‐ PLANS, SECTIONS , ELEVATIONS AND MISCELLENEOUS DETAILS

PE‐DG‐314‐646‐C004 I 25TH AUGUST '09

2180 CIVIL CHEMICAL LABORATORY  BUILDING  ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS

PE‐DG‐314‐646‐C005 I 25TH AUGUST '09

2181 CIVIL CHEMICAL LABORATORY BUILDING  ‐ GA  AND R.C OF BEAMS AND ROOF SLAB

PE‐DG‐314‐646‐C006 I 25TH AUGUST '09

2182 CIVIL CHEMICAL LABORATORY BUILDING  ‐ RC DETAIL OF MISC FOUNDATION/STR 

PE‐DG‐314‐646‐C008 I 5TH SEPTEMBER '09

2183 CIVIL DESIGN OF CW DUCT PE‐DC‐314‐651‐C001 I 17TH JUNE '09

2184 CIVIL G.A OF C.W DUCT PE‐DG‐314‐651‐C001 I 17TH JUNE '09

2185 CIVIL R.C DETAIL  OF C.W DUCT PE‐DG‐314‐651‐C002 I 17TH JUNE '09

Page 41 of 49

Page 42: Master Drawing List Rev01

12/12/20082186 CIVIL DESIGN OF CW PIPELINE PE‐DC‐314‐651‐C002 I 17TH JUNE '09

2187 CIVIL G.A AND R.C DETAIL OF C.W PIPELINE PE‐DG‐314‐651‐C003 I 17TH JUNE '09

2188 CIVIL HRSG AREA ‐  DESIGN OF PAVING FOR HRSG AREA PE‐DC‐314‐617‐C006 I 9THOCTOBER '09

2189 CIVIL HRSG AREA ‐ DETAIL  OF PAVING PE‐DG‐314‐617‐C0013 I 9THOCTOBER '09

2190 CIVIL DESIGN OF FOUNDATION FOR SERVICE WATER TANK PE‐DC‐314‐671‐C001 I 6TH NOVEMBER '09

2191 CIVIL G.A OF SERVICE WATER TANK FOUNDATION PE‐DG‐314‐671‐C001 I 6TH NOVEMBER '09

2192 CIVIL R.C OF SERVICE WATER TANK FOUNDATION PE‐DG‐314‐671‐C002 I 6TH NOVEMBER '09

2193 CIVIL FIRE WATER PH ‐  ANALYSIS AND DESIGN PE‐DC‐314‐649‐C001 I 15TH SEPTEMBER '09

2194 CIVIL FIRE WATER PH ‐ DESIGN OF COLUMS AND BEAMS PE‐DC‐314‐649‐C002 I 15TH SEPTEMBER '09

2195 CIVIL FIRE WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐649‐C003 I 15TH SEPTEMBER '09

2196 CIVIL FIRE WATER PH ‐ PLAN,SECTION , ELEVATION AND MISC DETAILS PE‐DG‐314‐649‐C001 I 15TH SEPTEMBER '09

2197 CIVIL FIRE WATER PH ‐ GA & RC DETAILS OF COLUMN FDNS  PE‐DG‐314‐649‐C002 I 15TH SEPTEMBER '09

2198 CIVIL FIRE WATER PH ‐ GA & RC DETAILS OF  SUPERSTRUCTURE PE‐DG‐314‐649‐C003 I 15TH SEPTEMBER '09

2199 CIVIL FIRE WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI 

PE‐DG‐314‐649‐C004 I 15TH SEPTEMBER '09

2200 CIVIL DESIGN OF FOUNDATION FOR FIRE WATER TANK PE‐DC‐314‐649‐C006 I 4THOCTOBER '09

2201 CIVIL G.A AND R.C DETAIL OF FIRE WATER TANK FOUNDATION PE‐DG‐314‐649‐C007 I 4THOCTOBER '10

2202 CIVIL FIRE STATION  BUILDING   ‐ ANALYSIS AND DESIGN PE‐DC‐314‐650‐C001 I 27TH JULY '09

2203 CIVIL ARCH FIRE STATION BLDG. ‐ PLAN , SECTION ,ELEVATIONS AND MISC DETAILS

PE‐DG‐314‐650‐C001 I 27TH JULY '09

2204 CIVIL FIRE STATION BLDG. ‐ GA AND RC  DETAILS OF COLUMN FOUNDATION

PE‐DG‐314‐650‐C002 I 27TH JULY '09

2205 CIVIL FIRE STATION BLDG. ‐ G.A AND RC DETAIL OF COLUMNS ,BEAMS AND SLABS

