1
ANNEXURE -I
Manipur State Power Distribution Company Limited,
(MSPDCL)Manipur, INDIA
REQUEST FOR PROPOSAL FOR
IMPLEMENTATION OF NEW SERVICE
CONNECTION and METER DATA ANALYSIS(HT
Consumers) FORMANIPUR and CONSUMER
SURVEY FOR IED-I, IED-II, IED-III AND IED-IV,
MSPDCL
December 2016
2
REQUEST FOR PROPOSALS
TENDER SPECIFICATION No.:
Selection of Professional Services for:
IMPLEMENTATION OF NEW SERVICE
CONNECTION and METER DATA ANALYSIS (HT
Consumers) FORMANIPUR and CONSUMER
SURVEY FOR IED-I, IED-II, IED-III AND IED-IV,
MSPDCL
Issued on:
December 2016
3
Table of Contents
Section 1. Instructions to Implementing Agency ............................................................................. 4
1. Instructions to Agency/Firm – Data Sheet ..................................................................... 11
Section 2. Scope of Work ................................................................................................................. 15
1. Context of the Power Sector in Manipur .................................................................... 15
2. Demographics and ethnic profile of Manipur ......................................................... 15
3. Scope of Work ........................................................................................................ 17
4. Payment Mechanism ................................................................................................... 20
Section 3. Technical Proposal Template ......................................................................................... 21
Technical Proposal Submission Form ....................................................................................... 21
Agency/Firm‟s Experience ............................................................................................................... 22
Team Members---------------------------------------------------------------------------------23
Section 4: Financial Proposal Template ........................................................................................... 24
Financial Proposal Submission Form ........................................................................................ 24
Financial Bid.......................................................................................................................... 24
Section 1: Instructions to Agency/Firm
4
Section 1. Instructions to Agency/Firm
Definitions Client – „Manipur State Power Distribution Company Limited
1. Introduction 1.1 Agency/Firm are invited to submit a Technical Proposal in
Hard copy at MSPDCL office and Financial Proposal on-line
submission at the Government website
www.manipurtenders.gov.in, for implementation of New
Service Connection for Pre-paid Meters and Meter Data
Analysis (HT Consumer) for 4 Divisions in Imphal. The
contract period shall be for a period of 1(one) year which may
be extended as per the requirement of MSPDCL or as per
mutual Agreement. The Proposal will be the basis for
contract negotiations and ultimately for a signed Contract
with the selected Agency/Firm.
1.2 Agency/Firm should familiarize themselves with local
conditions and take them into account in preparing their
Proposals.
1.3 Agency/Firm shall bear all costs associated with the
preparation and submission of their proposals and contract
negotiation. The Client is not bound to accept any proposal, and
reserves the right to annul the selection process at any time prior to
Contract award, without thereby incurring any liability to the
Agency/Firm.
Eligibility 1.4 Only professional services meeting the eligibility criteria under section 1.13 of data sheet will be considered for evaluation
Only One Proposal 1.5 Agency/Firm may only submit one proposal. If
anAgency/Firmsubmits or participates in more than one proposal,
such proposals shall be disqualified.
Proposal Validity 1.6 The Data Sheet indicates how long Agency/Firm‟ Proposals must
remain valid after the submission date. During this period,
Agency/Firm shall maintain the availability of Professional staff
nominated in the Proposal. The Client will make its best effort to
complete negotiations within this period. Should the need arise,
however, the Client may request Agency/Firm to extend the
validity period of their proposals. Agency/Firm who agree to such
extension shall confirm that they maintain the availability of the
Professional staff nominated in the Proposal, or in their
confirmation of extension of validity of the Proposal,
Agency/Firmcould submit new staff in replacement, who would
be considered in the final evaluation for contract award.
Agency/Firm who do not agree have the right to refuse to
extend the validity of their Proposals.
Section 1: Instructions to Agency/Firm
5
2.1 Agency/Firm may request a clarification of any of the RFP
documents up to the number of days indicated in the Data Sheet
before the proposal submission date. Any request for clarification
must be sent in writing, or by standard electronic means to the
Client‟s address indicated in the Data Sheet. The Client will
respond in writing, or by standard electronic means and will send
written copies of the response (including an explanation of the
query but without identifying the source of inquiry) to all
Agency/Firm. Should the Client deem it necessary to amend the
RFP as a result of a clarification, it shall do so following the
procedure under para. 2.2.
