MANAR MALL EXPANSION Submittal/Reference No : MAS-PL-009 dated 30 April 2015 Submittal Content : G.I.Angle & Channel Product : Manufacturer : Fixwell/Alpha Star Installer : _________________________________________________________ ______ SCL Engineer’s review comments: 1. Scope of works for material submitted not clear in the submittal. 2. Product catalog not highlighted for most of the product details enclosed in the submittal. 3. Provide schedule of all support sizes with area of usage, insulated, non-insulated pipework, etc. from proposed material/accessories. 4. Provide schedule of supports vs service discipline and type of pipe material to be supported from product enclosed in submittal. 5. Provide details of fixing opf secondary supports to main structural support for service clamping. 6. All supports submitted shall have galvanic order discrimination to avoid scaling. 7. All secondary supports provided shall have anti rust coating. 8. Ends of all supports cut shall be painted with galvanic coat. 9. Where required for certain services as per fire safety standards, supports shall be fire rated. Fire rating details shall be provided for the same. 10. Handling, storage, fabrication and installation shall be strictly as per standards and manufacturer’s recommendation. 11. Trained personnel shall be utilized at site for all related activities. 12. Product supplied at site shall be in compliance to local authority regulations. 13. Submit samples of each product for approval.

MAS-PL-009

Embed Size (px)

DESCRIPTION

Material

Citation preview

MANAR MALL EXPANSION Submittal/Reference No: MAS-PL-009 dated 30 April 2015Submittal Content

: G.I.Angle & ChannelProduct

:

Manufacturer

: Fixwell/Alpha StarInstaller

: _______________________________________________________________SCL Engineers review comments:1. Scope of works for material submitted not clear in the submittal.

2. Product catalog not highlighted for most of the product details enclosed in the submittal.

3. Provide schedule of all support sizes with area of usage, insulated, non-insulated pipework, etc. from proposed material/accessories.4. Provide schedule of supports vs service discipline and type of pipe material to be supported from product enclosed in submittal.

5. Provide details of fixing opf secondary supports to main structural support for service clamping.

6. All supports submitted shall have galvanic order discrimination to avoid scaling.

7. All secondary supports provided shall have anti rust coating.

8. Ends of all supports cut shall be painted with galvanic coat.9. Where required for certain services as per fire safety standards, supports shall be fire rated. Fire rating details shall be provided for the same.

10. Handling, storage, fabrication and installation shall be strictly as per standards and manufacturers recommendation.

11. Trained personnel shall be utilized at site for all related activities.

12. Product supplied at site shall be in compliance to local authority regulations.13. Submit samples of each product for approval.

SHANKLAND COX LIMITED

GF/RA/jm/10/12/2014