Jeff Gramling Mars Sample Return Director Mars Sample Return (MSR) Presentation to PAC Aug 16, 2020

Mars Sample Return Director Mars Sample Return (MSR) Aug

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mars Sample Return Director Mars Sample Return (MSR) Aug

Jeff GramlingMars Sample Return Director

Mars Sample Return (MSR)Presentation to PACAug 16, 2020

Page 2: Mars Sample Return Director Mars Sample Return (MSR) Aug

MSR Architectural Overview

Earth

Mars

Sample Retrieval Lander (SRL)

Tube Retrieval

Mars AscentVehicle

Orbiting Sample

Mars 2020

Tube Collection & Depot

Retrieve OS

Earth Return Orbiter (ERO)

Break-the-Chain

Avoid Earth

ERO with Capture, Containment and

Return System payload

Tube Delivery SRL

Sample Fetch Rover

Earth Entry Vehicle

2

Page 3: Mars Sample Return Director Mars Sample Return (MSR) Aug

Mars Sample Return Campaign Concept Review

Progress to Date• NASA conducted an Acquisition Strategy Meeting (ASM) in July 2019 and

made Center roles/responsibilities assignments• ESA obtained approval for MSR at Nov 2019 Ministerial Council• Campaign Reference Architecture Stakeholders Peer Review (CRASPR) in

January 2020 brought all implementing organizations together• MSR was included in President’s FY2021 budget request and has been

called out in FY21 House CJS report language• ESA selected Earth Return Orbiter (ERO) contractor in March 2020• ESA selected Sample Fetch Rover (SFR) contractor in June 2020

3

Page 4: Mars Sample Return Director Mars Sample Return (MSR) Aug

MSR Architecture Elements

Legend:ARC

GRC

GSFC

JPL

LaRC

MSFC

Mars 2020Sample Retrieval Lander Project

Earth Return Orbiter Project

Mars Ascent Vehicle

Sample Fetch Rover

Orbiting Sample

Capture/Containment & Return System Project

Returnable Sample Tubes

Capture & Containment Module

Earth Return Module

JSC

NASA

ESA

Future Sample Handling

Facility Project

Curation and Global Distribution of

Samples

TBD

Sample Transfer System

STA

System-Level Project and Program Office• Campaign Mgmt, SE, MA• Interface to Mars 2020 surface operations• Interface to Sample Handling Facility Project

• PP and restricted Earth return• Mission system

4

Mars Sample Return Program Director (HQ)

Page 5: Mars Sample Return Director Mars Sample Return (MSR) Aug

26 – 26 – 31SRL Launches in 2026

ERO launches in 2026Samples are returned in 2031

2026 2027 2028 2029 2030 2031J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Reg. Dust Storm Season Reg. Reg. Dust Storm Season Reg.

N Winter N Winter

Earth to Mars Spiral Down Low Mars Orbit (Relay) RDV and Contain Spiral Up Mars to Earth

Earth to Mars Surface*

Conj

MAVEDL

MOI

OS

EES

Conj

26-26-31

SRLERO

SFR

M2020

*See zoomed diagram for surface phases

*Illustrates an example scenario

Campaign Timeline Overview

• Sample Retrieval Lander (SRL) avoids winter and global dust storm season, enabling all-solar SRL/SFR

• SRL EDL occurs in a favorable season, maximizing landed mass• ERO can provide all relay services needed for MSR (SRL, SFR, M2020, Mars Ascent

Vehicle (MAV))• SRL and ERO fit on available launch vehicles and trajectories are feasible

5

Page 6: Mars Sample Return Director Mars Sample Return (MSR) Aug

2026 2027 2028 2029 2030 2031J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Reg. Dust Storm Season Reg. Reg. Dust Storm Season Reg.

N Winter N Winter

Earth to Mars Spiral Down Low Mars Orbit (Relay) RDV and Contain Spiral Up Mars to Earth

Earth to Mars Surface*

Conj

MAVEDL

MOI

OS

EES

Conj

26-26-31

SRLERO

SFR

M2020

*See zoomed diagram for surface phases

*Illustrates an example scenario

Await MAV

Launch

CLPA and Egress

Traverse

to Depot

Tube Pickup Return Traverse Tube

Transfer

Tube Transfer

MAV Launch

Traverse to SRL

Relay and Spiral to RSORelay Phase for

RDV

Operational

Margin

(surface elements)

Campaign

Margin

(between ERO and surface

elements)

Siesta

SRL Surface Activities (~13 months)Ls0 30 60 90 120 150 180

Await MAV Launch

Campaign Timeline Overview

6

Page 7: Mars Sample Return Director Mars Sample Return (MSR) Aug

SRL Comparison to Mars 2020/Perseverance• No science payloads• Precision landing (from M2020) simplifies landing site requirements• Stationary (SFR is contributed)• Simpler operations activities (more similar to InSight)