2.2 At any time before the submission of Proposals, the Client may
amend the RFP by issuing an addendum in writing or by standard
electronic means. The addendum shall be sent to all
Agency/Firmand will be binding on them. Agency/Firm shall
acknowledge receipt of all amendments. To give Agency/Firm
reasonable time in which to take an amendment into account in their
Proposals the Client may, if the amendment is substantial, extend
the deadline for the submission of Proposals.
3.1 The Proposal, as well as all related correspondence exchanged by
the Agency/Firm and the Client, shall be written in the language (s)
specified in the Data Sheet.
3.2 In preparing their Proposal, Agency/Firm are expected to
examine in detail the documents comprising the RFP. Material
deficiencies in providing the information requested may result in
rejection of a Proposal.
3.3. While preparing the Technical Proposal, Agency/Firm must give
particular attention to the following:
Language Documents to be issued by the Agency/Firm as part of this assignment
must be in the language(s) specified in the Data Sheet.
Technical Proposal
Format and
Content
(a) Full Technical Proposal: A brief description of the Agency/Firm‟
organization and an outline of recent experience of the
Agency/Firm on assignments of a similar nature is required (Ref:
Section 3: Technical Proposal Template). For each assignment,
the outline should indicate the names of Sub-Agency/Firm/
Professional staff who participated, duration of the assignment,
contract amount, and Agency‟s involvement. Information
should be provided only for those assignments for which the
Agency/Firm was legally contracted by the client as a corporation
or as one of the major firms within a joint venture. Assignments
completed by individual Professional staff working privately or
through other consulting firms cannot be claimed as the
experience of the Agency/Firm.
2. Clarification and Amendment of RFP Documents
3. Preparation of
Proposals
Section 1: Instructions to Agency/Firm
6
Agency/Firm should be prepared to substantiate the claimed
experience if so requested by the Client.
(b) Comments and suggestions on the Terms of Reference including
workable suggestions that could improve the quality/ effectiveness
of the assignment; and on requirements for counterpart staff and
facilities including: administrative support, office space,
equipment, data, etc. to be provided by the Client
(c) A description of the approach, methodology and work plan for
performing the assignment covering the following subjects:
technical approach and methodology, work plan, and organization
and staffing schedule.
(d) The list of the proposed Professional staff team by area of
expertise, the position that would be assigned to each staff team
member, and their tasks (Ref: Section 3: Technical Proposal
Template).
(e) Estimates of the staff input needed to carry out the assignment
(Ref: Section 3: Technical Proposal Template ). The staff-months
input should be indicated separately for home office and field
activities.
(f) CVs of the Professional staff signed by the staff themselves or by
the authorized representative of the Professional Staff (Ref:
Section 3: Technical Proposal Template).
(g) A detailed description of the proposed methodology and staffing
for training.
3.4 The Offers should be submitted in Hard copy for Techno-
Commercial Bids along with cost of Tender, requisite EMD and
Tender Documents at the MSPDCL office addressed to the
Executive Director(Tech)/ General Manager(Purchase), MSPDCL
and uploading of Financial Bidsat the website
www.manipurtenders.gov.in.A Technical Proposal containing
financial information may be declared non responsive.
Financial Proposals 3.5 The Financial Proposal shall be prepared using the attached
Standard Forms (Ref: Section 4: Financial Proposal
Template).The Agency/Firm Shall propose monthly fix
charges for 700 Nos. New Service Connections and Per
Connection charges for above the 700 Nos. New Service
Connection.
Taxes 3.6 The Agency/firm may be subject to taxes as may be applicable
onamounts payable by the Client under the Contract.
Section 1: Instructions to Agency/Firm
7
4. Submission,
Receipt, and
Opening of
Proposals
4.1 The original proposal (Technical Proposal and Financial
Proposal) shall contain no interlineations or overwriting,
except as necessary to correct errors made by the
Agency/Firmthemselves. The person who signed the proposal
must initial such corrections.
