m, Army Regulation 602-2 Soldier Materiel Systems Manpower and Personnel Integration (MANPRINT) in the Materiel Acquisition Process Pentagon Library (ANR-PL) ATTN: Wilitary Documents Sectioa Room 1A518, Pentagon ftMington, DO 20310-6050 Headquarters Department of the Army Washington, DC 19 April 1990

Manpower and - Washington Headquarters Services 602-2, 19 April 1990.pdf · m, Army Regulation 602-2 Soldier Materiel Systems Manpower and Personnel Integration (MANPRINT) in the

Embed Size (px)

Citation preview

m,Army Regulation 602-2

Soldier Materiel Systems

Manpower and

Personnel

Integration

(MANPRINT) in

the Materiel

Acquisition

Process

Pentagon Library (ANR-PL)ATTN: Wilitary Documents SectioaRoom 1A518, Pentagon

ftMington, DO 20310-6050

HeadquartersDepartment of the ArmyWashington, DC19 April 1990

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

olCHANCEAR 602-2Manpower and Personnel Integration (MANPRINT) in the MaterielAcquisition Process

This revision--

o Implements DOD Directive 5000.53 and incorporates theprovisions of DOD Directive 5000.1 and DOD Instruction5000.2 (throughout).

o Clarifies the relationship between the MANPRINT programand the MANPRINT (MP) domains (para 1-4).

o Assigns responsibilities to Program Executive Officers(PEOs) and Project/Product Managers (chap 2, sec I).

o Redefines HQDA responsibilities to reflect thereorganization of the DA Staff (chap 2, sec II).

o Replace product improvement section with materiel changemanagement (para 3-11)-

o Add a MANPRINT in the Source Selection Process (chap 5).

o Redefines the Human Factors Engineering Assessment (HFEA)and establishes the MANPRINT assessment and the MANPRINTreview (app B).

o Adds policy and procedures for an abbreviated MANPRINTManagement Plan (app D).

//!

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
EppsS
EppsS
EppsS

HeadquartersDepartment of the ArmyWashington, DC

May 1994s

ARInterin^ ChangeNo. 101Expires 1 3, May 1996

INTERIM CHANGE

Soldier-Materiel Systems

Manpowerand Personnel Integration (MANPRINT)

in the\Materiel Acquisition Process

Justification. This interim change adds soldier survivability(SSv) as a MANPRINT domain^ SSv is defined in terms of soldiersas those characteristics that enable them to withstand or avoidadverse military action (friend or foe), or the effects of naturalphenomena, that would result 'in the loss of life or the loss ofcapability to continue effectively/ the performance of theprescribed mission. SSv is defined in terms of a system as thosecharacteristics that can reduce\ fratricide, as well as reducedetectability of a soldier, prevent attack if detected, preventdamage if attacked, minimize medical injury if damaged (wounded),and reduce mental and physical fatigue.This change is based on issues and concerns for SSv noted during

Operations Just Cause and Desert Storm .and in simuiatea fratricideat the National Training Centers. It also provides initialdirection as to how SSv will be addressed during the materielacquisition cycle.

Expiration. This interim change expires two years from the dateof publication. It will be destroyed at that time unless sooner-rescinded or superseded by permanent change or revision.

1 . AR 602-2, 19 April 1990, is changed as follows:

Pace 3.

Paragraph l-4a; add "(1} . Soldier Survivability."

Paragraph l-4c(1) , line 5; after "... system safety," changeto read ", health hazards and soldier survivability."

Paragraph l-4c(4), line 3; after "...system safety/" changeto read ", health hazards and soldier survivability issues in anintegrated manner."

Paragraph l-4c(5), line 3; after "...system safety," change

Pentagon Library (ANR-PL)ATTN: Military Documents SectionRoom 1A518, PentagonWashington, DC 20310-6050

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
EppsS
EppsS

^n ^ 13 May 1994101, AR 602-2 *

to read ", health hazards, and soldier survivability information."

Paragraph l-4c<6), line 6; after "...health," change to read", safety and survivability...."

Paragraph l-4d(l), line 2; after "...effectiveness," insert"and survivability...."

Paragraph l-4d(2), line 4; after "...system safety", changeto read ", health hazards, and soldier survivability beforemaking...."

Page 4.

Paragraph l-5e, line 1; after"soldier survivability...."

Paragraph l-5f, line 2; after ""six" and insert "seven."

"... engineering," insert

.evaluating the," delete

Paragraph l-5k, line 11; after "...HFE," insert "SSv."

Pace 5.

Paragraph 2-4e, line 3; after"soldier survivability...."

Page 6.

.health hazards," insert

Paragraph 2-6e, line 3; after "personnel,11 change to read", training, and soldier survivability specialists."

Paragraph 2-6, Add new subparagraph "p" to read, "Approve anddistribute methodologies to be used by Army personnel inforecasting soldier survivability requirements."

Paragraph 2-9. Add new subparagraph "c" to read, "Providethreat weapon systems analyses and other data as they pertain tosoldier survivability to the U.S. Arrr.y Research Laboratory -Survivability/Lethality Analysis Directorate, ATTN: AMSRL-SL-I,Aberdeen Proving Ground, MD, 21005-5068."

Paragraph 2-lOa, line 3; after "...assessments," insert"soldier survivability."

Paragraph 2-lOb, line 3; after "...or potential healthhazards," insert "or impact upon soldier survivability...."

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

13 May 1994 101, AR 602-2

Page 7.

Paragraph 2-lle, line 6; after "...health hazard assessment,"insert "soldier survivability assessment,....11

Paragraph 2-llm, line 1; after "...personnel," delete "and."Change to read, "...personnel, training, and soldier survivabilityimplications...."

Paragraph 2-llp, line 2; change "six" to read "seven."

Paragraph 2-lls, line 2; after "...resource," insert"... soldier survivability...."

Paragraph 2-12a, line 2; after "...testing," insert "soldiersurvivability,...."

Paragraph 2-12g, line 2; after "...human factors engineering,"change to read ", system safety and soldier survivability RDTE."

Page 8.

Paragraph 2-12i, line 1; after "...human factors engineering,"change to read ", system safety and soldier survivabilityspecialists...."

Add new paragraph 2-121 to read, "Ensure that ARL, incoordination with other commands, prepares a soldier survivabilityassessment (SSvA) on MDAP, ADAP, and designated nonmajor programs.The SSvA will serve as the soldier survivability domain input tothe MANPRINT Integration and MANPRINT Assessment Reports (see AR602-1). SSv assessments of nondesignated ACAT III and IV programsare the responsibility of the materiel developer.

Paragraph 2-12r, line 1; after "...hazard," insert "andsoldier survivability assessment by the ARL Survivability/LethalityAnalysis Directorate (SLAD)...."

Paragraph 2-13b, line 3; after "...potential," change to read"...health hazards and soldier survivability (medical) concerns."

Paragraph 2-13d, line 1; after "...hazard," insert "andsoldier survivability...." Add "Provide SSv and medical concernsto SLAD for inclusion, as appropriate, in domain reports."

Paragraph 2-14a, line 1; after "...human factors," insert "andsoldier survivability. ..." Add " OTEA findings on SSv will beforwarded to SLAD for inclusion in domain assessments, asappropriate,"

AkaluM
Pencil
AkaluM
Pencil

101, AR 602-2 13 May 1994

Paragraph 2-14b, line 7; after "...effectiveness," add "andsurvivability,"

Paragraph 2-14c, line 3; after "...performance," insert "andsurvivability...."

Paragraph 2-14d, line 2; after "...soldiers,11 insert "soldiersurvivability...."

Paragraph 2-14e, line 1; after "...performance," insert ",soldier survivability,...."

Paragraph 2-14g, line 3; after "...with performance," insert"soldier survivability and...."

Paragraph 2-14i, line 7; after "...hazard," insert "andsoldier survivability...." Line 9; after "... safety," insert acomma (,); after "...health," insert ", and survivability...."

Add new paragraph 2-14j to read as follows:

SSv findings based on concerns in paragraph 2-14i will be forwardedto SLAD for use in domain assessments.

Page 9.

Paragraph 2-18f, line 2; after "...performance," insert ",soldier survivability,...."

Add a new paragraph 2-18i to read as follows:

Request SLAD conduct an SSvA on all ACAT I, II, and DA designatedprograms. Conduct internal MANPRINT assessments on all otherassigned systems.

Paragraph 3-3b, line 5; after "...safety," insert ", soldiersurvivability,....'1 Line 7; after "for," change to reac"...conducting human factors engineering and soldier survivabilityassessments."

Paragraph 3-3d, line 9; after "...safety," insert ", soldiersurvivability,...," Line 10; after "...hazards", insert "orsoldier survivability issues...." Line 11; after "...exposure,"insert "soldier survivability deficiencies...." Line 15; after thesentence ending with "...AR 70-1," insert "Soldier survivabilityissues . . . . "

Page 10.

Paragraph 3-4d, line 2; after "...reliability," insert "and

4

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

13 May 1994 101, AR 602-2

soldier survivability...." Line 3; after "...will," insert"enhance soldier survivability and...." Line 9; after "...safety,"insert " soldier survivability,...."

Page 12.

Paragraph 4-2c, line 6; change the sentence to read asfollows:

A copy of the approved SMMP for ACAT I and II, and ADAP programswill be provided to HQDA ODCSPER ATTN: (DAPE-MR), Washington, DC20310-0300, for informational purposes only. Copies of ACAT IIIand IV program SMMPs do not require review by HQDA ODCSPER unlessotherwise directed.

Paragraph 4-4b, line 3; change "six" to "seven."

Page 14.

Re-letter paragraph "g" to "h." Add new paragraph g to read,"Soldier survivability issues."

Paragraph B-3a, line 6; after "...Hazards," insert "SoldierSurvivability...."

Page 16.

Paragraph C-3b(4), line 4; after "...performance," delete "of"and insert ", survivability,...."

Paragraph C-5a, line 3; after "... safety," insert "soldiersurvivability,...."

Page 21.

Add the acronym "SSv" and the term "soldier survivability."

Add the acronym "SLAD" and the term "Survivability/LethalityAnalysis Directorate.

Pace 22.

a. Add the following definitions for Soldier Survivability.

1. SSv is defined in terms of soldiers as thosecharacteristics that enable them to withstand or avoid adversemilitary action (friend or foe), or the effects of naturalphenomena, that would result in the loss of life or the loss ofcapability to continue effectively, the performance of theprescribed mission.

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

101, AR 602-2 13 Mav 1994

2 . SSv is defined in terms of systems as thosecharacteristics that can reduce fratricide, as well as reducedetectability of a soldier, prevent attack if detected, preventdamage if attacked, minimize medical injury if damaged (wounded),and reduce mental and physical fatigue.

b. Add the following definition for Soldier SurvivabilityAssessment:

SSvA is a process used to identify potentialsurvivability issues which may be associated with the development,acquisition, operation, maintenance, support, and the changingenemy threat to Army materiel systems. The scope of the SSvAincludes: Fratricide and detection reduction, attack and damageprevention, medical injury minimization, and mental and physicalfatigue reduction. The SSvA will also include ballistics,electronic warfare, and chemical, biological, and nuclear effects.This identification (effort) will be conducted early in the systemlife cycle to preserve and protect the soldiers and civilianssupporting them to enhance soldier performance and systemeffectiveness .

2. Post these changes per DA Pam 310-13.

3. File this interim change in front of publication.

(DAPE-MRP)

By Order of the Secretary of the Army:

GORDON R. SULLIVANGeneral, United States ArmyChief of Staff

Official:

MILTON H. HAMILTONAdministrative Assistant to theSecretary of the Army

DISTRIBUTION: Distribution of this publication is made inaccordance with the requirements on DA Form 12-09-E, block number2533, intended for command level D for Active Army, Army NationalGuard, and U.S. Army Reserve.

•U.S. G.P.O.:1994-300-723:80157

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

PIN: 061525-901

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Headquartersof the Army

Washington, DC19 AMI 1990

*Army Regulation 602-2

Effective 18 May 1990

\Soldier Materiel Systems

•\

Manpowervand Personnel integration (MANPRINT) In the Materiel Acquisition Process

TWa UPDATE printing publishes a revision ofthte publication. Because fl\e publication hasbeen extensively revised, the\ianged portionshave not been highlighted.

By Order of the Secretary of the Army:CARL E. VUONOGene/a/, Untttd SIMMS ArmyChiolofStatf

OffkHak

MILTON H. HAMILTONAdrnWjfratfw Ass/star* to thtSecretary of tfw Army

Summary. This regulation implementsDOD Directive 5000.53 and incorporatesprovisions of DOD Directive 5000.1 andDOD Instruction 5000.2. It prescribes poli-cies and procedures and assigns responsibili-ties for the Manpower and PersonnelIntegration (MANPRINT) Program in theDepartment of the Army. It establishes arequirement for the System MANPRINTManagement Plan. MANPRINT is an um-brella concept encompassing the domains ofhuman factors engineering, manpower, per-sonnel, training, health hazards, and systemsafety. The focus of MANPRINT duringthe life-cycle system management of Armymateriel is on influencing materiel systemsdesign and associated support requirementsso that developmental, nondevdopmental,and materiel change (product-improved)systems can be operated and maintained inthe most cost-effective and safest manner

consistent with manpower structure, per-sonncrNaptitude and skill, and training re-source constraints of the Army.Applicability. This regulation applies tothe Active Army, the Army NationalGuard, and the U.S. Army Reserve.Internal control systems. This regula-tion is subject to the" requirements of AR11-2. It contains internal control provi-sions, but does not contain checklists forconducting internal control\reviews. Thesechecklists are being developed, and will bepublished at a later date. ,Supplementation. Supplementation ofthis regulation and establishment of com-mand and local forms are prohibited with-out pr ior approval from _HODA(DAPE-MR). WASH DC 20310-0300.Interim changes. Interim changes to thisregulation are not official unless they are au-thenticated by the Administrative Assistant

to the Secretary of the Army. Users will de-stroy interim changes on their expirationdates unless sooner superseded or rescinded.Suggested Improvements. The propo-nent agency of this regulation is the Officeof the Deputy Chief of Staff for Personnel.Users are invited to send comments* andsuggested improvements on DA Form 2028(Recommended Changes to Publicationsand Blank Forms) directly to HOPA(DAPE-MR), WASH DC 20310-0300. '- —--—-—— _ ~r. *,Distribution. Distribution of this publica-tion is made in accordance with the require-ments on DA Form 12-09-E, block number2533, intended for command level D forActive Army, ARNG, and USAR.

