5-1 Steps ofmanufacturingof die
1-select a suitable block with dimension (150 x 90 x 50)mm as shown in (fig.5-1)
Fig.5-1
2- facing and drilling by miller and drill machine with dimension (143 x 81 x41)(8.5 ,
15,6) as shown in fig.(5-2) (5-3) (5-4) (5-5)
fig.(5-2)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
3/19
fig.(5-3)
fig.(5-4)
fig.(5-5)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
4/19
3-join the two blocks together by bolts as shown in fig (5-6),(5-7)
Fig.(5-6)
Fig.(5-7)
4- use the marker to make the w.p in the center of machine as shown in fig.(5-8)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
5/19
Fig .(5-8)
5- draw a circle in the center of w.p as shown in fig.(5-9)
Fig .(5-9)
6- To grantee the accurate position of w.p by righted angle ruler as shown in fig.(5-10)
, (5-11)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
6/19
Fig .(5-10)
Fig .(5-11)
7- make a primary hole by using turning tool (carbide) as shown in fig.(5-12)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
7/19
Fig .(5-12)
8- drill the w.p to a depth of 10 mm as shown in fig.(5-13)
Fig .(5-13)
9- drill the w.p through all with 10 than 14,16 and 18.5 as shown in fig.(5-14)
,(5-15)
Fig .(5-14)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
8/19
Fig .(5-15)
Fig .(5-16)
10- separate the blocks to check the hole as shown in fig.(5-17) ,(5-18)
Fig .(5-17)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
9/19
Fig .(5-18)
11- use the marker to make the cosine profile using the upper and lower slide of lathe
machine as shown in fig.(5-19) ,(5-20)
Fig .(5-19)
Fig .(5-20)
12- re-join the two blocks by bolts as shown in fig.(5-21)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
10/19
Fig .(5-21)
13- use a paper model as a guide for the internal turning operation as shown in fig.(5-22)
Fig .(5-22)
14- re-separate the blocks to ensure the gained profiles accuracy as shown in fig.(5-23)
,(5-24) ,(5-25)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
11/19
Fig .(5-23)
Fig .(5-24)
Fig .(5-25)
15- use the grinder to get the finished surfaces as shown in fig.(5-26)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
12/19
Fig .(5-26)
16- manufacturing of plungers as shown in fig.(5-27) ,(5-28), (5-29), (5-30), (5-31)
Fig .(5-27)
Fig .(5-29)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
13/19
Fig .(5-30)
Fig .(5-31)
Fig .(5-32)
17- the final shape of plunger as shown in fig. (5-33), (5-34), (5-35), (5-36)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
14/19
Fig .(5-33)
Fig .(5-34)
Fig .(5-35)
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
15/19
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
16/19
Fig.(5-39) lower with plunger and tube
Fig.(5-40)
Fig.(5-41) close the die
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
17/19
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
18/19
8/12/2019 Manufacturing Cosine Die Profile for Tubes Hydroforming Test (Bulging)
19/19
Fig.(5-44)
Fig.(5-45)