9902006 Page 1 of 33 Revision B Rev. ECO Description Author Approved Date A INITIAL RELEASE B. Klatt W. Mayer 03/02/92 B To incorporate 9902008, to change ref. from 64 # to 99#, General Editorial Update B. Klatt M. Bautz 07/16/14 Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection Dwg. No. 9902006 Revision B May 23, 2014

Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  1  of  33   Revision  B  

Rev.   ECO     Description   Author   Approved   Date  A     INITIAL  RELEASE   B.  Klatt   W.  Mayer   03/02/92  B     To  incorporate    99-­‐02008,    to  change  ref.  

from  64  #  to  99#,  General  Editorial  Update  

B.  Klatt   M.  Bautz   07/16/14  

                                                                                                                                                                                 

 

Massachusetts  Institute  of  Technology  

Kavli  Institute  for  Astrophysics  and  Space  Research  (MKI)  

 Receiving  Inspection  

 

Dwg.  No.  99-­‐02006  Revision  B  May  23,  2014  

 

Page 2: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  2  of  33   Revision  B  

Table  of  Contents  

PREFACE   4  

1.0   PURPOSE   5  

2.0   SCOPE   5  

3.0   REFERENCE  DOCUMENTS   5  

4.0   GENERAL   5  4.1   PURCHASE  REQUISITIONS   5  4.2   STATISTICAL  SAMPLING   5  4.3   PURCHASED  ITEMS   5  4.4   ITEMS  ON  HOLD   5  4.5   NOT  ACCEPTED  ITEMS   5  4.6   ACCEPTED  ITEMS   6  4.7   LIMITED  LIFE  ITEMS   6  4.8   INCOMING  INSPECTION  ACTIVITY   6  4.9   RECEIVING  INSPECTION  FILES   6  

5.0   PROCEDURE   6  5.1   RECEIVING  INSPECTOR   6  5.2   PERFORMANCE  ASSURANCE  MANAGER   6  

6.0   CHECKLISTS   7  

CAPACITOR,  CERAMIC  –  CKR05/CKR06  –  MIL-­‐C-­‐39014/01  OR  /02   8  

CAPACITOR,  CERAMIC  –  CDR/CWR   9  

CAPACITOR,  TANTALUM,  NON-­‐SOLID  –  CLR79  –  MIL-­‐C-­‐39006/22   10  

CAPACITOR,  TANTALUM,  SOLID  –  CSR13  –  MIL-­‐C-­‐39003/01   11  

CAPACITOR,  METALIZED  PLASTIC  –  CRH01  –  CRH05  –  MIL-­‐C-­‐83421/01   12  

RESISTOR,  WIREWOUND,  ACCURATE  –  RBR  XX  –  MIL-­‐R-­‐39005/XX   13  

RESISTOR,  WIREWOUND,  RWR   14  

RESISTOR,  COMPOSITION  –  RCR05  AND  RCR07  –  MIL-­‐R-­‐39008/04  AND  /01   15  

RESISTOR,  FILM  –  RLR05  AND  RLR07  –  MIL-­‐R-­‐39017/05  AND  /01   16  

RESISTOR,  VARIABLE  –  RQXXX  –  MIL-­‐R-­‐39023/XX   17  

TRANSISTOR,  MILITARY  –  JANTX2N-­‐-­‐/JANTXV2N-­‐-­‐  -­‐  MIL-­‐S-­‐19500   18  

Page 3: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  3  of  33   Revision  B  

DIODE,  MILITARY  –  JANTX1N-­‐-­‐/JANTXV1N-­‐-­‐  -­‐  MIL-­‐S-­‐19500   19  

MICROCIRCUITS,  MILITARY  –  SMD   20  

MICROCIRCUITS,  GFE  –  GSFC  SCD   21  

MICROCIRCUITS,  NONSTANDARD  –MIT  SCD   22  

MICROCIRCUITS,  NONSTANDARD  –  OTHER  –  MIT  SCD   23  

RELAYS,  STANDARD  –  MIL-­‐R-­‐39016/12   24  

CONNECTORS,  GFE  –  GSFC  SCD   25  

PRINTED  CIRCUIT  BOARDS   26  

MECHANICAL  PARTS   27  

FASTENERS   28  

FABRICATED  MECHANICAL  PARTS   29  

FABRICATED  ASSEMBLIES   30  

METALIC  RAW  MATERIALS   31  

NONMETALIC  RAW  MATERIALS   32  

ADHESIVES   33      

 

