October 18, 2019 Map, Plan and Report Carpenter’s Acres Sewer District Town of Ballston Saratoga County, New York Prepared for: Town of Ballston PO Box 67 Burnt Hills, NY 12019 Prepared by: C.T. MALE ASSOCIATES 50 Century Hill Drive Latham, New York 12110 (518) 786-7400 FAX (518) 786-7299 C.T. Male Associates Project No: 19.9020 Unauthorized alteration or addition to this document is a violation of the New York Copyright 2019 State Education Law. C.T. MALE ASSOCIATES ENGINEERING, SURVEYING, ARCHITECTURE, LANDSCAPE ARCHITECTURE & GEOLOGY, D.P.C.

Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

October 18, 2019

Map, Plan and ReportCarpenter’s Acres Sewer District

Town of BallstonSaratoga County, New York

Prepared for:

Town of BallstonPO Box 67Burnt Hills, NY 12019

Prepared by:

C.T. MALE ASSOCIATES50 Century Hill Drive

Latham, New York 12110(518) 786-7400

FAX (518) 786-7299

C.T. Male Associates Project No: 19.9020

Unauthorized alteration or addition to thisdocument is a violation of the New York Copyright 2019State Education Law. C.T. MALE ASSOCIATES ENGINEERING, SURVEYING, ARCHITECTURE, LANDSCAPE ARCHITECTURE & GEOLOGY, D.P.C.

Page 2: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

CARPENTER’S ACRES SEWERMAP, PLAN AND REPORT

TABLE OF CONTENTS

Page

1.0 Introduction ..............................................................................................................11.1 Project Need..................................................................................................11.2 Alternatives Considered .............................................................................2

2.0 Description of Sewer Area......................................................................................32.1 Existing Sanitary Sewers in Project Area..................................................32.2 Proposed Sewer Area ..................................................................................32.3 Sewer Collection System.............................................................................32.4 Properties and Benefit Units.......................................................................4

3.0 Project Costs..............................................................................................................53.1 Capital Cost...................................................................................................53.2 Hookup Cost.................................................................................................63.3 Operation and Maintenance Cost..............................................................63.4 First Year Cost ..............................................................................................6

FIGURESFIGURE 1 Proposed Carpenter’s Acres Sewer District

APPENDIXAppendix A List of Parcels in Sewer Service Area Appendix B Low Pressure Sanitary Sewer Design / Layout (E/One)

Page 3: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 1 -

1.0 INTRODUCTION

For the purpose of establishing a new sewer service area that is located in the northern part of the Carpenter’s Acres neighborhood in the Town of Ballston, a Map, Plan and Report (Report) has been prepared to present the boundaries, the general plan, capital costs, method of financing, and first year operating costs of the proposed Carpenter’s Acres Sewer District.

This Report documents the need for the project, the alternatives considered, the costs, and the recommended sewer and treatment options to serve the proposed district. The following are documented in this Report:

Identifies and describes the selected district and alternatives Finalizes the properties in the service area for the selected district Presents the method for assessing sewer rates to the properties served Documents the estimated capital and operational costs

1.1 Project Need

The Town of Ballston recognizes the need to maintain and upgrade public infrastructure. The Town has been proactive in taking steps to upgrade and maintain its water and sewer systems and completed a sewer master plan in 2014 for serving various areas of the Town. One of the areas identified for a potential sewer project is the Carpenter’s Acres subdivision area. Some residents within this neighborhood have been petitioning the Town to provide sanitary sewer service since late 2015.

In general, these same residents have identified existing on-site septic systems that are past their useful life or are in various stages of failing. The neighborhood has public water and on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed. Since the late 2000’s, private development along NYS Route 50 between Brookline Road and NYS Route 67 has extended a sanitary sewer main (owned and maintained by Saratoga County Sewer District #1) along Route 50 to a point where it is now feasible for sanitary sewer infrastructure to be extended to this neighborhood.