Content* (Listed by paragraph number)

Chapter 1IntroductionPurpose • 1-1References • 1-2Explanation of abbreviations and

terms • 1-3The MANPRINT Program • 1-4Policies • 1-5Communications with industry • 1-6Filing and records keeping • 1-7

Chapter 2ResponslbllttJesSection /Program Executive Officers and Project/

Product ManagersProgram Executive Officers • 2-1

Project/Product Managers « 2-2

Section 11HQDA ElementsAssistant Secretary of the Army

(Manpower and Reserve Affairs(ASA(MRA)) • 2-3

Assistant Secretary of the Army (Research,Development, and Acquisition)(ASA(RDA)) • 2-4

Director of Information Systems forCommand, Control, Communications andComputers (DISC4) • 2-5

Deputy Chief of Staff for Personnel(DCSPER) • 2-6

Deputy Chief of Staff for Logistics(DCSLOG) • 2-7

Deputy Chief of Staff for Operations andPlans (DCSOPS) • 2-8

Deputy Chief of Staff for Intelligence -(DCSINT) • 2-9

The Surgeon\5eneral (TSG) • 2-10

Section /// \Commanders of Major Army CommandsCommanding General, U.S. Army Training

and Doctrine Command (CG,TRADOQ • 2-11 \ - -

Commanding General, Utt Army MaterielCommand (CG, AMQ VA-12 "

Commanding General, U.S. Atony HealthServices Command (CG, HSQ» 2-13

Secffon IV ' \Heads of Other Army ElementsCommanding General, U.S. Army

Operational Test and Evaluation(CG, OTEA) • 2-14

Director of Army Safety (DASAF) .• 3r-lS

Tfe reguUtion aupersedes ARW2-2,17 April 1987.

AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Content!—Continued

Commander, U.S. Army Soldier SupportCenter • 2-16

Commander, U.S. Army LogisticsEvaluation Agency (USALEA) • 2-17

CG, U.S. Army Information SystemsCommand; CG, U.S. Army Intelligenceand Security Command; CG, U.S. ArmyMedical Research and DevelopmentCommand; CG, U.S. Army StrategicDefense Command; and Chief ofEngineers • 2-18

Chapter 3MANPRINT in Lite Cycle System

Management of Army MaterielIntroduction • 3-1MANPRINT in tailored development

programs (The Army StreamlinedAcquisition Program) • 3-2

MANPRINT during preconcept activities(requirements formulation andtechnology base activities) • 3-3

MANPRINT in the concept explorationdefinition phase (proof of principleactivities) • 3-4

MANPRINT in the concept demonstrationand validation phase (proof of principle/development proveout activities) • 3-5

MANPRINT in the full scaledevelopment—low rate initial production(LRIP) phase (development proveout

' activities) • 3-6MANPRINT in the fell rate production -

and initial deployment phase • 3-7MANPRINT in the logistics readiness and

support review (MS IV) • 3-8MANPRINT in the major upgrade/system

replacement (MS V) • 3-9MANPRINT in nondevelopfnerital items-

(NDI) • 3-10MANPRINT in materiel change (MC)

management • 3-11

Chapter 4Systems MANPRINT Management PlanIntroduction to the System MANPRINT

Plan • 4-1Preparation of the System MANPRINT

Plan • 4-2Procedures • 4-3The abbreviated SMMP • 4-4

ChaptersMANPRINT In Source Selection

Process for Major Systems andDesignated Acquisition Programs

MANPRINT in the Source SelectionProcess for Major Systems andDesignated Acquisition Programs • 5-1

Treatment of MANPRINT • 5-2Procedures • 5-3

AppendixesA. References

B. MANPRINT Review/Assessment andSuggested Report Formal

2

C. Suggested Format for the SystemMANPRINT Management Plan(SMMP)

D. Abbreviated System MANPRINTManagement Plan

E. Sample Source Selection MANPRINTCriteria Weighting

F. Army Acquisition Executive (AAE)Policy Memorandum

GlossaryIndex

AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

-7f'

Chapter 1Introduction

1-1. PurposeThis regulation—

a. Establishes policies, procedures, documentation require-ments, and responsibilities for establishing and supporting Man-power and Personnel Integration (MANPRINT).

6. Emphasizes front-end planning of soldier-materiel system de-sign for optimum total system performance as part of the Armymateriel systems acquisition process. (See AR 70-1.) This includesClothing arid Individual Equipment programs (see AR 700-86),and Information Mission Area (IMA) systems, equipment, ser-vices, and supplies (see AR 25 series).

1-2. ReferencesRequired and related publications and a prescribed form are listed :',in appendix A.

1-3. Explanation of abbreviations and termsAbbreviations and special terms used in this regulation are ex-plained in the glossary.

1-4. The MANPRINT Programa. .MANPRINT refers to the comprehensive management and

technical effort to ensure total system effectiveness by continuousintegration into materiel development and acquisition of all rele-vant information concerning the following domains:

(1) Human factors engineering.(2) Manpower.(3) Personnel.(4) Training.(5) System safety.

. (6) Health hazards.6. The philosophy of the MANPRINT Program is to have the

Army and industry to answer the question: Can this soldier withthis training perform these tasks to these standards under theseconditions?

c. MANPRINT includes but is not limited to the following:s*(\) Integration of all actions in the materiel acquisition process*affecting human performance and reliability. This includes humanfactors engineering, manpower levels, personnel requirements,training requirements and methods (including training devices),system safety, and health hazards. ,, (2) Developing equipment that will permit effective soldier-ma-teriel interaction within physiological tolerance limits, training

| time, soldier aptitudes and skills, and physical capabilities.I (3) Determining and evaluating requirements for overall systemI performance requirements based upon capabilities and limitations\ of soldier performance.\ (4) Developing and applying methodologies to analyze huriian

factors engineering, manpower levels, personnel, training, systemety, and health hazard issues in an integrated manner.(5) Developing, maintaining, and using data bases containing

human factors, human performance, manpower, personnel, train-ing, system safety, and health hazard information.

,u s (6) Selecting, defining, and developing soldier-materiel interface^characteristics, work space layout, work environment, and effec-^ tive transfer of operator-maintainer skills for similar tasks on simi-

lar equipment. The process of developing and defining a work| environment includes detailed analyses of the proposed environ-

ment on the health and safety of operator and support personnel.Analyses of the work environment also includes consideration ofthe physical and cognitive demands on personnel based on the op-erating tempo of the unit in both a training and combatenvironment.

(7) Determining human performance requirements for new sys-tems and materiel change systems and matching available humanaptitudes with training concepts (including training devices andpublications) to produce required skills.

AR 602-2 »

(8) Providing basic soldier-materiel system task sequence datato describe, develop, and assess the human performance requiredin a soldier-materiel system.

(9) Determining the numbers and types of soldiers and civiliansneeded for manning a system to^p^yid^for^siabjie^iie^t^..pe^onnelplanning arid training; pro.vi i|]ig_. .jie^ ; di es^aSli hing newmilitary 'occupational specialty \^O§^^'^itib'nVi''siciir identifier(ASiydr special .qualificationijdJBntiJer^C^Qjp^^jnjw^p/imprpyedmateriel systems, doctrine, and force or unit structure.

(10) Assessing the manpower, personnel, and training burdenthat materiel design or development concepts may impose on theArmy (Active, USAR, ARNG, DA Civilian and Contractor).

(11) Confirming the effectiveness of MANPRINT by evaluatingthe soldier-rriateriel systems and unit performance.

(12) Applying, as appropriate, MANPRINT methodologies todevelopment items, nondevelopment iterns,rand materiel changemanagement systems throughout each phase of the acquisitioncycle. ; , .

(13) Integration of personnel assignmenrpolicies to ensure thatspecifically trained soldiers are •assigriea td/'units' aria positions forwhich trained.

(14) Providing MANPRINT assessments for the milestone de-cision reviews.

(15) Establishing at the service school or proponent level,MANPRINT Joint Working Groups (MJWG) to develop theSMMP and coordinate the MANPRINT program.. (16) Conduct analyses assessing the sensitivity of the system'sdesign, cost and performance to assumptions, estimates, and varia-tions in human dimensions of the system.

d. The objectives of the MANPRINT program are to—(1) Increase the Army's warfighting capability by enhancing 'ye operational effectiveness of the total system.(2) influence soldier-materiel system design for optimum total

system performance by considering human performance and relia-bility issues related to human factors engineering, manpower, per-sonnel, training, system safety, and health hazards beforefinalizing the functional allocation of tasks among people,.hard-ware, and software.

(3) Ensure that Army materiel systems and concepts for theiremployment do not exceed the capabilities and limitations of thefully equipped soldier to operate, maintain, supply, and transportthe materiel in its operational environment consistent with tacticalrequirements and logistical capabilities.

(4) Assist the Army trainer in determining-training require-ments as well as designing, developing, and conducting both Ar-my and joint service training necessary to meet the system trainingrequirements.

(5) Improve control of total life-cycle costs of soldier-materielsystems by ensuring consideration of the costs of personnel re-sources and training for alternative systems during the conceptualstages and for the selected system during subsequent stages ofacquisition.

(6) Ensure through human factors engineering studies, soldier-machine interface analyses and basic and applied research (experi-mental arid physiological psychology, physical anthropology, toxi-cology) that equipment designs and operational concepts arecompatible with the limits of operators and maintainers defined inthe target audience description.

(7) Develop a unified, integrated MANPRINT data base to de-fine ranges of human performance. Compare tKnse ranges againstsystem performance and provide for the timely development oftrained personnel.

(8) Provide MANPRINT data to support the development oftechnical, training, and field manuals and other training mediaand technical publications. Ensure the use of these publicationsdoes not require aptitudes, education, or training which exceed thecapabilities of the target audience.

(9) Apply MANPRINT concepts and current educational tech-nology to analysis, design, and development of training devices.

(10) Influence the manpower, personnel, and training (MPT)related objectives of the ILS process.

UPDATE 3

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

(11) Integrate combat development and technology base infor-mation systems with personnel long-range planning.

(12) Ensure that personnel trained for specific force moderniza-tion systems (by MOS and ASI) are assigned to units and posi-tions for which trained and that they are assigned in sufficientquantity to support fielding and sustainment.

e. The MANPRINT program thrust does not replace individu-al domain activities, responsibilities, or reporting channels. Ex-isting regulations control the individual domains.

1-5. Policiesa. MANPRINT will be used to integrate combat, training, and

materiel development with personnel resources, capabilities, andconstraints during all phases of the life-cycle of materiel systems(to include developmental, nonclevclopmental, and materielchange) as well as nonstandard commercial equipment procure-ment by major Army commands (MACOMs). MANPRINT willbe applied through the design process to the principal item of 0equipment, associated support items of equipment, other supportequipment, and training devices (embedded or stand alone).MANPRINI" will be accorded equal priority with all other systemcharacteristics to ensure effective man-materiel interface.

b. The combat developer will retain responsibility for the Sys-tem MANPRINT Management Plan (SMMP) and will update itthroughout (he acquisition process.

c. The format of the SMMP and abbreviated SMMP, at appen-dixes C and D respectively, will be the standard for all combat,training, and materiel developers. The SMMP will be used to pro-

' vide an audit trail of previous phases as well as to identify currentand anticipated issues and task assignments to resolve these issues.The combat developer or training developer will prepare a targetaudience description as a part of the SMMP.

d. MANPRINT will be a separate major area of the same visi-bility as technical management and cost and will be evaluatedthroughout all aspects of design, development, integrated logisticsupport (ILS), and program management,

^ e. Human factors engineering, biomedical, system safety, or be-, havioral research will be conducted in a timely manner to address' gaps that exist in human performance data. (See AR 602-1.)

f. The combat and materiel developers will establish detailedplans and procedures for supporting and evaluating the six do-mains of MANPRINT.

g. In accordance with policy and procedure established by thisregulation, combat developers, in conjunction with the materieldeveloper, will develop as lead agency prior to Milestone 0 anSMMP for each developmental, nondevelopmental, or materielchange management system. The MJWG has primary responsibili-ty for the development of the SMMP (we para i below).

h. At Milestone I and beyond, the MJWG will be co-chaired bythe combat developer and materiel developer to further refineSMMP development

i The combat developer at the proponent school or center willinitiate a MJWG to assist in writing the SMMP and carrying outthe MANPRINT process throughout the acquisition. MJWGmembership may be tailored by the proponent combat developerbased on the program and the nature of the acquisition. However,as a minimum, a MJWG should have an expert from each MAN-PRINT domain and representatives of the materiel developer; (forexample, program sponsor, HQ AMC). Other invitees to theMJWG should include individuals from the proponency office, thedirectorate of evaluation and standardization (DOE), Army Re-search Institute (ARI) field office, reserve components, supportingschools, and integrating centers. Where possible, an MJWGshould be formed with school or center resources./ In order to properly implement the applicable provisions of

DOD Directive 5000.53 and AR 70-1, it is necessary to conductMANPRINT reviews and assessments. Responsibility for the con-duct of the MANPRINT review rests with the applicable programsponsor. The objective of the MANPRINT review is to determinethe status and adequacy of MANPRINT efforts in the materiel ac-quisition program. The results of the MANPRINT review should4 AR 602-2 •

be documented w appropriate program decision documents (sys-tem concept paper, decision coordinating paper) and bnefed at themilestone decision review. (See appendix B for an overview ofMANPRINT reviews and assessments required by thisregulation.) .

k. ODCSPER will be responsible for the preparation ol theMANPRJNT assessment on all major and Level I nonmajor de-fensc as well as Army designated acquisition programs. MAN-PRINT assessments will be conducted prior to milestone decisionreviews on all acquisition programs, including materiel changeand nondevelopmental items. The abjective of the MANPRINTassessment is to determine the status and adequacy of MAN-PRINT efforts in the materiel acquisition program and to presentany unresolved MANPRINT issues or concerns to decision mak-ers at the appropriate decision points. Individual domain assess-ments (HFE, system safety, health hazards, manpower, personnel,and training) as well as other pertinent information will be used to

,2'formulate the overall MANPRINT assessment. HQ AMC,TRADOC, and applicable MACOMS will be responsible for pre-paring the MANPRINT assessment on all nonmajor acquisitionprograms.

