15/06/2017 1 Manchester Metropolitan University Design, Manufacture & Erection of Precast Concrete Frame Mark Gilliland, Estimating Manager CCPL Introduction Creagh Concrete Products Ltd. Core Business Design, Manufacture, Supply & Installation of Concrete, Concrete Products & Aggregates Standard Products • Hollowcore flooring • spanTherm flooring Stairs & Landings Agricultural products Small precast • Bradstone Aggregates, Blocks & Concrete

Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

1

Manchester Metropolitan University

Design, Manufacture & Erection of Precast Concrete Frame

Mark Gilliland, Estimating Manager CCPL

Introduction

Creagh Concrete Products Ltd.

• Core BusinessDesign, Manufacture, Supply & Installation of Concrete, Concrete Products & Aggregates

• Standard Products• Hollowcore flooring• spanTherm flooring• Stairs & Landings• Agricultural products• Small precast • Bradstone• Aggregates, Blocks & Concrete

Page 2: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

2

Introduction• Bespoke Products

• Wall panels (cross wall)• Sandwich panels• Architectural cladding• Retaining walls• Columns & Beams• Terrace units• Plate flooring• anything else made of concrete

• Recent & Current D&B Projects• Cowes School, Isle Of Wight• Greenwich Student Accommodation, London• Library Building, Univeristy of Roehampton• Apartment Development, Aberdeen• Blackpool MSCP, Blackpool• HMP The Mount, Hemel Hempstead

The process from tender to site

• Tender • 3D Modelling• Design & Detailing• Manufacturing• Logistics• Site Erection

Page 3: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

3

Case Study – MMU

Project OverviewDesign & Erection• Columns & Beams• Plate flooring & Hollowcore slabs• Wall panels• Stairs & Landings• Terrace units

Creagh Team• Design & Detailing - 5 engineers, 11 detailers• Manufacturing - 60 personnel at 3 sites - Toome, Ardboe,

and Hoveringham• Site erection - 42 personnel

Concrete Statistics• 26,170 tonnes of precast concrete• Heaviest piece 28.7 tonnes• 5936 tonnes of insitu concrete

Page 4: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

4

Project Overview

Precast package consisted of :-

– 327 columns– 546 beams– 325 wall panels– 55 stair flights– 64 ‘landing’ slabs– 36 terrace units– 753 plate flooring units– 134 hollowcore slabs– 16,333m2 of plate flooring & hollowcore slabs– 2240 pieces

Project Value £6.3M

Floor SlabsPlate Flooring and

Prestressed Hollowcore

Page 5: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

5

Page 6: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

6

Typical Design – Stage 1Worst case 11.45m effective span Live load during construction 1.5 kN/m2Slab self weight 5.44 kN/m2 (precast + void formers + insitu)Props at maximum 2.4m centresBackpropped a minimum of two levelsGirder designed for buckling to EC3180mm girder depthTop bar H10Bottom bars H6Diag. bars H7

Unpropped Design – Stage 1 5.2m effective span at 3rd floor, no lower floor levels under this areaTo avoid erecting an expensive and time consuming propping system from ground up to this level, an unproppedsolution was designed for these slabs.Girder depth increased to 220mmTop bar H16Bottom bars H6Diag. bars H8

Page 7: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

7

Page 8: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

8

Page 9: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

9

Typical Design - Stage 2Loading – Live 3kN/m2

- Partitions 1 kN/m2- Finishes 0.44 kN/m2- Ceiling and Services 0.5 kN/m2- Slab self weight 5.44 kN/m2

Minimum Natural Frequency 4Hz

Exposure class XC150 year design life60 mins fire resistanceMovement after installation limited to span / 350 (Non-brittle floor finishes)Long term deflection limited to span / 250

Control of Temporary WorksProp release strategy – permit to load, access and unload

Page 10: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

10

Page 11: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

11

Stair & Lift Cores

Precast wall panels, stairs and landing slabs

Page 12: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

12

Page 13: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

13

Page 14: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

14

Page 15: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

15

Page 16: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

16

The Structural Engineer - January 2014

Production

Page 17: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

17

Page 18: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

18

Page 19: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

19

Page 20: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

20

Page 21: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

21

Site

Page 22: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

22

Page 23: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

23

Page 24: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

24

Page 25: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

25

17m Circular Column

Page 26: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

26

Page 27: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

27

Atrium Stair

Page 28: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

28

Page 29: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

29

Page 30: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

30

Programme

Last piece being fitted 31st May 2013Creagh erecting for 20 weeks on site, to the hour. 2240 precast pieces, steel members in addition to this.

Page 31: Mark Gilliland, Estimating Manager CCPL...Microsoft PowerPoint - MMU Birley Fields Powerpoint Presentation - Mark Gilliland.pptx Author Patienceg Created Date 6/20/2017 11:48:50 AM

15/06/2017

31

Summary

• Project ran according to programme

• Main contractor extremely satisfied

• Design and erection by Creagh worked out very efficiently

• High quality concrete elements