Municipal sewer systems offer significant benefits to the community. Runoff from failing septic systems can deteriorate water quality in the adjacent creeks and water bodies. Inadequately treating sewage from failing septic systems can also pose a significant threat to

Page 4: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 2 -

drinking water and human health because diseases and infections may be transferred to people and animals directly and immediately. Inadequately treated sewage from failing septic systems is the most frequently reported cause of groundwater contamination.

1.2 Alternatives Considered

The Town of Ballston has been studying the possibility of providing sanitary sewer to all, or portions of, the Carpenter’s Acres neighborhood since 2016. The following studies have been completed.

A “Draft Carpenter’s Acres Sewer Project (Engineering Report)”, prepared by Adirondack Mountain Engineering, was prepared in November 2016 and subsequently presented at a public hearing. This report focused on the feasibility of providing sanitary sewers to the entire neighborhood (160 properties) and presented low pressure sewer and gravity sewer/pump station options. Based upon this report, the Town Board determined that the cost per household was too high and could not justify the project cost correlated with the benefit. In addition, there were many residents opposed to the project at the time, with the residents desiring sanitary sewer generally limited to the northern and western portions of the neighborhood.

In 2019, C.T. Male was authorized by the Town Board to consider a smaller sewer service area, restricted to the northern and western portion of the neighborhood, where there were more clusters of residents who desired a public sanitary sewer system. Two sewer service area options were discussed in C.T. Male’s feasibility study dated August 20, 2019. Ultimately, Option #2 was deemed the most reasonable option to move forward and is presented in this report.

Page 5: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 3 -

2.0 DESCRIPTION OF SEWER AREA

2.1 Existing Sanitary Sewers in Project Area

The Saratoga County Sewer District #1 currently owns and operates sanitary sewer infrastructure located on the east side of NYS Route 50. This infrastructure was installed in the past 10 years as private development, specifically apartment or condominium complexes, were constructed. The sanitary sewer infrastructure along NYS Route 50 consists of a parallel 3-inch and 4-inch forcemain extending from the entrance to the Cornerstone Condominium development south 1,200 feet to a sanitary manhole where the sewer flows into an 8-inch diameter gravity sewer main. This sewer flows south 1,500 feet to a SCSD #1 sewer that travels west to east following the National Grid power lines, then crossing Rolling Brook Drive and NYS Route 67, eventually flowing into the County interceptor sewer at the Zim Smith Trail. Prior studies have documented that this segment of sewer has enough capacity to receive flows from the entire neighborhood.

In addition to the infrastructure along NYS Route 50, the SCSD#1 currently owns the low pressure sanitary sewer systems located in Cornerstone Condos. At Cornerstone Condos there is a 2” line that runs southeast, which becomes a 3” line before it meets the sewer forcemain on NYS Route 50. For this development, the sewer piping is owned by SCSD#1 and the developer owns/maintains the grinder pumps.

2.2 Proposed Sewer Area

The proposed sewer service area includes 50 properties on Moonlight Drive, Robert Drive, Reita Street, and Cindy Lane. All of the properties are single family homes. A map showing the limits of the sewer service area is included as Figure 1. A list of the properties is included in Appendix A.

2.3 Sewer Collection System

The proposed low pressure sanitary sewer system consists of 2” and 3” SDR 11 HDPE piping and extends from the northwest corner of the subdivision, running north along Moonlight Drive, then west on Robert Drive, then south on Reita Street and east to the roundabout on Cindy Lane. These sewer mains will be installed in the Town road right-of-way. From Cindy Lane, the 3” sewer main would extend from Cindy Lane to Cornerstone Condos. Easements

Page 6: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 4 -

from property owner(s) on Cindy Lane and Cornerstone Condos will be required for this portion of the main. The 3” sewer would then be installed parallel to the existing Cornerstone Condos sewer mains, in the SCSD#1 easement.

The project also includes construction of small-diameter HDPE force main lateral and curb stop (generally 1.25-inch in diameter) to each property, terminating at the property line. After completion of the municipal portion of the sewer system, each property owner will be able to connect to the sewer system by installation of a grinder pump. A typical grinder pump system is comprised of a small tank with an integral grinder pump along with a control panel. Each grinder pump would convey flow to a sewer lateral, which will connect to the curb stop at the edge of the right-of-way.

