    DOD Maintenance Symposium27 Oct 2009

    Mr. Richard Stauffer, HQMC (LP)

    Marine CorpsGround Equipment Reset

  • UNCLASSIFIED

    UNCLASSIFIED Ground Equipment Reset Agenda

    Commandant’s Priorities

    Factors Affecting Reset

    Reset Plan

    Reset Integration

    Reset Process

    Reset Cost Model

    Reset Challenges

  • UNCLASSIFIED

    UNCLASSIFIED

    Commandant of the Marine Corps (CMC) priorities:

    OEF sourcing

    Maintaining persistent presence in the MARCENT AOR

    Reset supports CMC priorities by ensuring that…

    Required equipment is in the right place at the right time

    Required equipment is visible to the appropriate agencies

    Ground Equipment Reset Commandant’s Priorities

  • UNCLASSIFIED

    UNCLASSIFIED Ground Equipment Reset Reset Challenges

    To conduct in-stride reset of equipment while…

    Simultaneously redeploying to & engaging in Afghanistan

    Drawing down forces from Iraq

    Equipment availability; retrograde & redeployment timelines

    Modernizing legacy equipment to meet future challengesPrepositioning ISO Irregular Warfare…MPF/GeoPrepo

    Increasing the baseline of the force (202K)

    QDR and new Administration’s priorities

    Uncertainty in OCO funding beyond 2011

  • UNCLASSIFIED

    UNCLASSIFIED Ground Equipment Reset Reset Plan

    The Reset Plan…

    Establishes policy & guidance

    Promulgates roles & responsibilities

    Synchronizes reset efforts

    Provides strategic communication tool

    Ground Equipment Reset Plan

    6 June 2009

  • UNCLASSIFIED

    UNCLASSIFIED Ground Equipment Reset Reset Integration

    Reset ReconstituteRetrograde

    Equipment Strategies (Depot, Field, Procurement)

    Maintenance capacity & resources

    Registered demand signals

    Deployed Force Changes

    Execution timelines

    Equipment throughput

    Requirements Development

    Reconstitution Priorities

    MCLC (FWD)MARCENT MCLC, MCSC

    PP&OCD&I, MARFORS

    Reset Integration: DC I&L leads the planning process designed to ensure reset programming & execution are continually aligned and responsive to reconstitution requirements.

    Resource Programming

  • UNCLASSIFIED

    UNCLASSIFIED Equipment Retrograde & Movement Process

    KUWAIT/JORDAN

    MCLCBarstow, CA

    BICJacksonville, FL

    MCSCQuantico, VA

    OPFORS

    DRMO

    Depot

    MNF-W

    DRMO

    Al Taqaddum

    A/E TAMCN

    B/C/D TAMCNAlpha: CommElecBravo: Engineer

    Delta: Motor transportEcho: Ordnance Equipment

    IRAQ

    DP 2

    DP 1DP 3

    •SMC•CMC Priorities•GFM (Reset, UDP)

    MCLCAlbany, GA

    CODE A/B

    CODE H

    CODE H Afghanistan

    Decision Point Decision Issues Disposition

    DP1 OEF or CONUS MCLC

    DP2 Equipment Disposition MCLC/MCSC

    DP3 Equipment Distribution MCLC

  • UNCLASSIFIED

    UNCLASSIFIED

    MCSC Reset Strategies

    Process…Another View

    DC, PP&O and MARCENT:

    Planned reset inventory

    Reset Cost Model

    Retrograde and Reset Process Simulation Tool

    MCLC-Managed Maintenance•Depot

    •Field

    CMC Sourcing Priorities

    Retrograde

    Reset

    Reconstitution

    Quantifying maintenance requirements

    Issuing to requirement

    PresenterPresentation NotesKEY MESSAGE: Operational decisions made during enterprise reset planning have the greatest influence over current reset maintenance plans and production.

