Field Guide Guidelines for Preparing and Installing ARXX ICF Products Job: _____________________________ Date: _____________________________ Crew: _____________________________ ICF Redefining building. master builder An ARXX ICF installer who creates customer satisfaction by: Delivering high energy efficiency, Big savings in heating and cooling costs, More comfortable, quiet and secure projects, and Redefining building. 1 2 3 4 noun | mast- r bil-d r | e e

master builder - Fox Blocks NY · 2015-09-28 · 1 Start row 2 at the same corner you started with row 1, and using the opposite corner form you started with on row 1. 2 Place straight

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Field GuideGuidelines for Preparing and Installing

ARXX ICF Products

Job: _____________________________

Date: _____________________________

Crew: _____________________________

ICFRede�ning building.

master builder

An ARXX ICF installer who creates customer satisfaction by:

Delivering high energy efficiency,Big savings in heating and cooling costs,More comfortable, quiet and secure projects, andRedefining building.

12

3

4

noun | mast- r bil-d r |ee

2 | ARXX Field Guide

1.0 ARXX ICFs: the Greener Choice

1.1 Help the Environment ..............................4

1.2 Build Satisfied Customers .......................4

1.3 Build a Better Business ............................4

1.4 ARXX is Here to Help ...............................4

1.5 Using the Guide .......................................5

1.6 Additional Resources ...............................5

2.0 Job Information

2.0 Job Information ........................................6

3.0 Job Outline

3.0 Job Outline ...............................................7

4.0 Job Facts

4.1 Basement ..................................................8

4.2 Main Floor.................................................9

4.3 Second Floor ..........................................10

5.0 Checklists

5.1 Checklist: Pre-Job ..................................11

5.2 Checklist: Delivery ..................................11

5.3 Checklist: Start of Job ............................12

5.4 Checklist: Reinforcement.......................13

5.5 Checklist: Row 1 ....................................15

5.6 Checklist: Row 2 .....................................16

5.7 Checklist: Row 3 .....................................16

5.8 Checklist: Row 4 .....................................17

5.9 Checklist: Bracing...................................17

5.10 Checklist: Openings .............................20

5.11 Checklist: Top row ................................21

5.12 Checklist: Prior to Concrete ................22

5.13 Checklist: Concrete ..............................23

5.14 Checklist: Post Concrete .....................24

5.15 Checklist: Cold Weather Concreting ..25

Table of ConTenTs

ARXX Field Guide | 3

6.0 ARXX 12” High Form

6.1 ARXX 12” High Form .............................26

7.0 Building an ICF Wall

8’ Wall ............................................................27

9’ Wall ............................................................27

10’ Wall ..........................................................27

12’ Wall ..........................................................27

Multi-story Wall ............................................27

8.0 Basic ICF Estimating

8.1 Standard forms .......................................28

8.2 Corner Forms .........................................29

8.3 ICF Lok ....................................................29

8.4 Hooks and Claws ....................................29

8.5 Bracing ....................................................29

9.0 Final Job Results

9.1 Final Job Results ....................................30

10.0 Estimating Manhour Rates

10.1 Estimating Manhour Rates ..................31

11.0 Concrete Volumes

11.1 Concrete Volumes ................................34

12.0 Form Sizes and Coverage

12.1 Form Sizes and Coverage ...................35

13.0 Available Forms

13.1 Available Forms ....................................36

Table of ConTenTs

4 | ARXX Field Guide

1.1 Help THe environmenT

Over half of all greenhouse gas emissions, like carbon dioxide, come from the built environment – all the energy used to build, heat, cool and light the offices, homes, fast food and retail stores and buildings all around us.

Using ICFs can substantially reduce the energy needed to heat and cool buildings. Increased insulation is recognized as one of the most cost effective methods of reducing greenhouse gas emissions. 1.2 build saTisfied CusTomers

When you build a commercial or residential project with ARXX ICF, you’re helping the environment, at the same time you’re saving your client money on an ongoing basis, and giving them a better, more comfortable structure.

1.3 build a beTTer business

Your ARXX walls and foundations will go up faster, saving you time, money and scheduling headaches.

