MARVELE CARGO PORT IN KAUNAS Concession Project 2015 March

Marvele cargo port in Kaunas

Embed Size (px)

DESCRIPTION

Concession Project

Citation preview

Page 1: Marvele cargo port in Kaunas

MARVELE CARGO PORT IN KAUNASConcession Project2015 March

Page 2: Marvele cargo port in Kaunas

#1GDP/Capitagrowth in EU

Population

Real GDP growth

Inflation

Membership

Currency

3 million

2013 – 3.2%2014 – 2.9%2015f – 3.1%

2013 – 1.2%2014 – 0.2%

EU and NATOOECD from 2017

Euro

f - forecastStatistics LithuaniaEurostat, 2004-2013World Bank Doing Business Report, 2015OECD - The Organisation for Economic Co-operation and Development

2

Lithuania: Key Facts

#10 For ease of doingbusiness in EU

Russia

Czech Republic

Sweden

UnitedKingdom

SpainPortugal

France

GermanyBelgium

Netherlands

Denmark

Finland

Ireland

Italy

SlovakiaMoldova

Slovenia

Austria

Latvia

Belarus

Ukraine

Estonia

Poland

Lithuania

Bulgaria

Serbia

Montenegro

AlbaniaMacedonia

Bosnia andHerzegovina

Romania

Greece

Croatia

Turkey

Norway

Iceland

HungarySwitzerland

Page 3: Marvele cargo port in Kaunas

KaunasFEZ

PalemonasIntermodalCenter

Rail Baltica(planned)

Eastern wide gauge railways

KaunasReservoir

Via Baltica

Vilnius

SiauliaiKlaipeda

Kaunasairport

KaunasMarvelecargoport

Credit Info, 2014 Statistics Lithuania 3

Kaunas – Lithuania’s Industrial Heartland

• 19 out of the 100 largest Lithuaniancompanies are located in Kaunas district

• 20% of Lithuanian GDP

• 62% of regional produce is exported

• EUR 2.6 billion worth of exports per year

• 534 ha Free Economic Zone (FEZ)

Top export countries

Germany United Kingdom Sweden France

Anhydrite deposit

Page 4: Marvele cargo port in Kaunas

* by 95 percent probability of the lowest water levelSource: 2005-2014 (9 years) period data from Lithuanian Inland Waterways Authority (LIWA)In general, uninterrupted navigation is possible with a depth of not less than 140cmFEZ – Free economic zone

4

Kaunas FEZ

Kaunas airport

Klaipeda

Kaunas

minimum maintained depth* 1.5 mminimum maintained depth* 1.2 m

navigation 24 hnavigation 24 h (from 2020)water level monitoring stations

Distance – 83.4 kmWidth – 30 mTurning radius – 250 m

Russia

Cargo Route – Waterway E-41 (Klaipeda-Kaunas)

Rusne

Marve

le ca

rgo p

ort

TilzeJo

naici

ai

A. Raz

vilka

Baltup

enai

Smalinin

kai

Mituva

Jurba

rkas

Molyne

Lampe

dziai

bridg

e

Kulautu

vaPastuv

a

Baland

ziai

Grauze

nai

Ragain

e

Average depthMaintained depth

Lithuania

Distance – 126 kmWidth – 40 mTurning radius – 350 m

0

20

40

60

80

100

120

140

160

180

200

220

240

260

280

300Total distance Kaunas - Klaipeda: ~260 km

Page 5: Marvele cargo port in Kaunas

5

Background and Motives for the Port Development

Importance of inland waterway transport

• Before the 1990s, over 1.5 million tonnes of freight weretransported annually via the Nemunas

• 1 million tonnes per year potential turnover for cargo port

Strong political support

• Dedicated budget to maintain access roads to port• Commitment to ensure stated Nemunas fairway depth

Increasing pressure to reduce inland freight transportedby trucks in Lithuania, because of:

• Road congestion• High number of road accident casualties• High level of CO2 emissions• Increasing air pollution