1-6. Communication wrth Industryo. MANPRINT data and concerns will be made available to in-

dustry as MANPRINT related documents are generated or updat-ed at each acquisition milestone from program initiation throughmilestone V of the acquisition process. Industry will have accessto this infonnatiofl through the Army Materiel Command (AMC)Technical Information Liaison Office (TILO). The same policywill apply for tailored development programs such as the ArmyStreamlined Acquisition Program (ASAP).

b. Combat and materiel developers, in coordination with ODC-SPER (DAPE-MR), shall provide mechanisms for making MAN-PRINT data available to industry under Executive Order (E.O.)12591.

c. Program MANPRINT requirements will be communicatedto industry through the request for proposal (RFP) process. Sec-tion L (Instructions and Notices to Offerers) and Section M (Fac-tors-for-Award Criteria) of the RFP will be used to informindustry of MANPRINT requirements. SpccificaHy, Section L willdelineate stalement-of-work (SOW) specification paragraphswhich have MANPRINT implications and instruct industry toidentify in their MANPRINT Management Plan the managementprocedures and methods to be used to ensure integration of theMANPRINT domains within the systems engineering/design pro-cess. Section M will inform industry how Section L paragraphsand management information are related to Section M factors-for-award criteria to be used during source selection deliberations.

1-7. Filing and records keepingA MANPRINT case file by system (MARKS No. 602-2b) will beestablished by all organizations involved in MANPRINT activi-ties. (See AR 25-400-2.) A central MANPRINT data base will beestablished and managed by AMC.

Chapter 2ResponsibilitiesSection IProgram Executive Officers and Project/ ProductManagers

2-1. Program Executive OfficersThe Program Executive Officer (PEO) will—

a Include in Project and Product Manager (PM) charters theresponsibility for executing the MANPRINT program.

b. Monitor PM and contractor execution of MANPRINT pro-gram requirements.

c. Rate assigned PM execution of MANPRINT responsibilitiesand consider rating in PM performance appraisals.

UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

d. Develop policy and procedures to ensure PMs obtain MAN-PRINT domain assessments and make them available to request-ing headquarters.

e. Ensure that TRADOC Systems Manager (TSM) or the PMbrief MANPRINT status and Issues during each system review;for example, two-star pre-ASARC; ASARC. (See AR 15-14.)

2-2. Project/Product ManagersThe Project/Product Manager (PM) will—

a. Ensure MANPRINT program implementation on all sys-tems including nondevelopmental items (NDI) and separatelymanaged Materiel Change Management efforts.

b. Provide adequate support for effective MANPRINT effortimplementation and maintenance.

c Provide a MANPRINT manager.d. Provide technical, logistic support analysis (LSA), and relia-

bility, availability, and maintainability (RAM) input to supportthe MANPRINT data base located at Materiel Readiness SupportActivity (MRSA).

e. Initiate requests for the conduct and preparation of MAN-PRINT domain assessments and provide results to ODCSPERand other headquarters when requested./ Conduct MANPRINT reviews to determine the status and

adequacy of MANPRINT efforts. Input may be obtained from allapplicable sources including the MJWG.

g. Annotate the status and adequacy of MANPRINT efforts inprogram documents and brief at milestone decision reviews(MDR).

h. Include MANPRINT requirements in solicitation packagesin sufficient detail to permit a determination of effort required.

i. Establish MANPRINT as a separate major area in the sourceselection process in accordance with Army Acquisition Executive(app F).

j. Conduct Source Selection Evaluation Boards in accordancewith app F.

k. Incorporate MANPRINT provisions in materiel systemscontracts.

L Resolve MANPRINT issues and concerns, a prerequisite fortype classification (TC), before materiel production.

m. Include MANPRINT Issues and resolutions in the technicaltest (TT) and operational test (OT) programs and other tests andevaluations.

n. Monitor materiel system prime and subcontractors accom-plishment of MANPRINT objectives and requirements as speci-fied in the statement-of-work. Use this information in thedevelopment of system specifications and applicable militarystandards.

Section IIHQOA Elements

2-3. Assistant Secretary of trie Army (Manpower andReserve Affairs) (ASAJMRA))The ASA(MRA) will—

a. Exercise primary Secretariat responsibility for the MAN-PRINT program.

6. Coordinate with DCSOPS and DCSPER to ensure that themanpower, personnel, and training requirements to support sys-tems are integrated into the Army long-range planning processes,including the Total Army Analysis, to assure that systems, whenfielded, will be adequately manned and supported.

c. Coordinate with DCSPER to assure that all initiatives to in-tegrate MANPRINT throughout the acquisition process receiveappropriate support from the Secretariat.

d. Maintain close and continuous liaison with the MANPRINTPolicy Office within ODCSPER to assure that issues regarding theMANPRINT program receive early and effective attention.

e. Serve as a regular member of the Army Systems AcquisitionReview Council.

/ Review the Manpower Estimate Report (MER), required bySection 2434, Title 10, US Code, and the Manpower Billpayer

Plan, both of which are provided by ODCSOPS. Transmit the ap-proved MER to the Office of the Assistant Secretary of Defense(Force Management and Personnel).

g. Review the Army Soldier Oriented Research and Develop-ment Program, human performance Research, Development, Test,and Evaluation (RDTE) efforts, including research and develop-ment (R&D) programs conducted by U.S. Army Human Engi-neering Laboratory (USAHEL) and the Army Research Institute(ARI), relating to education and training, training simulation, per-sonnel systems, manpower systems management, human factorsengineering, and human performance.

2-4. Assistant Secretary of the Army (Research,Development, and Acquisition) (ASA(RDA))The ASA(RDA) will—

a. Include RDTE funds for MANPRINT in the annual sub-mission for the Program 6 (Research, Development, Test, andEvaluation) budget.

b. Establish Army policy and guidance for integrating MAN-PRINT within the research and development and acquisitioncommunity.

c. Ensure that PEO/PMs have had MANPRINT training.d. Fund contracted MANPRINT studies and methodologies

and ensure that MANPRINT methodologies have been applied toappropriate systems.

e. Ensure that manpower, personnel, training, and safety"•i- (MPTS) descriptions (encompassing manpower, personnel, train-XR ing, and safety, as well as health hazards and human factors engi-;v7jAjieering) are considered, assessed, refined, documented and

f reported to ASD(FM&P) at each phase of the acquisition processin accordance with DOD Directive 5000.53./ To the extent feasible, ensure that complete, production rep-

resentative systems and components (hardware and software;manuals; training programs; tables of organization and equipment;and doctrine, tactics, and operational procedures) are provided totest organizations and test units before system-specific pretesttraining begins for initial operational test and evaluation(IOT&E).

2-5. Director of Information Systems for Command,Control, Communications, and Computers (DISC4)The DISC4 will—

a. Establish policy and guidance to integrate MANPRINT con-siderations into requirements documents for the development andacquisition of information management systems.

b. Identify and incorporate criteria in the spectrum manage-ment process to guard against the effects of electromagnetic radia-tion hazards, as identified by The Surgeon General, for Armypersonnel operating radio and radar systems.

c. Ensure application of MANPRINT methodologies to hard-ware and software development, modification, and acquisition pro-grams that come under the responsibility of the InformationMission Area (I MA).

d. Ensure, in coordination with ODCSPER the resolution ofMANPRINT issues and concerns during the life cycle of informa-tion systems.

e. Ensure that IMA PEOs and PMs have had MANPRINTtraining.

2-6. Deputy Chief of Staff for Personnel (DCSPER)The DCSPER will—

o. Exercise primary DA staff responsibility for the MAN-PRINT program.

b. Develop, coordinate, and disseminate MANPRINT programpolicy and guidance to all Army commands and agencies.

c. For major and Level I nonmajor programs, review and moni-tor materiel objectives, requirements documents. Systems MAN-PRINT Management Plans, acquisition strategy documents, andother pertinent acquisition related documents in materiel develop-ment or improvement to ensure that MANPRINT is addressedearly and continuously in the development of total system per-formance requirements.

AR 602-2 • UPDATE

AkaluM
Pencil

d Provide behavioral sciences and human factors engineeringresearch support; (for example, processing research, development,test, and evaluation (RDTE) funding requirements). The DC-SPER research program is executed through the followingagencies:

(1) The U.S. Army Research Institute (ARI) for the Behavioraland Social Sciences, a field operating agency of DCSPER. (SeeAR 70-8.) ARI focuses on MPT-related research.

(2) The Human Engineering Laboratory (HEL), the Array'slead laboratory for human factors engineering, and an agency ofthe U.S. Army Laboratory Command (LABCOM). (See AR602-1.)

£* t. Provide for professional coordination and collaboration} yatnong human factors engineering, system safety, biomcdical,

.manpower, personnel, and training specialists./ Monitor, in coordination with TRADOC, the content and

quality of MANPRINT training courses.g. Approve and verify data contained in qualitative and quanti-

tative personnel requirements information (QQPRI) submissions.(See AR 71-2.)

h. Approve DA policy, guidance, and formats for all MAN-PRINT related documents; for example, SMMP, target audiencedescriptions (TAD).

L Appoint the DA personnel systems staff officer (PERSSO) forMajor Defense Acquisition Programs (MDAP), Army DesignatedAcquisition Programs (ADAP), and selected Level I, II, and IIInonmajor programs.

j. Ensure that MANPRINT is integrated into materiel systemrequirements, development, acquisition, and materiel changeprograms.

k. Serve as a regular member of the Army System AcquisitionReview Councfl (ASARQ in accordance with AR 15-14 and pre-pare MANPRINT assessments in preparation for milestone deci-sion reviews with a copy furnished Deputy Chief of Staff forLogistics. >

L Ensure that personnel assignment policies are established that yflprovide for assignment of specially trained personnel to units andpositions for which trained in time to support fielding andsustainraent.

m. Establish policy in coordination with ODCSLOG on howMANPRINT and ILS programs will interface (see 66 above).

n. Ensure, in coordination with ASA(RDA), that MAN-PRINT considerations are properly integrated into materiel RDAand materiel change programs.

o. Approve policy, guidance and formats for all MANPRINTrelated documents; for example, SMMP, TAX).

P 4-*J> S*-*- (LA -*—0 - -*-0 '2-7. Deputy Chief of Staff for Logtatlce (DCSLOQ)The DCSLOO will—

o. Ensure interface of MANPRINT with the Army ILS pro-gram for all developmental, nondevelopmental, and materielchange management systems and for logistics research anddevelopment.

b. Establish Army policy, in coordination with DCSPER, onhow the ILS and MANPRINT processes will interface. (See AR700-127.)

c Monitor the MANPRINT efforts, in coordination with otherArmy staff agencies, to ensure effective policy implementation.

d. Provide DCSPER with a copy of the ILS assessment for allmajor systems.

e. Provide AMC with a copy of the ILS assessment for allnonmajor systems.

2-fi. Deputy Chief of Staff for Operation* and Wane(DCSOPS)Tht DCSOPS will—

a. Ensure MANPRINT requirements are considered and in-cluded, as appropriate, during the preparation of materiel andtraining requirements documents.

b. Identify and resolve training issues.6 AR 602-2 •

c. Ensure the inclusion of relevant MANPRINT data in estab-lishing requirements for training devices for new equipment; insti-tutional, unit, and joint service training; and in developing table oforganization and equipment and table of distribution andallowances.

d. Ensure the inclusion of MANPRINT issues in operationaltesting (OT), user testing (UT), and evaluations.

e. Ensure MANPRINT is addressed by all Special Task Forces(STF) in accordance with AR 71-9.

/ Develop and disseminate training guidance and constraintsfor materiel acquisition to include training devices, hardware, andsoftware.

g. Establish Army policy and guidance for integrating MAN-PRINT in the Army training program in coordination withODCSPER.

h. Ensure that MANPRINT is considered in basis of issue plan(BOIP) and quantitative and qualitative personnel requirementsinformation (QQPRI) policy. (See AR 71-2.)

£. Prepare, in conjunction with the combat and materiel devel-opers, a Manpower Estimate Report (MER) and attendant Man-power Billpayer Plan for Major systems acquisitions and submit toASA(MRA).

2-9. Deputy Chief of Staff for Intelligence (DCSINT)The DCSINT will—

a. Establish threat policy in support of combat, training, andmateriel development activities. (See AR 381-11.)

b. Establish policy and guidance to integrate MANPRINT con-siderations inio the development and acquisition of intelligenceand security materiel systems. , „ ,

2-10. The Surgeon General (TSG)TSG will—

a. Provide consultation and advice to the Army staff and devel-oping agencies on medical aspects of MANPRINT, includinghealth hazard assessments, psychological-biological considera-

flfl lions, lessons learned, constraints, and guidelines. (See AR 40-10.)•"!;_ b- Establish and issue all medical policies, health standards, ex-

posure limits, or other policies that relate exposure of personnel toactual or potential health hazards throughout the materiel devel-opment and acquisition cycle.

c. Develop the medical and health standards data bases neededto support MANPRINT assessments in Army systems.

d. Perform the appropriate medical RDTE tasks for nonmedi-cai development and acquisition programs to include early identi-fication and resolution of potential or unknown health hazards ofemerging weapons and other materiel system technologies.

e. Coordinate with appropriate Army Medical Department(AMEDD) agencies and commands to accomplish health hazardassessments in response to requests for medical support. Serve asthe approval authority for all health hazard assessment reports,which will be forwarded through command channels for inclusionin MANPRINT assessments./ Provide guidance on medical aspects prior to issue of safety

releases for all testing including developmental, technical, opera-tional, user and force development test and evaluation (FDTE).

Section IIICommanders of Major Army Commands

2-11. Commanding Genera), U.S. Army Training andDoctrine Command (CG, TRADOC)The CG, TRADOC, will—

a. Ensure MANPRINT is considered and reported in the Con-cept Based Requirements System (CBRS) and in doctrinal, com-bat, and training developments.

b. Ensure that the proponent school or center combat develop-ers initiate a MJWG 3 to 6 months prior to the start of the opera-tional and organizational (O&O) plan.

c. Develop, as lead agency, an SMMP at proponent schools inconjunction with AMC for each development, nondeveJopment, ormateriel change management system.

UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

d. Develop target audience descriptions (TAD) for use by com-bat, training, and materiel developers and contractors for develop-mental, nondevelopmental, and materiel change managementsystems. The TAD is a document which describes the fu tu resoldiers (Active and Reserve components), DOD civilian and con-tractor personnel who will operate, maintain, and support the newor improved item of equipment. The TAD is developed through arefinement of baseline MOS descriptions and wil l provide as aminimum the following information on each MOS identified;

(1) Projected force structure authorizations by grade and oper-a t ing s t r eng th percentage and the s tandards of gradeauthorizations.

