Client Country Project Type Site & Location Year ScopeSurface
Preparation
Estimated Areas(SF2)
ConsumptionES301 (Gal.)
Aker Floating Productions
Norway Aker Smart 1 FPSOJurong Shipyard
(Singapore)2007-2008
Vessel full areas including modules and structures
Hydroblasting Grit blasting
4,304,000 66,000
Aulac Vietnam Aulac Angel Tanker Hyundai Vinashin
(Singapore)2005 Ballast tanks, cargo tanks and hull Grit blasting 451,900 7,920
BP UK / USA Thunder HorseOffshore Gulf of
Mexico2006 Helydeck and structures Hydroblasting 172,200 2,900
Jurong Shipyard Singapore Skid Truss Support StructureJurong Shipyard
(Singapore)2007-2008 Maintenance of steel structure Hydroblasting 107,600 1,720
Pemex Mexico Chemul FPU Bender Shipyard 2004 External hull, full area Grit blasting 860,800 22,440
Petrobras Brazil PRA-1 FSOMac Laren Shipyard
(Brazil)2005
I beams and panels from module, module assembly
Grit blasting 53,800 790
Petrobras Brazil P-51 FPU Brasfels (Brazil) 2005-2007Pontoon and columns below main
deck, assembly, full areaHydroblasting Grit blasting
4,411,600 73,920
Petrobras Brazil P-52 FPU Brasfels (Brazil) 2005-2006Pontoon and columns below main
deck, assembly, full areaHydroblasting Grit blasting
107,600 1,720
Petrobras Brazil P-54 FPSOJurong Shipyard
(Singapore)2005-2006 Vessel, full area
Hydroblasting Grit blasting
6,994,000 126,720
Petrobras Brazil P-53 FPUKeppel Shipyard-Tuas (Singapore)
2005-2006 Vessel, full areaHydroblasting Grit blasting
9,684,000 198,000
Petrobras Brazil P-53 FPUEstaleiro Rio
Grande (Brazil)2005-2008
Modules 01, 02, 03, 05, 06, 07,08, 09, 11, 12 and assembly
Grit blasting 2,152,000 36,960
Petrobras Brazil P-54 FPSO Maua Jurong
(Brazil) 2005-2006
Modules 01, 02, 03, 05, 06, 07,08, 09, 11, 12 and assembly
Grit blasting 1,076,000 15,840
Petrobras Brazil Mexilhao Gas RigBT Engineering
(Singapore)2007-2008 Module and equipment Grit blasting 215,200 3,960
Petrobras Brazil Garoupa Flotel Offshore Brazil 2007-2008 Full refurbishment Hydroblasting 473,400
Petrobras Brazil P-III FSO Maua Jurong
(Brazil) 2004 External hull, full area Hydroblasting 53,800 840
Petrobras Brazil P-52 FPUKeppel Fels (Singapore)
2004-2006Pontoon and columns below main
deck, full area Hydroblasting Grit blasting
3,766,000 58,080
Petrobras Brazil P-51 FPUKeppel Fels (Singapore)
2005 Nodes from pontoon, full area Hydroblasting Grit blasting
645,600 12,670
Petrobras Brazil P-34 FPSO GDK (Brazil) 2005General maintenance, skids from
chemical modules and piping Hydroblasting 538,000 7,920
Petrobras Brazil P-43 FPSO Jurong Shipyard
(Singapore) 2002
Cargo oil tanks, diesel oil tanks and double bottoms
Grit blasting 1,291,200 18,480
Marine & offshore projects
RefeRence list
1
Client Country Project Type Site & Location Year ScopeSurface
Preparation
Estimated Areas(SF2)
ConsumptionES301 (Gal.)
