<Reference>March 22, 2013
Tokyo Electric Power Company
Air dose rates in the buildings
1
Data collection period (1/2)
• Unit 1: April, 2011 - February (2/18), 2013• Unit 2: April, 2011 - February (2/18), 2013• Unit 3: April (4/25), 2011 - February (2/18), 2013• Unit 4: March (3/31), 2011 - February (2/18), 2013• Unit 5: February (2/25), 2013• Unit 6: February (2/26), 2013
2
Process Main Building (PM): April, 2011 – February (2/18), 2013
Incineration Workshop Building (MSW):May, 2011 – February (2/14), 2013
Miscellaneous Solid Waste Volume Reduction Treatment Building (HTI):April, 2011 – February (2/13), 2013
Side Bunker Building (SB):May, 2011 – March (3/7), 2012
Suppression Pool Water Surge-Tank Building (SPT)May, 2011 – November (11/30), 2012
Auxiliary Operation Shared Facility:August, 2011 – January (1/18), 2013
Data collection period (2/2)
3Unit 1 Reactor Building 1F
2.0
12
5.1
2.5
4.5
4.0
725 6.0
12801100220300247
290 800 1820
138 600 260
127
26
48
121
220
90
4538
90
22
3.5 0.56
6.0
5.0
4.5
7.0
7.0
0.1
4.0
0.25 0.23
0.3
0.30
0.12 0.12 0.14
X-49 SurfaceMAX 800
9.09.0
54
1.5
Floor Penetration
4700
Directlyabove Funnel
2200
5.0
4.5
2.0
4.5
10
0.18
4.7 8.5
0.08
X-40 B Surface MAX 20
Unit: mSv/h
Detail
Shield installed onSeptember 8, 2011
Upper part is 2.2mfrom the floor
20Upperpart150
3.5Upperpart30
2.5Upperpart9
7
Upperpart100Upper
part7
Upperpart5
1.5
11.4
Upperpart50
20
Upperpart4.5
130
Upperpart4
Upperpart4.5 Upper
part5 10
1.5
8
2.51.8
3
4
410 2 6
2.5
1200Upper part
1700
11.430
6180
183Surface of water220
Stairs1FL - MBFL
Large carry-inentranceRooftop
Unit 1
4Unit 1 Reactor Building 2F
6
46
30
240
700
180
9
24
41
>1000
100
52
189
11.6
Unit: mSv/h
5Unit 1 Reactor Building 3F
9
17
5.0
5.0
126.02.72.2
1.7
4.0
Floor debris100
10 22
9
3.5
13
3.5
2.2
2.0Debris
15
1.4
10
7.05.5
19
6
2.6
6
2.7
1.2
5.0
100
149
40
74
10
17
30
16
30
Puddle 200 - 300
Under thestairs654
5
Unit: mSv/h
6Unit 1 Reactor Building 4F
35 520
30
90
1619
40
2621
20 5
2050
19
3545
22
18 20 20
20
20
22
17
19
Unit: mSv/h
7Unit: mSv/h
(2 - 2.5m above the floor)
60
Unit 1 Reactor Building 5F
8Unit 1 Turbine Building B1F
20
10(階段踊り場)
20
8 (landing of the stairs)
5.5 (landing of the stairs)16
Max60 50
65
80
50
95
65
65
80
65
50
8.5
Unit: mSv/h
9Unit 1 Turbine Building 1F
70 0.451.5
0.1
0.2
0.13
0.6
0.3
0.045
0.14
0.08
0.4
25
1.00.15
5.50.55
0.3
0.2
0.15
0.24
0.5 1.3