 

Page 4: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  4  of  33   Revision  B  

Preface    

Revision  A  was  the  Initial  Release  of  99-­‐02006  written  by  Brian  Klatt  01/23/92  and  checked  by  W.F.  Mayer  on  03/02/92.        Revision  B  issued  a  general  editorial  update  and  changes  to  incorporate  99-­‐02008,  to  change  reference  from  64#  to  99#,  and  a  new  format  on  07/16/14.  

       

Page 5: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  5  of  33   Revision  B  

1.0 Purpose  This  procedure  provides  specific  instructions  for  performing  receiving  inspection  of  purchased  materials  or  parts,  including  fabricated  parts  and  assemblies  and  processes  performed  outside  of  MIT.  

2.0 Scope  This  procedure  applies  to  all  purchased  parts,  materials,  processes,  and  assemblies  used  in  the  fabrication  of  flight  hardware.  

3.0 Reference  Documents    MIT  Document   Title  99-­‐02001   Inspection  and  Documentation  99-­‐02004   Nonconforming  Material  and  

Nonconforming  Material  Reports  

4.0 General  

4.1 Purchase  Requisitions  All  purchase  requisitions  for  parts,  materials,  processes,  and  assemblies,  used  in  the  fabrication  of  flight  hardware  must  be  signed  by  the  Performance  Assurance  Manager.    Each  of  thee  signed  requisitions  will  be  copied  and  filed  in  the  receiving  area  for  reference  during  receiving  inspection.  

4.2 Statistical  Sampling  Items  are  statistically  sampled  or  10%  inspected  in  accordance  with  the  criteria  detailed  in  table  8-­‐2  of  the  Performance  Assurance  Implementation  Plan.    Inspection  methods  and  acceptance  criteria  are  listed  in  the  attached  checklists  for  each  unique  item.  

4.3 Purchased  Items  Purchased  items  are  held  in  receiving  inspection  and  not  released  into  bonded  stock  until  all  inspections  and/or  test  operations  are  complete  and  acceptable  and  required  certification  or  test  reports  have  been  reviewed  and  accepted.  

4.4 Items  on  Hold  Items  on  hold  for  any  reason  (e.g.,  it  needs  certifications,  test  reports,  data,  etc.)  must  be  identified  and  segregated  from  other  items  in  receiving  inspection.  

4.5 Not  Accepted  Items  Items  that  are  not  accepted  must  be  segregated  for  material  review.    A  reject  tag  is  prepared  and  attached  to  the  material  for  identification.    The  reject  tag  is  specified  in  “Inspection  and  Documentation”,  MIT  document  99-­‐02001,  paragraph  1.1.6.    Instructions  for  its  use  are  in  section  4.0  of  that  document.  

Page 6: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  6  of  33   Revision  B  

4.6 Accepted  Items  Items  that  are  accepted  require  an  Inspection  Status  Tag  which  is  specified  in  “Inspection  and  Documentation”,  MIT  document  99-­‐02001,  paragraph  1.1.5.    Instructions  for  its  use  are  in  section  3.0  of  that  document.  

4.7 Limited  Life  Items  Limited  Life  items  require  a  Shelf  Life  Tag  that  is  specified  in  “Inspection  and  Documentation”,  MIT  document  99-­‐02001,  paragraph  1.1.9.  

4.8 Incoming  Inspection  Activity  The  result  of  all  incoming  inspection  activity  is  recorded  on  the  Incoming  Inspection  Report  that  is  specified  in  “Inspection  and  Documentation”,  MIT  99-­‐02001,  paragraph  1.1.4.    Instructions  for  its  use  are  in  section  2.0  of  that  document.  

4.9 Receiving  Inspection  Files  Records  of  inspections  and  tests  are  filed  by  MIT  part  number  in  the  Receiving  Inspection  Files.    Certificates  of  Compliance  (C  of  C),test  data,  and  all  vendor  documentation  shall  be  included  in  this  file.  