4.2 The Technical Proposal shall be placed in a sealed envelope
clearly marked “TECHNICAL PROPOSAL”, NIT No., Tender
Specification No. etc. andshall bear the submission address,
reference number and be clearly marked
“DO NOT OPEN, EXCEPT IN PRESENCE OF THE OFFICIAL
APPOINTED, BEFORE [insert the time and date of the submission
deadline indicated in the Data Sheet]”. The Client shall not be
responsible for misplacement, losing or premature opening if the
outer envelope is not sealed and/or marked as stipulated. This
circumstance may be case for Proposal rejection.
4.3 The Proposals must be sent to the address/addresses indicated
in the Data Sheet and received by the Client no later than the
time and the date indicated in the Data Sheet, or any extension
to this date in accordance with para. 2.2. Any proposal received
by the Client after the deadline for submission shall be
returned unopened.
4.4 The Client shall open the Technical Proposal immediately after
the deadline for their submission and due date for opening
of Technical Bids.
Section 1: Instructions to Agency/Firm
8
5.1 From the time the Proposals are opened to the time the Contract
is awarded, the Agency/Firm should not contact the Client on any
matter related to its Technical and/or Financial Proposal. Any
effort by Agency/Firm to influence the Client in the examination,
evaluation, ranking of Proposals, and recommendation for award
of Contract may result in the rejection of the Agency/Firm‟
Proposal.
5.2 The client shall evaluate the Technical Proposals on the basis of
their responsiveness to the Terms of Reference, applying the
evaluation criteria, sub-criteria, and point system specified above.
Each responsive Proposal will be given a technical score (St). A
Proposal shall be rejected at this stage if it does not respond to
important aspects of the RFP, and particularly the Terms of
Reference or if it fails to achieve the minimum technical
score indicated in the Data Sheet.
5.3 The bidders whose technical score is more than 70 out of 100
Marksindicated in the Data sheet will be eligible and qualify for
opening Price Bid.
5.4 After the technical evaluation is completed, the Client shall
inform the Agency/Firm who have submitted proposals the
technical scores obtained by their Technical Proposals, and shall
notify those Agency/Firm whose Proposals did not meet the
minimum qualifying mark or were considered non responsive to
the RFP and TOR, that their Financial Proposals shall not be
opened. The Client shall open the Financial Bid for only the
technically qualified bidder.
5.5 Financial Proposals shall be opened in the presence of the
Agency/Firm‟ representatives who choose to attend.
5.6 The Client will correct any computational errors. When
correcting computational errors, in case of discrepancy between a
partial amount and the total amount, or between word and figures
the formers will prevail
5. Proposal Evaluation
Public Opening and
Evaluation of
Financial Proposals
Section 1: Instructions to Agency/Firm
9
6. Negotiations 6.1 Negotiations may be held at the date and address indicated in the
Data Sheet. The invited Agency/Firm will, as a pre-requisite for
attendance at the negotiations, confirm availability of all
Professional staff. Failure in satisfying such requirements may
result in the Client proceeding to negotiate with the next-ranked
Agency/Firm. Representatives conducting negotiations on behalf
of the Agency/Firm must have written authority to negotiate
and conclude a Contract.
Technical 6.2 Negotiations may include a discussion of the Technical Proposal,
negotiations the proposed technical approach and methodology, work plan
and organization and staffing, and any suggestions made by the
Agency/Firm to improve the Terms of Reference. The Client
and the Agency/Firm will finalize the Terms of Reference,
staffing schedule, work schedule, logistics, and reporting.
These documents will then be incorporated in the
Contract as “Description of Services”. Special attention will be
paid to clearly defining the inputs and facilities required from
the Client to ensure satisfactory implementation of the assignment.
The Client shall prepare minutes of negotiations which will be
signed by the Client and the Agency/Firm.
6.3 Unless there are exceptional reasons, the financial negotiations
will not involve the price quoted in the Financial Proposal.
6.4 Having selected the Agency/Firm on the basis of, among other
things, an evaluation of proposed Professional staff, the Client
expects to negotiate a Contract on the basis of the Professional
staff named in the Proposal. Before contract negotiations, the
Client will require assurances that the Professional staff will be
actually available. The Client will not consider substitutions
during contract negotiations unless both parties agree that undue
delay in the selection process makes such substitution
unavoidable or for reasons such as death or medical incapacity. If
this is not the case and if it is established that Professional staff
were offered in the proposal without confirming their availability,
the Agency/Firm may be disqualified. Any proposed substitute shall
have equivalent or better qualifications and experience than the
original candidate and be submitted by the Agency/Firm within the
period of time specified in the letter of invitation to negotiate.