0.04
0.02
0.250.05
0.12
0.050.05 0.1
0.50.35
0.90.05
0.30.450.1 0.11
1.0
0.1
0.7
0.04
0.1
0.25
0.18
0.1
Surface of the hose4.0
0.1
0.14Ground
5.0
0.3
Surface ofthe hose
6
0.06
0.4
Surface of the hose7.0
0.008
0.005
0.04
0.015
0.015
0.5
Surface ofthe hose
2.0
0.08
Surface of airlock1.7
Bottom part of the wall>1000
0.01
0. 040.25
Unit: mSv/h
Surface of airlock1.5
10Unit 1 Turbine Building 2F
0.18
>5000
0.03
0.08
0.04 0.05
2000
300
0.05 0.03
0.04
0.05
0.03
0.1
0.07
0.1
0.08 0.04
0.15 - 0.190.08- 2
0.08- 0.12
Railing of the overheadtraveling crane
0.1- 0.3
0.1- 0.2
0.04
0.04
0.1
0.07
Detail of the shielding
2018
0.030.10.0350.5 0.04
0.040.03
0.025
0.35Surface of the cask
2.2
Surface of the cask1.8
0.03 0.045 0.015
0.04 0.055
0.06
0.025 0.04 0.03
0.03
0.02
0.045
0.04
0.035
0.04
0.04
0.04
5.0
Temporary instrumentation rack room
0.15
0.1
0.1
0.02
0.15
0.1
0.080.10.27Surface of the filter
1.3
0.130.6
0.130.046
0.13 0.08
0.04 0.042 0.025
0.07 0.03 0.025
0.0550.04
Unit: mSv/h
Door
Shielding
PipingPrefab
air-
cond
ition
ing
mac
hine
room
Surface ofa tinplate
1.0
11Unit 1 Waste Treatment Building 1F
16020
11360
101.00.25
0.05
0.04
0.8
2520018090
350
3.0
1.2
0.075
3.0
0.5
9.5
2.0
4.0
Unit: mSv/h
12
1号機Rw/B
新FSTR
旧FSTR
× 2.0
× 2.0
× 2.0
× 1.0
× 1.0
Water puddle
× 30 × 60 × 60
× 12× 30
× 10
× 13
× 10
× 15
× 38
× 6
Unit 1 Waste Treatment Building Oil Drum Carry Out Gate
0.25
0.4
0.5
1.4
2.56.0
4.0 5.5
7.0
0.7
0.5
0.6
1.5 0.5
1.0
0.9 - 1.3
0.05 - 0.26
Surface of the filter3.0
Unit: mSv/h
13Unit 1, 2 Service Building 1F
0.035 0.035
0.04
0.045
0.08 0.220.10 0.018
0.08
Unit: mSv/h
14Unit 1, 2 Service Building 2F
0.016
0.016
0.022
0.0070.005 0.011
0.006
0.0070.007
0.0080.003
0.005
0.011
0.009
0.0020.009
0.007
0.007
0.006
0.035
0.008
Unit: mSv/h
15Unit 2 Reactor Building MB1F
11
130
7
90
Surface of accumulated water
~66
42
48
42
85
55
40
88
38
38
51
30
82
73
88
118
53
424713 20
10
6
7.2
7.0
13
1210
126
40
Stairs1FL - MBFL
8
11
73
108
68
50
Stairs1FL - MBFL
15
Unit: mSv/h
16Unit 2 Reactor Building 1F
21
10
10
9.5
18
15
In front of theinstrumentation rack
22
14
2.3
36
6.5
2416
10
Surface of the upper pene 3000 - 4400Surface of the upper pene 310 - 500
Close to the upper pene20 - 63
Atmosphere inside the shielding box
2.5 - 7
Upper part of 315°side
28 - 60mSv/h
13 15
9
13
ペネ表面10~73
40
21
Close to the upperX-40, 27 pene
25 - 70 (1.2m from the floor)52 - 100 (4.5 - 5.0m from the floor)