5.0 Procedure  

5.1 Receiving  Inspector  a. Obtains  copies  of  applicable  drawings,  purchase  order  requests,  specifications,  

inspection  checklists,  etc.  b. Obtains  necessary  equipment  required  such  as  tools,  microscope,  and  test  

equipment.  c. Checks  the  packing  list  against  the  items  received  and  the  purchase  order  

request.  d. Performs  required  inspections  and  tests.  e. Reviews  vendor  documentation  and  test  data  for  completeness  and  

compliance  with  procurement  documents.  f. Prepares  all  required  receiving  inspection  documentation  in  accordance  with  

MIT  document  99-­‐02001.  g. Prepares  the  Shelf  Life  Tag  if  applicable.  h. Returns  drawings,  specifications,  test  equipment,  etc.  obtained  in  a.  and  b.  

above.  i. Files  all  receiving  documentation  in  Receiving  Inspection  Files.  j. Moves  completed  items  to  appropriate  are;  i.e.  “Hold”,  “Bonded  Stock”  or  

“Material  Review”.  k. Refers  questionable  or  disputed  matters  to  the  Performance  Assurance  

Manager.  

5.2 Performance  Assurance  Manager  a. Initiates  training  classes,  as  necessary,  to  support  inspection  or  test  methods  

and  inspection  criteria.  b. Initiates  Material  Review  board  (MRB)  action  on  nonconforming  material  in  

accordance  with  MIT  document  99-­‐02004,  Nonconforming  Material  and  Nonconforming  Material  Reports.  

c. Approves  decisions  on  items  initially  dispositioned  to  “scrap”  or  “RTV”.    d. Establishes  criteria  for  items  not  covered  herein.  

Page 7: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  7  of  33   Revision  B  

6.0 Checklists  The  following  checklists  are  used  in  receiving  inspection  and  are  attached  for  information:    

Capacitor,  Ceramic  -­‐  CKR05/CKR06  Capacitor,  Ceramic  -­‐  CDR/CWR  Capacitor,  Tantalum,  Nonsolid  -­‐  CLR79  Capacitor,  Tantalum,  Solid  -­‐  CSR13  Capacitor,  Metalized  Plastic  -­‐  CRH05  Resistor,  Wirewound,  Accurate  -­‐  RBR  XX  Resistor,  Wirewound  -­‐  RWR  Resistor,  Composition  -­‐  RCR05/RCR07  Resistor,  Film  -­‐  D/M  Resistor,  Variable  -­‐  RQ  XXX        Transistor,  Military  -­‐  JANTX2N-­‐-­‐/JANTXV2N  Diode,  Military  –  JANTX1N-­‐-­‐/JANTX1VN-­‐-­‐  Microcircuit,  Military  SMD  Microcircuit,  GFE  Microcircuit,  Nonstandard  Microcircuit,  Nonstandard,  Other  Relays,  Standard  Connectors,  Military  Connectors,  GFE  Printed  Circuit  Boards  Mechanical  Parts  Fasteners  Fabricated  Mechanical  Parts  Fabricated  Assemblies  Metallic  Raw  Materials  Nonmetallic  Raw  Materials  Adhesives  

Page 8: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  8  of  33   Revision  B  

Capacitor,  Ceramic  –  CKR05/CKR06  –  MIL-­‐C-­‐39014/01  or  /02  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 9: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  9  of  33   Revision  B  

Capacitor,  Ceramic  –  CDR/CWR  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 10: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  10  of  33   Revision  B  

Capacitor,  Tantalum,  Non-­‐Solid  –  CLR79  –  MIL-­‐C-­‐39006/22

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 11: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  11  of  33   Revision  B  

Capacitor,  Tantalum,  Solid  –  CSR13  –  MIL-­‐C-­‐39003/01

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 12: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  12  of  33   Revision  B  

Capacitor,  Metalized  Plastic  –  CRH01  –  CRH05  –  MIL-­‐C-­‐83421/01  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 13: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  13  of  33   Revision  B  

Resistor,  Wirewound,  Accurate  –  RBR  XX  –  MIL-­‐R-­‐39005/XX    

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 14: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  14  of  33   Revision  B  

Resistor,  Wirewound,  RWR    

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 15: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  15  of  33   Revision  B  

Resistor,  Composition  –  RCR05  and  RCR07  –  MIL-­‐R-­‐39008/04  and  /01  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 16: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  16  of  33   Revision  B  