Sample Retrieval Lander Components

7

Page 8: Mars Sample Return Director Mars Sample Return (MSR) Aug

Capture & Containment Module

(CCM)

Earth Return Module (ERM)

Orbiting Sample (OS)

Earth Return Orbiter (ERO) ESA

Earth Entry Vehicle (EEV)

Capture, Containment and Return System (CCRS) Overview • CCRS is the payload on the

ESA provided ERO• Key functionalities:

• Rendezvous and capture Orbiting Sample (OS)

• In-flight robotic assembly of Earth Entry System (EES), including Break-the-Chain (BTC) and Containment Assurance activities

• EES delivery to Utah Test and Training Range (UTTR) while meeting biosignaturepreservation potential (BPP) requirements (w/ ESA/ERO)

• CCRS elements and their functions:• Capture and Containment

Module (CCM) • Earth Return Module (ERM)

8

Page 9: Mars Sample Return Director Mars Sample Return (MSR) Aug

FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY272019 2020 2021 2022 2023 2024 2025 2026

O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M

KDP NASA Review JPL Review ESA Review ESA Review Season Milestone Design

Qual Program Build/Assy I&T Env Testing Margin Delivery

7/16/20

Mars Sample Return

MSR Decision Points

Key Milestones

SRL Project Phases

SRL Reviews

Flight System

Mars Ascent Vehicle

Fetch Rover

Transfer Arm

CS/Aeroshell(nominal)

ERO Project Phases

ESA Decision Points

ERO Reviews

Orbiter

CCRS

ERO I&T / ATLO

11/18KDP A 9/1KDP B 9/1KDP C 7/27KDP E

12/13M2020 Prime Mission End

1/22Arch Peer Review 5/28

NASA/ESA Draft MOU7/30

M2020 Launch2/18

M2020 Landing

Pre-A A(10mo)

B(12mo)

C(23mo)

D(23mo) E

7/12ASM 9/15CCR 6/22SRR / MDR 6/28PDR 6/27CDR 6/25SIR 2/10PSR 7/24 PLAR

LP Core Structure Conceptual and Preliminary DesignLP Core PDR

Detailed DesignLP Core CDR

Fabrication LP Mech I&T 40d8/7

DEL FM Lander to I&T

LP Landing System Conceptual and Preliminary DesignLS PDR

Detailed DesignLS DDR

Landing System Fab LS I&T 40d 9/27 DEL FM Landing System to I&T

8/7REC LP Core2/10

Ship SRL to KSC 7/15

Launch

Launcher Study, Trades, Rqmts, I/F Testing, & Options6/18

Peer Review Vehicle Design and Fab

8/3

MAV SRR/MDR

3/1

MAV PDR

4/4

MAV CDRMAV-EM/MAV-ATLO I&T

5/7

MAV SIR124d

DEL MAV-ATLO to JPL42d

12/30DEL MAV-FM PE to KSC

3/19MAV-EM Qual Testing

7/11

Preliminary Design SRR9/30 Prelim Design

PDR Detailed Design4/30

CDR8/31

Build & Assembly

11/30SIS

12/31STM

2/27

FAR120d

8/18DEL FM Fetch Rover to I&T

Preliminary Design PDR6/1

Detailed Design CDR6/1

CDRDEL STA to JPL

7/28DEL FM STA to I&T

8/8DEL Cruise Stage Structure to I&T

Cruise Stage and Aeroshell Design and Fabrication Assembly and Test

9/10DEL Aeroshell to I&T

B1 BP B2 C D E1

12/17CM19

11/11CM22

SRR6/15

PDR4/2

CDR4/21

QAR12/22

7/31

ITT

3/15

Contract StartCritical Design

4/2PDR Build & Assembly

4/21CDR

5/28DEL PFM Orbiter to I&T

2/4

CCM Peer Rvw

12/15

I/F Review

3/15PDR

3/14CDR Build & Assembly I&T

8/1955d

11/4

AM73d

10/13DEL FM CCRS to ESA

5/28I&T / ATLO

12/29127d

6/1 10/1

Launch

Campaign Summary ScheduleBLUE: Work Performed By NASAGREEN: Work Performed By ESA Status Date:

Mars Sample ReturnMission Summary Schedule

BLUE: Work Performed by NASAGREEN: Work Performed by ESA Status Date: 7/16/20

9

Page 10: Mars Sample Return Director Mars Sample Return (MSR) Aug

Near-Term Plan

• NASA-ESA MOU in final signature (signatures expected by end of Aug)

• SMD-chartered Independent Review Board to be conducted prior to KDP-A• Eight week activity planned to start 8/17/20

• Mission Concept Review (MCR)• Independent cost and schedule reviews commissioned in

advance of KDP-A• Standing-up Standing Review Board (SRB)• Formulation Authorization Document (FAD) and Formulation

Agreement (FA) in work• Conduct MCR in mid-October

• KDP-A expected mid-November

10

Page 11: Mars Sample Return Director Mars Sample Return (MSR) Aug

11