EST Master Construction Limited is an indigenous Engineering,
Construction, Industrial Supplies and Procurement Company involved
directly and/or indirectly in some Oil /Gas projects executed by major
oil prospecting and service companies operating in the Niger Delta
Region. The level of our working experience is a combination of the
knowledge and exposure acquired by the individual professionals in
their previous and various capacities both in the practicing firms and
reputable construction companies within and outside the industry.
Our ability to handle technical projects is enhanced by the
professional focus of the company.
INTRODUCTION
Our aim is to achieve optimal Health, Safety and Environmental
awareness for all EST Master Construction Limited personnel
employed on the job. It is our collective responsibility to ensure that
the job is executed safely, devoid of Lost Time Injury (LTI), accident,
fatality and negative impact on the environment.
OBJECTIVE
To become a Role Model in the Engineering Construction Industry in Nigeria.
EST Master Construction Limited strives to build a team committed to providing quality and timely service in the most environmentally conducive manner to the satisfaction of our clients.
OUR MISSION
OUR VISION
EST Master Construction Limited is a product of long years of commitment
to the construction industry by a team of young, virile and dedicated
professionals.
Founded in 2000, by the amalgamation of the Partnership of AGB
Consultants (Consulting Civil/Structural Engineers), WESTARCH
Associates (Architects and Planners) and Ratel Technical Enterprises
(Nig.) Limited, the firm has grown tremendously with the increasing need
to utilize the resources of indigenous professionals in the construction
industry. The nucleus of EST Master Construction Limited is a
construction firm concentrating on Buildings, Highways and Bridges,
Coastal Engineering, Water Resources and Environmental Health
Engineering. Providing complete Building and Civil Engineering
Construction services enables EST Master Construction Limited work with
our clients from the earliest conceptual stage of the project through start
up bearing total project management responsibility or assisting only in
specific phases depending on the wants and needs of the client. The firm
has demonstrated its proven ability to tailor these services to address the
unique requirement of each project. Technical quality and communication
are enhanced by our policy of centralizing the professional practice at our
Head Office in Port Harcourt.
HISTORY
CONTACT INFORMATION
Registered Address: KM 18 International Airport Road, By Bulletin Yard/Aluu Security Check Point Rukpokwu Port Harcourt
Rivers State, Nigeria. Office Telephone number: +234(0) 8039582523 Email: [email protected] or [email protected]
Website: www.estmaster.com
General Description ClientUACN Property Development Company(UPDC) Plc
ArchitectsMorphosis Inc. Ltd.
Quantity SurveyorBilling Cost Associates
M & E EngineersJ.I. Sidiki & Partners
Structural EngineersPearl Consultants
Project Location: Vintage Gardens, Airforce Base, Port Harcourt.
Main ContractorEst Master Construction Ltd.
Construction Date: 2013-2014
vvv
vv
10 Units Semi-Detached Houses Extensive Landscaping, External Lighting, Driveways, Recreation centre with swimming pool, tennis court and other ancillary facilities Drainage, Pedestrian walkway, Internal Roads Borehole and water treatment plant
VINTAGE GARDENS
IRIEBE GARDENS
Project Location: Rivers State.
Iriebe Garden City
Construction Date: 2009
General Description
ContractorEst Master Construction Limited
ClientAfribank Estate Plc.
v 112 No Units of 4 and 5 bedroom detached houses made of 3 house types - Avocado, Lavender and Primerose
Sandcrete block perimeter fence
Recreation centre with swimming pool and tennis courts
Tarred road with pedestrian interlocking walkways and drainage
Street Lights
Borehole and treated water supply
v
v
v
v
Project ManagerGothiclen Consortium Ltd.
v
STANBIC-IBTC BANK BRANCH OFFICES
General description
ClientStanbic-IBTC Bank Plc
ArchitectsJames Cubitt Architects
Project ManagerCourtney Michael Partnership Nig. Ltd
Mechanical/Electrical Engineers
Structural EngineersMorgan Omonitan & Abe Ltd.
Project Location : 28, Calabar Road, Ikom, Cross River State. - Construction
23 Ogunu Road, Off Airport Road, Warri, Delta State - Renovation
623 Mbiama -Yenagoa Road, Yenagoa, Bayelsa State - Renovation
45 Idimu Road, Ikotun, Lagos State - Renovation
Freezone Onne, Rivers State - Renovation
Along Aba/Port Harcourt Expressway, Oyigbo Rivers State - Renovation
ContractorEst Master Construction Ltd.
Construction Date : August 2009-March 2010Quantity SurveyorsTillyard Nigeria
v One floor bank building, made of reinforced concrete frames
Sandcrete block perimeter fence
Fit-out installations
Borehole and water treatment plant
v
v
v
.
BATS TERMINAL BUILDING EXPANSION
General Description
Construction Date: August 2011 - April 2012
Project Location: Bristow Helicopters Terminal NAF Base, Port Harcourt.
v 2 Floor Airport Terminal Building
Reinforced Concrete Frames, Structural Steel Roof.