(2) MOS/civilian designation and description.(3) Anthropomctric data.(4) Physical qualifications.(5) Armed Forces Qualification Test (AFQT) quality distribu-

tion, and area aptitude scores.(6) Biographical information or civilian education, percentage

with English as a second language, and gender mix.(7) Skills and knowledge trained during advanced individual

training and noncommissioned officer (NCO) training.(8) Task performance information (by ski l l level if available).e. Coordinate and provide MANPRINT information to the

materiel developer for execution in all materiel programs. This in-cludes documenting in the SMMP the requirements for materieldevelopers' MANPRINT related efforts such as MPTS descrip-tion, human factors engineering assessment (HFHA), health ha/-

assessment, and logistic support analysis/ Prepare Manpower, Personnel and Training (MPT) input to

MANPRINT assessments and reviews.g. Ensure that requirements documents produced under AR

71-9, as well as specialized requirement documents used for com-puters or individual clothing and equipment, include adequatespecification of MANPRINT requirements.

h. Prepare the System Training Plan (STRAP), which inte-grates the MANPRINT goals, constraints, and requirements asstated in the SMMP and defines the total system training strategy(see glossary). 10 include training devices and training aids. tt

L Ensure the early preparation of task analyses (critical opva-tion and maintenance tasks) which are derived from mission areadeficiencies and combat and operational mission requirements.

j. Develop initial and progressive training standards leading tocombat or operational proficiency criteria for critical individualand collective tasks for the operation and maintenance of materielsystems. As required, provide both training*qualification standardsand combat or operational proficiency criteria to permit the as-sessment of the training val idi ty and performance validity pro-grams during Initial Operational Test and Evaluation (IOT&E),and Follow-on Operational Test and Evaluation (FOT&E).

k. Recommend, when appropriate, to ODCSPF.R (DAPF, 7.B),initiation of research and development projects in the field of edu-cation and training necessary to resolve issues involving unusualskills or learning processes.

/. Provide support to AMC in developing and maintaining theautomated MANPRINT data base. This includes providing man-power, personnel, and training data to Commander, MaterielReadiness Support Activity (MRSA), ATTN: AMXMD-EI., Lex-ington, KY 40511-5101, for inclusion in the data base-

m. Provide analyses of manpower, personnel, and training im-plications for inclusion in the concept formulation package (CI-'P).The CFP must state explicit MANPRINT risks and estimated re-quirements for each alternative

n. Conduct MANPRINT training for Army Staff agencies andMACOMs

o. Ensure, in conjunction w i t h all M A N P R I N T domains,MANPRINT issues and criteria are provided to testers and evalu-ators, that test results are collected and disseminated, and thatpost-fielding analysis is performed. (See AR 71-3.)

p. Ensure representation of individuals qualified by education,•Training, and experience in the six MANPRINT domains on allspecial study groups (SSGs) and special task forces (STFs).

AR 602-2

&LL,. IS i <[q. Provide resources to proponent centers, schools, and

subordinate commands to perform MAN'PRINT tasks withinTRADOC.

r. Ensure MANPRINT data are collected during user testingfor which TRADOC.' is responsible and is made available for useby other activities for continuous evaluation.^,s. Ensure that employment and doctrinal decisions that influ-ence engineering dcsipn are analyzed for resource and human per-formance implications

i. Include MANPRINT responsibilities in TSM chartersu. Provide assistance to AMC, in the preparation of MAN-

PRINT assessments on nonmajor level II and 111 programs inpreparation for all Milestone Decision Reviews with a copy fur-nished the logistician.

v. Collect and evaluate soldier performance data ( t ime and ac-curacy) for all critical operation and maintenance tasks m majorand designated acquisition program testing and evaluation.

w. Include soldier performance data on critical operation andmaintenance tasks in any calculations of system effectiveness andavailability presented to ASARC reviews.

x- Assess effectiveness of proposed t ra in ing for cri t ical opera-tions and maintenance tasks.

>. Vcnf> that soldiers used in testing arc representative of theuser population as defined in the target audience desciiption.

z. Verify that the testing environrm*nt is representative of theoperational environment in which the soldier and equipment willbe deployed and used

ua. Include MANPRINT issues in cost and operational effec-tiveness analysis (CX)EAs) and other studies and analyses whichsupport the materiel acquisition process.

ab. F.nsure that system safety engineers are assigned to supportmateriel development programs.

tic F.nsure TRADOC System Managers receive MANPRINTtraining,

ad- Develop for HQDA, DCSPER (DAPE-MR) approval poli-cy, guidance, and formats for all MANPRINT related documents;for example, SMMP, TAD.

2-12. Commanding General, U.S. Army MaterielCommand (CG, AMC)The CG, AMC. will—

ffi. Integrate MANPRINT (including inputs from human fac-»tors engineering, manpower, personnel, training, safety, testing,

and medical activities) into the materiel research, development,nondevelopment, materiel change (product improvement), and ac-quisition programs (from 6.2 exploratory development throughproduction and deployment).

b. Establish and maintain the automated MRSA MANPRINTdata base in coordination with DCSPER. DISC4, TSG, and CG,TRAIXJC.

c. Support TRADOC in the performance of early analyses, indeveloping and approving the SMMP and use it as guidance forformula t ing the M A N P R I N T assessment, Test and EvaluationMaster Plan (TEMP). II.S Plan (ILSP). and Request for Proposal(RFP).

d. F.nsure that the MANPRINT goals, constraints, and re-quirements stated in Ihe SMMP and materiel requirements docu-ments are reflected in M A N P R I N T assessments, Test andEvaluation Master Plan (TEMP), II.S Plan (ILSP) and Requestfor Proposal (RFP)

e. Develop, coordinate, and implement standards and proce-dures for all MANPRINT domains in all materiel and trainingdevice designs./ Fnsure that MANPRINT training is provided to all project,

program, and product managers (PM) as well as all scientists, en-gineers, and contract management personnel involved in the devel-opment process.jg. Perform appropriate basic and applied human factors engi-

Vfteering and system safety RDTE.h. Ensure the inclusion of MANPRINT in the technical testing

(TT), first article testing (FAT), production qualification testing(PQT), and production acceptance lest and evaluation (PAT&E).

• UPDATE 7

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

_j. Ensure human factors engineering amTsystem safety special-ists are assigned to materiel development and nondevelopmentprograms.

j. Ensure coordination with Commanding General, TRADOC,and Commanding General, U.S. Army Operational Test and Eval-uation Agency, to integrate all MANPRINT test and evaluationrequirements, objectives, issues, and criteria into the TEMP.

k. Assure that HEL (I.ABCOM) in coordination with othercommands prepare a human factors engineering assessments(HFEA) on all Major Defense Acquisition Programs (MDAP).Army Designated Acquisition Programs (ADAP). and nonmajorprograms (including levels II and III) . No waiver of HFEA is per-mitted. The HFEA will serve as the human factors domain inputto the MANPRINT assessment (See AR 602-1.)

/. Provide systems safety assessment and management input u>MANPRINT assessments throughout the life cycle of materielsystem development and acquisition as well as ensure M A N -PRINT input is integrated into system safety program require-ments in accordance with AR 385 16 and MIL-STD-882.

m. Prepare, in coordination with TSG, a written proposal forStudies involving the use of volunteers in accordance with AR70-25 (TSG has final approval authority for all studies using vol-unteers except research with nuclear or chemical warfare agents,which are approved by the Under Secretary of Defense for Re-search and Engineering).

n. Prepare, through PM for training devices (TRADE), a con-cept formulation package for all training devices and incorporatetraining assessments into the MANPRINT assessment.

o. Include MANPRINT as a separate major area in the sourceselection process. Request personnel qualified in specific MAN-PRINT domains from proponent and support agencies to partici-pate as members of the Source Selection and Evaluation Board(SSEB).

p. Provide representation to all special task forces (STFs) andspecial study groups (SSGs) to ensure that MANPRINT is con-sidered early and throughout the materiel acquisition process. (SecAR 71-9.)

q. Provide the MANPRINT manager for all AMC-developedmateriel systems.

r. Request a review of health hazard assessment by TSG duringthe concept exploration definition phase as well as subsequentphases where potential hazards arc identified.

i Ensure technical trade-off analyses include human perform-ance and reliability considerations.

i. Prepare, in coordination with TRADOC, a MANPRIN'T as-sessment on nonmajor levels II and III programs for all post-Mile-stone I Decision Reviews wi th a copy furnished the logistician.

u. Develop (through HEL) human factors approaches, method-ologies, and models to be used for the incorporation of HFF./MANPRINT into the acquisition process.

v. Provide (through HEL) HFE support to the combat andtraining developer during development of concepts, studies, analy-ses, system requirements, and user test and evaluations.

w. Fund contracted MANPRINT studies and methodologiesand ensure that ODCSPF.R approved MANPRINT methodolo-gies have been applied io appropriate systems.

x Ensure the inclusion of MANPRINT in the Army MaterielSystems Analysis Agency (AMSAA) Evaluation Reports and theU.S. Army Test and Evaluation Command (TECOM) AssessmentReports.

2-13. Commanding General, U.S. Army Health ServicesCommand (CG, HSC)The CG, HSC will—

a. Through the U.S. Army Environmental Hygiene Agency(HSHB-MO-A), Aberdeen P r o v i n g G r o u n d , M a r y l a n d21010-5422, prepare system health hazard assessment reports forinclusion in the program sponsor's MANPRINT Review and inthe MANPRINT Assessment. Forward to OTSG for approval.

6. Perform reviews of all requirements documents during con-cept exploration definition and subsequent phases to identify po-tential hazards.8 AR 602-2

c. Plan and execute as a combat developer, a MANPRINT pro-gram for medical (Class VI I I ) materiel development andacquisition.

d. Provide health hazard issues and data input as required tothe automated MRSA MANPRINT data base.

Section IVHeads of Other Army Elements

2-14. Commander, U.S. Army Operational Test andEvaluation Agency (CG, OTEA)The CG, OTEA, will—

a Analyze and evaluate the human factors of system perform-ance in simulated combat, or the operational setting, during initialoperational test and evaluation (IOT&E) and follow-on operation-al test and evaluation (FOT&E). Participate in MANPRINT andother system development activities to plan and prepare for thisanalysis.

b. F.nsure that test plans address the collection of soldier per-formance measurements (time and accuracy) of individuals, teams,crews, squads, and units involved in the use, operation, mainte-nance, and support of the system. Find whether soldier perform-ance of essential tasks is adequate under operational conditions.Evaluate the contribution of soldier performance to systemeffectiveness.

c. Estimate the workload or level of effort exerted by soldiers tomeet system performance demands. Find whether soldier perform-ance measurements are sensitive to hardware and software designfeatures and operating characteristics; manpower, personnel, andt ra in ing variables; and operational procedures

d- Identify detrimental effects of system use, operation, mainte-nance, and support upon soldiers and soldier performance. Evalu-ate the contribution of soldier performance to system availability.

if. I den t i fy soldier performance and other human factorsproblems which are amenable to correction by design changes tohardware and software./ Confirm that the personnel portions of applicable tables of

organization and equipment (TOE) are consistent with the de-mands of system and task performances.

g. Identify individual soldier characteristics; (for example, bio-graphical, physical, anthropometric, and aptitude variables) whichare correlated with soldier and system performance data fromtraining and testing. Verify that soldiers used in testing are repre-sentative of the user population as defined in the target audiencedescription. *

/!. Confirm the performance validity of t ra in ing programs; thatis, the transfer of training to soldier performance in the operation-al setting. Identify necessary tasks in tes t ing which were nottrained or which were inadequately trained. Identify tasks whichwere trained, but not necessary in testing.

i Ensure that all tests arc conducted in accordance withHuman Use Committee (HUC) recommendations and the provi-sions of the safety release. Assess the suitability of the Safety Re-lease for t r a in ing and for testing. Assess the operationaleffectiveness of the corrections made to previously identified high-severity ha/ards. Assess the effectiveness and realism of user-de-pendent or administrative hazard control measures under opera-tional conditions. Identify actual or potential hazards to soldiersafety and health which are revealed in operational tests.

j. Identify any soldier or system performance problems whichare attributable to incorrect, awkward, or inadequate operationalprocedures or techniques.

2-15. Director of Army Safety (DASAF)The DASAF will—

a. Ensure system safety issues and concerns are integrated intothe materiel development, acquisition, or improvement processthrough the MANPRINT program.

b. Provide an overall system safety policy for developing, ac-quiring, or changing materiel systems (see AR 385-16).

r. Prepare system safety lessons learned for MANPRINT anal-yses and provide input as required to the automated MANPRINT

UPDATE

AkaluM
Pencil

data base at the Materiel ReadincslTSupport Activity (MRSA),ATTN: AMXMD-EL, Lexington, KY, 40511-5101.

d. Delegate to AMC major subordinate commands (MSC) sys-tem safety assessment preparation responsibility for individualMANPRINT assessments.

2-16. Commander, U.S. Army Soldier Support CenterThe Commander, U.S. Army Soldier Support Center, specificallythe U.S. Army Personnel Integration Command, will—

a. Develop and institutionalize MANPRINT training withinthe Army and industry'- As Army proponent for MANPRINTtraining, U.S. Army Personnel Integration Command will plan,update, coordinate, and conduct, as appropriate, training courses

b. Provide Army proponency for manpower, personnel, andtraining (MPT) methodologies. Publish guidance, fac i l i t a te theconduct of analyses, and serve as a clearinghouse for emergingMPT analytic efforts.

c. Provide analytical capability to examine the impact of pro-posed and ongoing materiel acquisitions upon total Army man-power, personnel, and training considerations.

d. Perform independent MPT assessments on major systems forinclusion in the MANPRINT Assessment.

e. Establish guidance and procedures relative to the integrationof MPT into the MANPRINT process.

2-17. Commander, U.S. Army Logistics EvaluationAgency (USALEA)USALEA, as the logistician in the materiel acquisition process forother than medical equipment (AR 700-127), will

a. Review and recommend changes to requirements documents,System MANPRINT Management Plans. ILS Plans, materielfielding documents, solicitation documents, and other programmanagement and LSA documentation for MANPRINT and ILSconsiderations.

b. Participate in ILSMT activities and M A N P R I N T jointworking groups.

c. Inform the materiel developer, combat developer, and otherprogram participants of MANPRINT planning deficiencies in theILS program. USALEA will identify potential problems and helpresolve them.

2-18. CG, U.S. Army Information Systems Command; CG,U.S. Army Intelligence and Security Command; CG, U.S.Army Medical Research and Development Command; CG,U.S. Army Strategic Defense Command; and Chief ofEngineers •The Commanding Generals indicated and the Chief of Engineerswill—

a. Establish MANPRINT programs that incorporate the provi-sions of this regulation in their combat and training developments,materiel acquisition, and testing responsibihties.