1.4 arXX is Here To Help

ARXX has the best technical project support in the industry. We have building science experts, extensive knowledge and practical experience with building codes, CAD files, documentation and more.

Call us anytime you’re looking at a project whether industrial, commercial, institutional or residential. We can help in understanding potential energy savings and selecting the best product line to use on your project.

1.0 arXX iCfs: THe Greener CHoiCe

ARXX Field Guide | 5

1.5 usinG THe Guide

This field guide is not meant to replace the larger, more indepth ARXX Installation Guide, but to help you bring efficiency to the job by answering questions quickly.

Fill out each checklist in pre-job planning. This will help you to:

› ensure you’re prepared › finish the job faster › avoid mistakes › win more business, and be more profitable

Filling out job data while you build will give you information you’ll be able to refer to in the future and help you win more jobs. Happy customers can become references and position you as a leader in green building with ARXX ICF.

1.6 addiTional resourCes

At your ARXX training class you received an Installer’s Workbook. You can use it as a more complete reference in addition to this jobsite field guide.

If you need immediate assistance please contact the ARXX team:

› 1.800.293.3210 › www.arxx.com

1.0 ICfs: The Greener ChoICe

6 | ARXX Field Guide

Address: ____________________________________

____________________________________

____________________________________

Contact: ____________________________________

Phone: ____________________________________

Job type:

� grade beam � frost wall � bi-level basement (4’) � 6 course basement � 7 course basement � 8 course basement � basement and main floor � basement and two stories

basement ceiling height: __________________main floor ceiling height: __________________2nd floor ceiling height: __________________

Floor: � 9.5” � 11.5” � 12” other size: __________________________ � 14” floor topping: ______________________

Extras: Bracing:

� brick ledge � 100” � 12” high 6” form � 120” � height adjusters � 144” � 1 - 6 turns on job � tall wall � 7 - 12 turns on job � 13+ turns on job

Other: _____________________________________

2.0 Job informaTion

ARXX Field Guide | 7

Use the area below to sketch the job showing all corners. Include approximate dimensions for future reference.

3.0 Job ouTline

8 | ARXX Field Guide

4.1 basemenT

(basic formulas can be found on pages 28 - 29)

Total linear feet = ________________

Number of 90º corners = ________________

Number of 45º corners = ________________

Number of other corners = ________________

Number of courses of ARXX = ________________

Square foot of openings = ________________

Total number of standards = ________________

Total number of 90° corners = ________________

Total number of 45° corners = ________________

Linear feet of ARXX Lok = ________________

ARXX hooks = ________________

Rolls of tape = ________________

Rebar = ________________

Concrete = ________________

4.0 Job faCTs

ARXX Field Guide | 9

4.2 main floor

(basic formulas can be found on pages 28 - 29)

Total linear feet = ________________

Number of 90º corners = ________________

Number of 45º corners = ________________

Number of other corners = ________________

Number of courses of ARXX = ________________

Square foot of openings = ________________

Total number of standards = ________________

Total number of 90° corners = ________________

Total number of 45° corners = ________________

Linear feet of ARXX Lok = ________________

ARXX hooks = ________________

Rolls of tape = ________________

Rebar = ________________

Concrete = ________________

4.0 Job faCTs

10 | ARXX Field Guide

4.3 seCond floor

(basic formulas can be found on pages 28 - 29)

Total linear feet = ________________

Number of 90º corners = ________________

Number of 45º corners = ________________

Number of other corners = ________________

Number of courses of ARXX = ________________

Square foot of openings = ________________

Total number of standards = ________________

Total number of 90° corners = ________________

Total number of 45° corners = ________________

Linear feet of ARXX Lok = ________________

ARXX hooks = ________________

Rolls of tape = ________________

Rebar = ________________

Concrete = ________________

4.0 Job faCTs

ARXX Field Guide | 11

Checklists are an excellent way of ensuring important tasks don’t get overlooked. They also help provide answers when the lead hand cannot be onsite.

5.1 CHeCklisT: pre-Job

� 1 Blueprint shows rebar schedule or proper rebar design has been established.

� 2 Rough opening sizes are available for all window and door openings.

� 3 Wall heights have been pre-planned to determine the number of courses required.