The sewer system within the municipal right-of-way will be under ownership of the Town of Ballston with the Saratoga County Sewer District #1 maintaining the system. This is consistent with the O&M agreement developed with the Town and County for the Ballston Lake Sewer project, and the expectation is that agreement will be modified to include Carpenter’s Acres if the district is formed and constructed.

The low pressure sewer system was sized by Environmental One and is based on connecting to the existing low pressure sewer system at Cornerstone Condos/NYS Route 50. The sizing criteria for each grinder pump system is based upon a number of factors, including elevation of the pump in the overall system, anticipated flow rate (250 gpd per home), and the percentage of pumps on. A copy of this report is presented in Appendix B.

2.4 Properties and Benefit Units

Each property listed in the Saratoga County Real Property Tax Rolls within the Town as a single family parcel is proposed to be equal to 1.0 Equivalent Dwelling Unit (EDU) or one Benefit Unit (BU). All properties in this sewer district are single family homes, therefore they each count as one BU. A total of 50 BUs comprise the sewer district per Appendix A.

The properties shown in the proposed sewer district are all adjacent to a sewer main, thus would be able to connect to the main. The properties in the proposed sewer district benefit from the installation of the sewer main adjacent to their property. This proposal does not exclude any properties from the sewer district if a sewer main runs adjacent to their property.

Page 7: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 5 -

3.0 PROJECT COSTS

The project costs consist of three main components, capital cost, hookup cost, and operation and maintenance cost. The capital cost is the projected cost to build the infrastructure within the public right-of-way. The operation and maintenance cost is the annual cost to keep the sewer system functional and maintained.

3.1 Capital Cost

The projected capital cost for the project is presented in Table 1.

Table 2- Budget Level Cost Estimate

Description Quantity Units Unit Cost Cost Contractor Mobilization & Admin 1 LS $ 75,000 $ 75,000Maintenance & Protection of Traffic Control 1 LS $ 25,000 $ 25,000Road Restoration 480 SY $ 170.00 $ 81,600Air/Vacuum Release Valves 1 EA $ 9,000 $ 9,000Clean Out 9 EA $ 2,500 $ 22,500Service Connection to Force Main 50 EA $ 300 $ 14,4001-1/4" Lateral Pipe 2400 LF $ 32 $ 76,8002" SDR 11 HDPE Pipe 36 LF $ 36 $ 26,4993" SDR 11 HDPE Pipe 3425 LF $ 40 $ 137,000

Subtotal $ 467,799Contingency (25%) $ 116,950SUBTOTAL CONSTRUCTION $ 584,749ENGINEERING & OTHER SOFT COSTS (25%) $ 146,187 TOTAL PROJECT COSTS $ 730,936

The capital cost of $730,936 assumes the project will be constructed in 2020, and includes all engineering, construction administration and legal costs, plus a contingency based upon the preliminary level of the current plans.

The annual capital cost per benefit unit is $670.55 or $55.88 per month. This is based upon the assumption that the project will be fully bonded with a traditional municipal bond over a 30-year period, at 2.25%. Under this bonding scenario, the annual payment on the bond would be $33,527.64.

Page 8: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

- 6 -

The capital cost will be borne on all properties within the district, regardless of if they hook up to the sewer system or not.

3.2 Hookup Cost

Individual property owners will be responsible for purchasing, installing, and maintaining the E/One pump system along with the service lateral, as well as paying for electrical power to the pump. No separate hookup fee is proposed. The cost to install the grinder pump system and service lateral is estimated to be in the range of $3,500 to $5,000 per installation, depending on the distance of the lateral sewer line connecting the pump to the residence. The estimated cost for electricity to operate each grinder pump on an average single family residential property is estimated at $15 per year, per information from the grinder pump manufacturer.

At this time, it is anticipated that connection to the sewer system will not be mandatory pending finalization of the sewer use ordinance for this neighborhood if the sewer district is formed.

