Summer 2016 Reconstruction Projects Surrounding US 24 Ute Pass (Phase 2) For more information: CDOT 7194885908, El Paso County 7195206540, and City of Manitou Springs 7196852594 2. CDOT Bridge Rehabilitation, Rainbow Falls Bridge (Late March to September 2016)* Serpentine Drive 3. El Paso County – Trail and area enhancements at Rainbow Falls Recreation Area (TBD) US 24 1. CDOT Resurfacing Project – Site A – US 24E to Serpentine Dr. (September to midOctober 2016) 4. Manitou Springs – Slope Stabilization Project, Sunshine Trail south of US 24 (MidSeptember to Late October 2016) US 24 Ridge Road Manitou Ave./ Business 24 US 24/Manitou Ave. Interchange 1. CDOT Resurfacing Project – Site B (September to year end 2016) Manitou Ave. – City Hall to Westbound US 24 ramps Garden of the Gods Pl. – El Paso Blvd. to Eastbound US 24 ramps Intersection of Manitou Ave. and Garden of the Gods Pl. Bridge Deck rehabilitation over Fountain Creek The following reconstruction projects are scheduled to take place surrounding US 24 Ute Pass throughout summer 2016. All involved jurisdictions are collaborating on construction schedules to minimize inconvenience to the traveling public, to the extent possible. 1. CDOT – Site A: Resurfacing Project – US 24E to Serpentine Dr. (September to midOctober 2016) CDOT – Site B: Resurfacing Project – Four locations (September to year end 2016) 2. CDOT Bridge Rehabilitation Project: Rainbow Falls Bridge (Late March to September 2016)* 3. El Paso County: FEMA rehabilitation project – trail repairs – Project complete El Paso County: Transportation Enhancement Grant – Parking lot, trail and other facility enhancements (TBD – Completion: TBD) 4. City of Manitou Springs: Slope Stabilization Sunshine Trail south of US 24 (MidSeptember – Late October 2016) 5. El Paso County: Hazard Mitigation Project Open space creation from Voluntary Acquisition and Demolition of 3 properties (not noted on map, further up US 24 west) FEMA/Community Development Block Grant – Disaster Recovery (TBD) 6. CDOT I25/Cimarron Interchange DesignBuild Reconstruction Project (not noted on map): Construction at the I25 Interchange and US 24/Cimarron Street continues through Winter 2017 *Drivers wanting to access Manitou Springs from US 24 will temporarily need to use Serpentine Dr., Washington Ave., or preferably, the US 24/Manitou Ave. Interchange (best route for large trucks and tour busses).

Manitou Springs Working Document - word 8-10-16files.constantcontact.com/e432cefb001/99b699f9-2da8-4804...For$moreinformation:CDOT$719448845908,El$Paso$County$719452046540,and$City$of$ManitouSprings$719468542594$

  • Upload
    vodieu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Summer  2016  Reconstruction  Projects  Surrounding  US  24  Ute  Pass  (Phase  2)      For  more  information:  CDOT  719-­‐488-­‐5908,  El  Paso  County  719-­‐520-­‐6540,  and  City  of  Manitou  Springs  719-­‐685-­‐2594            

       2.    CDOT  Bridge  Rehabilitation,            Rainbow  Falls  Bridge  (Late  March          to  September  2016)*  

                                                                                                                                                                                                                                                                                                                                                                                                             Serpentine                                                                                                                                                  Drive                                                                                                            3.    El  Paso  County  –  Trail  and    

                                                   area  enhancements  at  Rainbow  Falls                                                    Recreation  Area  (TBD)                                                        

                                                       US  24                                                                1.  CDOT  Resurfacing  Project  –                      Site  A  –  US  24E  to  Serpentine  Dr.                          (September  to  mid-­‐October  2016)    

   

                           4.  Manitou  Springs  –  Slope  Stabilization                        Project,  Sunshine  Trail  south  of  US  24                        (Mid-­‐September  to  Late  October  2016)

    US  24                        Ridge  Road       Manitou  Ave./                                                                                                                                                                                                                                                                Business  24                                                                                                                                                                                                                                                                                                                                                                                                                                    US  24/Manitou  Ave.  Interchange

                                                                                                                                                                                                                                       

1. CDOT  Resurfacing  Project  –  Site  B  (September  to  year  end  2016)  • Manitou  Ave.  –  City  Hall  to  Westbound  US  24  ramps  • Garden  of  the  Gods  Pl.  –  El  Paso  Blvd.  to  Eastbound  US  24  ramps    • Intersection  of  Manitou  Ave.  and  Garden  of  the  Gods  Pl.    • Bridge  Deck  rehabilitation  over  Fountain  Creek  

 The  following  reconstruction  projects  are  scheduled  to  take  place  surrounding  US  24  Ute  Pass  throughout  summer  2016.  All  involved  jurisdictions  are  collaborating  on  construction  schedules  to  minimize  inconvenience  to  the  traveling  public,  to  the  extent  possible.    1. CDOT  –  Site  A:  Resurfacing  Project  –  US  24E  to  Serpentine  Dr.  (September  to  mid-­‐October  2016)     CDOT  –  Site  B:  Resurfacing  Project  –  Four  locations  (September  to  year  end  2016)  2. CDOT  Bridge  Rehabilitation  Project:  Rainbow  Falls  Bridge  (Late  March  to  September  2016)*  3. El  Paso  County:  FEMA  rehabilitation  project  –  trail  repairs  –  Project  complete                    El  Paso  County:  Transportation  Enhancement  Grant  –  Parking  lot,  trail  and  other  facility  enhancements  (TBD  –  Completion:  TBD)  4. City  of  Manitou  Springs:  Slope  Stabilization  Sunshine  Trail  south  of  US  24  (Mid-­‐September  –  Late  October  2016)  5. El  Paso  County:  Hazard  Mitigation  Project  -­‐  Open  space  creation  from  Voluntary  Acquisition  and  Demolition  of  3  properties  (not  noted  on  map,  further  up  US  24  west)  

FEMA/Community  Development  Block  Grant  –  Disaster  Recovery  (TBD)  6. CDOT  I-­‐25/Cimarron  Interchange  Design-­‐Build  Reconstruction  Project  (not  noted  on  map):  Construction  at  the  I-­‐25  Interchange  and  US  24/Cimarron  Street  continues  through  

Winter  2017  *Drivers  wanting  to  access  Manitou  Springs  from  US  24  will  temporarily  need  to  use  Serpentine  Dr.,  Washington  Ave.,  or  preferably,  the  US  24/Manitou  Ave.  Interchange  (best  route  for  large  trucks  and  tour  busses).