� 4 Wall heights have been pre-planned to determine where cuts will be made.

� 5 Wall heights have been pre-planned to determine depth of dig.

5.2 CHeCklisT: delivery

� 1 There is clear access for a delivery truck.

� 2 Space is available to unload.

� 3 People will be onsite to unload delivery truck.

� 4 Job is squared prior to material being moved in. (this is difficult to do afterwards)

Remember: most drivers will not unload a truck for you. You will need at least two, but preferably four or more people to unload the truck to your site.

5.0 CHeCklisTs

12 | ARXX Field Guide

5.3 CHeCklisT: sTarT of Job

Materials:

� 1 rebar and design

� 2 blueprint

� 3 buck material and opening sizes

� 4 ARXX ICF forms and accessories

� 5 alignment and scaffold system including screws and 2’ x 10’ planks

� 6 anchor bolts or simpson hangers

� 7 strapping

Tools:

� 1 ARXX ICF saw, pruning or drywall saw and handsaw

� 2 tie wire and pliers

� 3 spray foam adhesive

� 4 rebar bender / cutter (if needed)

� 5 1” fibertape

� 6 chalk and string lines

� 7 proper signage for brand recognition and future reference

5.0 CheCklIsTs

ARXX Field Guide | 13

5.4 CHeCklisT: reinforCemenT

� 1 Horizontal rebar should alternate between two notches during coursing allowing vertical rebar to be held in place (see #2 and #3 on page 14).

� 2 All lap splices should overlap 40 bar diameters, unless Engineering shows otherwise.

� 3 Contact lap splices must be tied. Non- contact lap splices do not need to be tied.

� 4 “T” walls need to be tied together with tie wire or heavy duty zip ties.

� 5 Lintel rebar may require 2” concrete cover at bottom (verify with local building code).

� 6 “C” stirrups as per reinforcing charts or Engineering.

Reinforcing SteelBelow grade walls: usually tension side.Above grade walls: usually center of wall.

5.0 CheCklIsTs

14 | ARXX Field Guide

"T" wall

compression side (eg. backfill)

tension side (eg. inside face of wall)

ARXX Prime 8” web

non-contact lap splice

contact lap splice

Common rebar layouT

ARXX Field Guide | 15

"T" wall

compression side (eg. backfill)

tension side (eg. inside face of wall)

ARXX Prime 8” web

non-contact lap splice

contact lap splice

5.5 CHeCklisT: row 1

� 1 Footing and slab is clean, level and squared.

� 2 Chalk lines are complete. (outside of form is outside of building dimension)

� 3 . Mark all window and door openings on working surface. Have someone start to build bucks.

� 4 Place the ARXX ICF corner form - align with chalk line. (right or left corner)

� 5 Starting at corner form, place straight ARXX ICF forms, attaching tightly together end-to- end with an ARXX Claw or zip tie.

� 6 When opposite end of wall is reached, place the appropriate corner. (consider how the joints will line up on row 2)

� 7 Decide if you are going to use a butt or lapped joint. (butt joints do not need to be cut on a line, lapped joints must be cut straight and on a line)

� 8 Once the first row is complete, install rebar as per plans, code or Engineering.

5.0 CheCklIsTs

16 | ARXX Field Guide

5.0 CheCklIsTs

5.6 CHeCklisT row 2

� 1 Start row 2 at the same corner you started with row 1, and using the opposite corner form you started with on row 1.

� 2 Place straight forms in line from the corner form. Webs should line up automatically.

� 3 Use hooks or zip ties to connect rows 1 and 2 together at 24” o/c, and first and third web from every corner.

� 4 Once the second row is complete, install rebar as per plan, code or Engineering.

� 5 Install a single row of ARXX Lok, lapping the ends by one triangle.

� 6 Check top of second course to confirm level footings. Shim and/or trim as needed to be +/- 1/4”.

� 7 If satisfied, kick wall to the chalk lines and adhere to footings with spray foam at 16” o/c and both sides of wall. (insert tip of can under the form so foam fills about 2” of space)

� 8 Remember that courses 1,3,5,7 and courses 2,4,6,8 are all the same pattern for stacking. Once you have the first two courses stacked this is your blueprint for all other courses.