6. Request a health hazard assessment review in accordancewith AR 40-10 during the concept exploration definition phase aswell as subsequent phases where potential hazards arc identified.

c Submit to TSG a written proposal for studies involving theuse of volunteers in accordance with AR 70-25 (TSG has final ap-proval authority for all studies using volunteers except researchwith nuclear or chemical warfare agents which arc approved bythe Under Secretary of Defense for Research and Engineering).

d. Provide safety assessments of their materiel acquisition sys-tems for inclusion in the MANPRINT assessments for their re-spective programs.

e. Obtain MPT assessment data from the combat developer forintegration into the MANPRINT and the ILS programs for thesystem under development.

/ Ensure that research findings relating to or affecting humanperformance and reliability are reported to DAPF-MR

g. Request HEL (LABCOM) perform an HFEA as input to theMANPRINT Review/MANPRINT Assessment for their respec-tive programs.

h. Execute MANPRINT Reviews for their respectiveprograms.

Chapter 3 /MANPRINT in Life Cycle System Management ofArmy Materiel

3-1. Introductiono. MANPRINT is focused on influencing the design of materiel

systems and associated support requirements so that developmen-tal, nondevelopmental, and materiel change management systemscan be operated, maintained, and supported efficiently and safelywithin the manpower structure, personnel aptitudes, and trainingresource constraints of the Army.

b. The engineering design philosophy of MANPRINT is fo-cused on optimum system performance on the battlefield, whichincludes consideration of both soldier and equipment capabilityMANPRINT is an option-oriented process as opposed to an ob-jective-oriented process. The MANPRINT process will providedecision makers information upon which to make tradeoffs on ar-eas such as qua l i ty and numbers of people, training, technology,conditions, standards, costs, and personnel assignment policy.

3-2. MANPRINT in tailored development programs (TheArmy Streamlined Acquisition Program)The Army's policies for tailoring development programs are incor-porated in the Anny Streamlined Acquisition Program (ASAP).MANPRINT will be integrated throughout the ASAP in the samemanner as the current Life Cycle System Management Model(LCSMM). The ASAP activities and approaches are included inparenthesis after LCSMM phases in paragraphs 3-3 through 3-6(See A.R70-U

3-3. MANPRINT during preconcept activities(requirements formulation and technology baseactivities)

a. MANPRINT goals, constraints, and requirements stated inthe SMMP wil l be considered and integrated during all phases ofthe life cycle (AR 70-1) for all materiel systems. The MAN-PRINT effort for a specific system is initiated when the decision ismade to meet a battlefield or training materiel need by improvingold or developing new equipment. MANPRINT will be integratedinto program initiation documents such as the operational and or-ganizational (O&O) plan, t r a in ing device needs statement(TONS), and the mission needs statement (MNS). MANPRINTdomains will be considered and assessed during market investiga-tions and be considered in the acquisition strategy.

b. MANPRINT in this phase will consider the human elementin terms of manpower, capabilities, skills available or achievable,and forecasted training capabilities and training burden. The sys-tem definition is critical and must be identified in order to do apreliminary comparative analysis. Health hazard, system safety,and human performance data on ihe predecessor system, if one ex-ists, should be identified and plans made for conducting a humanfactors engineering assessment.

c Exploration of available technologies and methodologies be-gins during this phase. Research required to support the trainingrequirement will be conducted to resolve critical training issues.The need for this research will be documented as a separate re-search and development requirement under AR 70-8. Research toidentify what human attributes correlate to successful perform-ance on a given function or task will be undertaken.

d. The combat, materiel, and training developers should workclosely to prepare an adequate and attainable training strategy (seeglossary). When a system requires a training device, the combatdeveloper has lead responsibility for MANPRINT, with the train-ing developer assuming a support role. When a non-system train-ing device is r equ i r ed , the t ra in ing developer assumesresponsibility and will manage all MANPRINT activities requiredrather than the combat developer. If simulators or other trainingdevices arc required, they should be designed to pose no safety orhealth hazards whatsoever. If hazards cannot be completely de-signed out, then hazardous exposure must be limited to lowestpracticable levels consistent with cost and time constraints and re-quired operational effectiveness. Hazards that cannot be designed

AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

out must have documented accepTance of the hazards by the pro-ponent in accordance with AR 70-1. Health hazards, health crite-ria, and procedures to control risks to the user will be fullydocumented in all system, training, maintenance, and operationalpublications,

e. The combat or training developer, in conjunction with themateriel developer, will initiate a SMMP in this phase to includepreparation of the initial target audience description. (See chap 4.)The combat developer (system) or training developer (nonsystem)will develop and update the training device SMMP throughout thelife-cycle of the system./ The plan for trade studies and analyses must be carefully pre-

pared. Missions and mission environments must be analyzed todetermine design drivers. Trade studies must focus on human per-formance and reliability associated with each technology.

g. The total system (see glossary) into which the new item ofequipment will be integrated must be carefully and thoroughlyidentified.

h. MANPRINT front-end analyses; for example, early compa-rability analysis, performed during this period will focus on prede-cessor systems and lessons learned.

3-4. MANPRINT In the concept exploration definitionphase (proof of principle activities)

a. MANPRINT inputs will be included in the conceptual phasestudies and analyses and the concept formulation package, includ-ing the trade-off analysis (TOA), and the cost and operational ef-fectiveness analysis (COEA). MANPRINT analyses accomplishedprior to program initiation provide a baseline to which technicalapproach alternatives and their resulting MANPRINT implica-tions can be compared. MANPRINT requirements and con-straints must be established for inclusion in requirementsdocuments and solicitation documents.

b. The combat and training developers in conjunction with themateriel developer will integrate MANPRINT into appropriatetechnical and management plans. MANPRINT data will be devel-oped to—

(1) Determine probable and projected MANPRINT require-ments and include in the SMMP and required operational capabil-ity (ROC).

(2) Develop planning for personnel support and training pro-grams (that is, development of the System Training Plan (STRAP)which outlines the initial training strategy) in accordance with AR350-35 and identify critical issues for further study or testing andinclude in the SMMP.

(3) Support operational and organizational concepts and pro-vide requisite MANPRINT input to the Program ManagementDocuments (PMDs), especially the integrated logistics supportplan (ILSP), the system engineering management plan (SEMP),the TEMP, and the SMMP.

c Estimates of manpower and personnel costs, including train-ing costs and projections of the cost of recruiting and retainingsoldiers with the required aptitudes, will be explicitly consideredin COEA and in selection of the best technical approach. Cost andtraining effectiveness analysis (CTEA) of training devices will bespecifically addressed to determine savings resulting from de-creased annual man-day requirements, annual instructor require-ments, and training annual costs. (See AR 71-9.) The assumptionsand methods used to measure the cost effectiveness of training de-vices will be reported in sufficient detail to permit other analysts toreplicate the computations. Cost data will be updated during sub-sequent phases,

d. For materiel with a predominant human interface, it is criti-cal to collect and evaluate human performance reliability data todetermine whether the proposed system concept will deliver theexpected performance using personnel with no greater aptitudesand no more training than planned. Where the conceptual systemis a drastic departure from current materiel, and thus predecessordata may not be applicable, actions must be taken to highlight and10 AR 602-2

l<??yempnasize MANPRINT issues in subsequent phases. Health haz-ard, system safety and human performance issues will be consid-ered as critical test issues for resolution. (See AR 40-10, AR385-16, and AR 70-10.)

e. Application of various training methodologies and explora-tion of available training technologies continue during this phase./ A MANPRINT Review and a MANPRINT Assessment will

be conducted.g. The combat developer will update the SMMP, if required, in

conjunction with the materiel developer through the MJWG pro-cess. The materiel developer will update the HFEA, SSA, andILSP. The U.S. Army Health Services Command will update theHHA for input to the MANPRINT Review and Assessment. Areview of the projected target audience identified in the TAD willbe performed to ensure it is compatible with the system design.The SMMP will be jointly approved by the materiel developer andthe proponent prior to the milestone decision review.

h. Joint (combat, training, and materiel developers) tailoring ofmilitary specifications, standards, and contract data requirementslist will be accomplished. Industry must be given the opportunityto identify trade-off points and human tasks associated with thesystem.

i. Integrate MANPRINT requirements and activities into theprocurement documents and process (RFP, SOW, SSEB).

j. MANPRINT domain representatives, including users, willmonitor through the PM the contractor efforts to ensure compli-ance with contractual requirements.

k, MANPRINT issues and criteria wilt be included in tests andevaluations conducted during this phase of the acquisition cycle.

/. The MANPRINT portion of the requirements documentswill provide soldier performance specifications which considermaximum and minimal personnel aptitudes and skills that will berequired.

3-5. MANPRINT In the concept demonstration andvalidation phase (proof of principle/developmentproveout activities)

a. MANPRINT standards, measures, testing issues, and crite-ria will be provided to the test and evaluation community throughcoordination of the TEMP.

b. MANPRINT data to support the BOIP and QQPRI will bedeveloped during this phase. (See AR 71-2.)

c. The requirement to conduct continuing training •require-ments analyses as a part of the concept demonstration and valida-tion phase will be documented in the requirements document. Thefollowing will be completed by the end of this phase:

(1) A training strategy for the user, initially developed duringconcept exploration, will be expanded and documented in a newequipment training plan (NETP) in accordance with AR 350-35.

(2) Identification of training devices and aids and special (rain-ing requirements. (See AR 350-38.)

d. A MANPRINT Review and a MANPRINT Assessmentwill be conducted or updated, as appropriate.

e. MANPRINT issues will be evaluated in technical testing andevaluation (TT&E) and user testing and evaluation (UT&E)./ Integrate MANPRINT requirements and activities into the

procurement documents and process (RFP, SOW, SSEB).g. MANPRINT domain representatives, including users, will

monitor the contractor efforts to ensure compliance with contrac-tual requirements. MANPRINT will be an issue in all preliminarydesign reviews and critical design reviews.

h. MANPRINT issues and criteria will be included in tests andevaluations conducted during this phase of the acquisition cycle.

i. The combat developer, assisted by the materiel developer,will update the SMMP if required. The materiel developer will up-date the HFEA, system safety assessment (SSAX and ILSP. TheU.S. Army Health and Services Command will update the healthhazards assessment (HHA) for input to the MANPRINT reviewand MANPRINT assessment A review of the projected target au-dience identified in the TAD should be performed to ensure it iscompatible with the system design. The combat developer willconduct crosswalks among the SMMP, RFP, and ROC.

UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

3-6. MANPRINT In the full scale development—low rateInitial production (LRIP) phase (development proveoutactivities)

a. MANPRINT issues will be evaluated in TT and (user test-ing) (UT), particularly those approved as critical in the indepen-dent evaluation plan (IEP).

b. A MANPRINT Review and MANPRINT Assessment willbe conducted and updated as appropriate.

c. MANPRINT data will be developed as required during thisphase and may support an amended BOIP and/or QQPRI.

d. The combat developer, assisted by the materiel developer,will update the SMMP, if required, through the MJWG process.The materiel developer will update the HFEA, SSA, and ILSPand LSA strategy. The Medical Command will update the HHAfor input to the MANPRINT Review and MANPRINT Assess-ment. A review of the projected target audience identified in theTAD should be performed to ensure it is compatible with the sys-tem design.

e. Engineering change proposals will be reviewed for MAN-PRINT implications./ Integrate MANPRINT requirements and activities into the

procurement documents and process (RFP. SOW, SSEB).g. MANPRINT domain representatives, including users, will

monitor the contractor efforts to ensure compliance wi th contrac-tual requirements.

h. MANPRINT issues and criteria will be included in tests andevaluations conducted during this phase of the acquisition cycle.

3-7. MANPRINT In the full rate production and initialdeployment phase

a. During this phase, the MJWG will assure that MANPRINTactions have been completed and the materiel is ready for fielding.New equipment training and institutional training must be readyto prepare soldiers to operate, maintain, and support the emergingmateriel. Manpower spaces must be documented with sufficientlead time to ensure that soldiers with the requisite skills and abili-ties are available to fill these spaces. Personnel assignment policiesmust be established to support initial fielding and sustainmcnt.Critical and major MANPRINT problems not resolved duringmateriel development must be addressed, resolved, or reconciled.

b. Proponents, users, and providers will continually assess thefielded system for potential improvements that could enhanceMANPRINT aspects of the system or the potential follow-onsystems.

3-8. MANPRINT In the logistics readiness and supportreview (MS IV)

a. The MANPRINT assessment during this phase will verifythe degree to which MANPRINT requirements have been met.When a requirement has not been met, cost-effective corrective ac-tions will be identified and implemented.

b. Impacts on readiness and the MANPRINT domains will beevaluated when determining if an engineering change proposal(ECP) or materiel change (product improvement) is requiredThese issues will be documented and reported in the updated deci-sion coordinating paper (DCP).

3-9. MANPRINT in the major upgrade/replacement(MSV)

a. The MANPRINT Review and MANPRINT Assessmentduring this phase will evaluate MANPRINT lessons learned anal-yses and provide guidance for program improvements or newstarts.

b. The MANPRINT issues documented in the SMMP willserve as the basis for the initial SMMP of a new start. The MAN-PRINT issues will also be reported in the updated DCP.

3-10. MANPRINT in nondevelopmental items (NDI)a. MANPRINT influences nondevelopmental item (NDI) prior

to program initiation. The SMMP prepared with the O&O Plan orTDNS will be a critical factor for the decision on whether or not

to pursue a NDI strategy. Further, MANPRINT concerns mustbe reflected in all requirement documents.

6. Given a proposed NDI strategy, MANPRINT issues are in-serted into the Independent Evaluation Plan (IEP) which form thebasis for the market investigation. The market investigation (MI)team, to include specific MANPRINT domain represent at ives,will conduct the MI and produce an independent evaluation re-port (IER). Critical MANPRINT issues, questions, and concernsmust be answered in the Independent Evaluation Report before adecision to continue an NDI program can be made.

c Market surveillance activities gather MAN PR I NT-relevantdata for use in the preparation of solicitation documentation.MANPRINT issues and concerns will enter the source selectionprocess as readily identifiable critical factors.

d. Data pertaining to each NDI alternative, whether or not se-lected for procurement, will be incorporated into the automatedMANPRINT data base for use in future procurements.