6.5 Negotiations will conclude with a review of the draft Contract. To
complete negotiations the Client and the Agency/Firm will
initial the agreed Contract. If negotiations fail, the Client will invite
the Agency/Firm whose Proposal received the second highest score
to negotiate a Contract.
Financial
negotiations
Availability of
Professional
staff/experts
Conclusion of the
negotiations
Section 1: Instructions to Agency/Firm
7.1 After completing negotiations the Client shall award the Contract
to the selected Agency/Firm.
7.2 The Agency/Firm is expected to commence the assignment on the
date and at the location specified in the Data Sheet.
8.1Information relating to evaluation of Proposals and
Recommendations concerning awards shall not be disclosed to the
Agency/Firm who submitted the Proposals or to other persons
not officially concerned with the process, until the publication of
the Award of Contract. The undue use by any
Agency/Firm of confidential information related to the process
may result in the rejection of its Proposal and may be subject to
the provisions of the client‟s antifraud and corruption policy.
7. Award of
Contract
8. Confidentiality
Section 1: Instructions to Agency/Firm
11
Instructions to Agency/Firm – Data Sheet
Paragraph
Reference Particulars
1.1 Name of the Client: Manipur State Power Distribution Company Limited
1.2 Financial Proposal to be submitted on-line at government website
www.manipurtenders.gov.in and
Techno-Commercial Bids to be submitted in Hard Copy at MSPDCL office before the
last date of submission of Tender.
Technical Bids shall be marked with NIT No., T.S No. etc.
The name of the assignment is: IMPLEMENTATION OF NEW SERVICE
CONNECTION and METER DATA ANALYSIS (HT Consumers) FOR
MANIPUR and CONSUMER SURVEY FOR IED-I, IED-II, IED-III AND
IED-IV, MSPDCL MANIPUR and CONSUMER SURVEY FOR IED-I,
IED-II, IED-III AND IED-IV, MSPDCL
1.3 A pre-proposal conference will be held: No
1.4 Proposals must remain valid for 90 days after the submission date
1.5 Clarifications may be requested not later than 7 days before the submission date. The
address for requesting clarifications is:
MSPDCL, Secured Office Complex, 3rd Floor, AT Line, North AOC, District : Imphal West
Manipur – 795001
Or contact directly the following Officer‟s :
1. N. Lokeshwor Singh
Dy. General Manager (Purchase), MSPDCL
Mob. No. 7085053988, e-mail –[email protected]
2. I. Saratchandra Singh
Manager (Purchase). MSPDCL
Mob. No. 8132950191, e-mail – [email protected]
1.6 Proposals shall be submitted in English language.
1.7 Whether consortium or any form of association is permitted for the purpose of bidding for
this assignment: No
1.8
Training is a specific component of this assignment: Yes
Section 1: Instructions to Agency/Firm
Paragraph
Reference Particulars
1.9 The price included in Financial proposal will include the below mentioned aspects as
well:
(1) The Price offered shall be Firm till the completion of assignment or any such
extended period and should be inclusive of all applicable taxes.
(2) Cost of accommodation of team, necessary travel, including transportation of the
Personnel by the most appropriate means of transport and the most direct
practicable route;
(3) Cost of office accommodation, investigations and surveys;
(4) Cost of applicable international or local communications such as the use of telephone
and facsimile required for the purpose of the Services;
(5) Cost, rental and freight of any instruments or equipment required to
beprovided by the Agency/Firm for the purposes of the Services;
(6) Cost of printing and dispatching of the reports to be produced for the Services;
(7) Cost of such further items required for purposes of the Services not covered in
the foregoing.
(8) Other than the price accepted as part of the Financial proposal of the
selectedAgency/Firm, the client will not bear any additional expenses such as
out of pocket expenses etc.