    Planned Reset Inventory: DC, PP&O and MARCENT determine both the inventory available for reset and the retrograde sequence for ground equipment. In CMC’s reset plan, DC, PP&O is tasked to “develop Marine Corps reconstitution priorities” and “manage the OIF/OEF force list and associated ground equipment levels.” Similarly, MARCENT is directed to “ensure required capabilities remain in theater for mission accomplishment.” Taken together, these actions shape the inventory of the OIF ground equipment that is available for reset – this is the planned reset inventory. MARCENT’s task to “validate force requirements and equipment density lists to support Marine Corps operations in the USCENTCOM AOR” indicates that the off ramp schedule has been incorporated into retrograde planning from a ground equipment perspective.Quantifying Maintenance Requirements: Modeling tools show the total resource and capacity requirement to retrograde/redeploy and reset OIF ground equipment at the end of a two-year period; they do not reflect how resources and capacity support the process over a two-year period.The Reset Cost Model: The RCM applies equipment reset strategies against the inventory of OIF ground equipment to estimate reset costs by TAMCN. It does not incorporate operational redeployment or offramping factors.The Retrograde and Reset Process Simulation Tool: This tool identifies nodal and arc capabilities and characteristics, and develops a network process simulation that demonstrates current retrograde and reset capacity and future requirements. It does not incorporate operational redeployment or offramping factors.Reset Strategies: The reset strategies are developed by Life Cycle Managers (PMs) based on many factors – authorized equipment quantities, on hand inventory postures, life cycle of equipment, current and future fielding plans, equipment shortfalls, equipment obsolescence, and long term Marine Corps requirements, etc. The strategies categorize reset actions for each equipment type such as Depot, Field Level Repair, Procurement, or no reset. These strategies are estimates and will most likely change as equipment is inspected in the reset process. An example of an item not requiring reset or replacement would be an OIF unique piece of equipment purchased by the Marine Corps that will not become a system item. Reset strategies are updated biannually. From the MCLC perspective, reset happens to individual items of OIF ground equipment. When equipment moves from the retrograde phase to the reset phase, MCLC manages the maintenance according the MCSC’s reset strategies. Depot-level maintenance will be performed based on established sources of repair and the accompanying statements of work. MCLC will manage and perform field-level maintenance to mitigate this burden on the operating forces. When a designated item of equipment has been repaired to a ready-for-issue condition it is considered reset...reset happens one piece at a time.For MCLC, reconstitution occurs when a reset item fills a requirement. CMC sourcing priorities direct how available reset equipment will be distributed among units and organizations.

    https://www.marcorsyscom.usmc.mil/news/syscomnews.nsf/0/7383A3E4E9F11DD1852573BE0051E8F1/$FILE/MRAP on ship ramp.jpg

  • UNCLASSIFIED

    UNCLASSIFIED Ground Equipment Reset Reset Cost Model

    Operational analysis model used to calculate reset costs Estimates USMC reset “liability” in OIF/OEF

    Maps reset strategy to equipment in theater; 4 categories:1. Procure: Equipment with this strategy will be procured through the acquisition process.2. Depot: Equipment with this strategy will be repaired using depot level maintenance. The cost for this type maintenance is 65% of the equipment’s procurement cost.3. Field: Equipment with this strategy will be repaired using organizational or intermediate level maintenance. The cost for this type of maintenance is 20% of the equipment’s procurement cost.4. No Reset: Equipment with this strategy will not require reset and will be returned to the operating forces.

    4.a. No Reset Obsolete: Equipment with this strategy will not require reset and will be disposed of.

    Used to justify resource requirements

  • UNCLASSIFIED

    UNCLASSIFIED

    MCLC OEF Ops & R2 Process - MCLC Fwd TACON to MarCent EA

    2012

    Projected “Waves” of OIF/OEF Equipment

    2009

    Jan

    VELOCITY

    MCLC Expands & Contracts Capability and Staff in AOR to Meet Workload Spikes & Evolving Support

    Requirements Jan

    MCLC OIF R2 Process until EOM - MCLC Fwd TACON to MarCent EA

    Duration

    Workload Intensity

    PresenterPresentation NotesThis slide depicts the workload spikes that MCLC is prepared to support in the AOR for retrograde.The retrograde process is started prior to MCLC FWD receipt of equipment, as units execute a 5-step process for disposition of all other supplies and material, in conjunction with the transfer of designated Classes of Supply to MCLC FWD.

