11
MARK CENTER (BRAC 133) LONG TERM IMPROVEMENT February 12, 2011 Alexandria, VA Tom Fahrney, VDOT Commonwealth BRAC Coordinator

Mark Center (BRAC 133) Long Term Improvement

  • Upload
    sezja

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Mark Center (BRAC 133) Long Term Improvement . Tom Fahrney, VDOT Commonwealth BRAC Coordinator. February 12, 2011 Alexandria, VA. Alternative F. Alternative G. Alternative F. Pros Provides HOV/Bus access to Mark Center Does not require reconstruction of rotary (lower costs) - PowerPoint PPT Presentation

Citation preview

Page 1: Mark Center (BRAC 133)  Long Term Improvement

MARK CENTER (BRAC 133) LONG TERM IMPROVEMENT

February 12, 2011Alexandria, VA

Tom Fahrney, VDOT Commonwealth BRAC Coordinator

Page 2: Mark Center (BRAC 133)  Long Term Improvement

Alternative F

Page 3: Mark Center (BRAC 133)  Long Term Improvement

Alternative G

Page 4: Mark Center (BRAC 133)  Long Term Improvement

Alternative Fo Pros

Provides HOV/Bus access to Mark Center Does not require reconstruction of rotary (lower costs) Maintains Seminary Road through traffic third-level

flyover Shorter project completion schedule Within existing VDOT Right-of-Way

o Cons Introduces signalized intersection on third-level flyover

Page 5: Mark Center (BRAC 133)  Long Term Improvement

Alternative Go Pros

Provides more direct HOV/Bus access to Mark Centero Cons

Requires total reconstruction of rotary (significant cost increase) All through traffic must go through rotary requiring significant

expansion of the rotary Requires gates to control reversible operation on Seminary Road Prohibiting HOV eastbound access from ramp may encourage U-

turn movements on Seminary Road Extends project completion approximately 18 months or more Significant Maintenance of Traffic issues during construction

Page 6: Mark Center (BRAC 133)  Long Term Improvement

NEPA Processo Categorical Exclusion (CE)

No significant environmental impacts Not required to identify alternatives Requires air quality and noise study Can utilize city’s established public information

process 6-8 month process

Page 7: Mark Center (BRAC 133)  Long Term Improvement

NEPA Processo Environmental Assessment (EA)

Environmental impacts not clearly established Requires a reasonable number of alternatives Requires air quality and noise study Requires formal public review 12-14 month process

Page 8: Mark Center (BRAC 133)  Long Term Improvement

Alternative F Schedule

Page 9: Mark Center (BRAC 133)  Long Term Improvement

Alternative G Schedule

Page 10: Mark Center (BRAC 133)  Long Term Improvement

Recommendationso Eliminate request to study Alternative Go Support Categorical Exclusion (CE)o Allow VDOT to utilize city’s established

public information process

Page 11: Mark Center (BRAC 133)  Long Term Improvement

Alternative F Study Area