6.0 10
8.0
8.06.0
6.0
6.0
12
20
24
2.513
24
28
20
25 18
15
2.5
20
24
7.8
10
9
13
8
7
Landing5.0
Landing13
0.4
14
0.750.350.230.21
0.075
0.22
0.150.15
0.15 0.16
4.0
30
7.0
RCIC-26
Surface 130
15
13
13
15
12
Unit: mSv/h
In front of thesump rack
28
8.0Large carry-in entrance 1F
Large carry-in entrance 2F
17Unit 2 Reactor Building 1F Southeast Side (Inside the TIP Room)
11
18
1.5
2.8 1.8
4.0
2.0
2.7
2.6
16 14
10
63.5
6
21
4.58.0 56.5
4.5
Unit: mSv/h
18Unit 2 Reactor Building 2F
16 15 24
97.2
5267.630.4
79.1
38.1
55.6
31
43
31.1
Landing
23
Upper part of the floor29 - 33
Close to the penetration36 - 100
303F
2F
56
22
25Working floor 100
X29B/C pene 330 - 1640
10
14
16
12
Unit: mSv/h
19Unit 2 Reactor Building 3F
25
29
40
3811
13
12
23
18
17
10
11
10
Landing
8
10
4F
3F
12
10
13 21 22
40
31
22
26
34
44
Unit: mSv/h
20Unit 2 Reactor Building 4F
45
10
13
5F
4F
15
Landing12
11
14
14
11 17
22
1816
18
Unit: mSv/h
21Unit 2 Reactor Building 5F
114
190
207
250
154
47
57
99
81
230
11167
45
40
78
48 60
80
77
7855
59 128 153
356
173
133
80
139
506
376
401
415
829
880
783
530
Unit: mSv/h
(Blow-out Panel Opening)
22
Unit 2 Turbine Building B1F
>1000
Unit: mSv/h
23
Unit 2 Turbine Building 1F
0.4
0.05
0.6
0.05
0.110.060.30.35
0.23
7.0
0.6
0.1
1.0
0.8
0.4
0.20
0.10.05
0.3
2
0.06
0.70.50
2.0
0.80 10
0.5
0.5
0.025
0.03
1.0
0.05 1.5
0.55
0.05
0.1
0.1
0.09
0.4
0.15
0.02
0.02
0.015 0.2
0.025
4.5
3.5
0.9
2.0
2.2
1.0
0.60.35
0.08
0.10.4
0.01
0.012
0.02
0.015
0.04
0.04
0.12
0.11
0.8
4.0 0.1
0.150.05
0.1
9
0.40
0.2
0.60
0.450.5
0.020.04 0.04
0.04
0.015
0.1 0.5
Surface3.0
Surface2.5
Surface3.5
Surface6.0
Surface3.0
Surface5.0
0.70
Unit: mSv/h
0.7
24
Unit 2 Turbine Building 2F
80 600
40 10
2
0.04
0.1
0.020.060.015
0.02
0.3
0.05 0.050.13
0.10.1
0.10.02
0.050.017
0.035
0.05
0.0230.018
0.025
0.018
0.028
0.0230.02
0.04
0.18
0.02
0.16
0.500.040
0.08
0.020
1.9
0.045
0.25
0.22
0.02
0.04
0.020
0.025 0.070.25
0.04
0.02
0.02
0.03
Unit: mSv/h
25
Unit 2 Waste Treatment Building 1F
0.50 0.50
0.20
0.2
0.2
0.04
0.04
350.35
0.025
0.03
0.02 0.03
0.05
0.12
0.05
0.05
0.03
0.45
1.5Surface of piping
12
15
4
2.5
0.02
Unit: mSv/h
26Unit 2 Waste Treatment Building MB1F
Surface of accumulated water~140
15 - 20
50 - 75
4
18
100
46
190
173
125
Side of hatch154
176230
192
158
176
180
179
186
234
Side of hatch360
169
158
164
186
240
193
Unit: mSv/h
27Unit 3 Reactor Building 1F