PE‐DG‐314‐650‐C003 I 27TH JULY '09

Page 42 of 49

Page 43: Master Drawing List Rev01

BHEL PSNRID Area Title Drg_No Purpose Sch. Sub

1319 CIVIL GRID & BENCHMARK PILLAR DRAWING GEL/70356/5325/GPD I 30/04/2008

1320 CIVIL PHYSICAL SURVEY DRAWING GEL/70356/5325/P I 30/04/2008

1321 CIVIL CONTOUR SURVEY DRAWING GEL/5325/11112008/C I 30/04/2008

05 December 2008 Page 43 of 49

Page 44: Master Drawing List Rev01

BHEL RDPRID Area Title Drg_No Purpose Sch. Sub

438 IPBD Layout of IP Busduct 0 5 61 08 2 0521 A 26/11/2008

439 IPBD Foundation plan for busduct support 0 5 61 08 2 0522 A 10/12/2008

440 IPBD OGA of SPVT Cubicle 0 5 61 08 2 0523 A 03/12/2008

441 IPBD GA of NG cubicle 0 5 61 08 2 0524 I 03/12/2008

442 IPBD GA of HAB equipment 0 5 61 08 2 0525 I 12/11/2008

443 IPBD Wiring diagram of SPVT cubicle 0 5 61 08 2 0526 A 03/12/2008

444 IPBD Wiring diagram of NG cubicle 0 5 61 08 2 0527 A 03/12/2008

445 IPBD Wiring diagram of CTs 0 5 61 08 2 0528 A 26/11/2008

446 IPBD Single line diagram 0 5 61 08 2 0529 I 03/12/2008

447 SPBD Lay Out of SPB 0 6 61 08 2 0530 A 29/10/2008

448 SPBD Foundation plan for busduct support 0 6 61 08 2 0531 A 05/11/2008

05 December 2008 Page 44 of 49

Page 45: Master Drawing List Rev01

BHEL RPTID Area Title Drg_No Purpose Sch. Sub

449 RO/DM Process Flow Diagram 1-BW-220-00229 A 30/07/2008

450 RO/DM RO DM Plant Layout drawing 1-BW-220-00222 A 31/10/2008

451 RO/DM Process & Instrumentation A 30/04/2008

452 RO/DM Diagram A 31/10/2008

453 RO/DM PLC architectural drawing 3-BW-310-00861 A 30/07/2008

454 RO/DM Single line diagram (SLD) A 30/11/2008

455 RO/DM Design Philosophy I 30/09/2008

456 RO/DM Cable Schedule I 30/11/2008

457 RO/DM Instrument Schedule I 31/12/2008

458 RO/DM PLC GA drawing I 31/03/2009

459 RO/DM MCC drawing I 31/03/2009

460 RO/DM PG test procedure I 30/09/2009

05 December 2008 Page 45 of 49

Page 46: Master Drawing List Rev01

BHEL TBGID Area Title Drg_No Purpose Sch. Sub

633 LAYOUT&SLD SINGLE LINE DIAGRAM 400kV TB-3-314-510 A 30/06/2008

634 LAYOUT&SLD LAYOUT PLAN 400kV TB-3-314-316-002 A 30/07/2008

635 LAYOUT&SLD SECTIONAL ELEVATION 400KV TB-3-314-316-003 A 30/07/2008

636 LAYOUT&SLD EARTH MAT LAYOUT TB-XXX-316-004 I 15/10/2008

637 LAYOUT&SLD CABLE TRENCH LAYOUT TB-XXX-316-005 A 24/11/2008

638 LAYOUT&SLD STRUCTURE LOADING DIAGRAM TB-0-316-314-006 I 15/08/2008

639 LAYOUT&SLD SAG / SWING CALCULATION TB-314-316-101 I 30/09/2008

640 LAYOUT&SLD SHORT CIRCUIT FORCE CALCULATION ON FLEXIBLE CONDUCTOR

TB-314-316-102 I 15/08/2008

641 LAYOUT&SLD DESIGN CALCULATION FOR THE EARTHING TB-XXX-316-103 A 15/09/2008

