Upload
sureshagarwal
View
29
Download
3
Tags:
Embed Size (px)
DESCRIPTION
Detail presentation on manufacturing of transformers
Citation preview
Technical Associates
Limited
Energising India since 1969
An ISO 9001:2008 Company
2About Us
Manufacturers of
Power and Distribution
Transformers
Turnkey Transmission &
Distribution EPC Projects
We offer solutions spanning the full length of
Transmission & Distribution Opportunities
3About Us
Currently manufacturing transformers from 5 KVA,
11 kV up to 200 MVA 220 kV class.
Planned production of Power Transformers upto
765 kV at new plant in India.
Manufacturing Capacity 18,000 MVA Per Annum.
Turnkey Projects for building electrical substations,
transmission & distribution lines upto 400 kV.
Aggressive Targets, Confidence to grow
4About Us: Milestones
1967: Technical Associates was founded as a partnership firm.
1973: Present manufacturing location at Lucknow established
1985: Indian Transformer Manufacturers Association (ITMA) set up with TAL as a founder member
1991: TA gets ISO 9000 certification for complete transformer manufacturing process
2001: TA becomes regular manufacturer of 40.0 MVA, 132 kV Power Transformers
2006: Turnkey Power Projects division set up for executing Transmission & Distribution EPC projects.
2007: Work commences on setting up a state of the art manufacturing plant in Sitarganj, Uttarakhand
for manufacture of Extra High Voltage Power transformers up to 765 kV class.
2008: State of the art plant commissioned at Sitarganj (Uttarakhand). It will enlarge TALs transformer
product portfolio to include EHV Transformers up to 765 kV; a quantum leap in manufacturing
and technology.
2009: TAL Sitarganj Unit raised first Invoice.
2009: TAL commissions Vapour Phase Drying Plants and Impulse Generators (HAEFELY,
Switzerland).
2010: Both plants of TAL certified for compliance with ISO 9001:2008 standard.
2011: TAL delivers it's first 100 MVA 220/132 kV Auto Transformer to APTRANSCO.
2011: TAL executes it's first export order for Power Transformers for ZESCO, Zambia.
2011: TAL manufactured 160 MVA, 220/132 kV voltage class Power Transformer and successfully
Impulse tested by ERDA Vadodra.
2012: TAL executes export order for Power Transformers for Tokai Power Products Ltd., Bangladesh
and Distribution Transformation for ABERME, Republic of Benin, West Africa.
2012: TAL installed UP's first 2 MWp Solar Photovoltaic Power plant in District Barabanki Inaugurated
by Honorable Chief Minister of Uttar Pradesh.
2013: TAL executes export order for Power & Distribution Transformers for Energie du Mali, Africa.
2013: TAL received approval from RDSO for manufacturing and supply of Traction Transformers
upto 30MVA, 220 KV.
2013: TAL Sitarganj unit approved by Power Grid corporation of India Ltd. (PGCIL) & NTPC.
2013: TAL testing facilities duly approved and accredited to NABL.
2013: TAL approved for repair of 400/220/132 KV Power Transformers by Power Grid corporation
of India Ltd. (PGCIL).