34
20
27
52
8.0
69.8
96
74.37
30 - 4051
42
96
37
53
5044
46
27
155
151098
37.51
2227
35
68.88
55
430
2290
200
203.1
4.5
50
3545
25
8.0
91.646.2
73.22
15.91
65.59
18.50
95.83
21.74
34.12
27.50
24 36 90
13
2.2
Surface of the floor
MAX4780
50
4445
Unit: mSv/h
28Unit 3 Reactor Building 2F
Close to a valve 45
Top of the access ladder 50
Floor 60
4845
70
75
5032
Close to a handle of a valve
170Shielding box
280
5254
90
9898
22
Unit: mSv/h
29Unit 3 Reactor Building 5F
500
Unit: mSv/h
30Unit 3 Turbine Building B1F
Unit: mSv/h
Max750
Max400
31Unit 3 Turbine Building 1F
134.0 1.2 4.0 4.0 3.5
4.0
5.0
2.5
1.0
0.4
6.0
3.5
0.1
1.0
0.1
0.8
0.3
10
2.5
0.20.08
0.170.4
0.2
1.8
30
1.0
3.5
0.5
4.0 4.0
Surface oftransfer pipingMax 12
0.2
Surface of transfer pipingMax 60
1.5
4.0
0.9 1.5
0.7
10
3.00.4
8.0
Surface of transfer pipingMax 80
0.60.3
0.8 0.5
90
35
0.7
12
0.1 0.6
0.25
Surface of transfer pipingMax 40
Surface oftransfer pipingMax 40
Surface of transfer pipingMax 50
0.1
0.15
0.5
Surface4.00.3
1.5
0.15
Surface of a hose60
Surface of a hose30
0.1
0.4
3.5
0.015
0.850.03
0.4
0.05
0.5
8.5
1.3
1.00.81.5
2.0
0.2
0.2
3.5
3.0
0.1
Surface2.8
Surface3.0
Surface7.0
Surface2.5
Surface2.5
0.08
0.11
Unit: mSv/h
4.0
0.8
0.5
0.4
0.7
4.0
32
Unit 3 Turbine Building 2F
5.01.0
3.06.0
2.6
1.5 2.0
1.0 0.65
0.25 0.25
0.3
0.120.27
0.3
0.27
0.32
4.0 3.5 3.0
0.25
0.25
0.6
0.6
0.3
1.5 1.0 0.4
0.12 0.4
0.7
1.0 0.6
2.0
2.0
2.0
1.5
2.0
0.2
0.4
0.5
0.3
3.0
0.180.8
2.5
0.32
0.35
1.2
1.5
0.55
Temporary Shielding Installation
0.55
0.2
3.03.0
6.0
0.50.5
4.0
6.0
0.5
0.3
0.652.0
Surface of a hose60
Surface of a hose50
2.5
3.0 4.0
0.12
0.035 0.075
0.7
0.5
0.6 0.65
Debris16
Unit: mSv/h
33
Unit 3 Waste Treatment Building 1F
0.8
0.8
1.0
0.7
0.4
1.02.5
1.6
1.1
0.6
0.8
0.3
1.1 0.8 1.3 1.3
0.6
1.0
4
2.0
0.9
2.0
2.0
0.4
3.5
0.6
Cooling building1.0Control house
0.25
0.04
0.04
0.05
0.35
5.0
1.5
0.05
0.05
0.05
0.35
1.1Surface ofpiping
5.0
1.0
Unit: mSv/h
34
Unit 3, 4 Service Building MB1F
0.8
0.3
1.2
15
0.15
0.7
0.1
0.3
0.4
0.2
8
0.2
0.1
0.15
0.3
1
Unit: mSv/h
35
Unit 3, 4 Service Building 1F
0.121.0
0.4 3.0
0.25
0.06
0.15
0.3
0.15
0.10.1
0.15
0.15
0.70.18 0.2
0.130.10.060.11.0
2.0
1.51.6
0.03
0.025
0.02
0.070.09
0.035
0.018
0.015
0.038
Unit: mSv/h
36
Unit 3, 4 Service Building 2F
0.06
0.03
0.035
0.03
0.015
0.017 0.013 0.014
0.018
0.0120.0120.045
0.017
0.028
0.035
0.028
0.021 0.03