5.7 CHeCklisT: row 3

� 1 Start at the same corner as row one and lay forms out along the wall. All joints should line up with joints on row 1.

ARXX Field Guide | 17

� 2 Use hooks or zip ties at first and third webs from each corner, and in both directions from corner.

� 3 If a form needs to be cut, it’s size should be the same as row 1.

Optional: use ARXX hooks or zip ties on an entire row at 2’ o/c. (second web back from all joint lines)

� 4 Install rebar as per plan, code or Engineering.

5.8 CHeCklisT: row 4

� 1 Start at the same corner as row 1 and lay forms out along wall.

� 2 All joints should line up with joints on row 2.

� 3 Use hooks or zip ties at first and third web from each corner, and in both directions from corner.

� 4 If a form needs to be cut, its size should be the same as row 2.

� 5 Install rebar as per plan, code or Engineering.

5.9 CHeCklisT: braCinG

� 1 When laying out bracing keep, in mind how it will safely support scaffold planks.

� 2 At each inside corner you should have at least one scaffold; place it on the fourth web from the corner. (24”)

� 3 Space bracing so planks will fit. (9 or 10 webs apart work well for 14’ planks)

5.0 CheCklIsTs

18 | ARXX Field Guide

� 4 Attach strongbacks using one #10 sheet metal screw at the top of the slots into the web of each ARXX ICF form. Keep screws loose enough to slide in the slot. Do not use tapping screws. Strongback should line up with cut lines on forms to ensure they will line up with top row webs.

� 5 Attach one turnbuckle and scaffold bracket to one strongback and measure to make sure height will be good for concrete placement. If not, try another set of holes in the strongback.Install all turnbuckles at same height.

� 6 Attach turnbuckles to ground slab or floor. (not less than 45°; extend if needed)

� 7 Install all scaffold brackets.

� 8 Place planking and secure in place.

� 9 Install guard rails, if required.

�10 Plumb all corners and install a string line at top of wall along the outside edge. Slide a 3/4” spacer block between the string and the form at each corner. Slide a 3/4”spacer block along wall and adjust the plumb of the wall with the alignment turnbuckles as you move along the wall from corner to corner.

�11 Just before concrete placement it’s good practice to adjust the top of the wall in about 1/4”. Leave the corners plumb.

�12 During the concrete placement monitor the stringline and if the wall moves toward the string have someone adjust it back.

�13 After the concrete placement, re-align walls using the string, blocks and turnbuckles.

Remember: it’s easier to push a wall out than it is to pull the wall in.

5.0 CheCklIsTs

ARXX Field Guide | 19

5.0 CheCklIsTs

strongback and brace pole scaffold bracket guard rail completed scaffold

20 | ARXX Field Guide

5.10 CHeCklisT: openinGs

� 1 Establish the bottom of buck and mark on forms.

� 2 If the outside edge of the buck lines up on a web, you should alter the web pattern or simply slide the buck over.

� 3 Cut the forms to accept the bucks. (there are times when a 12” high form or height adjuster will work well)

� 4 If needed, install vertical rebar into spaces under the buck locations.

� 5 Bucks should be built with access points in the bottom to allow for concrete placement.

� 6 Place the bucks into position on the wall. The buck does not need to line up with cut lines on forms.

� 7 Build forms around the buck.

� 8 If you do not use hooks or zip ties, allow a space above the buck for settlement of forms.

5.0 CheCklIsTs

ARXX Field Guide | 21

5.11 CHeCklisT: Top row

� 1 Establish where the lintel rebar will need to be prior to laying forms in place.

� 2 If needed, place lintel rebar on top of window and door bucks. Remember to keep the rebar off the buck to allow the proper amount of concrete to flow around rebar as required by code.

� 3 Start at same corner as row 1 and lay forms out along wall.

� 4 Use the ARXX Claw or zip ties to hold the forms together horizontally.

� 5 Use hooks or zip ties at first and third webs from each corner, and in both directions from corner.

� 6 Use hooks or zip ties on the entire row at 2’ o/c. (second web back from all joint lines)

� 7 Install service penetrations as required. Insert beam pockets if needed.