3-11. MANPRINT In materiel change (MC) managementa. MANPRINT is critical to all materiel changes (both produc-

tion and retrofit) to a system. The system will normally have beenfielded long enough for empirical MANPRINT data to be availa-ble. Regardless of the specific materiel change proposal, MAN-PRINT lessons-learned data must be captured by incorporationinto the automated MANPRINT data base and MANPRINTguidelines and constraints must be developed through MAN-PRINT lessons learned analysis.

b. While great care will be taken to assure that defective hard-ware components are replaced and improved, equal care must betaken to assure soldier-machine interface problem components arealso replaced or improved. This requires that MANPRINT fielddata be collected during the sample data collection (SDC) effort inaccordance with AR 750-37.

c. All validated data acquired through analysis or test will beincorporated into the automated MRSA MANPRINT database.

d. MANPRINT issues are inserted into the IEP for the evalua-tion of the operational effectiveness and suitability of the materielchange. Critical MANPRINT issues, questions and concerns mustbe answered in the Independent Evaluation Report before a deci-sion to continue a materiel change can be made.

e. The System Improvement Plan (SIP) supporting documenta-tion will contain a copy of the approved SMMP.

/ Materiel change proposals will be evaluated for resultingMANPRINT impacts. For those changes with MANPRINT im-plications, the sponsor will coordinate with the combat developerto determine if a revised SMMP is required.

Chapter 4System MANPRINT Management Plan

4-1. Introduction to the System MANPRINT ManagementPlan

a. The SMMP is a living planning and management guide. TheSMMP will be used by all activities involved in materiel develop-ment and acquisition to ensure MANPRINT issues are addressedthroughout the system's life-cycle. The SMMP documents thedata that is available or must be generated, how and when thedata will be generated, and how it will be used to address MAN-PRINT issues and concerns. It provides the proponent with docu-mentation that all available data have been examined and a planor program established to address MANPRINT concernsthroughout the materiel acquisition process (MAP).

6. The SMMP provides an audit trail. The SMMP will docu-ment the data sources, analyses, trade-offs, and decisions madethroughout the acquisition process. The plan serves as documenta-tion of what was considered and why it was or was not used. TheSMMP provides a source for continuity to lessen the impact ofpersonnel changes on the MANPRINT effort. New personnel canreview the SMMP and determine why and what tasks, actions,and analyses have or have not been scheduled and performed,

AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

_what action must be coordinated and scheduled, avolved in the effort.

who is in-

4-2. Preparation of me System MANPRINT ManagementPlan

o. The SMMP will contain the information in the formatshown at appendix C.

6. A SMMP will be prepared for each development, non-devel-opmental, and materiel change (product improved) system.

c. The SMMP will be jointly approved by both TRADOC andIhe materiel developer 60 days prior to the MDR The SMMP willbe coordinated with Secretary- of the Army for Research Develop-ment and Acquisition (SARDA) for MDAP systems, the PEC) forADAP and nonmajor Level I systems, and with other appropriateorganizations and agencies involved in the MANPRINT effort. Acopy of the SMMP will be provided to HQDA (DAPE-MBI)WASH DC 20310-0300 for staffing and comment. The SMMPwill be utilized as an audit trail for past decisions and a planningdocument to resolve current issues. The SMMP will govern analy-sis and integration of effort among domains.

4-3. ProceduresThe SMMP is initiated prior to program initiation and develop-ment of the O&O plan by the combat or training developer whena deficiency requiring a materiel solution is identified. At thispoint in the acquisition process, the SMMP will be vague and, insome areas, blank. As the acquisition process progresses, the planwill become more specific and definitive. Initiation of the SMMPfollows a logical progression.

a. Identify all potential data sources and analyses requirements.6. Document program guidance that is available.c. Determine whether a predecessor system (or reference com-

ponents) exists.d. Examine the list of data sources and determine those which

are appropriate for the effort being initiated, those readily availa-ble, and those which must be generated; also determine the availa-bility of resources to generate this data. As the programprogresses, data sources may be added or eliminated depending onrequirements and resources.

e. Review the acquisition strategy (which may be extremelyvague at this time) and set priorities for when data must beavailable./ Date and number each SMMP and subsequent updated ver-

sions of the SMMP.

4-4. The abbreviated SMMPo. In some cases a fully developed SMMP may not be required.

This section provides guidance to determine if a full SMMP isnecessary to support the materiel acquisition process.

6. The combat or training developer is responsible for initiatingthe abbreviated SMMP document and coordinating with represen-tatives of the MJWG representing the six domains of the MAN-PRINT program.

c. Appendix D shows the format and criteria necessary to de-termine whether a full or abbreviated SMMP is required.

roughout all aspects of design, development, integratedsupport, and program management.

b. Using this basic philosophy, treatment of MANPRINT willbe tailored to suit the nature and priorities of the program andcontract effort. An acceptable method of criteria weighting isshown in figure E-l. Because MANPRINT is evaluated separate-ly and throughout, cvaluators are cautioned to avoid doublecounting.

5-3. Proceduresa. The solicitation.(1) The statement of work and the specifications will contain

appropriate MANPRINT requirements. In particular, the specifi-cation will describe how the system is to look and act to the userand how the requirements will be verified.

(2) Offerers will be instructed by the solicitation to addressMANPRINT in every applicable portion of their offers and as aseparate major area.

(3) Offerers will be informed in the evaluation and award fac-tors section of the overall position of MANPRINT evaluation im-portance relative to other separate major areas.

(4) All RFPs will contain a requirement for a contractorMANPRINT Management Plan to be provided as part of the con-tractor proposal.

6. The evaluation criteria. MANPRINT will be a separate ma-jor area of the same visibility as technical, management and costand will be evaluated throughout all aspects of design, develop-ment, integrated logistic support, and program management.

c. Structure of the Source Selection Evaluation Board (SSEB).(1) The SSEB will be structured so as to establish and maintain

MANPRINT considerations as a visible part of the process.(2) There will be a MANPRINT entity at the area level and

MANPRINT expertise applied throughout the remaining organi-zation where appropriate.

d. Exceptions to policy.(1) Exceptions to this policy may be granted by the cognizant

Program Executive Officer (PEO) in coordination with HQDA,MANPRINT Directorate, when it can be compellingly demon-strated that MANPRINT is not a major consideration in designor selection.

(2) A copy of approved waivers, including rationale and alter-native treatment, will be sent to HQDA (DAPE-MR), WASHDC 20310-0300.

Chapter 5MANPRINT in the Source Selection Process forMajor Systems and Designated AcquisitionPrograms

5-1. MANPRINT in the Source Selection Process forMajor Systems and Designated ProgramsThis chapter provides policy and procedures for treatment ofMANPRINT in source selection for major systems and designatedacquisition programs.

5-2. Treatment of MANPRINTa. MANPRINT will be a separate major area of the same visi-

bility as technical, management and cost and will be evaluated12 AR 602-2 UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Appendix AReferences

Section!Required Publications

AR 15-14Systems Acquisition Review Council Procedures. (Cited in paras2-1 and 2-6.

AR 25^400-2The Modern Army Recordkeeping System (MARKS). (Cited inpara 1-7.)

AR 40-10Health Hazard Assessment Program in Support of the Army Ma-teriel Acquisition Decision Process. (Cited in paras 2-10, 2-17and 3-4.)

AR70-ISystems Acquisition Policy and Procedures. (Cited in paras 1-1,1-5, 3-2 and 3-3.)

AR70-8Personnel Performance and Training Program (PPTP). (Cited inparas 2-6 and 3-3.)

AR 70-10Test and Evaluation During Development and Acquisition of Ma-teriel. (Cited in para 3-4.)

AR 70-25Use of Volunteers as Subjects of Research. (Cited in paras 2-12and 2-18.)

AR 71-2Basis of Issue Plans (BOIP), Qualitative and Quantitative Person-nel Requirements Information (QQPRI). (Cited in paras 2-6, 2-8,and 3-5.)

AR71-3User Testing. (Cited in para 2-11.)

AR 71-9Materiel Objectives and Requirements. (Cited in paras 2-8, 2-11,2-12 and 3-4.)

AR 350-35Army Modernization Training. (Cited in paras 3-4 and 3-5.)

AR 350-38Training Device Policies and Procedures. (Cited in para 3-5.)

AR 381-11Threat Support to U.S. Army Force, Combat and Materiel Devel-opment (Cited in para 2-9.)

AR 385-16Systems Safely Engineering and Management. (Cited in paras2-12 and 2-15.)

AR 602-1Human Factors Engineering Program. (Cited in paras 1-5, 2-6and 2-12.)

AR 700-86Life Cycle Management of Clothing and Individual Equipment(Cited in para 1-16.)

AR 750-37Sample Data Collection: The Army Maintenance ManagementSystem (Cited in para 3-11.)

DOD Directive 5000.53Manpower, Personnel, Training and Safety (MPTS) in the De-fense Acquisition Process (Cited in paras 1-5 and 2-4.)

Section IIRelated Publications

A related publication is nwety a source of additional intotmalion. The userdoes not have to read it to understand tnis publication,

AR 70-15Product Improvement of Materiel

AR 350-6Army-Wide Small Arms Competitive Workmanship

AR 570-2Organization and Equipment Authorization Tables Personnel

AR 570-5Manpower Staffing Standards System

AR 700-129Management and Execution of Integrated Logistics Support Pro-gram for Multi-Service Acquisitions

AR 702-3Army Materiel Systems Reliability, Availability, and Maintain-ability (RAM)

AR 702-9Production Testing of Army Materiel

AR 750-1Army Materiel Maintenance Policy and Retail MaintenanceOperations

DOD Directive 5000.1Major and Nonraajor Defense Acquisition Programs

DOD-HDBK-743Anthropometry of U.S. Military Personnel (Metric)

DOD-HDBK-761Human Engineering Guidelines for Management InformationSystems

DOD-HDBK-763Human Engineering Procedures Guide

DOD Instruction 5000.2Defense Acquisition Program Procedures

MIL-H-46855Human Engineering Requirements for Military Systems Equip-ment and Facilities (Metric)

MIL-HDBK-759Human Factors Engineering Design for Army Materiel

MIL-STD-882System Safety Program Requirements

AR 700-127Integrated Logistics Support. (Cited in paras 2-7 and 2-17.)

AR 602-2 • UPDATE

MIL-STD-970Standards and Specifications, Order of Preference for the Selectionof

13

AkaluM
Pencil
AkaluM
Pencil

MIL-STD-1388-1DOD Requirements for a Logistic Support Analysis

MIL-STD-1388-2Logistic Support Analysis Record

MIL-STD-1472Human Engineering Design Criteria for Military Systems, Equip-ment and Facilities

MIL-STD-H74Noise Limits for Army Materiel

Section IIIPrescribed Forms

DA Form 5859-RAbbreviated System MANPRINT Management Plan (SMMP).(Prescribed in app D.)

Appendix BMANPRINT Review/Assessment and SuggestedReport Format

B-1. MANPRINT review/assessment requirementsFigure B-1 provides an overview of the requirements for MAN-PRINT reviews and assessments in major and nonmajor systemacquisitions.

B-2. FormatA suggested format for use in nonmajor program MANPRINTassessments follows:

a. Cover Sheet: MANPRINT assessment of the (materielname), (month), (year).

6. Executive summary.c. Manpower and personnel issues.d. Training issues.e. System safety/health hazard issues./ Human factors engineering issues.g. Recommendations and conclusions.

B-3. Description of paragraphsa. Executive summary. The executive summary briefly identifies

the system and the acquisition phase or milestone for which theMANPRINT assessment is being prepared. The major portion ofthe executive summary summarizes the MPTS issues and the rec-ommendations under the headings of "Manpower and Personnel",'Training", •'System Safety/Health Hazards", and "Human Fac-tors Engineering". The executive summary rarely exceeds onepage and never exceeds two pages.

b. Critical issues and other concerns. Critical issues and otherconcerns should be discussed in the appropriate domain paragraphlisted above. Information can be obtained from domain assess-ments and other program documents.

c Conclusions and recommendations. This paragraph addresseseach major conclusion and provides a recommended solution.

* Ltf\p

14 AR 602-2 * UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

MflNPRINT REUIEUIS RND ASSESSMENTS

MRJOR SYSTEMS & LEVEL I NONMttJOR NONMttJOH SYSTEMS LEVEL II & III

MflNPRINTREUIEWS

«-MS !-*>

PROGRRMSPONSOR

MS II-*>U

PEO/PM

RSRRC

MRNPRINTRSSESSMENT

HQDflODCSPER

RSflRC

MS I U

RSRRC

MflNPRINT REUIEUIS

HQDflODCSPER

flSRRC

MflJOR SVSTEM

Prescribed by RR 602-2; PM has Program sponsor is Materieldiscretion on how the reuleuj Is Oeueloper until designationconducted. Can task proponents of PM. Functional reuleuiand/or MSCs for data/input. presented at RSRRC to Include

MflNPRINT; no prescribedMR HP HI NT RSSESSMENT format.

PROGRRMSPONSOR

IPR REUIEU1

HQ.RMC

IPR REUIEUJ

NONMflJOR SVSTEM

Program sponsor is MaterielOeueloper until designationof PM. PM presents functionalreuieuj at IPR; no prescribedformat.

Directed by RR 602-2 ODCSPER coordinates Inputfrom the six domains forpresentation at RSRRC.O.S. flrmy PersonnelIntegration Command doesMPT Rssessments from auailabledata.

HQ RMC to assess all sin domainsfor MS reuieuis with TRHOOCinput on MPT.

Figure B-1. MANPRINT review and asseaement graphic

Appendix CSuggested Format for the System MANPRINTManagement Plan (SMMP)

C-1. Executive summaryProvides an overview of the MANPRINT strategy to be employedand the highlights of the SMMP.

C-2. System descriptiona. Description of the proposed materiel system. Provide an over-

view including, but not limited to, the materiel deficiency beingaddressed, missions, operational environments, design versions oralternatives, and essential total system (soldier-in-lhe-loop) per-formance characteristics.

6. Acquisition strategy. Briefly discuss the LCSMM strategy tobe employed and how it will impact the MANPRINT effort.

c. Agencies. List the lead agency and all agencies expected to beinvolved in supporting the system acquisition.

d. Guidance.(1) Decisions. List all decisions that will have a direct impact on

the design and/or MANPRINT issues.

AR 602-2

(2) General DA and MACOM guidance. List all available gui-dance provided for MANPRINT issues.

(3) Assumptions. List all assumptions, not provided in guidance,that will have a direct impact of the design and/or MANPRINTissues.

C-3. MANPRINT strategya. Goals. Identify the MANPRINT goals to be achieved during

the acquisition process.b. Data sources and availability.(1) Predecessor system. Determine the predecessor or reference

systems and components, if any. Consider predecessors for eachcomponent of the materiel system, training devices, and repair andsupport equipment.