Resistor,  Film  –  RLR05  and  RLR07  –  MIL-­‐R-­‐39017/05  and  /01

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

   

Page 17: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  17  of  33   Revision  B  

Resistor,  Variable  –  RQXXX  –  MIL-­‐R-­‐39023/XX

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

MIN. RES. Ω

MAX. RES. Ω

Page 18: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  18  of  33   Revision  B  

Transistor,  Military  –  JANTX2N-­‐-­‐/JANTXV2N-­‐-­‐  -­‐  MIL-­‐S-­‐19500  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 19: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  19  of  33   Revision  B  

Diode,  Military  –  JANTX1N-­‐-­‐/JANTXV1N-­‐-­‐  -­‐  MIL-­‐S-­‐19500  

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 20: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  20  of  33   Revision  B  

Microcircuits,  Military  –  SMD

100 % RECEIVING

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 21: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  21  of  33   Revision  B  

Microcircuits,  GFE  –  GSFC  SCD

100 % RECEIVING

VISUAL INSPECTION TEST DATA

Date Part Number Purchase Order Number

Manufacturer and Distributor

YES

NO

 

Page 22: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  22  of  33   Revision  B  

Microcircuits,  Nonstandard  –MIT  SCD

100 % RECEIVING

VISUAL INSPECTION SOURCE INSPECT.

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 23: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  23  of  33   Revision  B  

Microcircuits,  Nonstandard  –  Other  –  MIT  SCD

100 % RECEIVING

VISUAL INSPECTION SOURCE INSPECT.

Date Part Number Purchase Order Number

Manufacturer and Distributor

 

Page 24: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  24  of  33   Revision  B  

Relays,  Standard  –  MIL-­‐R-­‐39016/12

100 % RECEIVING

Date Part Number Purchase Order Number

Manufacturer and Distributor

Page 25: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  25  of  33   Revision  B  

Connectors,  GFE  –  GSFC  SCD

100 % RECEIVING

VISUAL INSPECTION TEST DATA

Date Part Number Purchase Order Number

Manufacturer and Distributor

YES

NO

 

Page 26: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  26  of  33   Revision  B  

Printed  Circuit  Boards

100 % RECEIVING

TEST

Date Part Number/ Drawing Number

Purchase Order Number

Manufacturer

 

Page 27: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  27  of  33   Revision  B  

Mechanical  Parts

100 % RECEIVING

VISUAL INSPECTION (specify additional items)

DATA

Date Part Name and Part Number

Purchase Order Number

Manufacturer and Distributor

 

Page 28: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  28  of  33   Revision  B  

Fasteners

100 % RECEIVING

Date Part Number or

Size

Purchase Order Number

Manufacturer and Distributor

Page 29: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  29  of  33   Revision  B  

Fabricated  Mechanical  Parts

100 % RECEIVING

VISUAL INSPECTION (Specify additional items)

DATA

Date Part Name and Part Number

Purchase Order Number

Manufacturer and Distributor

 

Page 30: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  30  of  33   Revision  B  

Fabricated  Assemblies

100 % RECEIVING

VISUAL INSPECTION TEST

Date Assembly Name and Assembly Part Number

Purchase Order Number

Manufacturer and Distributor

 

Page 31: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  31  of  33   Revision  B  

Metallic  Raw  Materials

100 % RECEIVING

VISUAL INSPECTION

Date Material Name and

Part Number

Purchase Order Number

Manufacturer and Distributor

 

Page 32: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  32  of  33   Revision  B  

Nonmetallic  Raw  Materials

100 % RECEIVING

VISUAL INSPECTION Limited Life Item

Date Material Name and

Part Number

Purchase Order Number

Manufacturer and Distributor

 

Page 33: Massachusetts%Institute%of%Technology% … · 2014-07-16 · 99"02006& Page5&of33& RevisionB& 1.0 Purpose% This&procedure&provides&specific&instructions&for&performing&receiving&inspection

99-­‐02006   Page  33  of  33   Revision  B  

Adhesives  

100 % RECEIVING

VISUAL INSPECTION (specify additional items)

Limited Life Item

Date Adhesive Name and

Part Number

Purchase Order Number

Manufacturer and Distributor