20
Marine Environmental & Construction Project Management Projects on time and within budget

Marine Environmental & Construction Project Management Projects on time and within budget

Embed Size (px)

Citation preview

Page 1: Marine Environmental & Construction Project Management Projects on time and within budget

Marine Environmental & Construction Project Management

Projects on time and within budget

Page 2: Marine Environmental & Construction Project Management Projects on time and within budget

O&G Construction-Marine ProjectsHarvey Solutions formed 2007Marine Environmental & Construction Project ManagementCliff Harvey-Owner/Director

Clients & Projects:1. Ocean Engineering Systems;

1. Hong Kong- Pipeline trenching, 2. Turkey (Marmara & Black Sea)

2. Woodside;1. Karratha-shore crossing & pipe pull2. Pipeline trenching3. Berth pocket blasting & dredging

3. Chevron-KJV;1. LNG access channel dredging2. MOF island construction reclamation3. Temporary island wharf construction

4. APLNG-Conocophillips1. 43% Gladstone LNG dredging & reclamation (~14 Mil cubes)2. Construction of Jetty, MOF, Landing ramps, ferry terminals, aggregate import and

export terminals

Page 3: Marine Environmental & Construction Project Management Projects on time and within budget

Environmental

• 10 years prawn farm construction, operation management, development & assesments

• Plume modelling and monitoring-– national & international

• Interface management/relationship development– Excellent track record with State, Federal agencies

• Marine transport (MSQ), regulation (AMSA), Parks (GBRMPA & DAFF)

• Hydrocarbon spill management– Marine & intertidal

Page 4: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Hong KongTwin Pipeline burial

Page 5: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Hong KongFleet management

500t Derrick Barge Hong Kong

Page 6: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Hong KongPlant

Mixed air diving

Post-lay Trenching machine

Barge deck layoutOn the fly engineering

Page 7: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Hong KongVessel & Plant import/export

Page 8: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Business developmentCNG compressor distributorship Turkey

Concurrent contracts for Botas and VISCAS Turkey

Page 9: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Pluto-material offload facility & berth pocketMarine Blasting

Page 10: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Pluto Shore crossing Pipe pull

Page 11: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Pluto Shore Crossing Backfill

Page 12: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Pluto Shore Crossing Backfill

Page 13: Marine Environmental & Construction Project Management Projects on time and within budget

Previous Projects: Pluto BMF Dredging & Blasting

Page 14: Marine Environmental & Construction Project Management Projects on time and within budget

EnvironmentalSite management: (EMP’s)• Waste (WMP’s)

• General• Contaminated• Hard waste• Waste stream procedures and procedures

• Training of staff increasing awareness and behavioural change

• Interface management• Sub-contractor • Client

Page 15: Marine Environmental & Construction Project Management Projects on time and within budget

Oil spill management (>10m3)

Page 16: Marine Environmental & Construction Project Management Projects on time and within budget

River health assessments

Page 17: Marine Environmental & Construction Project Management Projects on time and within budget

Peak flow management

Page 18: Marine Environmental & Construction Project Management Projects on time and within budget

Plume management

Page 19: Marine Environmental & Construction Project Management Projects on time and within budget

Seabed Survey

Page 20: Marine Environmental & Construction Project Management Projects on time and within budget

Stairway to the moon

END