1.10 Amounts payable by the Client to the Agency/Firm under the contract to be
subject to Tax: Yes
1.11 Agency/Firm must submit one Hard copy of Technical Proposal
1.12
The Project Leader shall be responsible for overall execution of the project. He shall provide expert opinion and guidance to the team for delivery of the project, co-ordination for the project and participate in key discussions/meetings.
Section 1: Instructions to Agency/Firm
13
1.13 Criteriaand point system for evaluation of the Technical & Financial Proposals:
A. Technical Evaluation (70%):
# Parameters Marks
Experience and Track Record
1
Experience of Operation and Management including fuse
call management or Metering, billing and Collection for
consumers continuously in last two years as below:
i. Upto 50,000 consumers 10
ii. 50,001 to 1 lac consumers 15
iii. 1 Lacs to 2 Lacs 30
iv. More than 2 Lacs 45
2
The Firm should have Software for Billing to Public/
Consumers and New Service Registration/Connection. They
should submit necessary documents for supporting/verifying
the functionality of the Software working for at least one
years.
30
3 Experience of Meter Data Analysis for at least 2000
consumers monthly. 25
Financial Evaluation (30%):
Details Maximum Marks Weightage
(30 % of the score)
Financial Proposal Part-A
Financial Proposal Part-B
The Maximum Mark 0f 100 for part (A&B) to be awarded to the L1 bidder.
The L2 marks shall be (L1 Rate/L2 Rate) x 100 and 30% weightage average
shall be taken against the total marks of the bidder
The total marks considered for award of contract shall be 70% of Technical Bids + 30% of Financial Bids
Note: The minimum technical score required (combined both Sl. No. 1,2 and 3) for
consideration and opening of financial proposal shall be 70 Marks.
Section 1: Instructions to Agency/Firm
1.15
Expected date and address for contract negotiations:
Date: 25/01/2017
Address:
GM (Purchase),
MSPDCL,
Secured Office Complex, 3rd
Floor, AT Line, North AOC,
District Imphal West, Manipur – 795001
1.16 Expected date for the commencement of the Services:
Date: January 2017at Manipur, India
Section 2: Scope of work
15
Section 2. Scope of Work 1. Context of the Power Sector in Manipur
The Power Sector in Manipur is unique owing to the following factors:
Demographic, ethnic profile and the role of Manipur in the overall development of the
NER
Re-structuring & transformation of the Power Sector in the State
The discussions on the above factors are provided subsequently.
2. Demographics and ethnic profile of Manipur
The State of Manipur is comprised of ten
hill districts and six valley districts
occupying a total geographical area of
22,327sq.km. Over 80% of the State is
characterized by hilly terrain & sparse
habitation (remote villages / hamlets with
as little as 30 to 40 households) and
thereby provide significant challenges in
operations for a power utility.
The state has a population of 21, 66,791
grouped into tribal communities.
Characterized by tribes and ethnic
communities.
Manipur borders Myanmar in the east,
Nagaland state in the north, Assam and
Mizoram in the west. With its
geographic positioning and with the
support from the government on the
development of the agricultural and
horticultural industries, Manipur is
gradually emerging as the gateway for
external trade in the region.
Section 2: Scope of work
16
Realizing the potential of the region and role of power sector in the development, the state
government has taken many restructuring & reformative initiatives with the primary objective
to improve the power situation in the state. The key reform initiative was the unbundling of
the Electricity Department of Manipur (EDM) into two successor corporate entities:
Manipur State Power Distribution Company Limited (MSPDCL) – Controls the
functions of distribution and retail supply licensee within the state of Manipur;
Manipur State Power Company Limited (MSPCL) – Controls the functions of state
owned generation and transmission licensee for Manipur as a State Transmission
Utility.
As part of the unbundling, MSPDCL was tasked with providing reliable power supply,
effective revenue realization, and satisfactory consumer service delivery in the Manipur.
MSPDCL is at a cusp of transformation and has recently taken many initiatives for its
development and intends to appoint a Agency/Firm on retainership basis for providing
regulatory and analytical support on various operational matters, thereby helping in capacity
building and overall transformation of MSPDCL.
The period of retainership support shall be for 1 year which may be extended as per
requirement of MSPDCL or as per mutual agreement by both the parties.
