Master Cleaing Schedule.xlsx

Embed Size (px)

Citation preview

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping

    CFPIL-5-HK-D7.2-07

    A] CLEANING SCHEDULE FOR PRE PROCESSING AND STORAGE AREA

    a) During Production Season:

    Sr. No. Area

    1 Open ground floor Area

    a. Dry cleaning by broom

    2 Floor washing

    3 Doors cleaning

    4 Drainage cleaning

    5 Empty out Dustbin

    b) During NO Production:

    Sr. No. Area

    1 Open ground floor Area

    a. Dry cleaning by broom

    2 Doors cleaning

    3 Drainage cleaning

    4 Empty out dustbin

    5 Wall & roofs, lamps etc. cleaning

    6 Top ceiling cleaning

    7 Electrical cable & cable tray

    B] CLEANING SCHEDULE FOR PRE PROCESSING AND STORAGE AREA

  • 2. During Production

    Sr. No. Area

    1 Door panel

    2 Dry cleaning of open floor space by broom

    3 Drainage cleaning

    4 Empty out dustbins

    5 Top ceiling cleaning

    6 Floor washing

    Approved By

    (Functional Head)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01

    Master cleaning Schedule for House Keeping

    CFPIL-5-HK-D7.2-07

    b) During No Production

    Sr. No. Area

    1 Door panel

    2 Dry cleaning of open floor by broom

    3 Drainage cleaning

    4 Empty out dustbins

    5 Walls, roofs & lamps etc. cleaning

    6 Exhaust fan

    7 Top ceiling cleaning

    8 Electrical cable & cable tray

    C] CLEANING SCHEDULE FOR Cooking and Seasoning, Freezing, Dehydration and Retort Area

    a] During Production :

    Sr. No. Area

    1 Cleaning of drainage

    2 Washing the floor

    3 Dry cleaning of open floor space by broom

    4 Doors

    5 Empty out dustbin

    6 Waste hopper area

    7 Waste hopper cleaning

    8 Wall tiles cleaning

    9 Top ceiling cleaning

  • 10 SS tables, kettles

    Approved By

    (Functional Head)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping

    CFPIL-5-HK-D7.2-07

    Sr. No. Area

    1 Cleaning of drainage

    2 Washing the floor

    3 Dry cleaning of open floor space by broom

    4 Doors

    5 Empty out dustbin

    6 False ceiling

    7 Walls cleaning

    8 Wall tiles cleaning

    9 Top ceiling cleaning

    10 SS tables, kettles

    D] CLEANING SHEDULE FOR Dehydrater Room, Cup Filling Room, FFS machine room

    Sr. No. Area

    1 Dry cleaning of open ground floor by broom

    2 Doors

    3 Wall tiles cleaning

    4 Empty out dustbin

    5 Drainage cleaning

    6 Dehydrater trays

    7 Top ceiling cleaning

    8 Floor washing

    Sr. No. Area

    b) During NO Production

    a) During Production

    a) During No Production

  • 1 Dry cleaning of open ground floor by broom

    2 Doors

    9 Wall tiles cleaning

    4 False Ceiling & roofs etc.Cleaning

    5 Walls cleaning

    6 Empty out dustbin

    7 Drainage cleaning

    8 Dehydrater trays

    9 Strip curtain cleaning

    10 Top ceiling cleaning

    11 Electrical cable & cable tray

  • Sr. No. Area

    1 Dry cleaning of ground floor by broom

    2 Wet Cleaning of ground floor by taski machine

    3 Empty out dustbin

    4 Doors & partition cleaning

    5 Walls tiles cleaning

    6 Top ceiling cleaning

    7 Terrace cleaning

    Approved By

    (Functional Head)

    E] CLEANING SCHEDULE FOR CHILLER, BOILER, ELECTRICAL, AUTOMATION, WATER TREATMENT, QUARANTINE& WAREHOUSE. a) During Production