40 trucks

1,000 t

1 self-propelled barge

1,000 t

Page 6: Marvele cargo port in Kaunas

Anhydrite Mining Project in Pagiriai, Lithuania. 2011

6

Anhydrite Extraction

Potential yearly extraction:

• Over 0.4 million tonnes of crushed anhydrite• 6,700 cubic meters of dimension stone

Current status: negotiations with investorsExpected project start: 2015 Q4Planned: anhydrite industrial production facilities in Kaunas FEZ

OperatorUAB “Margasmiltė”

KaunasReservoir

KUN

KaunasMarvelecargoport

Anhydrite deposit

14 km

325 million tonnes(80 million cubic meters) deposit

150 yearsminimum deposit extraction lifetime

Page 7: Marvele cargo port in Kaunas

7

Port Development

Contract type

Contracting authority

Key dates

Project duration

Planned infrastructure

Capital investment

Financing

Concession, DBFMO

Ministry of Transport and Communications

June 2015 – Tender announcementMarch 2015 – Market soundingFebruary 2014 – Government approvalDecember 2012 – Completed feasibility study

Max 25 years

Quay extended 80 mInternal roads and engineering networkCargo handling equipmentWarehouses

EUR 11 million

Financing structure proposed by bidder

Traditional procurement

Lithuanian Inland Waterways Authority

July 2015 – Completion

-

120 m long quayAccess roadStorage platformEngineering network

EUR 2.5 million

European Regional Development FundState budget

Stage I Stage II

Page 8: Marvele cargo port in Kaunas

Nemunas river

8

Stage I – Infrastructure to be Transferred

Engineering networks• Water supply – 0.5 km• Drainage – 0.5 km• Domestic sewage – 0.5 km• 0.4 kV electricity – 0.4 km• Lighting – 0.4 km

190 m

150 m

8-12 m

PlatformConcrete blocks - 5,377 m2

Reinforced concrete blocks - 1,122 m2

Altitude 23 m

Altitude 22 m

100 m

20 m

14 m39.2 kN/m2

53 m58.8 kN/m2

Page 9: Marvele cargo port in Kaunas

Stage II Optional

Minimum infrastructure

• Administration building(temporary or permanent)

• Truck scales• Waste container• Site security system• Telecommunications• 1 crane• 1 container loader• Documentation for safe

port operation

Load/unload capacity

• Up to 6 barges in 24 hours

Development phase I(Minimum requirements)

• 80 m extended quay• 10,000 m2 hard surfaced loading bay• Access to the river for firefighter

trucks

Indicative specification

• 5,000 m2 of roads• 0.5 km water supply network• 0.5 km drainage network• 0.3 km electricity supply network• 0.3 km lighting network

Load/unload capacity

• Up to 9 barges in 24 hours

Development phase II(Subject to discussions)

• Covered warehouses• Permanent administration building• Other infrastructure for necessary

operations

Development phase III(Subject to concessionaire‘s offer)

• Available once phase I andphase II successfully completed

• Further development of port might involve:

• cargo• marina

Concession – Scope and Timing

9

Contract signed

6 months 3 years 5 years

Terms negotiatedTerms negotiated

Minimuminfrastructure Development phase I Development phase II Development phase III

Completionof phase II

Page 10: Marvele cargo port in Kaunas

Nemunas river

Stage II – Expectation

10

Minimum capacity• 68,344 TEU/TEU2 per year load/unload• 9 barges (or 700 t) load/unload per 24 hours• 267,452 TEU/TEU2 per year storage infrastructure

Minimum infrastructureDevelopment phase IDevelopment phase II

Administration building

WarehouseRiver access for fire fighters

Page 11: Marvele cargo port in Kaunas

Optional – Development Phase III

Reserved territory (10.7 ha) could be dedicatedto cargo port expansion or recreational activities*

Steps to be completed first

• Assessment of environmental impact• Detailed plan and technical

documentation (approx. 1 year)

Option I - cargo

• Total quay length – 480 m• Area of platforms – 8.5 ha

11

*The feasibility of activities in the reserved territoryshould be identified during the environmentalimpact assessment.