642 LAYOUT&SLD DSLP CALCULATION TB-314-316-104 A 15/08/2008

643 LAYOUT&SLD ERECTION KEY DIAGRAM TB-XXX-316-007 I 30/04/2009

644 LAYOUT&SLD EQUIPMENT EARTHING DETAILS TB-314-316-008 I 30/10/2008

645 LAYOUT&SLD SLD FOR AC & DC DISTRIBUTION BOARD TB-XXX-316-009 A 15/10/2008

646 PROT&SLD PROTECTION KEY DIAGRAM TB-XXX-510-010 A 30/12/2008

647 PROT&SLD RELAY SETTINGS TB-XXX-510-012 I 30/10/2009

648 PROT&SLD POWER & CONTROL CABLE SCHEDULE TB-XXX-510-013 I 30/09/2009

649 CT OGA DRAWING FOR 400KV CT A 15/03/2009

650 CT RATING PLATE FOR 400KV CT A 15/03/2009

651 DISC INSU UNIT DIAGRAM FOR DISC INSULATOR/GTP A 15/06/2009

652 DISC INSU INSULATOR HARDWARE DRAWING A 15/06/2009

653 400KV CB OGA DRAWING 3-518-46-99901 A 28/02/2009

654 400KV CB SCHEME 3-518-46-99903 A 28/02/2009

655 400KV CB RATING PLATE 3-518-46-99906 A 28/02/2009

656 400KV CVT OGA DRAWING A 30/03/2009

657 400KV CVT RATING PLATE A 30/03/2009

658 BOI OGA DRAWING FOR CR PANEL & AUTOMATION A 15/04/2009

659 BOI SCHEMATIC DRAWING FOR CR PANEL & AUTOMATION

A 15/04/2009

660 BOI OGA DRAWING FOR 400kV ISOLATORS & EARTH SWITCH

A 05/05/2009

661 BOI SCHEME FOR 400kV ISOLATORS & EARTH SWITCH A 05/05/2009

662 BOI RATING PLATE FOR 400kV ISOLATORS & EARTH SWITCH

A 05/05/2009

663 BOI OGA OF 390kV LIGHTNING ARRESTOR A 15/05/2009

664 BOI OGA / GTP 400kV POST INSULATOR 400-SC-A-0010 A 15/06/2009

665 BOI OGA DRAWINGS FOR MARSHALLING KIOSK/JBs A 15/07/2009

666 BOI SCHEME FOR MARSHALLING KIOSK/JBs A 15/07/2009

05 December 2008 Page 46 of 49

Page 47: Master Drawing List Rev01

667 BOI OGA DRAWING FOR 220V BATTERIES A 30/06/2009

668 BOI GTP FOR 220V BATTERIES A 30/06/2009

669 BOI OGA FOR 220V BATTERY CHARGER A 30/06/2009

670 BOI GTP FOR 220V BATTERY CHARGER A 30/06/2009

671 BOI OGA FOR LT SWITCHGEAR A 30/08/2009

672 BOI GTP FOR LT SWITCHGEAR A 30/08/2009

673 BOI DESIGN DOC FOR OUTDOOR ILLUMINATION A 30/10/2009

674 BOI GTP/CATALOGUE FOR OUTDOOR ILLUMINATION A 30/10/2009

675 BOI YARD LIGHTNING LAYOUT FOR OUTDOOR ILLUMINATION

A 30/10/2009

676 BOI OGA FOR CLAMPS & CONNECTORS A 30/06/2009

677 BOI GTP & DRG FOR AL TUBE I 15/06/2009

678 BOI GTP FOR ACSR CONDUCTOR I 15/06/2009

679 BOI DRUM DRG FOR ACSR CONDUCTOR I 15/06/2009

680 BOI GTP FOR GT SHIELD WIRE I 15/06/2009

681 BOI GTP FOR POWER & CONTROL CABLES I 30/05/2009

682 BOI GTP FOR MS ROD I 30/11/2008

683 BOI GTP FOR GI FLAT I 30/07/2009

684 BOI GTP FOR CABLE TRENCH MATERIAL I 15/08/2009

685 DESIGN DESIGN OF BEAM (400KV) TB-299-618-011 I 30/10/2008

686 DESIGN DESIGN OF TOWER INCL. FOUNDATION BOLT(400KV)