Section 2: Scope of work
17
3. Scope of Work
3.1. Objective of Study
3.1.1 The objective of this proposal is to associate with MSPDCL as an Executing Agency
to provide end to end services from collecting NSC (New Service Connections) application
electronically till meter installation & database updating in Imphal Electrical Distribution
Circle – I of MSPDCL which has approx. 1.3 lakhs consumers with prepaid meters.
3.1.2 These services will be done by using web based application along with latest android
Mobile App/Tablet based technology to reduce the time for releasing the new connection and
eliminate malpractices in the new connection process.
3.1.3 The services shall also include data analysis for HT consumers, monthly recording of
energy consumption for Single phase consumer, Meter checking and data validation from the
field etc.,
3.1.4 Area of Implementation will be in the following divisions/Circle.
a) New Service Connection – For Imphal Division, Circle - I
b) Existing Consumer Indexing – For Imphal Division, Circle – I
c) Existing HT Consumer data collection and analysis –All area/Circle under
MSPDCL
d) Mobile/Table PC base software/ Application – All area/Circle under MSPDCL
e) Monthly/Quarterly consumer energy recording and checking and updating–For
Imphal Division, Circle – I
3.2. Scope of Work: Scope of Work (SOW) is categorized into 5 modules:
Module 1: New Connection and Un-electrified consumer record
1.1.1 Deploy latest technologies and software (that enables future integration with
SAP/ERP and its compatibility) by undertaking all new service connection activities
from receiving application from consumer to installation of meter, including database updating.New Consumer data to be captured as per Annexure B format.
1.1.2 Introduction and implementation of “New connection at door step” concept for
consumers by using „MSPDCL –New Connection Application Mobile/Tab PC
based solution. Use of online software for managing and tracking issuance of new
connection in best possible time.
1.1.3 Online submission of new connection application, for the consumers. Consumer may also call customer care for requirement of new connection.
1.1.4 To carry out various activities like survey of site, sanction of estimate, issuance of
demand note, collection of amount towards new connection, release of new
connection. On line Tracking of the same and information of all activities with responsible person, is communicated to consumer at every stage.
1.1.5 On line, real time MIS report generation regarding new connections (information
should be available Division and Sub Division wise).
1.1.6 Use of system generated ticket number for all NSC applications.
1.1.7 On line data base updating of new consumers for billing.
1.1.8 On line Tracking of issuance of first bill to new connection consumers.
1.1.9 On line dash board for new consumers billed in the month.
1.1.10 The survey should also include the un-electrified household as per format in
Section 2: Scope of work
Annexure C.
1.1.11 New consumer shall be given as per existing/latest tariff order or wherever it is applicable on existing order issued by MSPDCL.
1.1.12 All the materials required for New Service Connection shall be provided by
MSPDCL.
Module 2: Existing Consumer indexing /GIS consumer mapping
2.1.1 Door to Door Consumer survey, GPS tagging of all consumers (in case of old
consumers the list will be provided by the particular Sub Division for verification on
field) with the poles and the DTR the consumer is connected with. Unique DTR and
Pole numbers are to be generated if not available.
2.1.2 Consumer indexing shall be captured as per R-APDRP guideline and procedure.
2.1.3 All existing consumers‟ data is to be captured as per format provided in Annexure B.
2.1.4 Deploy a team for receiving new connection application from consumer along with
required documents, site survey with GPS co-ordinates, issuance of Demand Note,
receiving the payments, meter installation for releasing the connection and finally
data base updating.
2.1.5 Ensuring streamlined, timely and transparent information inflow and outflow through
web based NSC software systems with actionable MIS and dashboards which will be
single source of Truth.
2.1.6 The implementing agency/firm shall maintain/manage the meter change data for all
the consumers (existing and new) and perform the following:
a) Capture Meter details on arrival of meters in the store.
b) Capture details of defective meters collected from consumer‟s premise.
c) Check/Capture outstanding data tagged with the defective meter.
d) Check/Verify outstanding data tagged with the meter before issuing the meter for
installation at consumer premise.
Module 3: Existing HT Consumer data collection and analysis
3.1.1 HT consumer shall also be captured as per Annexure D format and updated on real
time using the same application from filed.