3.3 Operation and Maintenance Cost

Once a property owner hooks up to the sanitary sewer system, they will be responsible for paying operation and maintenance costs to the Saratoga County Sewer District #1. The annual O&M costs for 2020 is $287.50 or $23.96 per month. The O&M fee includes $237.50 for truck/treatment and $50 for maintenance of the lines, stations, trunk sewers, and meter vaults.

3.4 First Year Cost

The total first year cost for the average property in the proposed sewer district is $958.05 or $79.84 per month. This cost includes capital cost plus O&M.

Page 9: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

Pine Grove Ave

Sarat

oga R

d

North Ave

Reita St

Cindy Ln

Robert Dr

Moonlight Dr

Harold St

Pine Grove Ave

Parcel ID: 216.-1-54.112Street Address: 423 ROBERT DR

Parcel ID: 216.17-1-15Street Address: 627 CINDY LN

Parcel ID: 216.17-1-8Street Address: 511 REITA ST

Parcel ID: 216.17-1-5Street Address: 505 REITA ST

Parcel ID: 228.6-1-1Street Address: 624 CINDY LN

Parcel ID: 216.17-1-12Street Address: 630 CINDY LN

Parcel ID: 216.17-1-4Street Address: 463 ROBERT DR

Parcel ID: 216.17-1-9Street Address: 629 CINDY LN

Parcel ID: 216.17-1-11Street Address: 632 CINDY LN

Parcel ID: 216.17-1-10Street Address: 631 CINDY LN

Parcel ID: 228.5-1-15Street Address: 622 CINDY LNParcel ID: 228.5-1-14

Street Address: 620 CINDY LN

Parcel ID: 216.17-1-51Street Address: 405 ROBERT DR

Parcel ID: 228.5-1-81Street Address: 618 CINDY LN

Parcel ID: 216.17-1-17Street Address: 615 CINDY LN

Parcel ID: 216.17-1-25Street Address: 599 CINDY LN

Parcel ID: 216.17-1-1Street Address: 409 ROBERT DR

Parcel ID: 228.5-1-10Street Address: 612 CINDY LN

Parcel ID: 216.17-1-16Street Address: 617 CINDY LN

Parcel ID: 228.5-1-11Street Address: 614 CINDY LN

Parcel ID: 216.17-1-6Street Address: 507 REITA ST

Parcel ID: 216.17-1-7Street Address: 509 REITA ST

Parcel ID: 228.5-1-12Street Address: 616 CINDY LN

Parcel ID: 216.17-1-29Street Address: 420 ROBERT DR

Parcel ID: 216.17-1-18Street Address: 514 REITA ST

Parcel ID: 216.17-1-19Street Address: 611 CINDY LN

Parcel ID: 216.17-1-37Street Address: 431 ROBERT DR

Parcel ID: 228.5-1-9Street Address: 610 CINDY LN

Parcel ID: 216.17-1-27Street Address: 452 ROBERT DR

Parcel ID: 216.17-1-40Street Address: 437 ROBERT DRParcel ID: 216.17-1-39

Street Address: 435 ROBERT DRParcel ID: 216.17-1-41

Street Address: 443 ROBERT DR

Parcel ID: 216.17-1-42Street Address: 449 ROBERT DR

Parcel ID: 216.17-1-38Street Address: 433 ROBERT DR

Parcel ID: 216.17-1-35Street Address: 357 MOONLIGHT DR

Parcel ID: 216.17-1-43Street Address: 448 ROBERT DR

Parcel ID: 216.17-1-49Street Address: 422 ROBERT DR

Parcel ID: 216.17-1-14Street Address: 626 CINDY LN

Parcel ID: 216.17-1-48Street Address: 428 ROBERT DR

Parcel ID: 216.17-1-46Street Address: 436 ROBERT DR

Parcel ID: 216.17-1-47Street Address: 432 ROBERT DR

Parcel ID: 216.17-1-45Street Address: 440 ROBERT DR

