Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Embed Size (px)

Citation preview

Page 1: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Market Interface CommitteeReport

Robert D. Schwermann

MIC Chair

April 30, 2009

Page 2: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

MIC Topics for this Report

• Election of MIC Officers• Merchant Alert Protocol Guideline• Preschedule Evaluation Task Force• Preschedule Process Drafting team• ATC Drafting team• State of the MIC

Page 3: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

NEW MIC Leadership

● MIC - Chair: Phil Tice – Deseret Power Vice Chair: Robert Harshbarger – Puget

Sound Energy● MIS –

Chair: Emily Shults – Sempra Vice-Chair: Shayleah LaBray - PacifiCorp

● SIS – Chair: Steve Beuning – Xcel Energy Vice-Chair: Dave Schiada - SCE

Page 4: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Merchant Alert Protocol (MAP) Guideline

Page 5: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

5

Background

July 2006 Record high temperatures Four NERC Energy Emergency Alerts

(EEA) issued Northwest Power Pool (NWPP)/ Pacific

Northwest Security Coordinator (PNSC) - grid not in jeopardy should not have been a problem

NWPP/PNSC - this was a merchant issue

5

Page 6: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Solution

•Merchant Communications Business Practice (MCBP) drafting team formed

•Guideline approved by the MIC on March 12, 2009 for implementation by June 1, 2009

•Some raised concern that WECCNet may get inundated.

•MIS chair can suspend the use of the guideline.

Page 7: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

7

Merchant Alert Protocol

Process:

1. With access to wesTTrans OASIS bulletin board Submit requests online using a template

2. Without access to wesTTrans OASIS bulletin board Requests BA to submit request

3. Respondents who have excess resource capability directly contact the requesting merchant to negotiate terms

Page 8: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Prescheduling Evaluation Task

Force

PETF

Page 9: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Summary of Conclusions

● Reliability incidents have occurred when prescheduling was done several days in advance of flow

● Present prescheduling practices do not line up well with the gas scheduling process

● No WECC documentation for region-wide prescheduling practices

● Daily assessment data needs to be clarified

Page 10: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

PETF Status

● MIC accepted the report● MIC released task force● Thanks to:

Leesa Nayudu – PETF Chair Emily Shults – PETF Vice Chair WECC Staff – Mike Wells and Michelle

Mizumori

Page 11: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Pre-schedule Process Regional Criterion Drafting

Team Status

Page 12: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Background

● SRRC assigned MIC to develop Regional Criterion

● The Objectives: Address issues noted in PETF report

- Codify the pre-schedule process.- To the fullest extent practical, pre-scheduling should

occur the day before the flow day. - Establish a pre-schedule process that aligns, as

close as possible, electric and gas trading days. - Develop and document pre-schedule process

definitions and calendar rules.

Page 13: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Current Status

● Drafting team formed with balance of TP/TC, regional and MIC/OC representation

● Team has developed an initial draft● Team is developing questions for the

comment form to accompany the draft● Initial posting of draft planned for this week

Page 14: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

ATC Drafting Team

Page 15: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

15

ATC Success: Why it Worked

●We were tuned into the NERC/FERC process Silence is often deemed as consent Engaged the NERC Standards process Imbedded WECC membership into the

NERC drafting process- Supported by a large group of stakeholders

Page 16: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

16

ATC Success: Lessons learned

● Moving forward at NERC/WECC Follow through…

- Answer the NOPRs / Interpretations“Approval” is not the final word

- Place personnel on Future Drafting Teams Engage WGs and TFs “before” submitting

requests to draft a standard- They have flexibility and agility- “Pre-drafting” for inclusion in Requests

Page 17: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

State of the MIC and the future

Page 18: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Where have we been● Western Governors Association and WECC

Board noted need to “address both commercial Issues and business practices”.

● 2006 Board changed bylaws to allow for expanded role of the Market interface Committee

● 2006 Board Approved new MIC Charter

“…steward for commercial Business Practices in the Western Interconnection in support of the WECC reliability mission.”

“…evaluate the existing and proposed BP’s of NAESB, NERC and WECC….”

Page 19: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

MIC Major accomplishments

● Wrote Conditional Firm Strawman in response to Order 890

● Prepared comprehensive evaluation of potential seams caused by MRTU and reported to FERC

● Developed Energy Product Codes which were adopted by NERC

● Created Preschedule Evaluation White Paper and working on the draft to codify the process

Page 20: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

MIC Major accomplishments

● Developed Energy Trading Time Guideline

● Developed Merchant Alert Protocol Guideline

● Successfully lobbied and won Western point of view on NERC ATC standards

● Worked with OC/WSPP and other industry members to successfully pass BAL-002-WECC-1

Page 21: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Current and future MIC projects

● Within-Hour scheduling flexibility (from 2/14 Disturbance Report)

● Preschedule Process Regional Criterion● Continuing monitoring of MRTU

implementation● Supporting implementation of BAL-002-

WECC-1, ATEC and FRR

Page 22: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Current and future MIC projects

●Member outreach and education on NAESB efforts

●Coordination - Joint Initiatives●Coordination - UFAS on congestion

management procedures●Coordination - Variable Generation

Subcommittee

Page 23: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Challenges

● Biggest challenge is…..change in the WECC “culture” to: acknowledge and accept the legitimacy and

importance of commercial issues in the role of the WECC

deal with these issues in a responsive, balanced, and professional manner while still safeguarding the reliability of the power system.

● Coordinate with other committees that are doing parallel work

Page 24: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

WHY DOES THE BOARD CARE??

●Merchant Alert Protocol Guideline To assure that WECC has access to

energy to reliably operate the system

●ATC efforts Assure that what FERC implements is

acceptable to WECC interests

Page 25: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

WHY DOES THE BOARD CARE??

● Pre-Schedule Process Drafting Team Answers ongoing debate Consistent Approach

● The MIC effectiveness To assure that commercial perspectives are

heard and acted upon to reliably operate our Western Grid

Page 26: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

Thank you for your guidance and

leadership these past two years

QUESTIONS???

Page 27: Market Interface Committee Report Robert D. Schwermann MIC Chair April 30, 2009

MIC Voting Results – MAP Guideline

VOTING CLASS YES NO ABSTAIN

TRANSMISSIONPROVIDERS

12 1 3

TRANSMISSIONCUSTOMERS

16 1 3

STATE andPROVINCIAL

0 0 0

TOTALS 28 2 6

Result: PASSED