5Pan India Presence
Sales Network
Plant Locations
6Overseas Supplies
7Products Portfolio
8Power Transformers
S. No Rating Voltage Class
33 kV Power Transformer
1 3.15 MVA 33/11 kV
2 5 MVA 33/11 kV
3 6.3 MVA 33/11 kV
4 7.5 MVA 33/11.5 kV
5 8.0 MVA 33/11 kV
6 10 MVA 33/11 kV
7 20 MVA 33/11.5-6.25 kV
66 kV Power Transformer
1 12.5 MVA 66/11 kV
2 12.5/ 16 MVA 66/11 kV
3 20 MVA 66/11 kV
4 16/ 20 MVA 66/11 kV
5 25/ 31.5MVA 66/11 kV
132 kV Power Transformer
1 10/16 MVA 132/11 kV
2 12.5 MVA 132/11 kV
3 20 MVA 132/11 kV
4 20/25 MVA 132/33 kV
5 31.5 MVA 132/33 kV
6 40 MVA 132/33 kV
220 kV Power Transformer
1 60 MVA 220/132/11 kV
2 100 MVA 220/132/11 kV
3 160 MVA 220/132 kV
100 MVA, 220/132/11 kV Power Transformer
12.5 MVA, 66/11 kV Power Transformer 40 MVA, 132/33 kV Power Transformer
9Distribution transformers Three phase
All the above rating can also be manufactured for 33 kV or 22 kV voltage range Transformers upto 300 kVA, 11/0.433 kV are generally manufactured with
aluminum winding, though copper wound transformers can be manufactured if
required
Transformers of 315 kVA and higher ratings are with copper winding
S. No Rating Voltage Class
1 10 kVA 11/0.433 kV
2 15 kVA 11/0.433 kV
3 16 kVA 11/0.433 kV
4 25 kVA 11/0.433 kV
5 40 kVA 11/0.433 kV
6 63 kVA 11/0.433 kV
7 100 kVA 11/0.433 kV
8 200 kVA 11/0.433 kV
9 250 kVA 11/0.433 kV
10 250 kVA 33/0.4 kV
11 300 kVA 11/0.433 kV
12 315 kVA 11/0.433 kV
13 400 kVA 11/0.433 kV
14 400 kVA 6/0.42 kV
15 400 kVA 11/0.42 kV
16 500 kVA 11/0.433 kV
17 630 kVA 11/0.433 kV
18 750 kVA 11/0.433 kV
19 1000 kVA 11/0.433 kV
20 1500 kVA 11/0.433 kV
21 2000 kVA 11/0.433 kV
8 MVA, 33/11 kV Distribution Transformer
Distribution Transformers (11 kV) Distribution Transformers (33 kV)
10
Distribution transformers Single phase wound core
Transformer of 10 kVA are copper / aluminum wound Transformer of 16 kVA and higher rating can be made either with copper or
aluminum or composite windings
Transformer with primary voltage of 11 kV and intermediate ratings are also manufactured
S. No Rating Voltage Class
1 5 kVA 6.3/0.240 kV
2 5 kVA 25/0.240 kV
3 5 kVA 11/3 kV/240 kV4 10 kVA 6.3/0.240 kV
5 10 kVA 25/0.240 kV
6 10 kVA 11/0.250 kV
7 16 kVA 6.3/0.240 kV
8 25 kVA 6.3/0.240 kV
9 50 kVA 6.3/0.240 kV
11
Manufacturing Facilities
12
Core Conductor Insulation Tank fabrication
Ready cut core
End frame
fabricationCore assembly
Aluminum / Copper rod
Bare Strip / Wire to size
Paper covering for Strip /
Wire
Coil winding LV & HV
Coil pre heating & pressing
Core coil assembly
Ratio check
Main assembly connections
Ratio Check
Vacuum Drying/ Vapour
Phase Drying
Press Board, Insulating
paper, Permawood
Slit paper, blocks, spacers,
supports, strips
Tanking
Oil filling
Filtration
Testing
Inspection
Dispatch
Manufacturing process
Fabricated Tank
CRGO Coil
13
Manufacturing Facilities Lucknow
Spread out over 8 acre area with ~ 6,000 sq. meters of covered sheds
Shops are of adequate height with liberal floor area and are equipped with E.O.T cranes and other material handling facilities
Separate facilities have been earmarked for assembly of Distribution and Power Transformers
TAL has invested heavily in backward integration and does in-house production of major raw materials
Core processing (Slitting, Cutting and Annealing)
Conductor manufacturing (Drawing, Annealing and Paper covering)
Transformer oil processing
Tank fabrications
Winding
Assembly and tanking
Manufacturing capacity of ~ 4,000 MVA per annum of mixed transformer ratings
Distribution Transformer Bay Power Transformer Test StationPower Transformer Bay
14
Lucknow plant
Core Cradles designed especially for high quality large
Core Assembly
Winding Machines for handling heavy weight coil winding
at variable speeds upto 10.0 MT capacity
15
Complete facilities for Insulation cutting/ processing
Lucknow plant
16
Complete facilities for Drawing of Round/ Rectangular Copper/ Aluminium conductor for use in Transformer windings
Multi Layer Paper strip covering machines for Winding conductor
Lucknow plant