Parcel ID: 216.17-1-30Street Address: 347 MOONLIGHT DR

Parcel ID: 216.17-1-44Street Address: 444 ROBERT DR

Parcel ID: 216.17-1-3Street Address: 461 ROBERT DR

Parcel ID: 216.17-1-32Street Address: 351 MOONLIGHT DR

Parcel ID: 216.17-1-13Street Address: 628 CINDY LN

Parcel ID: 216.17-1-31Street Address: 349 MOONLIGHT DR

Parcel ID: 216.17-1-34Street Address: 355 MOONLIGHT DR

Parcel ID: 216.17-1-33Street Address: 353 MOONLIGHT DR

Town of Ballston Saratoga County, NY

Project Number: 19.9020Data Source: NYSGIS ClearinghouseProjection: State Plane NAD83 NYE (Feet)Date: October, 3, 2019File: CarpentersAcresSewerDistrict_11x17.mxdGIS: D.Landreville

Carpenter's AcresProposed Sewer District Map Legend

Proposed LateralsProposed Low Pressure Sanitary SewerProposed Carpenter's Acres Sewer District ParcelsBallston ParcelsRoads

Map Note: The locations and features depicted on this mapare approximate and do not represent a field survey.

©0 200 400100

FT1 inch = 200 feet

Page 10: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

Appendix A

List of Parcels in Sewer Area

Page 11: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

PRINT_KEY PROP_ADDR OWNER1 OWNER2 MAIL_1ADDR MAIL_CITY MAIL_STATE MAIL_ZIP

228.5-1-81 618 CINDY LN Morrissey, Patrick J Morrissey, Susan K 618 Cindy Ln Ballston Spa NY 12020

216.-1-54.112 423 ROBERT DR Tambasco, Deborah A Tambasco, Kevin J 423 Robert Dr Ballston Spa NY 12020

216.17-1-12 630 CINDY LN Rogers, Edwin L Lynn, S 630 Cindy Ln Ballston Spa NY 12020

216.17-1-13 628 CINDY LN Daniel Iskaros 628 Cindy Ln Ballston Spa NY 12020

216.17-1-14 626 CINDY LN Barno, Michael Barno, Conlon 626 Cindy Ln Ballston Spa NY 12020

216.17-1-15 627 CINDY LN Carignan, Leo W Carignan, Donna 627 Cindy Ln Ballston Spa NY 120202550

216.17-1-16 617 CINDY LN Doren, Bryan M 617 Cindy Ln Ballston Spa NY 12020

216.17-1-17 615 CINDY LN Bedard, William M Bedard, Carol 615 Cindy Ln Ballston Spa NY 12020

216.17-1-18 514 REITA ST MacWaters, Bruce 514 Reita St Ballston Spa NY 12020

216.17-1-19 611 CINDY LN Weekes, Stephen J Weekes, Susann C 611 Cindy Ln Ballston Spa NY 12020

216.17-1-25 599 CINDY LN Prastio, James J Prastio, Amy 599 Cindy Ln Ballston Spa NY 12020

216.17-1-27 452 ROBERT DR Galbraith, John A Galbraith, Elaine 452 Robert Rd Ballston Spa NY 12020

216.17-1-29 420 ROBERT DR McNamara, Scott MCNAMARA DENISE 420 Robert Dr Ballston Spa NY 12020

216.17-1-30 347 MOONLIGHT DR MARVEL JACOB G MARVEL MISHA 347 Moonlight Dr Ballston Spa NY 12020

216.17-1-31 349 MOONLIGHT DR Poirier, Jason A Poirier, Ronda T 349 Moonlight Dr Ballston Spa NY 12020

216.17-1-32 351 MOONLIGHT DR Powers, Thomas J Powers, Judidth A 351 Moonlight Dr Ballston NY 12020

228.6-1-1 624 CINDY LN Cornelius, George E Cornelius, Kathleen A 624 Cindy Ln Ballston Spa NY 12020

216.17-1-11 632 CINDY LN Bisnett, Thomas A OSUCHOWSKI NORA A 632 Cindy Ln Ballston Spa NY 12020

228.5-1-9 610 CINDY LN Bouyea, Jeffrey A Bouyea, Mara 610 Cindy Ln Ballston Spa NY 12020