0.02
Unit: mSv/h
37Unit 4 Reactor Building MB1F
0.035
0.04
0.2
0.1
0.2
0.15
0.20.1
0.120.07
0.3
0.15
0.15
0.15
0.02
0.2
0.2
0.1
0.150.150.1
0.25
0.25
0.35
0.35
0.26
0.1Landing of the stairs
0.35
0.06
0.15 0.55
Unit: mSv/h
38
0.025
0.025
0.06
0.02
0.055
0.07
0.017
0.015
0.017
0.2
0.02 0.150.06
0.06
0.017
0.050.035
0.05
0.07
0.025 Debris piping0.3
Average of the upper part0.04
0.05
0.04
0.015
0.02
0.055
0.0150.01
0.03
0.020.035
0.055
0.05
Unit: mSv/hUnit 4 Reactor Building 1F
39Unit 4 Reactor Building 2F
0.060.04
0.06
0.07
0.015
0.06
0.015
0.025
0.045
0.4 0.9
0.03
0.03
0.05
0.8
1.2 0.35
0.02
0.04
0.250.015
0.13
0.1
0.2
0.2
0.03
0.04
0.03
Debris0.1
Debris0.1
0.9
0.26
0.5
0.07
Above thescaffolding
0.2 - 0.5
Unit: mSv/h
40Unit 4 Reactor Building 3F
0.04
0.05
0.7
0.2 0.6
0.250.25Hx Surface
4.5
0.040.045
0.05
0.15
0.04
Above thescaffolding
Unit: mSv/h
41Unit 4 Reactor Building 4F
0.08
0.1 0.05
0.1
0.1
0.07
0.1
0.05
0.1
0.1
0.1
0.07
0.09
0.08
0.65
0.25
0.17
0.150.15
0.09
Above the scaffolding
0.12
0.15
0.2 0.3
0.2
0.12 0.1
0.1
Unit: mSv/h
42Unit 4 Reactor Building 5F
0.3
0.25
0.35 0.35
0.55
0.5
0.45
0.4
0.35
0.5
0.45
0.4
0.35
1.0
0.3 0.3
0.5 0.45 0.6
0.45
0.5
1.0
0.3
0.71.3
0.5
0.8
0.45
0.5
0.4
0.3
0.3 0.45 0.35
0.35 0.4
Overhead traveling crane
0.4
0.4 0.50.45
0.15
0.2 0. 15
Upper part
0.25
0.7
0.25
0.4
0.4
DebrisMAX1.0
0.3
0.4
Floor collapsed
0.75
0.18
0.35
DebrisMAX28
0.6
0.5 0.5
0.8
0.9 0.6
0.55
0.4
0.6
1.0
0.35
0.3
0.25
Unit: mSv/h
0.15
43
14××23
Unit 4 Turbine Building 1F
0.15
0.2
0.2
0.3
2.0
1.7
1.0 0.4
0.5
0.10.3
1.02.1
0.22
0.2
0.1
0.5
1.5
1.30.2
8.0
0.068
0.3
Surface of a hose20Surface of a hose
35
Surface of a hose10
0.35
0.4
1.7
1.8 0.7
0.6
1.0 0.5 0.5 0.65
Surface of a hose8
0.02
0.050.025
0.75
0.02
0.05
Surface of a hatch10
2.5
0.2
Unit: mSv/h
×0.5×5.5
Surface of water
0.18
0.2 2.0
0.50.1
44Unit 4 Turbine Building 2F
0.15
0.3
0.080.1
0.14
0.150.13 0.11
0.260.2 0.09
0.2
0.10.1
0.08
0.07
0.08 0.080.07
0.020.030.020.040.050.07
0.1 0.05
0.09
0.09
0.13
0.12
0.0060.20.3
0.180.18
0.120.11
0.1
2.00.16
0.1
0.10
0.50
0.10
0.05
0.2
0.15 0.20.2
0.2 0.20.2
0.13
0.04
0.07 0.1
0.4
0.13
0.05
0.04
Debris1.0
0.15
0.07 0.02
0.35
0.5
0.6
0.25
0.5
0.20.16
Unit: mSv/h
45Unit 4 Waste Treatment Building 1F
0.04
1.0
2.0
0.7
0.3
0.055
0.06
0.03
0.030.08
2.1
0.6
0.020.18
0.1
0.15
0.0070.15
2.0
0.05
0.05
Surface6.0
2.5
1.5
2.0
1.7 Surface6.0
0.06