17
Cranes of 5, 10, 25, 35, 150 MT lifting capacity
Lucknow plant
18
New manufacturing facility at Sitarganj
New Plant in Uttarakhand, North India
T1: 11 kV
transformer
assembly
T2: 33 kV
transformer
assembly
T3: Central
Store
T6: 66/ 132
kV
Assembly &
Testing
EHV Test
Area
T8:
Fabrication
T7: Core
Slitting,
cutting,
annealing
T5: 66/ 132/
220/ 400 kV
Winding
T4:
Insulation
Processing
T9: Impulse
Test Area
T9: 220/ 400
kV
Assembly
19
Manufacturing facilities Sitarganj Spread out over 12.5-acre area and is fully equipped to manufacture EHV power transformers upto 765 kV voltage class
The manufacturing sheds occupy a total covered area of ~ 23,000 sq.m. ranging from 4 m to 24 m in height, and spans of 12 m to 24 m
The plant has been designed for optimal material and work flow, and integrated manufacturing operations with separate bays planned for:
Single phase and Three phase 11 kV distributions transformer
Three phase 33 kV distribution transformer
Three phase 66 & 132 kV power transformer
Single phase and three phase 220 to 765 kV power transformer
Coil winding
Insulation processing
Mild steel fabrication
Impulse testing set-up
Manufacturing capacity of 14,000 MVA per annum of mixed transformer ratings. Would be able to manufacture and deliver one 132 kV
transformer per day
Distribution Transformer Bay Power Transformer Test StationMaterial Handling Facility up to 300MT (2 X 150) Power Transformer Bay
20
New manufacturing facility at Sitarganj
21
New manufacturing facility at Sitarganj
22
66/132 kV Winding Area
23
66/132 kV Winding Area
24
66/132 kV Winding Area
25
66/ 132 kV - Assembly
26
66/ 132 kV - Assembly
27
100 MVA 220/132/11 kV Auto Transformer CCA
28
Autoclave & Vapour Phase Drying Oven (VPD)
29
132 kV transformers under test
30
132 kV transformers under test
31
66/132 kV test station
32
220/ 400 kV assembly with 2x150 MT EOT cranes
33
Impulse Test area: 1600 kVP, 160 KJ Impulse Generator
34
Design & engineering and R&D EXPERT DESIGN & ENGINEERING TEAM
TALs GM and senior consultant are both Ex GMs of BHEL The director of the design & engineering has been working with TAL for last 41 years
TAL has a very strong, highly experienced design & engineering and R&D team capable of taking new challenges
STRONG R&D
TAL has strong R&D team having capabilities of
developing new products in house
All the products manufactured by the company
have been developed in-house including the 220
kV & 132 kV transformers
The company has a fully computerized design
office and all transformer designs are done on
the basis of in-house developed software
For mechanical design, Computer Aided Design
tools like AutoCad & Solidworks are used
extensively
Large number of TAL transformers have
successfully cleared Impulse Voltage Withstand
Capability tests at 3rd party, Government
accredited Laboratories like CPRI (Central
Power Research Institute)
TAL also has some of the largest no. of
transformers that have cleared 3rd party short
circuit tests, amongst companies of TALs size
S.No Designation Qualification Years of
Experience
1 GM (Technical) M.E. (Elect) 38
2 Sr. Consultant B.Sc. (Elect. Eng.) 45
3 Director B.E. (Elect. Eng.) 42
4 Plant Head B.E. (Elect.) 39
5 General Manager B.E. (Mechanical) 37
6 Deputy General Manager BE (Electrical Engg.) 14
7 Deputy General Manager Diploma in Electrical 15
8 Deputy General Manager B.Tech (Electrical) 18
9 Manager B.Tech (Mechanical) 20
10 Sr. Engineer B.Tech (Elect) 5
11 Sr. Engineer B.Tech (Elect)+Pursuing M.Tech 3.6
12 Sr. Draftsman B.A.+ ITI 6
13 Sr. Draftsman B.A.+ ITI 5
14 Engineer BE(Power Electronics) 7
15 Engineer B. Tech (Electrical & E.) 2
16 Engineer Diploma in Mechanical 3
17 Trainee Engineer B.Tech (Mech)+Pursuing MBA 2
18 Trainee Engineer B. Tech (Mech.) 1
19 Trainee Engineer M.E. (High Voltage) 0.1
20 Trainee Engineer M.E. (High Voltage) 0.1
21 Draftsman ITI & Diploma (Mech) 3
35
Testing facilitiesOVERVIEW
Independent testing facilities for Power and Disttibution transformers at bothLucknow and Sitarganj plant.