228.5-1-10 612 CINDY LN Itani, Abdallah M 612 Cindy Ln Ballston Spa NY 12020

228.5-1-11 614 CINDY LN Minns, Megan P Minns, Daniel E 614 Cindy Ln Ballston Spa NY 12302

228.5-1-12 616 CINDY LN Harmon, Jason E Harmon, Julie M 616 Cindy Lane Ballston Spa NY 12020

228.5-1-14 620 CINDY LN Hodgins, Jean Ivey 620 Cindy Ln Ballston Spa NY 12020

228.5-1-15 622 CINDY LN Bornheim, James H Bornheim, Janice 622 Cindy Ln Ballston Spa NY 12020

216.17-1-1 409 ROBERT DR Wolfsont, Chester Wolfsont, Martha 409 Robert Dr Ballston Spa NY 12020

216.17-1-3 461 ROBERT DR Brady, Gerald D Brady, Cherly D 461 Robert Dr Ballston Spa NY 12020

216.17-1-4 463 ROBERT DR Myers, Michael J Myers, Erica W 463 Robert Dr Ballston Spa NY 12020

216.17-1-5 505 REITA ST Hughes, Brendan P Hughes, Heather 505 Reita St Ballston Spa NY 12020

216.17-1-6 507 REITA ST Walker, Scott W 507 Reita Street Ballston Spa NY 12020

216.17-1-7 509 REITA ST FAZIO BERNADETTE ROY JOCELYN JOSEPH 509 Reita St Ballston Spa NY 12020

216.17-1-8 511 REITA ST La Rock, Richard R La Rock, Wanda A 511 Reita St Ballston Spa NY 12020

216.17-1-9 629 CINDY LN MALEWICZ COURTNEY A 629 Cindy Ln Ballston Spa NY 12020

216.17-1-10 631 CINDY LN Ewing, Ruth Ewing, Phillip R 631 Cindy Ln Ballston Spa NY 12020

216.17-1-33 353 MOONLIGHT DR Whittemore, Scott Whittemore, Kathleen 353 Moonlight Dr Ballston Spa NY 12020

216.17-1-34 355 MOONLIGHT DR Walker, Michael P Walker, Erin K 355 Moonlight Dr Ballston Spa NY 12020

216.17-1-35 357 MOONLIGHT DR AGAN MATTHEW D AGAN SARA N 357 Moonlight Drive Ballston Spa NY 12020

216.17-1-37 431 ROBERT DR DAVIES THOMAS E DAVIES KATHERINE 431 Robert Dr Ballston Spa NY 12020

216.17-1-38 433 ROBERT DR Rychcik, David C Rychcik, Kelly 433 Robert Dr Ballston Spa NY 12020

216.17-1-39 435 ROBERT DR WHEELER, WARREN K WHEELER, ROSEMARY 435 Robert Dr BALLSTON SPA NY 12020

216.17-1-40 437 ROBERT DR Thayer, Monica 437 Robert Dr Ballston Spa NY 12020

216.17-1-41 443 ROBERT DR BYDAIRK TRUST 443 Robert Drive Ballston Spa NY 12020

216.17-1-42 449 ROBERT DR Billa, Ronald D Billa, Cathy 449 Robert Dr Ballston Spa NY 12020

216.17-1-43 448 ROBERT DR SCHULTHEISS NORMAN 448 Robert Dr Ballston Spa NY 12020

216.17-1-44 444 ROBERT DR MOSHER DAVID A MRAZ KRISTIN L 444 Robert Dr Ballston Spa NY 12020

216.17-1-45 440 ROBERT DR CUSHING ERIC J CUSHING KARI P 440 Robert Dr Ballston NY 12020

216.17-1-46 436 ROBERT DR Marcella, Scott Marcella, Kimberly 436 Robert Dr Ballston Spa NY 12020

216.17-1-47 432 ROBERT DR Catherall, Andrew J Catherall, Dorothy 82 Riley Cove Rd Malta NY 12020

216.17-1-48 428 ROBERT DR Leggieri, Darryl Leggieri, Heather 428 Robert Dr Ballston Spa NY 12020