Nemunas river

Page 12: Marvele cargo port in Kaunas

Nemunas river

Optional – Development Phase III

Option II - recreational

• Total quay length – 280 m• Area of platforms – 1.65 ha• Port water area – 2.9 ha

12

Page 13: Marvele cargo port in Kaunas

Investor Selection

13

Economic and financial Positive1.0 as of last yearEUR 13 million

Prequalification criteria Minimum requirementThe candidate shall meet

Net profit in last 3 yearsEquity to debt ratioCapability to finance project

Technical and professional

1 managed and completed1 operated in last 3 years

TBD*TBD*

EMAS, ISO 14001 or equivalent certificate

LST EN ISO 9001, LST EN ISO 9002, LST EN ISO 9003 or equivalent certificate

Experience in:

• Management of the construction of the harbour(s)• Harbour(s) operation

Qualification:

• At least 2 certified construction managers

• At least 1 certified design manager

Track record

• At least one port developed in last 5 years• At least one port operated in last 3 years

Technical capability to apply environment protection measures

Quality management standards adopted

3 years of construction manager experience in projects of the exceptional significance (harbours)3 years of design manager experience in projects of the exceptional significance (harbours)

* to be determined after market sounding

Page 14: Marvele cargo port in Kaunas

Most Economically Advantageous Tender

14

PRICE

QUALITY

20%

80%

5% Minimum infrastructure creation term

75% Fixed concession fee

25%

5% Development phase I completion term

10% Length of quay extended during Development phase I

10%

20% Development phase II completion term

10%

40% Comprehensiveness of technical specification

Variable concession fee based on revenue level

Size of hard surface quay area constructed during Development phase I

Combined area of administration and storage buildings

Page 15: Marvele cargo port in Kaunas

Indicative Tender Schedule

15

Contract award

Concession competition notice2 months

1 month

2-3 months

2 month

1-2 months

2 month

2 month

3-4 months

PQQ

PQQ Assessment

Preliminary Solution Preparation

Preliminary Solution Assessment

Binding Solution Preparation

Binding Solution Assessment

Negotiation

Final Arrangements andFinancial Close

Page 16: Marvele cargo port in Kaunas

Partnership Scheme

16

Ministry ofTransport And

Communications

Contracting authority

Investor

Bidder

ConcessionContract

Special PurposeVehicle Ltd.

Project implementation

Users of theInfrastructure

ProjectAdministrator

CommercialBanks

InternationalFinancing

Institutions

InvestmentFunds

PrivateInvestors/

Shareholders

Manages contract

Provide funding

Pay for services

Providesservices

Assigns ports infrastructure

Assigns contract management rights

Concessionaire

Page 17: Marvele cargo port in Kaunas

Next Steps

17

2015 MarchDraft tender documentationprepared

2015 JuneTender announced

2015 MayTender documentation finalised

2015 JulyStage I completed

2015 MayMarket sounding completed

2015 MarchMarket sounding initiated

2015Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

Q1 Q2 Q3 Q4

Dec

Page 18: Marvele cargo port in Kaunas

2011 2012 2013

Project Timeline

18

2014 2015 2016

Assessment of environmental impact completedLand lot registered Detailed plan approvedTechnical project preparedTechnical project examination conductedConstruction permits issued

2015 07 01Stage I completion

2015 06 01Tender announcement

2015 05 08Market feedback

2016 12 01Operator selected

2012 12 17Feasibility studycompleted

2013 07 18Project approved byPPP commission

2014 02 12Project approvedby Government

2013 05 09Project approved byMinistry of Finance

Page 19: Marvele cargo port in Kaunas

Contacts

+370 37 322812

+370 673 51096

[email protected]

Rasa Gruodyte

Project manager