Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
GE Oil & Gas
Maritime and Land Logistics: Status Quo and PerspectivesMichele StangaroneGeneral ManagerGeneral Manager
LEADING PROGRESS TOGETHER
General ManagerGeneral ManagerGE Oil & Gas GE Oil & Gas -- TurbomachineryTurbomachinery Global SalesGlobal Sales
The Value Chain of Natural Gas
2GE Title or job number
4/16/2013© 2013 General Electric Company - All rights reserved
LNG availabilityLNG availabilityRefrigerationRefrigeration
TransportationTransportationDistributionDistributionEnd UsersEnd Users
NGV Adoption … NGV Adoption … the “Chicken & Egg” the “Chicken & Egg” dilemmadilemma“Chicken” … “Chicken” … InfrastructureInfrastructureAdoption cost & risk Adoption cost & risk
SubSub--optimal optimal earlyearly--adopter user adopter user experience experience
Underdeveloped financing & insurance modelsUnderdeveloped financing & insurance models
Slow & uncertain permitting & commissioning processesSlow & uncertain permitting & commissioning processes
3Energy Strategic Marketing
4/16/2013
“Egg” … # of NGVs“Egg” … # of NGVs
2© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
Portable & rePortable & re--deployable deployable solutionssolutions
Equipment financing & Equipment financing &
Fast fill rate & “applianceFast fill rate & “appliance--like” like” operating experienceoperating experience
GE’s Approach… GE’s Approach… solving the “solving the “ChickenChicken ””
NGV Infrastructure ChallengesNGV Infrastructure Challenges GE’s PhilosophyGE’s Philosophy
Adoption cost & riskAdoption cost & risk
SubSub--optimal earlyoptimal early--adopter adopter user experience user experience
Underdeveloped financing & Underdeveloped financing &
4Energy Strategic Marketing
4/16/2013
Equipment financing & Equipment financing & “fleet“fleet--like” insurance modelslike” insurance models
Factory tested, preconfigured Factory tested, preconfigured solutions for shorter permitting solutions for shorter permitting & installation& installation
Bringing scale Bringing scale and speed to and speed to accelerate accelerate MicroLNGMicroLNG & LNG in a Box & LNG in a Box
adoptionadoption
Underdeveloped financing & Underdeveloped financing & insurance modelsinsurance models
Slow & uncertain permitting & Slow & uncertain permitting & commissioning processescommissioning processes
3© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
GE Small LNG Solutions
LNG In A Box™ System
10-50,000 gallon/day
Micro LNG50-250,000 gallon/day
Pre-treatment
Raw Gas
Compression
LNG+Storage/Aux
+
5© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
• Portable Plug-n-Play
• Prepare the “pad”
• Simple equipment financing
• 6 month cycle time
• Modular Fixed Plug-n-Play
• Civil work for a small plant
• Project or equity financing
• 18 month cycle time“LNG In A Box” is a registered trade mark of the General Electric Company
Co-Creation Business Model
Strategic Partnerships
Critical Needs Identification
GE Expertise & Product Portfolio
GE’s Go-to-Market Model
Global GRC talent & large tech portfolio
Mass CustomizationGE Capital Financing & Customer co-development
Identify customer operational pain
6© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited© 2012 General Electric Company – All Rights Reserved
large tech portfolio GE Capital Financing & Government Relations
Working with our customers & suppliers to drive thought leadership & innovative
technologies
& supplier design contestoperational pain points
7Energy Strategic Marketing
4/16/20132
© 2013 GE Oil & Gas. All Rights ReservedUnauthorized Reproduction Prohibited
Case Study: MicroLNGWorking together to develop & deploy new solutions to drive Micro LNG adoption
GE committed … investment & speed … < 2 Micro LNG plants [125000 gallons
each]
• Utilize Clean Energy’s experience & domain expertise
• Utilize GE’s technology & supply chain
8© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
• A fueling network that will enable trucks to operate on Liquefied Natural Gas (LNG) coast to coast and border to border
• Clean Energy operates 66 LNG stations with a total plan of 150 LNG stations.
Partnership key items
© 2013 GE Oil & Gas. All Rights ReservedUnauthorized Reproduction Prohibited
BACKUPBACKUP
9© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
BACKUPBACKUP
Case Study: CNG In A BoxTM system developmentWorking together to develop & deploy new solutions to drive CNG adoption
• Technology to create “pain killers”
• Utilize Chesapeake’s experience & domain expertise
• Utilize GE’s technology & supply chain
GE• Develop• Manufacture• Finance• Support
Chesapeake• Collaborate• Distribute• Service• Support
Partnership Roles
10© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
GE committed … investment & speed … < 12 Months From Concept to Operation
GE Micro LNG Solution
LiquefactionLNG
StorageTruck
Loading
NGL Recovery NGL StreamTo B.L.
CO2 & H20 Removal
Gas fromPipeline
Process Units(Base)
Industrial Plant Compressor Compander Motor/VSDS ValveGas Engine
11© 2013 GE Oil & Gas. All Rights Reserved
Unauthorized Reproduction Prohibited
Power Gen Island
Electrical Distribution
Control System
Waste Water
Demi Water
Storage LoadingRemoval
Auxiliaries (Optional)
Aux Motor Power Gen Gas Engine Water & Process Tech In telligent Platform PLC Controls
Micro-LNG … combining rich LNG heritage with wide GE portfolio