Surface5.0
4.0
4.0
1.0
1.0
3.5
1.6
1.4
0.01
0.01
0.004
0.7
1.5
1.01.0
1.4
Surface5.0
Surface6.5
Unit: mSv/h
46Unit 4 Waste Treatment Building 4F, 3F, 2F
0.55
0.2
4.0
5.0
0.30.20.31.5
0.4
0.05
0.15
0.2
1.5
1.4
1.51.3
0.008
0.2
0.055
0.2
0.2
Unit: mSv/h
4F 3F
2F
47Unit 5 Reactor Building B1F
0.030
0.0065
×
×
Unit: mSv/h
48Unit 5 Reactor Building 1F
0.0020
0.0014
0.00070
×
× ×Unit: mSv/h
49Unit 5 Reactor Building 2F
0.0012
0.00070
×
×Unit: mSv/h
50Unit 5 Reactor Building 3F
0.00030
×
0.00090×
Unit: mSv/h
51Unit 5 Reactor Building 4F
0.00080×Unit: mSv/h
52Unit 5 Reactor Building 5F
×
0.16
0.0012×Unit: mSv/h
53
Unit 5 Turbine Building B1F
0.00030
0.00050×
×
Unit: mSv/h
54Unit 5 Turbine Building 1F
0.00040
0.00050
×
×Unit: mSv/h
55Unit 5 Turbine Building 2F
0.00060
0.00040× ×
Unit: mSv/h
56
Unit 5 Waste Treatment Building B1F
0.0055×
Unit: mSv/h
57
Unit 5 Waste Treatment Building 1F
0.00030
×
Unit: mSv/h
58Unit 6 Reactor Building B2F
×
0.0011
Unit: mSv/h
59
Unit 6 Reactor Building B1F
×
0.00090
Unit: mSv/h
60Unit 6 Reactor Building 1F
×
0.013×
0.0060
Unit: mSv/h
61Unit 6 Reactor Building 2F
×
0.00070
×
0.015
Unit: mSv/h
62Unit 6 Reactor Building 3F
×
0.0018
0.0025
×
Unit: mSv/h
63Unit 6 Reactor Building 4F
×
0.0020
Unit: mSv/h
64
Unit 6 Reactor Building 5F
×
0.0010
Unit: mSv/h
65Unit 6 Reactor Building 6F
×
0.00090
×
0.0013
Unit: mSv/h
66
Unit 6 Turbine Building B1F
×
0.00050
×
0.00030
Unit: mSv/h
67Unit 6 Turbine Building 1F
×
0.00030×0.00030
Unit: mSv/h
68
Unit 6 Turbine Building 2F
×0.00040×
0.0010
Unit: mSv/h
69
Unit 6 Waste Treatment Building B1F
×
0.0075
Unit: mSv/h
70
Unit 6 Waste Treatment Building 1F
×
0.00030
Unit: mSv/h
71Process Main Building 1F
2.21.2
0.03
0.80
25 16
6.5150
22
2.02.7
0.5
0.6
0.8
0.6
0.055
0.14
0.4
1.0
9.0
0.15
0.3
0.12
1.5
0.45 0.1 1.0
0.03
2.00.5
0.15
0.07 0.11
0.2
0.015
0.030
0.030
0.0600.020
0.030
0.080.028
0.75 0.6
0.65
0.5
0.01
0.027
0.25
0.08
0.100.05
0.02
0.06
0.07 0.03 0.025
0.05
0.02
0.02 0.7
0.7
0.7
Surface of piping5.0
0.075 Surface of piping7.0
Surface of piping8.0
1.5
72Process Main Building 2F
0.02 0.01
0.04
0.3
0.012
0.05
0.13 0.03
0.012
150.1
0.002 0.002
0.002 0.002
~0.65
0.012
2.00.2
0.5
0.09
0.01
0.020.0190.04
0.004
0.003
0.005
0.004
0.03
0.050.05
0.150.04
0.0450.5
0.025 0.02 0.04
0.06
0.04
0.11
73Process Main Building 3F
0.008
0.006 0.01
0.003
0.006
0.0070.007
0.006
0.003 0.0040.004