Approx. two km long asphalt pavement road
General Landscaping
v
v
v
Project ManagerSavant Integrated Concepts Ltd.
ClientBristow Helicopter Ltd.
ClientRivers State Government
ContractorEst Master Construction Limited
Construction Date: 2008
Project Location: 11 Emenike Street, Mile 1, Diobu, Port Harcourt.
v
v v
v
Four Floors Hospital Complex, Reinforced concrete frames rectangular
in shape, approx 46 x 26 x 15m. Sandcrete block perimeter fenceGate House, Generator House
External Lighting
v
v
and Waste disposal House
Parking Lot
General description
NEW NIGER HOSPITAL
ArchitectsDivine Dimensions Consult
Structural EngineersOkey-Pitars Nig. Ltd.
Quantity SurveyorKaso Associates
Electrical/Mechanical EngineersOnbi Services
General Description
Client UACN Property Development Company(UPDC) Plc
ArchitectsHarcourt Adukeh Associates
Quantity SurveyorAman Associates
Mechanical Engineers Hemsac Associates
Structural EngineersEtteh Aro & Partners
Project Location: 26, Aba Road, Port Harcourt.
ContractorEst Master Construction Ltd.
Construction Date: 2005-2007
v
v v
v
W shape office Block complex, of reinforced concrete frames, approx. 8000m floor area
Perimeter fence, Gate House Extensive Landscaping, External Lighting, Driveways,
Car Parking lot and elevated diesel storage tank of approx. 15,000 litres
Borehole and water treatment plant
2 and Generator House
UPDC OFFICE BLOCK
ClientPMC Limited
Construction Date: 2003-2005
ContractorEst Master Construction Limited
ArchitectsCustom Realities
Project Location: Abacha Road, GRA Phase II, Port Harcourt.
v
v v v
Four Floors Office Block, made of reinforced concrete frames rectangular in shape, approx 60 x 30 x 13m. Approx floor area = 7500m
Sandcrete block perimeter fenceGate House and Generator HouseExternal Lighting
2
General description
PMC OFFICE BUILDING
ClientAdmiralty Fleet Ltd.
Construction Date: 2001-2002
BICS SHOPPING MALL
v
v v v
Four Floors Shopping Mall, made of reinforced concrete frames
Sandcrete block perimeter fenceGate House and Generator HouseExternal Lighting
Project Location: 62 Olu Obasanjo Road, Port Harcourt.
General description TurnkeyEst Master Construction Limited
8
.
BICS SUITES
General description
Project Location: 26, Harbert Macaulay Street , OLD GRA, Port Harcourt.
Construction Date: 2004-2006
v Five floor modern 20No Luxury suites, X in plan (4 winged) with a central circulation area, inclusive of basement for car park, equipped with 2No 12 persons Lifts
Granite External wall finish
Reinforced concrete frames, structural steel roof and shore protection
Swimming Pool
Borehole, water treatment plant and sewage treatment plant
ClientAdmiralty Fleet Ltd
TurnkeyEst Master Construction Limited
v
v
v
v
v
.
ClientUnited Bank for Africa
Construction Date: 2002-2004
Project Location: Port Harcourt.
Olu Obasanjo Road,
General description
v
v v
Three Floors Office Block Development, of reinforced concrete frames,
Perimeter fence, Extensive Site FillingGate House and Generator House
External Lightingv
30mx25mx10m
Drainages, Car Parking Lot and Driveways and
REGIONAL OFFICE FOR UBA
TurnkeyEst Master Construction Limited
.
ClientChief F. N. Alabraba
Construction Date: 2007-2008
ArchitectsAlliedblue
v v
v
v
1 No. Duplex, made of reinforced concrete frames Sandcrete block perimeter fence
Extensive landscaping
External Lighting
v
v v
Service Quarter
Borehole and water treatment plantPerimeter fence, drainage, car parking lot, Gate House and
Generator House
Project Location: GRA Phase II Port Harcourt
No. 5 Ndoni Street,
General description
R E S ID E N T IA L D E V E L O P M E N T
ContractorEst Master Construction Limited
Structural EngineersAbbibet Consultants
ClientPrinciple Ltd.
Construction Date: 2003-2005
ContractorEst Master Construction Limited
Project Location: 129 Woji Road, GRA Phase II, Port Harcourt.
ArchitectsHarcourt Adukeh Associates
Structural EngineersEtteh Aro & Partners
· Four Floors residential development with Penthouse,of reinforced concrete frames approximately 3500m2total floor area.
· Oval shaped swimming pool, approximately 150ms surfacearea· Two floors service quarters approximately 500m2· Borehole and water treatment plant· Perimeter fence, drainage, car parking lot, GateHouseand Generator
House
General description
PRINCIPLES COURT
ClientAdmiralty Fleet LtdConstruction Date: 2000-2001
TurnkeyEst Master Construction Limited
v
v v v
Four Floors Office Complex, approx. 90m x 36m x13m
Drainages and parking lotsGate House and Generator House
External wall finished with granite tiles
Project Location: Port Harcourt.
105 Olu Obasanjo Road,
General description
FLEET HOUSE