TB-XXX-618-012 I 15/11/2008

687 DESIGN DESIGN OF EQUIP. SUPPORT STRUCTURE INCL FND BOLTS(400KV)

TB-XXX-618-013 I 30/06/2009

688 DESIGN DESIGN OF TOWER FOUNDATION (400KV) TB-XXX-607-019 I 30/11/2008

689 DESIGN DESIGN OF EQUIP. FOUNDATION (400KV) TB-XXX-607-020 I 30/07/2009

690 DESIGN DESIGN OF CABLE TRENCHES TB-XXX-607-024 I 01/05/2009

691 CIVIL DRG YARD DETAILS OF FOUNDATION BOLTS FOR 400KV TOWERS

TB-X-XXX-607-601-1 I 15/12/2008

692 CIVIL DRG YARD DETAILS OF FOUNDATION BOLTS 400KV EQUIP. STRUCTURES

TB-X-XXX-607-601-2 I 15/07/2009

693 CIVIL DRG YARD FOUNDATION LAYOUT FOR 400KV SWITCHYARD TB-X-XXX-607-603 I 15/11/2008

694 CIVIL DRG YARD RCC DETAILS OF TOWER FOUNDATION (400KV) TB-X-XXX-607-605 I 15/12/2008

695 CIVIL DRG YARD RCC DETAILS OF EQUIP. FOUNDATION (400KV) TB-X-XXX-607-607 I 15/07/2009

696 CIVIL DRG YARD RCC DETAILS OF CABLE TRENCHES TB-X-XXX-607-609 I 30/05/2009

697 CIVIL DRG YARD DETAILS OF ROAD TB-X-XXX-607-613 I 30/12/2008

698 CIVIL DRG YARD DETAILS OF FENCING & GATES TB-X-XXX-607-614 I 30/12/2008

699 CIVIL DRG YARD LAYOUT & DETAILS OF DRAINAGE TB-X-XXX-607-620 I 31/07/2009

1284 DESIGN DESIGN OF STRUCTURE FOR 400kV BEAM MKD. B1 TB-278-618-011-1 A 30/04/2008

1285 DESIGN DESIGN OF STRUCTURE FOR 400kV BEAM MKD. B2 TB-278-618-011-2 A 30/04/2008

1286 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T1 TB-278-618-012-1 A 30/04/2008

05 December 2008 Page 47 of 49

Page 48: Master Drawing List Rev01

1287 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T2 TB-278-618-012-2 A 30/04/2008

1288 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T3 TB-278-618-012-3 A 30/04/2008

1289 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T4 TB-278-618-012-4 A 30/04/2008

1290 CIVIL DRG YARD DESIGN CRITERION FOR SWITCHYARD STRUCTURES & CIVIL WORKS

TB-314-607-029 A 30/04/2008

1291 BOI SIZING CALCULATION FOR 220V BATTERY & CHARGER

TB-314-316-010 A 30/04/2008

1292 BOI SHED PROFILE FOR 400KV SOLID CORE POST INSULATOR

SIL-MC-8044 A 30/04/2008

1293 BOI CORONA GRADING RING FOR 400KV SOLID CORE POST INSULATOR

SIL-MC-8004-T A 30/04/2008

1301 BOI GUARANTEED TECHNICAL PARTICULARS OF ACSR MOOSE CONDUCTOR

BHEL/87003 A 30/04/2008

1302 BOI WOODEN DRUM DRAWING FOR ACSR MOOSE CONDUCTOR

HAL/ACSM/BHEL/PGCI A 30/04/2008

1311 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400kV TOWER T1 MKD. FT1

TB-314-607-014-1 A 30/04/2008

1312 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400kV TOWER T2 MKD. FT2

TB-314-607-014-2 A 30/04/2008

1313 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400Kv TOWER T3 MKD. FT3