Tip: two layers of ICF foam cut from scrap onsite will give you a 5” pocket; cut it out after the concrete cures.

� 8 Install one row of ARXX Lok, overlapping ends by one triangle. Weld points should be close to webs.

� 9 Install vertical rebar as per plan, code or Engineering.

5.0 CheCklIsTs

22 | ARXX Field Guide

5.12 CHeCklisT: prior To ConCreTe

� 1 Attach a string line to monitor wall during concrete placement. A good spot for the string line is opposite the bracing about 2” down from the top of the wall. (see “Bracing”- section 5.9 )

� 2 Rebar and lintel steel is complete as per plan.

� 3 Openings have been braced and framed.

� 4 Corners have been secured with tape or strapping.

� 5 Forms with more than three foam bars past the last web have been strapped.

� 6 Stacked joints (any joints 8” or less apart) have been strapped.

� 7 Short wall sections (4’ or less) have been strapped.

� 8 Beam pockets are in place.

� 9 Sill plate attachment is ready for installation after concrete placement.

� 10 Space is ready for concrete pump to set up.

If ICFs will be used for next level of structure:

� 11 Top of form has been covered to protect from concrete spillage.

� 12 Service penetrations have been installed. (vents, central vacuum, exhaust etc.)

� 13 Rebar dowels are ready to be installed.

� 14 When placing concrete, remember to leave a portion of the web exposed. This will allow you to tie the next row down when you continue building.

� 15 Embeds are installed and secured.

5.0 CheCklIsTs

ARXX Field Guide | 23

5.13 CHeCklisT: ConCreTe

� 1 Establish concrete crew and who will be responsible for what:

- one person to place concrete - two people to consolidate concrete - one or two people to level walls

Tip: extra manpower on pour day is a good idea.

� 2 You will have to tell the pump operator how many lifts you will be doing and what slump concrete you want. (2’ to 4’ lifts with a 5” to 6”slump is normal)

� 3 Start placing concrete at least 2’ from a corner. (never into a corner as it could move the wall) Always flow the concrete through the corner.

Tip: if the concrete gets through the top rebar and ARXX Lok with just a bit of restriction, the slump is good. If the concrete flows freely past the top rebar and ARXX Lok, the slump is too high.

� 4 Create a lift of concrete on either side of corner before actually filling the corner. These lifts on either side act as an anchor holding the corner in place.

� 5 At a window, fill from one side and let the concrete flow under the window buck, then stop the pump, move to the opposite side of the buck and continue. Some windows will require extra concrete to be placed into the opening at the bottom of the buck.

� 6 Consolidate concrete during each lift, following the person who is placing concrete.

5.0 CheCklIsTs

24 | ARXX Field Guide

� 7 Leave at least 18” to 24” at top of wall for final lift. This will allow concrete pump to keep up.

� 8 Monitor walls during and after concrete placement, and then adjust turnbuckles to level walls.

� 9 If required, install anchor bolts.

� 10 Ensure all window and door bucks have been consolidated properly by hitting face of buck with a hammer.

� 11 Clean concrete off footings, slabs, scaffold, walls, tools etc.

� 12 Before you leave, take one last look to ensure your walls are straight and plumb.

5.14 CHeCklisT: posT ConCreTe

� 1 Bracing can be removed the next day unless it’s windy. If it is windy, it’s recommended that you place temporary bracing prior to removing the ARXX bracing.

Note: concrete must cure the same amount of time as a conventional job prior to continuing the project.

5.0 CheCklIsTs

ARXX Field Guide | 25

5.15 CHeCklisT: Cold weaTHer ConCreTinG

When building with ARXX in cold weather there are a few additional precautions that need to be taken.

� 1 Keep walls covered to keep snow out of wall cavity. Concrete does not melt snow.

� 2 If you get snow into the wall cavity you must remove it prior to concrete placement. This can be done by cutting temporary holes into the bottom of forms or drizzling hot water into the forms (in the winter hot water is available from the mixer trucks).

� 3 Use 18” wide insulated tarps (or equivalent along top of wall.

� 4 In very cold weather (0°F / -20°C) only remove 8’ of insulation at a time while placing concrete. This will allow the warmth of the concrete to preheat the wall and rebar during the pour.