(2) Early availability of data and risk analysis. Discuss thetypes and importance of data and when it is to be available for in-clusion in analyses. Determine its impact on the MANPRINTstrategy to be employed and the associated level of risk incurred.Provide the rationale and background employed in deciding howto address MANPRINT issues throughout the acquisition life-cycle.

(3) Planned level of MANPRINT analysis effort Identify whatand when analyses are to be conducted based on the availability of

• UPDATE 15

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

data and resources. Include how they will affect the risk incurredby the MANPRINT strategy employed.

(4) Baseline MOS description. Describe the quantity, quality,and performance of soldiers and civilians who operate, maintain,and support the predecessor system. Indicate how these character-istics relate to performance of operational, maintenance, and sup-port tasks associated with the predecessor system.

C-4. Critical issuesList and discuss the major risk areas that, if unresolved, will causethe program to be modified. Each challenge will have at least oneassociated MANPRINT concern (see Tab D).

C-6. Tab*a. TAB A—Data Sources. List all potential data sources, the

MANPRINT areas (manpower, personnel, training, human fac-tors engineering, system safety, and health hazards) addressed andthe data item's relative importance to the system's development.This will form the cornerstone for all analyses and planning.

b. TAB B—System and MANPRINT milestone schedule. Usinga Gantt Chart format, display all significant program milestones(Milestone Decision Reviews, design reviews, etc.) and MAN-PRINT tasks to be accomplished from research and exploratorydevelopment through first unit equipped.

c. TAB C—Task Description. For each task to be performed,list the following information (necessary for Tab B preparation):

(1) Task description (narrative).(2) Rationale (why is it necessary).(3) Resources (personnel and dollars).(4) Time to complete (optimistic, normal, pessimistic).(5) Responsible agency (lead agency).(6) Support agencies.(7) Dependencies (tasks that must be completed prior to this

one or require data during the execution of this task).(8) Feeds (tasks that cannot start until this one has been com-

pleted or use data from this task while they are in process).d. TAB D—MANPRINT Major Issues/Concerns.' Use a sepa-

rate sheet for each issue or concern. Record the background,planned solution, and current status of each issue, concern ortracking list item. Update each sheet periodically. When the issueor concern is resolved, update the sheet to show that the item isclosed, and record the necessary entry in TAB F—Audit Trail.

e TAB E—Coordination. List all commands, agencies, and ac-tivities with whom the SMMP must be coordinated./ TAB F~Audit Trail. Document significant MANPRINT re-

lated decisions made during the entire system's life.g. TAB G—Target Audience Description. Identify likely charac-

teristics of personnel for whom the new materiel or equipment isbeing developed or acquired. Describe the range of individualqualifications and relevant dimensions for the proposed operatorsand maintainers.

g. TAB H—Lessons Learned and Deficiencies of PredecessorSystem. Identify, by domain, major lessons learned and deficien-cies which have been identified from all applicable predecessorsystems.

Appendix DAbbreviated System MANPRINT Management Plan(ASMMP)

D-1. PurposeThe decision matrix/criteria, as shown in figure D-l (SMMP de-cision graphic), should be followed in making the initial assess-ment as to the level of MANPRINT effort required for the systemunder consideration and to determine whether or not an abbrevi-ated SMMP or a full management plan is appropriate. The criteriawere designed to give commanders basic information on theMANPRINT impact of the system from representatives of the sixdomains.

D-2. ProcedureCombat developer enters the system title and description on DAForm 5859-R (Abbreviated System MANPRINT ManagementPlan (SMMP)). DA Form 5859-R will be locally reproduced on8V6- by HV4-inch'paper. A copy for reproduction purposes is lo-cated at the back of this regulation. Using the decision criteria dia-gram guidance, MJWG completes a MANPRINT impactassessment and enters results. If an ASMMP is appropriate,MJWG authenticates DA Form 5859-R and forwards it to theproponent and the materiel developer for review and approval.Upon approval, DA Form 5859-R is placed with the programdocuments.

16 AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

( START J

Cana[ Predecessor SystemI be identified?

YES

NO YES

Will the proposed systemuse i previously untriedtechnology, technologyapplication, combinationof existing technologies,

«r combination of equipment?

NO________{Does the predecessor or proposed^

system hive any identified orpotential health hazards

classified asRisk Category I. H. or ffl? J

NO'Does the predecessor or proposed^

system have any identified orpotential safety hazards

classified as. Risk Category I. P.. or m?

YES

YES

YES

NO

Does the predecessor systemhave my unresolved or

the proposed system mypotential human factors

engineering issues or concerns? ,

YES

System requires aFULL

System MANPRINTManagement Plan

(SMMP)to be initiated.

Will the fielding of the proposed systemsignificantly impact the trmining bise?

Three or more of the followingis a "Yes" response.

• Will additional or unit training be required?• WiU system/system support design increaseperformance skill requirements?• Will operator/mainuiner new equipmentmining be required?• b institutional trmining planned?• Are training support items (e,g, training devices,exportable material*, technical manuals, uniquesubauembtie*. computer software, ammunition,critical for syncfuonizaaon with letting?

YES

YES

YES

NO

Go to top ofright hand column

NO

Will the estimated number ofoperators or maintainm forthe proposed system increaie

over the predecessor syslem(s)?

NO

Will the fielding of the proposedsystem involve more than onecareer management field (CMF)for the operators or msintainen?

NO

Will the operator or muntaineraptitude requirements increase

significantly over the predecessorsystem(s)?

NO

System may use anABBREVIATED

System MANPRINTManagement Plan

(SMMP)to be initiated.

. SMMP declfton graphic

AR 602-2 • UPDATE 17

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Appendix ESample Source Selection MANPRINT CriteriaWeightingEvaluation criteria. MANPRINT will be a separate major area ofthe same visibility as technical, management, and cost, and will beevaluated throughout all aspects of design, development, integrat-ed logistics support and program management. Using this basic

philosophy, treatment of MANPRINT shall be tailored to suit thenature and priorities of the. program/contract effort. An accept-able method of criteria weighting is shown in figure E-l. BecauseMANPRINT is evaluated separately and throughout, evaluatorsarc cautioned lo avoid double counting.

MANPRINTin

Source Selection EvaluationTOTAL EVALUATION WEIGHTING (100%)

AREALEVEL

ELEMENTLEVEL

r

FACTORLEVEL

Figure E-1. Source selection evaluation graphic

18 AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Appendix FArmy Acquisition Executive (AAE) PolicyMemorandum

Extracted from the ARMY ACQUISITION EXECUTIVE(AAE) POLICY MEMORANDUM #89-2

ARMY ACQUISITION EXECUTIVE (AAE)POLICY MEMORANDUM

expertise applied throughout the remaining organization whereappropriate.

d. Exceptions to Policy:

Exceptions to this policy may be granted by the cognizant Pro-gram Executive Officer (PEO) in coordination with the HQDA,MANPRINT Directorate when it can be compelltngly demon-strated that MANPRINT is not a major consideration in designor selection. A copy of approved waivers, including rationale andalternative treatment, will be sent to HQDA (DAPE-MR).

29 March 1989Number 89-2

Enclosure Signed by Michael P.W. StoneArmy Acquisition Executive

SUBJECT:Treatment of MANPRINT in Solicitations and the Source Selec-tion Process.

The purpose of this memorandum is to recap, amplify and re-emphasize Army policy and procedures for treatment of MAN-PRINT considerations in major systems acquisitions anddesignated acquisition programs, especially in identification andstatement of MANPRINT requirements and their emphasis inArmy solicitations and the source selection process.

a. The Solicitation:

(1) The statement of work and the specification shall containappropriate MANPRINT requirements. In particular, the specifi-cation shall describe how the system is to look and act to the user(section 3.0, Requirements) and how the requirements will be veri-fied (section 4.0, Quality Assurance Provisions). AMC-P 602-1,MANPRINT Handbook for Request for Proposal (RFP) Devel-opment, section 3.3.1, MANPRINT in the Statement of Workand section 3.3.2, MANPRINT Inputs to the System Specificationshould be used as a guide.

(2) Offerers will be instructed by the solicitation to addressMANPRINT in every applicable portion of their offers and as aseparate major area. AMC-P 602-1, section 3.3.4, MANPRINTParagraph in the Instruction to Offerers should be used as a guide.

(3) Offerers will be informed in the evaluation and award fac-tors section of the overall position of MANPRINT evaluation im-portance relative to other separate major areas.

b. The Evaluation Criteria:

MANPRINT shall be a separate major area of the same visibili-ty as technical, management and cost and shall be evaluatedthroughout all aspects of design, development, Integrated Logis-tics Support and program management. Using this basic philoso-phy, treatment of MANPRINT shall be tailored to suit the natureand priorities of the program/contract effort. An acceptablemethod of criteria weighting is attached. Because MANPRINT isevaluated separately and throughout, e valuators are cautioned toavoid double counting.

c. Structure of the Source Selection Evaluation Board (SSEB):

The SSEB shall be structured so as to establish and maintainMANPRINT considerations as a visible part of the process. Thereshall be a MANPRINT entity at the area level and MANPRINT

AR 602-2 • UPDATE 19

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Glossary

Section iAbbreviations

ADAPArmy Designated Acquisition Program

AFQTArmed Forces Qualification Test

AMCUS. Army Materiel Command

AMEDDArmy Medical Department

ARIU.S. Army Research Institute for the Be-havioral and Social Sciences

ASAPArmy Streamlined Acquisition Program

ASARCArmy Systems Acquisition Review Council

ASIadditional skill identifier

ASMMPAbbreviated System MANPRINT Manage-ment Plan

BOIPbasis of issue plan

CFPconcept formulation package

CGcommanding general

COEAcost and operational effectiveness analysis

CTEACost and training effectiveness analysis

CTPcoordinated test program

DADepartment of the Army

DCPdecision coordinating paper

DCSINTDeputy Chief of Staff for Intelligence

DCSLOGDeputy Chief of Staff for Logistics

DCSOPSDeputy Chief of Staff for Operations andPlans20

DCSPERDeputy Chief of Staff for Personnel

DISC4Director of Information Systems for Com-mand, Control, Communications, andComputers

DODDepartment of Defense

DTdevelopment testing (technical testing)

DTPdetailed test plans

ECAearly comparability analysis

FATfirst article testing

FOT&EFollow-on operational test and evaluation

HARDMANhardware versus manpower comparabilitymethodology

HELU.S. Army Human Engineering Laboratory

HFEhuman factors engineering

HFEAhuman factors engineering assessment

HHAhealth hazards assessment

HQheadquarters

HQDAHeadquarters, Department of the Army

HSCU.S. Army Health Services Command

IEPindependent evaluation plan

ILSintegrated logistics support

ILSPintegrated logistics support plan

IMAInformation Mission Area

INSCOMU.S. Army In te l l igence and SecurityCommand

IOT&EInitial operational test and evaluation

AR 602-2 • UPDATE

IPTinitial production testing

LABCOMU.S. Army Laboratory Command

LCSMMLife Cycle System Management Model

LSAlogistic support analysis

MAAmission area analysts

MACOMmajor Army command

MANPRINTmanpower and personnel integration

MAPmateriel acquisition plan/process

MDAPMajor Defense Acquisition Program

MDRmilestone decision reviews

MERManpower Estimate Report

MILSTDMilitary Standard

MJWGMANPRINT Joint Working Group

MOSmilitary occupational specialty

MFTmanpower, personnel, and training

MRSAMateriel Readiness Support Activity

NCOnoncommissioned officer

NDInondevelopmental item

NETnew equipment training

NETPnew equipment training plan

ODCSPEROffice of the DCSPER

04Ooperational and organizational plan

OToperational testing (user testing)

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

OTEAU.S. Army Operational Test and EvaluationAgency

PAT&Eproduction acceptance test and evaluation

PEGprogram executive officer

PERSSOpersonnel systems staff officer

PMprogram/project/product manager

PMDprogram management document

QQPRIqualitative and quantitative personnel re-quirements information

RDTEresearch, development, test, and evaluation

RFPrequest for proposal

RFQrequest for quotation

ROCrequired operational capability

SDCsample data collection

SDCU.S. Army Strategic Defense Command

SEMPsystem engineering management plan

SIPSystem Improvement Plan

STRAPSystem Training Plan55 v- SoiXTADtarget audience descriptions

TONStraining device needs statement

SMMPSystem MANPRINT Management Plan

SOWstatement of work

SQIspecial qualification identifier

SSAsystem safety assessment

SSEBSource Selection Evaluation Board

SSGspecial study group

SSIspecial skill identifier

STFspecial task force

TOPtest design plan/technical data package

TEMPTest and Evaluation Master Plan

TRAtraining requirements analysis

TRADEtraining devices

TRADOCU.S. Army T r a i n i n g and D o c t r i n eCommand

TSGThe Surgeon General

TSMTRADOC systems manager

TTtechnical test

USAISCU.S. Army Information Systems Command

USASCU.S. Army Safety Center

UTuser testing

Section IITerms

Early comparability analysisA "lessons learned" approach to identifymanpower, personnel, and training resourceintensive tasks (high drivers) on current ma-teriel that must be resolved in new or prod-uct improved systems. By-products of themethodology are initial MPT constraintsand input to target audience description.

Hardware versus manpower comparabilitymethodology (HARDMAN)The Army HARDMAN comparabilitymethodology is a structured approach to thedetermination of the manpower, personnel,and training resource requirements for aconceptualized materiel system. Additional-ly, HARDMAN estimates the impact ofthese MPT requirements on system effec-tiveness and life-cycle costs. The objective ofusing HARDMAN is to provide Army de-cision makers with information on compet-ing design proposals in order to intelligentlyassess the supportability of each from a

AR 602-2 • UPDATE

MPT standpoint. Although the methodolo-gy can be applied at later phases of the ma-

^jleriel acquisition process, it is most effectiveprior to Milestone 1.

Health hazard assessment (HHA)The HHA process is to identify potentialhealth ha/ards. which may be associatedwith the development, acquisition, opera-tion and maintenance of Army materiel sys-tems. This identification will be done earlyin the system life cycle to preserve and pro-tect the soldiers and other employees, en-hance soldier performance and systemeffectiveness, reduce system retrofit neededto eliminate health hazards, reduce readi-ness deficiencies a t t r i b u t a b l e to healthh a z a r d s a n d r e d u c e p e r s o n n e lcompensation.