TB-314-607-014-3 A 30/04/2008

1314 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400Kv TOWER T4 MKD. FT4

TB-314-607-014-4 A 30/04/2008

1315 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T1 MKD. FT1

TB-3-314-607-604-1 A 30/04/2008

1316 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T2 MKD. FT2

TB-3-314-607-604-2 A 30/04/2008

1317 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T3 MKD. FT3

TB-3-314-607-604-3 A 30/04/2008

1318 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T4 MKD. FT4

TB-3-314-607-604-4 A 30/04/2008

1325 BOI DRG FOR 4" IPS (EXTRA HEAVY DUTY) TUBE PG2568 I

1326 BOI GTP FOR 4" IPS AL TUBE GTP-4"9EH) I

1328 400KV CB SUPPORT STRUCTURE 3-518-46-99902 A

1329 400KV CB WIRING DIAGRAM OF CONTROL UNIT 3-518-46-99904 A

1330 400KV CB OGA & DATA OF CONTROL UNIT 3-518-46-99905 A

1331 400KV CB SF6 GAS & OIL SCHEME LINE DIAGRAM 3-518-46-99907 A

1332 400KV CB TYPE TEST REPORTS FOR 420KV SF6 CB SGE/TTTP/031 A

05 December 2008 Page 48 of 49

Page 49: Master Drawing List Rev01

BHEL TRYID Area Title Drg_No Purpose Sch. Sub

720 HRSG GA OF BOILER ELEVATION 170 A 23/07/2008

721 HRSG GA OF BOILER PLAN 170 A 23/07/2008

722 HRSG FLOOR PLANS 186 I 20/08/2008

723 HRSG BOILER FOUNDATION PLAN(GROUND FLOOR PLAN & LOADING DETAILS)

174 I 17/09/2008

724 HRSG GA OF HRSG CHIMNEY 206 I 20/08/2008

725 HRSG FOUNDATION LOADING OF HRSG CHIMNEY 2-87-010-80720 I 17/09/2008

726 HRSG SCHEME OF WATER AND STEAM CIRCUIT WITH VALVES,FITTINGS AND INSTRUMENTATION

164 A 17/09/2008

727 HRSG SCHEME OF FLUE GAS PATH WITH INSTRUMENTATION

2-97-400-80094 I 17/09/2008

728 HRSG GA OF HRSG-EROSS SECTION IN PLAN 171 I 15/10/2008

729 HRSG GA OF HRSG-EROSS SECTION IN ELEVATION 172 I 15/10/2008

730 HRSG GA OF HRSG-EROSS SECTION IN FRONT VIEW 173 I 15/10/2008

731 HRSG INSTALLATION OF PRIMARY INSTRUMENTS 223 I 15/10/2008

732 HRSG VALVES SCHEDULE 179 I 15/10/2008

733 HRSG LEGEND FOR CONTROL SYSTEM 167 I 29/10/2008

734 HRSG DRUM LEVEL CONTROL SYSTEM 167,214,218,219 I 29/10/2008

735 HRSG MAIN STEAM TEMPERATURE CONTROL AND WRITE UP

167,214,217 I 29/10/2008

736 HRSG RECOMMENDED HRSG PROTECTION LOGIC 221,233 I 19/11/2008

737 HRSG LIST OF ALARM AND TRIP SET POINTS 220,236 I 24/12/2008

738 HRSG INSTRUMENT MASTER DATA SHEET 215 I 24/12/2008

739 HRSG BOILER ELECTRICAL SCOPE DIAGRAM I 19/11/2008

740 HRSG SAFETY VALVE SETTING DIAGRAM 180,235 I 19/11/2008

741 HRSG RECOMMENDED QUALITY OF FEED WATER I 17/09/2008

742 HRSG RECOMMENDED QUALITY OF BOILER WATER AND STEAM PURITY

I 17/09/2008

743 HRSG RECOMMENDED QUALITY OF BLOW DOWN 168 I 17/09/2008

744 HRSG BOILER WATER VOLUME I 17/09/2008

745 HRSG JUNCTION BOX GROUPING WITH CABLE SCHEDULE 169,225,226,231 I 04/03/2009

746 HRSG O&M MANUAL 203 I 31/03/2010

05 December 2008 Page 49 of 49