0.003 0.04 0.12
0.004
Above the opening1.3
0.06
0.005
0.007
10
2.3
3.0
0.006
0.005
0.023
0.015
1.7
0.011
0.05 0.01
0.08
9.0
2.5
0.1
0.2
0.08
0.5 - 12
3.2
Surface of piping7.0
Surface of piping40
74Process Main Building 4F
0.4
0.02 0.015
0.015
0.050.08
0.15
0.045
9.0
0.012
0.009
0.2
Above the opening0.3
8.5
0.015
0.021
0.011
0.0080.008
0.0120.02
45 24
70
45
20
0.3
20
0.17
0.015 0.009
0.021
0.006
0.005
0.0060.005
Above the opening0.12
0.110.8
0.03
0.015
0.130.09
0.10.035
0.060.1
0.25 3.0 11
4.0
0.021
0.008
0.008
1.00.25
75Incineration Workshop Building B1F
0.008
0.007
0.010.008 0.008
0.012 0.01
0.0060.008
0.009
0.01
0.01 0.01
0.01
0.01
0.008
0.008
0.01
0.01
0.009Unit: mSv/h
76Incineration Workshop Building 1F
0.07 0.1 0.06
0.01
0.09
0.008
0.003
0.02 0.003
0.003
0.004
0.008
0.0090.009
0.008
0.008
0.01
0.01
0.70.014
0.02
0.01
0.01
0.007
0.010.008
0.0080.008
0.008
0.0080.02
0.015
0.126
0.0120.6
7.5
0.1
0.6
0.10 0.12
0.9 0.004
0.371
0.003
0.005
0.005
0.04
0.016
0.05
Upper side of large carry-in entrance (overheadtraveling crane area)
0.008 - 0.23
0.13 - 0.4
4.0
0.1
0.14
0.14
0.2
1.0
Maximumsurface dose
0.4
Maximumsurface dose
0.26
Overheadtraveling crane
0.104
0.089
0.034
0.219
0.11
Unit: mSv/h
77Incineration Workshop Building 2F
0.005
0.004
0.0045
0.004
0.0021 0.0015
0.0013
0.0013
0.0011
0.001
0.001
0.00120.001
0.0016
0.0018Unit: mSv/h
78Miscellaneous Solid Waste Volume Reduction Treatment Building 1F
0.05
0.35
0.22
0.025
0.006
0.008
0.08 0.035
0.065
5.0
0.15
0.06
1.1
0.065
0.003
0.055 0.09
40 10 5
2
0.16
0.05
0.15
0.15
2.2
0.075
3.5
0.2
0.11
3.0
0.0350.075
1.0
Surface of piping8.0
0.85
0.4
0.20.12
0.15
0.30
0.4
0.25 0.08
0.17
Surface of piping11
0.25
0.15
0.03
0.06
Surface of piping10
0.030
0.35
0.12 0.060.25
Surface of piping45
5.0Surface of piping
7.5
2.0
0.03
0.06
0.01
0.1
0.013
0.15
0.1
0.1
0.25
0.015
0.08
0.07
0.13
0.08
0.50
0.22
0.035
0.030
0.04
0.045
0.12
0.16
Surface of piping0.8
0.14
0.15
Unit: mSv/h
0.100.12
0.250.620.750.550.420.320.45
0.500.500.450.450.350.400.60
0.08 0.04
0.50
0.50
PI-902B2.3
PI-902A5.0 PIT-400A
2.3
PIT-500A1.9
0.26 0.20 0.27 0.30 0.28 0.23
0.28 0.20 0.15 0.25 0.20 0.20
PIT-300B1.8
PI-400B2.2
PI-500B3.0
0.50
0.10
0.06
79Miscellaneous Solid Waste Volume Reduction Treatment Building 2F
0.4
0.03
0.08 0.005
0.012
0.2
0.35
0.1
0.14
0.01
0.01
0.025
0.010.0050.06
0.010.005 0.005
0.013
0.023
0.04
0.03
0.04
0.025
0.02