� 5 When complete, cover the wall to protect concrete from cooling. The hydration process will keep the wall at a good temperature without the need for any extra hoarding or heating.

� 6 Remember to cover exposed concrete at bucks.

5.0 CheCklIsTs

26 | ARXX Field Guide

wHy CHoose THe arXX 12” HiGH form insTead of a ½ bloCk?

› A ½ block only allows you to get within 8” of the height you need so you will end up rip cutting entire rows of forms. Contractors nationwide asked ARXX for an alternative. › Having both a 16 ¾” and a 12” form allows you to get the course heights you need, eliminating the need to rip cut forms. Simply preplan your job to understand how many rows of 12” forms you need. › The double X web design in ARXX forms allows for easy rip cuts, without sacrificing strength. › Simply put, ARXX continues to be the strongest form in the market. › ARXX also continues to hold the patent on exposed webs.

6.0 arXX 12” HiGH form

ARXX Field Guide | 27

8’ wall

› six courses of 16 ¾” forms = 8’ 4½” › + 1 ½” sill plate = 8’ 6”

Even if you need a slab you will still end up with a clean 8’ of finished headroom.

9’ wall

Add a 12” high form at any location within the wall.

10’ wall

Add two 12” high forms at any location within the wall.

12’ wall

Add four 12” high forms at any location within the wall. (or just use nine courses of 16 ¾” forms)

mulTi-sTory wall

For multi-story jobs preplan with a cross- section to achieve the most efficient locations for the 12” high forms.

This cross-section shows simpson hangers being used to attach the floor system.

7.0 buildinG an iCf wall

ARXX Field Guide | 28

8.1 sTandard forms

1. Calculate the total lineal foot (LF) of wall.2. From the plan add up the LF taken up by corners:

- outside 90° corner = 4’ of wall - inside 90° corner = 2’ of wall - outside 45° corner = 3’ of wall - inside 45° corner = 2’ of wall - standard form = 4’

3. Subtract LF of wall taken up by corners from the TLF of wall. The answer will be the LF of wall for standard forms

4. Divide the answer above (3) by four. Four represents the length of each standard form. The answer will be the number of standard forms per row.

5. After determining your wall heights and how you will course them, multiply the answer for (4) by the number of courses you will need. This answer is the total gross number of standards needed for job.

6. Calculate total square footage of all openings and divide that number by square feet of ARXX ICF used (refer to section 12.0).

7. Deduct the answer for (6) from the answer to (5).

The formula looks like this:

((LF - (# of turns x 4)) /4 * # of courses high) - TSF of openings / sq. ft. of ICF used

8.0 basiC iCf esTimaTinG

ARXX Field Guide | 29

8.2 Corner forms

1. Count the number of turns for the type of corner you are estimating. (90° or 45°)

2. Multiply the answer from (1) by the number of courses high.

8.3 arXX lok

› Total LF of job x number of courses of ARXX Lok (usually 2)

8.4 Hooks and Claws

› Total number of forms x 2. This will give you more than you need. Use the remaining hooks/claws on your next job, and adjust from there.

8.5 braCinG: › Total LF of wall ÷ by 6.

Note: for more in depth estimating, please refer to the ARXX ICF Installation Guide.

8.0 basIC ICf esTImaTInG

30 | ARXX Field Guide

By filling this page out you will know where you are with your crew. This will help your company improve, as well as quote jobs more accurately.

Total gross square foot of wall (TSF) = ___________(total lineal foot of wall x total height of wall)

Total man hours (TMH) on site = ________________(number days worked x hours/day x number workers)

Total man hours include such items as:

- ICF delivery - building walls- laying rebar - installing scaffold- building and installing bucks - placing concrete - removing scaffolding- water protection (if it’s a basement)- jobsite cleanup

TMH ÷ TSF = ____________________ man hours/ft²

An easy job should come in around a .06 mhsfA complex job can be above a .1 mhsf

9.0 final Job resulTs

ARXX Field Guide | 31

This guide will help you calculate the approximate man hours/gross ft.² of the ICF wall area for your job.