216.17-1-49 422 ROBERT DR NDAIYE IBRAHIMA DIATTARA AISSATOU 422 Robert Dr Ballston Spa NY 12020

216.17-1-51 405 ROBERT DR Yeager, Steven Yeager, Danielle M 405 Robert Dr Ballston Spa NY 12020

Page 12: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

C.T. MALE ASSOCIATES

Appendix B Low Pressure Sanitary Sewer Design/

Layout (E/ONE)

Page 13: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

Environment One Corporation

Pressure Sewer Preliminary

Cost and Design Analysis

For

Carpenter Acres, NY

rev. 2

Prepared For:

C.T. Male Associates

50 Century Hill Drive

NYLatham US

Tel: 518-786-7400

Fax:

Prepared By: N. Shafarzek

August 19, 2019

M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne

Page 14: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

Carpenter Acres, NY

rev. 2

On:Prepared by : August 19, 2019N. Shafarzek

Notes :

Analysis based on drawings and data provided. Station recommendations preliminary.

GPD values effect retention times only, not line sizing or hydraulics.

Elevations taken from google earth - no elevation on drawings received.

Please note: Running flow for 50 homes through the 2" and 3" line will not work well, if at

all. The friction losses are simply too high in combination with the large static head due to

the elvation spike at the beginning of zone 11 (TDH values rise to almost 400 ft if we attempt

to use existing pipe sizing).

We highly recommend using new SDR11 HDPE pipe to serve this subdivision. I noticed

SDR 9 was used for the previous installation - This is overkill and the pipe IDs are smaller

for the same nominal size which will increase TDH unnecessarily.

rev. 2 - adjusted layout per Andrew Bailey @ CT Male. While the service area was reduced

in size more stations were added so the overall flow is about the same as in rev. 1. (48 accum.

pumps vs. 50) Using existing 2" line is still a no-go due to high number of stations and

elevation spike in zone 11.

<<<<< E N D O F N O T E S >>>>>

M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne

Page 15: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

August 19, 2019

Budgetary Low Pressure Sewer System Costs

Carpenter Acres, NY

rev. 2

Quantity Sub TotalDescription Unit Cost Installation

Valves 1 Air/Vacuum Release Valve $0.00$0.00 0.00

9 Clean Out $0.00$0.00 0.00

$0.00

Pumps 48 DH071-93 $0.00$0.00 0.00

48 Pump/Panel Installation $0.00$0.00 0.00

48 Lateral (Boundary) Kits $0.00$0.00 0.00

48 Lateral (Boundary) Installation $0.00$0.00 0.00

2,400 linear feet of 1-1/4" lateral pipe $0.00$0.00 0.00

$0.00

Piping 1,498 2.00" Pipe $0.00$0.00 0.00

3,277 3.00" Pipe $0.00$0.00 0.00

1,281 4.00" Pipe $0.00$0.00 0.00

$0.00

Total Per Connection Total (w/o other) >>>>>>>>>>>> $0.00$0.00Grand Total Per Connection Grand Total (including other) >>>>>>>>>>>> $0.00$0.00

Number of Connections 55

Note: The System Costs above are based on piping sized for, and Grinder Pumps manufactured by Environment One Corporation.

Page 1 M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne

Page 16: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

PRELIMINARY PRESSURE SEWER - PIPE SIZING AND BRANCH ANALYSIS

Prepared By: Carpenter Acres, NY

August 19, 2019rev. 2N. Shafarzek

Max Main

Elevation

Minimum Pump

Elevation

Zone

Number

Connects

to Zone

Number

of Pumps

in Zone

Max

Sim Ops

Accum

Pumps

in Zone

Length of Main

this Zone

Pipe Size

(inches)

Max Flow

Per Pump

(gpm)

Gals/day

per Pump

Max

Velocity

(FPS)

Friction Loss

Factor

(ft/100 ft)

Friction

Loss This

Zone

Accum Fric

Loss (feet)Max Flow

(GPM)

Static Head

(feet)

Total

Dynamic

Head (ft)