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping

    CFPIL-5-HK-D7.2-07

    Sr. No. Area

    1 Dry cleaning of ground floor by broom

    2 Empty out dustbin

    3 Doors

    4 Wall cleaning

    5 Exhaust fans, electrical lamps etc.

    6 Wall tiles

    7 Top ceiling cleaning

    8 Electrical cable & cable tray

    F] CLEANING SCHEDULE FOR CANTEEN AREA

    Sr. No. Area

    1 Dry cleaning of Ground floor.

    2 Disinfectant Water mopping of ground floors

    3 Dining Table cleaning by white cloth mopper

    4 Empty out Dustbin

    5 Lockers

    6 Walls

    7 Basins cleaning

    8 Doors & Windows cleaning

    9 Roofs ceiling & lamps etc. cleaning

    10 Chairs & tables washing

    11 Top ceiling cleaning

    12 Water cooler cleaning

    13 Electrical cable & cable tray

    2. During NO Production :

  • 14 All toilets cleaning

    15 Liquid / Soap near toilet basin

    G] CLEANING SCHEDULE FOR WATER TANK

    Sr. No. Area

    1 Raw Water Ground storage tank

    2 Process water tank

    3 DM Water tank

    4 Drinking water tank

    H] CLEANING SCHEDULE FOR WASHING UNIFORM

    Sr. No. Area

    1 Associate Apron washing

    2 Cap washing

    3 Workers apron washing

    Approved By

    (Functional Head)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01

    Master cleaning Schedule for House Keeping

    CFPIL-5-HK-D7.2-07

    I ] CLEANING SCHEDULE FOR LABORATORY

    Sr. No. Area

    1 Open Ground floor dry cleaning by broom

    2 Floor washing

    3 Wash basin

    4 Empty out dust bin

    5 Door and window partition cleaning

    6 Wall tiles cleaning

    7 Chairs and tables cleaning

    8 Lamps cleaning

    9 Lab terrace cleaning

    K] CLEANING SCHEDULE FOR OUTSIDE AREA

    Sr. No. Area

    1 Sweeping of roads

  • 2 Empty out all dustbins

    3 Gutter cleaning

    4 Wet cleaning open ground floor Boiler Area

    5 Wet cleaning open ground floor Electrical Area

    6 Wet cleaning open ground floor General store

    7 Wet cleaning open ground floor Workshop area

    8 Outside area shutter and window net cleaning

    9 Top ceiling cleaning

    10 General store terrace cleaning

    11 Electrical cable / cable tray

    12 Electrical, Boiler, Workshop, G.Store

    Approved By

    (Functional Head)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping Rev. No : 00

    Date : 10/10/2015Page : 1 of 5

    A] CLEANING SCHEDULE FOR PRE PROCESSING AND STORAGE AREA

    a) During Production Season:

    Frequency Reference Instruction

    Open ground floor Area

    Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -41

    Daily CFPIL-5-HK-I7.2 -45

    b) During NO Production:

    Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -41

    Daily CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    B] CLEANING SCHEDULE FOR PRE PROCESSING AND STORAGE AREA

  • 2. During Production

    Frequency Reference Instruction

    Weekly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -41

    Daily CFPIL-5-HK-I7.2 -45

    Quarterly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2-40

    Issued By

    (Food Safety Team Leader)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01

    Master cleaning Schedule for House Keeping Rev : 00

    Date : 10/10/2015

    Page : 2 of 5

    b) During No Production

    Frequency Reference Instruction

    Monthly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -40

    Monthly CFPIL-5-HK-I7.2 -41

    Daily CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    C] CLEANING SCHEDULE FOR Cooking and Seasoning, Freezing, Dehydration and Retort Area

    a] During Production :

    Frequency Reference Instruction

    Once is a shift. CFPIL-5-HK-I7.2 -41

    Once in a shift CFPIL-5-HK-I7.2-40

    Once in a shift CFPIL-5-HK-I7.2-40

    Weekly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -45

    Once in shift CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Quarterly CFPIL-5-HK-I7.2 -45

  • Once in shift CFPIL-5-HK-I7.2 -41

    Issued By

    (Food Safety Team Leader)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping Rev : 00