3.1.2 The Implementing agency shall analyse the meter data of HT/ High end consumers
and offer the following services for effective billing and collection:
a) Collect Meter Data and upload on the Meter Data Software for Billing Validation.
b) Identify:
1) Max Demand load
2) Instantaneous Parameters
3) Magnetic Tamper
4) Phase Missing
5) CT Short, CT Reversal and CT open.
Section 3: Technical Proposal Template
19
Module 4: Mobile/Table PC base software/ Application
4.1.1 Android Mobile App/Tablet based Application, real time monitoring and data
capturing or updating from field.
4.1.2 Should be able to integrate with existing SAP/ERP system.
4.1.3 The same shall be kept provision for future addition or technologies.
4.1.4 The application deployed along with source code and any related
software/technologies shall be handed over to MSPDCL after the completion of the
contract period.
Module 5: Monthly/Quarterly consumer energy recording and checking and updating.
5.1.1 Through the Mobile/Tablet app mentioned in Module 4, Consumers for Imphal
Electrical division, Circle – I, and their energy consumption shall be recorded on
real time monthly/quarterly whichever is technically feasible or with due
agreement between the two parties. (MSPDCL and IA)
5.1.2 Changes taken place at the same premises w.r.t meter, connection or any related
to electricity and power supply shall be recorded accordingly.
3.4. Exclusions
a) The duties and responsibilities of implementing agency/firm shall be limited to those
expressly spelt out above.
4. Payment Mechanism
4.1 The terms of payment shall be as under:
i. 6% of the Order value shall be paid by the end of every month for a period of 12
months after completion of the works/ monthly deliverables and verified by the
concerned Divisional officers.
ii. The remaining balance 28% shall be paid after full completion of work and
submission of complete report/ deliveries.
iii. However, in case of failure to complete the work within 12 months, Penalty @
5% of the order value shall be deducted every month from the remaining balance
payment subject to a maximum of 10% of the Order value.
Section 2: Scope of work
Section 3. Technical Proposal Template
Technical Proposal Submission Form
Location, Date To: GM (Purchase)
MSPDCL,
Secured Office Complex, 3rd
Floor,
North AOC, District: Imphal West, Manipur – 795001
Dear Sir:
We, the undersigned, offer to provide the consulting services for “IMPLEMENTATION OF
NEW SERVICE CONNECTION, CONSUMER INDEXING (Existing Consumers)
METER DATA ANALYSIS (HT Consumer) FOR MANIPUR and CONSUMER
SURVEY FOR IED-I, IED-II, IED-III AND IED-IV, MSPDCL” in accordance with your
Request for Proposals dated _____ and our Proposal. “We are hereby submitting our
Proposal, which includes this Technical Proposal and a Financial Proposal sealed in a
separate envelope”.
We hereby declare that:
(a) All the information and statements made in this Proposal are true and we accept that
any misinterpretation or misrepresentation contained in this Proposal may lead to our
disqualification.
(b) Our Proposal shall be valid and remain binding upon us for the period of time
specified in the Data Sheet.
(c) We have no conflict of interest.
(d) Our Proposal is binding upon us and subject to any modifications resulting from the
Contract negotiations.
We understand that MSPDCL is not bound to accept any or all the Proposal that it receives.
Yours sincerely,
Name and Title of Signatory:Name of Agency/Firm:
In the capacity of: Address:
Tel: Email:
Section 3: Technical Proposal Template
21
Agency/Firm‟s Experience (In different sections as per Evaluation
Criteria 1.13)
(a) The assignments need to be supported by documentary evidence in form of
completion certificates/citations/work orders/contracts
Assignment name: Approx. value of the contract (in INR):
Country:
Location within country:
Duration of assignment (months):
Name of Client: Total No of staff-months of the assignment:
Address: Approx. value of the services provided by your firm under
the contract (in INR):
Start date (month/year): Completion date (month/year): No of professional staff-months provided by associated
Agency/Firm:
Name of associated Agency/Firm, if any: Name of senior professional staff of your firm involved
and functions performed (indicate most significant
profiles such as Project Director/Coordinator, Team
Leader):
Narrative description of Project:
Description of actual services provided by your staff within the assignment:
Attach a copy of Work Order / Completion Certification as a proof
Section 3: Technical Proposal Template
22
TEAM COMPOSITION AND TASK ASSIGNMENT: Professional Staff
Name of Staff Position
Assigned Task Assigned
Team Leader
Residential Project Manager
NSC Executive
IT Executive
Customer Care Executive
Meter Installation Team
23
ANNEXURE – A
FINANCIAL BID FORMAT uploaded in the website www.manipurtenders.gov.in:
Provide your Total quote/ Financial Bid in the Format below:-
Part-A
Sl. No. Details Rate in INR Qty Total Amount INR
Module 3
3.1 Price offered per month for
Meter Data Analysis (HT
Consumer)
1000
3.2 Total Price offered for a period
of 1(year) years (1x12)
Module 5
5.1 Energy and Data recording per
consumer (Quarterly) for LT
consumers.