Friction loss calculations were based on a Constant for inside roughness"C" of:This spreadsheet was calculated using pipe diameters for: SDR11HDPE 150

1.00 1.19 1.53 60.29 424.00 338.00 86.00 146.292.00 129.002.0022.00 2.3823 3 11.00250

2.00 2.52 12.35 58.76 424.00 340.00 84.00 142.763.00 490.002.0033.00 3.5736 9 11.00250

3.00 0.65 2.96 46.41 424.00 338.00 86.00 132.414.00 456.003.0044.00 2.1949 18 11.00250

4.00 0.98 10.08 43.45 424.00 341.00 83.00 126.456.00 1,026.003.0055.00 2.74512 30 11.00250

5.00 2.52 4.56 37.93 424.00 347.00 77.00 114.936.00 181.002.0033.00 3.5734 4 11.00250

6.00 1.38 12.70 33.37 424.00 357.00 67.00 100.3711.00 922.003.0066.00 3.29614 48 11.00250

11.00 1.38 6.79 20.67 424.00 400.00 24.00 44.6715.00 493.003.0066.00 3.2962 50 11.00250

12.00 1.19 2.53 25.38 438.00 416.00 22.00 47.3814.00 213.002.0022.00 2.3822 2 11.00250

13.00 1.19 1.53 24.38 426.00 397.00 29.00 53.3814.00 129.002.0022.00 2.3822 2 11.00250

14.00 2.52 8.97 22.85 416.00 416.00 0.00 22.8515.00 356.002.0033.00 3.5730 4 11.00250

15.00 1.83 6.96 13.88 361.00 353.00 8.00 21.8816.00 380.003.0077.00 3.8371 55 11.00250

16.00 0.54 2.27 6.92 361.00 361.00 0.00 6.9217.00 420.004.0077.00 2.3270 55 11.00250

17.00 0.54 4.65 4.65 361.00 361.00 0.00 4.6517.00 861.004.0077.00 2.3270 55 11.00250

1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One.

M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne

Page 17: Map, Plan and Report Carpenter’s Acres Sewer District Town ......on-site septic systems. Public sanitary sewer options were not possible when the neighborhood was first constructed

PRELIMINARY PRESSURE SEWER- ACCUMULATED RETENTION TIME(HR)

Carpenter Acres, NYPrepared By:

N. Shafarzek August 19, 2019rev. 2

Length of Zone Average Retention

Time (Hr)

Accumulated

Retention Time (Hr)

Connects to

Zone

Zone

Number

Average Fluid

Changes per Day

Accumulated

Total of Pumps

this Zone

Pipe Size (inches) Gallons per 100

lineal feet

Capacity of Zone Average Daily Flow

This spreadsheet was calculated using pipe diameters for: SDR11HDPE 250Gals per Day per Dwelling

129.00 19.87 750 37.75 0.64 5.751.00 2.00 3 2.00 15.40

490.00 75.47 2,250 29.81 0.81 5.112.00 3.00 9 2.00 15.40

456.00 152.61 4,500 29.49 0.81 4.313.00 4.00 18 3.00 33.47

1,026.00 343.37 7,500 21.84 1.10 3.494.00 6.00 30 3.00 33.47

181.00 27.88 1,000 35.87 0.67 3.065.00 6.00 4 2.00 15.40

922.00 308.56 12,000 38.89 0.62 2.396.00 11.00 48 3.00 33.47

493.00 164.99 12,500 75.76 0.32 1.7811.00 15.00 50 3.00 33.47

213.00 32.81 500 15.24 1.57 4.3512.00 14.00 2 2.00 15.40

129.00 19.87 500 25.16 0.95 3.7313.00 14.00 2 2.00 15.40

356.00 54.83 1,000 18.24 1.32 2.7714.00 15.00 4 2.00 15.40

380.00 127.17 13,750 108.12 0.22 1.4615.00 16.00 55 3.00 33.47

420.00 232.32 13,750 59.19 0.41 1.2416.00 17.00 55 4.00 55.31

861.00 476.25 13,750 28.87 0.83 0.8317.00 17.00 55 4.00 55.31

1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One