    Date : 10/10/2015Page : 3 of 5

    Frequency Reference Instruction

    Monthly CFPIL-5-HK-I7.2 -41

    Weekly CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -40

    Monthly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -42

    Yearly CFPIL-5-HK-I7.2 -42

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Once in a Day CFPIL-5-HK-I7.2 -45

    D] CLEANING SHEDULE FOR Dehydrater Room, Cup Filling Room, FFS machine room

    Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -41

    Weekly CFPIL-5-HK-I7.2 -45

    quarterly CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2-40

    Frequency Reference Instruction

  • Daily CFPIL-5-HK-I7.2 -40

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly. CFPIL-5-HK-I7.2 -45

    Yearly. CFPIL-5-HK-I7.2 -45

    Daily CFPIL-5-HK-I7.2 -42

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly. CFPIL-5-HK-I7.2 -45

  • Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Quarterly CFPIL-5-HK-I7.2 -45

    Quarterly CFPIL-5-HK-I7.2 -40

    Issued By

    (Food Safety Team Leader)

    E] CLEANING SCHEDULE FOR CHILLER, BOILER, ELECTRICAL, AUTOMATION, WATER TREATMENT,

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for House Keeping Rev : 00

    Date : 10/10/2015Page : 4 of 5

    Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -42

    Yearly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    F] CLEANING SCHEDULE FOR CANTEEN AREA

    Frequency Reference Instruction

    Twice in a day CFPIL-5-HK-I7.2 -40

    Twice in a day CFPIL-5-HK-I7.2 -40

    Twice in a day CFPIL-5-HK-I7.2 -45

    Twice in a day CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -42

    Twice in a day CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

  • Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2 -40

    G] CLEANING SCHEDULE FOR WATER TANK

    Frequency Reference Instruction

    Quarterly CFPIL-5-HK-I7.2 -44

    Quarterly CFPIL-5-HK-I7.2 -44

    Quarterly CFPIL-5-HK-I7.2 -44

    Monthly CFPIL-5-HK-I7.2 -44

    H] CLEANING SCHEDULE FOR WASHING UNIFORM

    Frequency Reference Instruction

    Once in a Shift CFPIL-5-HK-I7.2 -43

    Once in a Shift CFPIL-5-HK-I7.2 -43

    Once in a Shift CFPIL-5-HK-I7.2 -43

    Issued By

    (Food Safety Team Leader)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01

    Master cleaning Schedule for House Keeping Rev : 00

    Date : 10/10/2015

    Page : 5 of 5

    I ] CLEANING SCHEDULE FOR LABORATORY

    Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

    Daily CFPIL-5-HK-I7.2-46

    Daily CFPIL-5-HK-I7.2-45

    Daily CFPIL-5-HK-I7.2-45

    Weekly CFPIL-5-HK-I7.2-45

    Weekly CFPIL-5-HK-I7.2-45

    Monthly CFPIL-5-HK-I7.2-45

    Monthly CFPIL-5-HK-I7.2-45

    Quarterly CFPIL-5-HK-I7.2-40

    K] CLEANING SCHEDULE FOR OUTSIDE AREA

    Frequency Reference Instruction

    Daily CFPIL-5-HK-I7.2 -40

  • Daily CFPIL-5-HK-I7.2 -45

    Weekly CFPIL-5-HK-I7.2 -41

    Weekly CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -40

    Weekly CFPIL-5-HK-I7.2 -40

    Monthly CFPIL-5-HK-I7.2 -45

    Monthly CFPIL-5-HK-I7.2 -45

    Quarterly CFPIL-5-HK-I7.2 -40

    Yearly CFPIL-5-HK-I7.2 -45

    Yearly CFPIL-5-HK-I7.2 -45

    Issued By

    (Food Safety Team Leader)

  • Capricorn Food Products India Ltd., Functional Procedure Manual, Edition: 01Master cleaning Schedule for HoVersion : 0

    Date : 15/03/2015CFPIL-1-HK-D7.2-07 Page : 4 of 7

    Sheet1Sheet4