This guide is based on historical job reports and cover all phases of the installation of ARXX Edge, ARXX Prime and ARXX Steel forms including:

› unloading/handling forms › stacking/cutting forms › fabricating/installing bucks › fabricating/installing reinforcing steel › handling/installing the bracing alignment system (BAS) › installing accessories, waterproofing, connectors, etc. › placing/consolidation of concrete › stripping the BAS › final clean-up

Contractors should use their best judgement in applying lighter or heavier rating points to each of the 20 categories. The estimated rate results are for general guidance and are not intended to be used to bid on a project.

› Answer each of the 20 categories by indicating the rating point that best matches the specific project. › Add the total for each row, and then total all the points for the Total Project Rating. › Select from the Manhour Rate chart the MH/GSF.

10.0 esTimaTinG man Hour raTes

32 | ARXX Field Guide

› Multiply the MH/GSF by the gross sq. ft. of ICF wall in the whole project (do not deduct for openings) example: 0.07 x 2,286 sq. ft. = 160 manhours › Divide the total manhours by the crew size example: 160 manhours / 4 crew = 40 hours to complete project.

Contractors are encouraged to track their MH/GSF per project and create their own historical data to improve accuracy in estimating, more accurate bidding and monitor their construction efficiency.

Man Hour Rate Chart

Building Rate MH / GSF Rate

20 0.03

21 - 24 0.04

25 - 28 0.05

29 - 32 0.06

33 - 36 0.07

37 - 38 0.08

39 - 40 0.09

41 - 42 0.10

43 - 44 0.11

45 - 47 0.12

48 - 50 0.13

51 - 55 0.14

56 - 61 0.15

62 - 67 0.16

68 - 73 0.17

74 - 79 0.18

80 - 82 0.19

83 - 84 0.20

10.0 esTImaTInG man hour raTes

ARXX Field Guide | 33

Points WeatherConditions

% of 90° or 45° Corner

Forms / Total Forms

% of Other Corner Forms / Total Forms

Typical # of Courses /Stories

Total

1 mild 0 - 16% 0 1 - 7

3 rain / snow 17 - 24% 1 - 16% 8 - 10

5 severe hot / cold 25%+ 17%+ 11+

PointsSF Openings / GSF of Wall

Area

SF of Radius Wall / GSF Wall Area

Average lintel has:

ARXX Crew Experience

LevelTotal

1 0 - 7% 0 no stirrups high

3 8 - 20% 1 - 10% C stirrups medium

5 21% 11% cage stirrups low (unless job is 2000+ forms)

PointsSite Accessand Ground Conditions

Window and Door Horizontal Rip Cuts

Number of Tees or Pilasters /

Story

Embedments Total

1 ideal no rip cuts 0 few andsimple

2 fair up to 4” rip cuts 1 - 7 few and

complex

3 poorup to 4”

rip cuts top and bottom

5+ more andcomplex

Points ICF Type Used

Courses of Brick Ledge per Story

LF Rebar per Standard

Form

Number of Stories

(includingbasement)

Total

1 block 0 0 - 9 1

2 tongue & groove 1 10 - 14 2

3 knock down 2+ 15+ 3+

Points ARXX Crew Size

Bottom course on a:

Concrete Placement

Type

Dimensions are ARXX Friendly

Total

1 1 - 4 slab boom pump 8” increments

2 5 - 10 strip footing chute non 8”

increments

3 11+ piles/stepfootings

crane / bucket or line

pump

3+ wall lengths < 3’

Total Building Rate(add all sections)

10.0 esTImaTInG man hour raTes

34 | ARXX Field Guide

cu. Y

ards

cu. M

eter

s

per f

orm

per f

orm

cu.y

ard

cu. m

eter

512

2035

512

2035

40.

066

0.05

15.2

20.0

0.3

0.8

1.3

2.3

0.3

0.6

1.0

1.8

60.

099

0.07

610

.113

.20.

51.

22.

03.

50.

40.

91.

52.

78

0.13

20.

101

7.6

9.9

0.7

1.6

2.6

4.6

0.5

1.2

2.0

3.5

100.

165

0.12

66.

17.

90.

82.

03.

35.

80.

61.

52.

54.