TALs Test lab has been assessed and accredited in accordance with thestandard ISO/IEC 17025:2005 by National Accreditation Board for Testing
Calibration Laboratories (NABL).
All routine tests/Impulse test & Temperature rise tests as per IS2026/IEC60076are performed in house using fully automated, computerized test benches &
advanced testing software. TAL can also conduct specialized advance tests
such as measurement of Partial Dischargge, SFRA etc. at its works.
Short circuit tests are conductted at CPRI (Indias leading, independent testcenter).
Impulse voltage withstand ability tests are carried out through two impulsegenerators (1600 kVp, 160 kJ and 900 kVp, 45 kJ) from Haefely, Switzerland
with expandable capacity to test transformers of 765 kV voltage class.
Testing with Yokogawa Power Analyzer
Impulse Testing
Facility
36
Our Quality Policy
We, at Technical Associates, are committed to achieve total satisfaction of our customers by:
Effectively implementing and continually improving the Quality System.
Delivering on time, products conforming to agreed specifications at competitive prices.
Collectively and individually striving to do things right the first time and every time - both in personal life as well as at the workplace.
Continuous up-gradation of technology and active involvement of all employees and associates in productivity improvement.
37
Turnkey Projects
38
Turnkey Projects
TAL Engineering Projects Division (EPD) was established in 2006 to
enhance and capitalize Technical Associates strong presence in the power T&D sector
It undertakes complete execution of turnkey electrification projects from
conceptualization , design, engineering, procurement, erection and
commissioning
The tasks taken up by TAL EPD include Rural Electrification Works,
Distribution & Transmission lines from LT (440 V) to 220 kV, and electrical
Substations from 11 kV to 220 kV
Scope of works undertaken include:
Complete design, engineering & planning
Procurement & project management
Erection / construction / commissioning / testing
Handing over to customer / training
Works undertaken include:
Planning, erection and commissioning of HVDS network
Rural electrification planning and commissioning
Setting up of LT lines for urban / Rural networks
Setting up of 11 kV distribution substations and lines
Setting up 33/66/132/220 kV switch-yards and lines
Energy auditing
Planning, erection and commissioning of intelligent rural load management systems
Main strengths :
Experienced engineers, technicians & support staff from the field of project
tendering, engineering, execution, erection, commissioning and testing
High level of quality control
66 kV Sub-station with TAL transformer 132 kV Sub-station under construction
66 kV Sub-station at Mohra, Haryana
39
CustomersCUSTOMER SEGMENTS
Key customer segments catered by TAL include: State (regional) electricity utilities
Overseas electricity boards.
Government & private power companies
Government and private power equipment manufacturing
companies
Infrastructure companies
Other manufacturing companies
KEY CUSTOMERS
40
Partnering with us - the advanTAge
Your Partner in Progress
A proven track record
Historically proven capabilities in
engineering / design
State-of-the-art infrastructure
40 year old credibility
Close proximity