Human Factors Engineering Assessment(HFEA)An HFEA is a review of the status ofhuman factors engineering in an acquisitionprogram to determine whether any criticalor major HFE issues exist. The scope of theHFEA includes human performance andsoldier-equipment interfaces, as they applyto the design of equipment, facilities, andprocedures. An HFEA also includes ananalysis of the impact of soldier perform'ance on system reliability, effectiveness, op-erational availability, and maintainability,providing supporting data exist.

LogtsticianThe command or agency responsible for in-dependent logistic surveillance and evalua-tion of materiel acquisition programs. Forother than medical systems/equipment, theU.S. Army Logistics Evaluation Agency(USALEA) performs this function. Formedical systems/equipment, the U.S. ArmyMedical Materiel Agency (USAMMA) ac-complishes this function.

Manpower and personnel integration(MANPRINT)The process of integrating the full range ofhuman factors engineering, manpower, per-sonnel, training health hazard assessment,and system safety to improve soldier per-formance and total system performancethroughout the entire materiel developmentand acquisition process.

MANPRINT assessmentA MANPRINT assessment for a system in-tegrates the results of all six domain assess-ments into a source document for input tothe decision review process. MANPRINTassessments will be conducted prior to mile-stone decision reviews on all acquisitionprograms, including materiel change andnondevelopmental items. The objective ofthe MANPRINT assessment is to deter-mine the status and adequacy of MAN-PRINT efforts in the materiel acquisitionprogram and to present any unresolvedMANPRINT issues or concerns to decisionmakers at the appropriate decision points.

21

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

!A^^u<x^Individual domain assessments (HFE, sys-tem safety, health hazards, and manpower.personnel, and training) as well as otherpertinent information will be used to formu-late the overall MANPRINT assessment.ODCSPER will be responsible for the prep-aration of the MANPRINT assessment onall major defense as well as Army managedacquisition programs. HQ AMC,TRADOC, and applicable MACOMs willbe responsible for preparing the MAN-PRINT assessment on all nonmajor acquisi-tion programs.

MANPRINT reyfewThe objective of the MANPRINT review isto determine the status and adequacy ofMANPRINT efforts in the materiel acquisi-tion program. The results of the MAN-PRINT review should be documented in theappropriate program decision documents(system concept paper, decision coordinat-ing paper) and briefed at the milestone deci-sion review. A MANPRINT review will beconducted in conjunction with IntegratedLogistics Support Management Team(ILSMT) reviews on all acquisition pro-grams (developmental, nondevelopmental,materiel change, major and nonmajor). Re-sponsibility for the conduct of the MAN-PRINT review rests with the applicableprogram sponsor.

Program sponsorGeneric term for the actual manager of theprogram at its basic level; i.e. the programmanager (PM) MDAP, ADAH, and level Inonmajor programs; the project officer orequivalent for levels II and III nonmajorprograms.

Syitcsfl MANPRINT Management Plan(SMMP)The SMMP serves as a planning and man-agement guide and an audit trail to identifytasks, analyses, trade-offs, and decisions thatmust be made to address MANPRINT is-sues during the materiel development andacquisition process. The SMMP is initiatedby the combat or training developer whenthe MAA identifies battlefield deficiency re-quiring development of new or improvedmateriel. The SMMP will be updated asneeded throughout the MAP.

Target audience description (TAD)The TAD delineates the quantity, quality,and performance of the soldiers or civilianswho will most likely operate, maintain, andsupport an Army system. Ii is the keyMANPRINT document which identifies thelikely characteristics of personnel for whomnew materiel or training is being developedor acquired. The TAD describes the rangeof individual qualifications on all relevantphysical, mental, physiological, biographi-cal, and motivational dimensions. The TADrelates these characteristics to the ability ofthe soldier or civilian to accomplish tasksassociated with the operation, maintenance,22

and support of the system. Early identifica-tion of these MANPRINT concerns in-creases the flexibility available to resolve theissues in terms of design, afford ability, andsupportability.

Total systemA system is a composuc of skilled people,procedures, materials, tools, equipment, fa-cilities, and software that provides an opera-t i ona l c apab i l i t y to perform a statedmission. A total system includes the man-power (the number of personnel alloca-tions), personnel (operators, maintainers.and support), and training to ensure theneeded skilled personnel, and the requiredsupport equipment (hardware and software;technical, field, and training manuals; train-ing programs, tables of organization andequipment; and doctrine, tactics, and opera-tional procedures) for the operation andsupport of a system to the degree that thesystem can be considered a self sufficientu n i t i n i t s i n t e n d e d o p e r a t i o n a lenvironment.

Training strategyTra in ing s t ra tegy is a term whichincludes—

c. Who is to be trained (active compo-nent, reserve, civilian).

6. What is to be trained (system specifictasks and combat critical tasks).

c. When is the training to take place (ba-sic training, advanced individual training,and NCO training).

d. Where is the training to take place (in-stitution or unit). The examples are not allinclusive. Training strategy is distinguishedfrom training concept, which should answerthe question as to "how" the t ra in ingshould be conducted; for example, on theactual equipment, embedded training, train-ing devices, or simulators. Suslatnmenttraining to maintain readiness levels must beconsidered and requires data on anticipatedskill decay rates and resource constraints(including time) at the unit level.

e. What training concept (i.e., classroomtraining, OJT, devices and aids) will beused.

A-3J.D

AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

Index

This index is organized alphabetically by topic and byaublope within a topic. Topic and subtoptcs areidentified by paragraph number.

AAE Policy Memo 89-2, 2-2Army Systems Acquisition Review Council

2-3,2-6,2-11Cost and operational effectiveness analysis

2-11,3-4Cost and training effectiveness analysis, 3-4Engineer change proposal, 3-8Hazards, 3-3Health hazard assessments, 2-10, 2-11,

2-12. 2-13,2-18. 3-6Human factors engineering assessments,

2-12, 3-3, 3-4, 3-6Integrated logistics support, 1-4, 1-5, 2-6,

2-7,2-12, 2-17, 2-18, 3-6Industry MANPRINT Management Plan

1-6

Life Cycle System Management:MANPRINT, 3-1Phases. See Table of ContentsTailored development, 3-2

MANPRINT:Database, 2-2Definition, 1-4Domain assessments, 2-1, 2-2Domain, 1-4, 2-12, 3-3Inclusions 1-4Project/Product manager, 2-2, 2-12Objectives, 1-4MANPRINT Program, 1-4, 2-3, 2-6,

2-13,2-15,2-18The question, 1-4Relationship to domains, 1-4Status brief requirement, 2-1Studies/methodologies, 2-4. 2-5, 2-12,

2-16, 3-3MANPRINT assessments:

AMC, 1-5, 2-12Description, 1-5DOD Directive 5000.53, 1-5MACOM, 1-5MPT, 2-11Milestone decision reviews, 1-4, 1-5Nonmajor programs, 1-5, 2-12Objective, 1-5ODCSPER, 1-5, 2-6Preparation, 1-5, 2-12, 2-13. 2-15, 2-16,

2-18, 3-4,3-5, 3-8, 3-9Studies/methodologies, 2-12TSG input, 2-10TRADOC input, 1-5, 2-11

MANPRINT data, 1-6, 2-11. 3^», 3-5,3-6

MANPRINT database, 1-4, 2-2, 2-11,2-12,2-13, 2-15

MANPRINT Joint Working Group:Chairmanship, 1-5Combat developer, 1-5Establishment, 1-4, 1-5, 2-11Membership, 1-5System MANPRINT Management Plan,

1-5

TRADOC, 2-11MANPRINT reviews:

DOD Directive 5000.53, 1-5Description, 1-5MPT, 2-11Milestone decision review, 1-5Preparation, 1-5, 2-13, 2-18, 3-4, 3-5,

3-9Program sponsor, 1-5PM, 2-2Purpose, 2-2Suggested format, appendix BTRADOC input, 2-11

MANPRINT training, 2-4. 2-5, 2-6, 2-11,2-12, 2-16

Manpower Estimate Report, 2-3, 2-8Materiel change management, 2-2, 2-6,

2-11, 3-11Milestone decision review, 2-1, 2-2, 2-6,

2-11,2-12,3^*MPTS descriptions, 2-4, 2-11

NDI, 2-2, 2-11,3-10

PERSSO, 2-6

Responsibilities. See table of contentsRFP, 1-6, 2-2, 2-6, 2-8, 2-12, 2-13. 3-4,

3-5, 3-6

System MANPRINT Management PlanAMC 2-12Abbreviated, 4-4, appendix DApproval, 3-4Combat developer, 1-5, 3-4, 3-6Development, 1-5, 2-6, 2-11, 3-9Initiation, 3-3Materiel change management, 1-5Nondevelopmental item. 1-5ODCSPER, 2-6Policy, 4-2Procedures, 4-3Purpose, 4-1Suggested format, appendix BTraining Developer, 1-5TRADOC, 2-11

Soldier Oriented Research andDevelopment, 2-3

Source selection:Evaluation Boards, 2-2, 3-4, 3-5, 3-6Major area, 1-5, 2-2, 2-12Policy/procedures 5-2, 5-3Sample weighting criteria, appendix E

STRAP, 2-11, 3-4System safety, 2-11, 2-12, 2-15, 2-18, 3-3,

3-4

Target audience description, 1-5, 2-6,2-11, 3-3

Testing, 2-2, 2-4, 2-8, 2-11, 2-12, 2-14,3-4, 3-5. 3-6

AR 602-2 • UPDATE 23

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

RESERVED

24 AR 602-2 • UPDATE

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

ABBREVIATED SYSTEM MANPRINT MANAGEMENT PLAN (SMMP)FOR

(Enter System Title)For use of this torm, see AR 602 2. the proponent agency is DCSPGR

The purpOM of (he criteria ttttad below is to determine rt a fui SUMP is necessary The criteria were designed to give commanders betic informationon the MANPRWT impact at a system from representatives o! the sm domains.

System Description: (Enter system description before sending this toon to MJWG members)

fCwatou* on PmO» 3 It

MJWQ Member/Domain B«p

ProponentDCO

AkonedAUCuse

SupportingUEDQAC

System SatetyOffice* orPOC

HEL

MANPRIMT Impact AsMttment

1. Does a predecessor sysicmfe; exist?No S«p tare and devetop a ft*» SUMP

V0c. (Js( oradBCAsxorl's) and proceed to next flam.

2 WW the proposed system use a previous^ untried technology, technology application, combination ot enstmgtechnologies, or combinalion ol aguipmeni?

Ves. Slop here and dovetop 4 lull

No Proceed to next "em

3 Does the predecessor, or proposed system, have one or more unresolved or potential health hazards with a RiskAssessment Code o* I. B. or 14 (Aft -4O- r0)7.

Vet... Slop nera and devotop a toll SUMP. UM (ho health h*z*nJ(s) tfanltf/eo* m answering the Question as Inebasis for MAMPRNT neaJtfi ha^wtf *s*wea

No. Proceed to next item

4. Does the predecessor, or proposed systern.hsve one or more unresolved or potential salety hazards with a RiskAssessment Code ot I. II. or Ul (AR 305-10)7

Ye*.. Slop here and devwtop J fuH SMMP. Use Ihf health n*2ard(s) identified in ans*«rmg the question as thebasts for UMPfWT system safety issues.

Mo. Proceed to next item

S. Does the predecessor system have any unresolved or the proposed system any potential human lectors •no/meeringissues or concMns?

Yes... Stop hen and dew/op a lull SMMP.

Ho. Proceed to next item

DA FORM 5859-R, DEC 89

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

t

Ot

26 AR 602-2 * UPDATE • R-FORMS

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

ABBREVIATE? SMMP FOR

ProponentDOTO

Manpower

Representative(ProponencyOffice)

PersonnelRepresented{PtoponencyOffice)

Personnel

(ProponencyOrtee)

a. WW the Wkftng Q| the propaew) vystem signNicanUy Impact me training base (AceW and ftCJ? (A >•*• to three ot Ihelive (ottawrng point* equals a ~yes" to the question)• WM addrtional or unit framing be required?» Wii •ystanVsyttem support design increase performance aUH r«quiramenu?• WW operatOT/maintainer new equipmem framing be required?• Is institutional training planned?• Are baring support Hams (e.g. framing devices, exportable material*, lechnicmi manuals, unique sutetaamb/iiaj,computer software, ammunition), critical or synchronization with Mating?

Vet Stop hen and develop a toll SMMP

No Proceed to next item

7. tt the answer to any ot the lotowtng is 'Yes', develop a tul SMMP.

• Win the estimated number of operators or memtamers tor the propoaed system mcreaa* over thepredecessor sy*tam{s}? Yes Ho

The MOSMSfe invokedThe impact on AfOS/AS/

> WiN the field of the propoaed system involve more than oneoperators or maintainers7Yes NoPoints to Consider

management held (CMFJ tor the

Proponents for CMF tmofved• W* the operator or nuuntamer aptitude requnmcnts innease signtiicantly over the predecessor syetamfsj Yea No

PoinU to Considerf>d the predecessor require AfQT Category I or t soldiers to meet syxlem performance requirements?Will tfw requirement continue?

A. AUTHENTICATION

i . Manpow7f*affaoftnal HepfseentatnM

a Typed Neme/OrgantcaUon

2. Human Factor* Engineering Repreeennttvem. Typed NemsrQrganuation

b. Signature c. DATE

b. Sienature c. IMTE

9. Heefch Hazard Repraeentattve

a. Typed NemefOrgenuttion b Signature

4. TralnJngRapraiMMttv.

a Typed NameOgeniation h Signature

c. DATE

C. DATE

5. Syatani Safety Rapr»aamat*<>a

a Typed Neme/OrQanlzation

Thn mtatte m»tew of me UANPftNT domainK teficatas the dov^vwiMni ot a l.iU Riik

b. SigMture c. DATE

»n«ched. ao tt^ a w* be i*ao^ «v« )te to me m«w^ d»vB*op« and ndustry Tha atteMWtwl SMMP ml be tniewad and updated prioi to thenext milestone decision review.

DA FORM 5859-R, DEC 89

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil

f.

28AR 602-2 . UPDATE • R-FOflMS

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
EppsS
EppsS

*W«EVIATEO SMMP FOR

B. APPROVAL<• TRAOOC Grnvnendem

* Signaiw*

2. DATE

7- ConttauettartQmfMnU:

3. AMC MSC Command*

0. Sionetuft]

4. DATE

it)O A FORM 6859-R, DEC 89 Page 3 of 3'

AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
AkaluM
Pencil
EppsS
EppsS
EppsS
EppsS

i

EppsS
EppsS
EppsS
EppsS