416

" tal

l12

0.19

80.

151

5.1

6.6

1.0

2.4

4.0

6.9

0.8

1.8

3.0

5.3

60.

108

0.08

29.

312

.20.

51.

32.

23.

80.

41.

01.

62.

98

0.13

60.

104

7.4

9.6

0.7

1.6

2.7

4.8

0.5

1.2

2.1

3.6

16 3

/4" t

all

100.

170.

135.

97.

70.

92.

03.

46.

00.

71.

62.

64.

624

” Ste

el F

latw

all

60.

148

0.11

36.

758.

80.

71.

83.

05.

20.

61.

42.

34.

08

0.19

70.

151

56.

61.

02.

43.

96.

90.

81.

83.

05.

36

0.07

40.

057

13.5

17.5

0.4

0.9

1.5

2.6

0.3

0.7

1.1

2.0

16” S

teel

Wa�

e G

rid8

0.10

00.

076

10.0

13.2

0.5

1.2

2.0

3.5

0.4

0.9

1.5

2.7

Use

this

if y

ou ru

n sh

ort a

t end

of c

oncr

ete

plac

emen

tQ

uick

Con

cre t

e V o

l um

esN

umbe

r of f

orm

s

�lle

d fo

r eve

ryFo

rm ty

pe &

siz

e

Cu. Y

ards

nee

ded

for t

his

# of

form

s

Cu. M

eter

s ne

eded

for t

his

# of

form

s11.0 ConCreTe volumes

AR

XX

Edg

e™

AR

XX

Prim

e™

AR

XX

Ste

el™

ARXX Field Guide | 35

Co

ncre

teE

PS F

oam

Tota

lFi

nish

edTo

tal

Wal

l are

a

Thic

knes

sTh

ickn

ess

Wid

thH

eig

htLe

ngth

cove

rag

e

Sq. F

eet

44

2.5

916

485.

336

62.

511

1648

5.33

88

2.5

1316

485.

3310

102.

515

1648

5.33

12+

122.

517

1648

5.33

66.

252.

625

11.5

16.7

548

5.58

87.

875

2.37

512

.516

.75

485.

5810

9.87

52.

515

16.7

548

5.58

Stee

l Fla

twal

l6

62.

511

2448

8.0

88

2.5

1324

488.

06

varia

ble

varia

ble

9.25

1648

5.3

Stee

l Waf

fle G

rid8

varia

ble

varia

ble

1116

485.

3

Stan

dar

d F

orm

Siz

es a

nd C

ove

rag

e

All

num

ber

s in

inch

es

Form

Typ

e &

Siz

e

12.0 form sizes and CoveraGe

AR

XX

Edg

e™

AR

XX

Prim

e™

AR

XX

Ste

el™

36 | ARXX Field Guide

4

16

"

6

16"

8

16

"

10

16"

>12*

16

"

6

16.7

5"

8

16.7

5"+

10

16

.75"

1 si

de

Stee

l Fla

twal

l6

24

"

8

24"

6

16"

Stee

l Wa�

e G

rid8

16

"

+ in

com

bin

atio

n w

ith t

he A

RXX

Ed

ge

pan

el s

yste

mas

of 0

2/20

10

Ava

ilabl

e Fo

rms

* A

RXX

Ed

ge

conn

ecto

rs u

sed

t

o m

ake

wid

er c

ore

size

s.

++

++

++

1

sid

e

Core

Si

ze

*

*

*

*

*

Stan

dard

Fo

rms

45°

corn

ers

90°

corn

ers

form

heig

htta

per

top

bric

kle

dge

expo

sed

web

sbu

ried

web

s

�eld

cut

to

suit

13.0 available forms

AR

XX

Edg

e™

AR

XX

Prim

e™

AR

XX

Ste

el™

ARXX Field Guide | 37

noTes

_____________________________________

_____________________________________

_____________________________________

_____________________________________

______________________________________

______________________________________

_____________________________________

_____________________________________

_______________________________________

_______________________________________

_______________________________________

_______________________________________

_______________________________________

_______________________________________

______________ _______________________

_______________________________________

______________________________________

______________________________________

_______________________________________

_______________________________________

_____________________________________ _