0 100 200 300 400 500 600 700 800 900 1.000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 G W h/day C O N V EN TIO N A L D E M AND G TS SHIPPERS 0 50 100 150 200 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 G W h/day ELEC TR IC IT Y S E C TOR SCENARIOS G TS SH IP P E R S GW h/m onth sh ip p ers D iference CONVENTIONAL 24.820 25.395 -575 high 5.006 -1.107 medium 3.448 +450 low 2.109 +1.789 GTS E LE C TR IC ITY 3.898 MARCH.- Comments on the initial month operation plan Gas demand Conventional demand forecasted by the shippers is 575 GWh lower than the GTS forecast. Electricity sector forecasted by the shippers is 450 GWh higher than the GTS medium scenario forecast (3.448 GWh).

MARCH.- Comments on the initial month operation plan

Embed Size (px)

DESCRIPTION

MARCH.- Comments on the initial month operation plan. Gas demand Conventional demand forecasted by the shippers is 575 GWh lower than the GTS forecast. Electricity sector forecasted by the shippers is 450 GWh higher than the GTS medium scenario forecast (3.448 GWh). - PowerPoint PPT Presentation

Citation preview

Page 1: MARCH.- Comments on the initial month operation plan

0

100

200

300

400

500

600

700

800

900

1.000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

GW

h/d

ay

CONVENTIONAL DEM AND

GTS SHIPPERS

0

50

100

150

200

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

GW

h/d

ay

ELECTRICITY SECTOR

SCENARIOS GTS SHIPPERS

GWh/month shippers DiferenceCONVENTIONAL 24.820 25.395 -575

high 5.006 -1.107medium 3.448 +450

low 2.109 +1.789

GTS

ELECTRICITY 3.898

MARCH.- Comments on the initial month operation plan

•Gas demand

Conventional demand forecasted by the shippers is 575 GWh lower than the

GTS forecast.

Electricity sector forecasted by the shippers is 450 GWh higher than the GTS

medium scenario forecast (3.448 GWh).

Page 2: MARCH.- Comments on the initial month operation plan

•UGS - Without notable comments.

•LNG Terminals.

- Sagunto LNG-Terminal: it only can download and upload vessels in

march.

- Cartagena LNG-Terminal: it will stop on 22 of March of 2013.

- In Barcelona, Cartagena, Bilbao, Sagunto and Reganosa´s LNG

Terminals, the average of the users program does not reach the

minimun technical of the plant.

•IIPP- Without notable comments.