  • UNCLASSIFIED

    UNCLASSIFIED

    Reset Liability: Snapshot in Time

    PresenterPresentation NotesGround Equipment Reset Liability Determination (estimate for future planning). a. FY09 4th Qtr OIF Ground Equipment Reset liability, when general supply items (i.e. tents, boots, etc.) are excluded, estimates the handling of over 73K individual pieces of equipment with estimated cost of approx. $1.6B. 50 of the 633 equipment types (i.e. – Tanks, LAVs, howitzers, etc.) make up over 80% of our total estimated reset cost. A high percentage of these items are planned for Depot work and not replacement. The estimated reset liability is based on PM reset strategies: 20% of the total quantity of equipment is projected to require depot work; 28%,replacement / procurement; 32%, field level maintenance; and 20%, no reset.b. FY09 4th Qtr OEF Ground Equipment Reset liability, when general supply items (i.e. tents, boots, etc.) are excluded, estimates the handling of over 59K individual pieces of equipment and estimated cost of approx. $876M. 79 equipment types make up over 80% of our total estimated reset cost. A high percentage of these items are planned for Depot work and not replacement. The estimated reset liability is based on PM reset strategies: 27% of the total quantity of equipment is projected to require depot work; 27%, require replacement / procurement; 29%, field level maintenance; and 17%, no reset.c. Reset strategies are developed by Life Cycle Managers (PMs) based on several factors – authorized equipment quantities, on-hand inventory postures, life cycle of equipment, current and future fielding plans, equipment shortfalls, equipment obsolescence, and long term Marine Corps requirements, etc. The strategies categorize reset actions for each equipment type such as Depot, Field Level Repair, Procurement, or no reset. These strategies are estimates – reset actions will ultimately be determined as equipment is inspected in the reset process. The MCSC PM Reset strategies are updated biannually. d. Estimated costs and workloads change – this information is captured quarterly. The Marine Corps remains flexible in order to conduct physical inspections of equipment being redeployed, react to new operational requirements, or revise reset strategies based on service equipment requirements.

  • UNCLASSIFIED

    UNCLASSIFIED Marine Corps Ground Equipment Impacts and Risk

    Reset funding received/requested through FY‐11 supports Marine Corps equipment reset requirement (Ground Equipment liability ‐ $2.5B)

    • Assumes that all equipment is retrograded/redeployed and is available for RESET actions to be executed prior to FY‐12

    RISK: Equipment is not available during year of execution, funding received can not be obligated, and reset requirement (liability) is carried over to future year

    Operational requirement remains in theater beyond FY‐11• Assumes:

    ‐ Forces/capability sets deployed require sustainment‐ Forces/capability sets, specifically the equipment that uniquely meets theater requirements redeployed/retrograded will be reset

    RISK: Deployed materiel readiness impacted

    LONG TERM IMPLICATION:• Post‐deployment maintenance is deferred or not performed • Global Force Management Readiness for theater specific capability is reduced

  • UNCLASSIFIED

    UNCLASSIFIED

    Questions?

    USMC Reset Strategy

    Marine Corps�Ground Equipment Reset Ground Equipment Reset �AgendaGround Equipment Reset �Commandant’s PrioritiesGround Equipment Reset �Reset ChallengesGround Equipment Reset �Reset PlanGround Equipment Reset �Reset IntegrationSlide Number 7Slide Number 8Ground Equipment Reset �Reset Cost ModelProjected “Waves” of �OIF/OEF EquipmentReset Liability: Snapshot in TimeMarine Corps Ground Equipment Impacts and Risk