130000
8 Sub-Total C
Sub-Total D (with Applicable
Taxes on Sl.No. 8)
TOTAL (inclusive of all
applicable taxes)
Part-B
NB: The Rate offered is “FIRM” till the completion of assignment or any extended period
as per requirement of MSPDCL.
-Sd-
(P. Birendra Singh)
General Manager (Purchase), MSPDCL
Sl.
No.
Details Rate in
Rupees
Qty Total Amount INR
Module 1
1.1 Price offered Per Connection charge
for New Service Connections (1-ph &
3-ph)
30000
1.2 Price offered per consumer for
Consumer Indexing of New
Consumers.
30000
1.3 Price offered per consumer for survey
and data collection for un-electrified
household
10000
Module 2
2.1 Price offered per consumer for
Consumer Indexing of existing
Consumers.
130000
Module 4
4.1 Mobile app / Table PC base
Software/Application
6 Sub Total A
7 Sub Total B (with applicable Tax on
sl no.6)
Grant Total (Sub-total A+B)
ANNEXURE - C
24
Copy to:
1. The Commissioner (Power), Govt. of Manipur for favour of information.
2. The Managing Director, MSPDCL for favour of information.
3. The Executive Director (Tech) (MSPDCL) Manipur for information please.
4. The General Manager (Comml), MSPDCL for information and necessary action
please.
5. The General Manager, Electrical Circle No-I, for information please
6. The General Manager, (Finance & Accounts), MSPDCL, for information.
7. The OSD, IT, Imphal. He is requested to upload the above Annexure- I along with
the Scope of work, Terms & coditions and price bid in the website
www.manipur.gov.in
8. The SIO, NIC, Imphal; He is requested to upload the above Annexure-I along with
the Scope of work, Terms & Conditions and Price Bids in the website
9. www.manipurtenders.com
10. The PMU SP/DW.
25
ANNEXURE- B
ANNEXURE - C
26
ANNEXURE – C
Survey for Un-Electrified Household
GPS Coordination
Name (Head of the family)
House No. Patta No.
Address
Sub-Division
Nearest Existing Consumer no.
BPL Yes/No
BPL No.
Govt. employee Yes/No
MGEL No.
Reason for Un-Electrification
27
Customer Information Technical Information
Consumer No. DTR ID: Pole ID:
Connection ID: Meter Type
Sub-Division: Old Consumer No.: Meter Serial No.: Rating in Amp:
Customer Name: Make & Class:
Father/Husband Name: Seal: OK/ Broken Seal No.:
Occupant Name: Installation Date: Meter Condition: Working/Dead
House No. Ward No. Viewing Glass: OK/Broken/ Fogged
Road Name Signs of Tampering: Yes/No
Locality Name: Meter Location: Inside/Outside/Under Staircase
Nearest Consumer ID: Approachability: Inside/Approachable from outside
Khasra(Patta) No. GPS Readability: Ok/Not possible Identifiability: Ok/Not possible
Mobile No. E-mail Meter Box Detail
Tariff Category Status: OK/Broken Box Type:
Feedback from Customer Seal No.:
Meter Photo along with the Consumer after installation
Voltage Profile Very Good / Good / Average Details of Connected Load
Town Date Tube: Bulb: Geyser: Ceilling Fan: TV: Pump: Refrigerator: AC: Others: Surveyor Signature
ID
Connected Phase
Sanctioned Load
Total Units Consumed
HT Consumer Survey Form, MSPDCL Annexure-D
ANNEXURE - C
28