0.06
2.0
0.004
0.008
0.015 0.015
0.020
0.045
0.008
0.007
0.01
0.005
0.0060.004
0.004 0.006
0.008 0.007
0.3
0.1 0.75
0.15
Surface of piping40
0.055
0.03
0.01
0.0070.0030.006
0.0040.004
0.005
0.02
Unit: mSv/h
80Site Bunker Building B1F
0.015
Trench0.015
0.0150.08
0.03
0.02
0.15
0.08
0.02
0.01
0.01
0.013
0.0230.01
0.0060.005 0.005
4.51.5
Unit: mSv/h
81Site Bunker Building 1F
0.005
0.04
0.02
0.002
0.008 0.04
0.085
0.03
0.006
0.0020.0020.003
0.16 0.06 0.025 0.012
0.04
0.02
0.020.02
0.018
2.5
0.15
1.1
1.6
0.035
0.020
0.10.08
0.06 0.055
0.03 0.04
0.035 0.04
Unit: mSv/h
82Site Bunker Building 2F
0.008
Air extractor filterMAX 0.8
0.0080.01
0.007
0.01
0.01
0.018
0.024
0.030.01
0.015
0.08
0.015
0.002
0.05
0.05 0.05 0.05
0.030.03
0.040.04
0.14 0.08 0.07
0.02
0.015
0.005
0.15 0.20
0.0150.013
0.020
0.15
0.02
0.006
Unit: mSv/h
83Suppression Pool Water Surge-Tank Building B1F
0.50.40.4
0.2
0.16
0.17
0.18
2.0
1.0
Unit: mSv/h
B1F
84Suppression Pool Water Surge-Tank Building 1F
0.004
0.006 0.004
0.06
0.007 0.013 0.05
0.01
0.1
0.14
0.18
0.08
0.015 0.02
0.015 0.020.012
0.012
To HTI/B0.08
0.080.1
0.18
Unit: mSv/h
1F
2F
85Auxiliary Operation Shared Facility B1F
0.001
0.0022
0.00180.0020.007
0.009
0.006
0.0050.005
0.004 0.0015
0.004 0.0006
0.003
0.0015
0.004
0.002
0.0025
0.0040.0035
Surface of waste2.5
0.0015
0.0045
Duct
Wall
Temporary scaffolding(4.0m from the floor)
0.0045
0.007
0.008
0.007
0.008
0.008
0.002 0.0030.003
0.004
0.0010.005
0.001
0.00040.001
0.501.0
2.0 0.080
0.13
0.30
0.100.0013
0.0006 0.0006
0.0006
0.0005
0.0010.005
0.002
0.0007
0.0050.0005
0.0013
0.002
0.02 0.025
0.00080.01
0.0012
0.0008
0.0007
0.0004
Unit: mSv/h
86Auxiliary Operation Shared Facility 1F
0.030
0.02
0.012 0.02
0.03
0.007
0.3
0.012
0.020.011
0.009
0.02
0.008
0.0220.011
0.45
0.010
0.01
0.011
0.008
0.015
0.045
0.006
0.04
0.016
0.015
0.035 0.02
0.015
0.007
0.003
0.0045
0.008
0.007
0.0110.0100.002
0.004
0.065
0.0020.003
0.0040.003
0.050
0.02
0.004
0.0080.004
0.004
0.004
Surface of piping1.5
Surface of piping1.0
Surface of piping2.0
Unit: mSv/h
0.040
87Auxiliary Operation Shared Facility 3F
0.004 0.004 0.004
0.004
0.004
0.003
0.004 0.0050.005
0.006
0.010
0.005
0.006 0.007 0.004 0.004 0.002
Overheadtraveling crane
0.008 0.003
0.004
0.0050.002
0.010 0.006 0.005
Fuel Handling Machine
0.009
0.003
0.0030.003 0.005 0.004
0.003 0.005 0.003 0.003
0.0030.002
0.002
3FL 2FL 1FL
Unit: mSv/h