Petrobras Brazil P-17 FSU Brasfels (Brazil) 2002General maintenance and
conversion Hydroblasting Grit blasting
430,400 7,390
Petrobras Brazil P-43 FPSO Maua Jurong (Brazil) 2003 Modules Grit blasting 215,200 3,700
Petrobras Brazil P-48 FPSO Brasfels (Brazil) 2003 Modules, full areas Grit blasting 5,918,000 88,440
Petrobras Brazil P-40 FPSO Offshore Brazil 2003 Main deck, only primer Hydroblasting 118,400 660
Petrobras Brazil P-50 FPSO Dinamic Shipyard
(USA) 2003
Modules PO2A&B and PO3A&B, equipment and
piping Grit blasting 753,200 14,520
Petrobras Brazil P-50 FPSO Jurong Shipyard
(Singapore) 2003-2004 Vessel, full area
Hydroblasting Grit blasting
6,994,000 118,800
Petrobras Brazil P-47 FPSO Ultratec (Brazil) 2003General maintenance
inside cargo tanks Hydroblasting
Mechanical Treat 495,000 6,600
Petrobras Brazil P-50 FPSO Maua Jurong (Brazil) 2003-2005 Vessel, assembly and
repairs, full area Hydroblasting 1,936,800 35,380
Portuguese Navy Portugal Submarines 209PNSubmarines (new
building)HDW (Germany) 2006-2008
Full areas (quantities up to June 2008 only)
Grit blasting 176,500 3,120
Queiroz Galvão Brazil Alaska Star FPU Offshore Brazil 2005 Hull, legs, underdeck Hydroblasting 48,400 660
Queiroz Galvão Brazil Olinda Star FPUMaua Shipyard
(Brazil)2007-2008 Full areas
Hydroblasting Grit blasting
914,600 14,780
SBM MonacoSBM Imodico So
17480 1 e 2Single buoys x2 (refurbishment)
Brasfels (Brazil) 2007-2008 Full refurbishmentHydroblasting Grit blasting
226,000 4,220
Shinpetrol Vietnam VSP01Tanker 22, 500 DWT
(new buildings)Cam Ranh Shipyard
(Vietnam)2007-2008 Full areas Grit blasting 1,183,600 18,480
Teco NorwayIran Noah, Iran Nabi, Iran Noor, Iran Nessa,
Iran NajmFive VLCC Tankers Seagoing Since 2003 Ballast tanks
Wet Grit blasting Hydroblasting
5,380,000 92,400
Tesma Indonesia Brotojoyo FPSOSembawang Shipyard
(Singapore)2006
Ballast tanks, pump room and fore peak tank
Hydroblasting 150,600 1,980
Transocean USA Discover 534 Drill ShipSembawang Shipyard
(Singapore)2006
Maintenance of the entire ship
Hydroblasting 269,000 4,490
Transocean USA Discover Seven Seas Drill ShipSembawang Shipyard
(Singapore)2007-2008 Ballast tanks Hydroblasting 215,200 2,640
Transocean USA Nordic Jack-Up RigJohor Shipyard
(Singapore)2007-2008 Ballast tanks Hydroblasting 322,800 5,020
Transocean USA Harvey Ward Oil Rig Sembawang Shipyard
(Singapore) 2002 Drill water tanks
Hydroblasting Grit blasting
139,900 1,850
RefeRence list
Marine & offshore projects
2
Client Country Project Type Site & Location Year ScopeSurface
Preparation
Estimated Areas(SF2)
ConsumptionES301 (Gal.)
Transpetro Brazil M/V Bicas Tanker Sembawang Shipyard
(Singapore)2005 Ballast tanks Hydroblasting 484,200 8,180
Transpetro Brazil M/V Brotas Tanker Sembawang Shipyard
(Singapore)2005 Ballast tanks Hydroblasting 484,200 7,660
Transpetro Brazil N/T Carioca Tanker (Argentina) 2006 Cargo tanks Hydroblasting 46,300 690
Transpetro Brazil N/T Poti Tanker ASRY (Bahrain) 2006 Ballast tanks Grit blasting 86,100 1,140
Transpetro Brazil N/T Pirajuí Tanker ASRY (Bahrain) 2007 Ballast tanks Grit blasting 123,700 1,550
Transpetro Brazil N/T Pedreiras Tanker ASRY (Bahrain) 2008 Ballast tanks Grit blasting 91,500 1,150
Transpetro Brazil N/T Bicas Tanker ASRY (Bahrain) 2008 Ballast tanks Grit blasting 75,300 930
Transpetro Brazil N/T Pirajuí Tanker Selmetal Shipyard 2004 Ballast tanks Hydroblasting 53,800 580
Transpetro Brazil O/O Mafra Tanker (repair) Dubai Dry Docks, UAE 2000 Ballast tanks Grit blasting 134,500 1,930
Transpetro Brazil N/T Norma Tanker Renavy (Brazil) 2001 Cargo tanks Hydroblasting 38,700 580
Transpetro Brazil O/O Mafra Tanker ASRY (Bahrain) 2001 Ballast tanks Grit blasting 86,100 1,400
Transpetro Brazil Ataulfo Alves Tanker Sembawang Shipyard
(Singapore) 2002 Cargo oil tank bottoms Hydroblasting 118,400 1,410
Transpetro Brazil Cartola Tanker Sembawang Shipyard
(Singapore) 2002 Cargo oil tank bottoms Hydroblasting 118,400 1,370
U.S. Navy USA USS Belleau Wood Aircraft Carrier
(repair) Sasebo, Japan 2000 Ballast tanks Hydroblasting undisclosed undisclosed
U.S. Navy USA USS Detroit Support Ship (repair) NWS, USA 2000 Bilges Hydroblasting undisclosed undisclosed
U.S. Navy & U.S. Coast Guard
USA All applications Several types Mostly USA, Japan,
Middle East 1994-2008 Mostly tanks and bilges
Hydroblasting, abrasive, power tooling
3,228,000 47,520