19
1 Mandatory Supporting Documents for Supplier Payment Claim TM SRM E-INVOICING

Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

1

Mandatory Supporting Documents

for Supplier Payment Claim

TM SRM E-INVOICING

Page 2: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

2

SRM: Supplier Relationship Management

Page 3: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

3

1. Mandatory supporting documents required for supplier payment claim.

2. Checklist form for documentation verification by users/cost centre/Project Manager

3. Custodian of original copy documents in TM.

4. Acceptance Certificate

Table of Content

Page 4: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

4

Introduction

1. The supporting documents required for payment claim is based on the contractual requirement specifically under Payment Term Clause.

2. Due to issues on the thickness of packing list documents, a taskforce was formed in TM to study on the supporting documents.

3. In order to ensure compliance with the contractual requirements and the practicality with SRM E-Invoicing System, the project team come out with the table of mandatory supporting documents.

4. For the documents which submitted by suppliers to Project Manager/Cost Centre/users for work completion and delivery notification, the process is remain as business as usual.

Page 5: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

5

Purpose

1. Due to the complexity of TM business documentation requirement as public company and GLC, a clear demarcation of documents custodian or ownership in TM need to be clearly classified.

2. To ensure that the supporting documents can be easily located in TM.

3. To facilitate the auditing process especially from the interested parties such as SPRM, Inland Revenue Board (IRB), Internal/External Auditors and others.

Page 6: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

6

Sample of Contract Payment Term (JKH Contract)

Page 7: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

7

Sample of Contract Payment Term (Equipment Contract)

Page 8: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

8

Sample of Contract Payment Term (Equipment Contract)

Page 9: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

9

Mandatory Supporting Documents

Page 10: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

10

Mandatory Supporting Documents cont.

Page 11: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

11

Mandatory Supporting Documents cont.

Page 12: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

12

1. Acceptance Certificate for work completion is comprises of COA, ATC, QC and CPC.

- Certificate of Acceptance (COA)

- Acceptance Test Certificate (ATC)

- Quality Certificate (QC)

- Certificate of Practical Completion (CPC)

2. All Acceptance Certificate must include information on Defect Liability End Date to indicate the warranty period of the items/services supplied to TM.

3. Final Certificate of Acceptance shall be used for release of Retention Sum or Final Payment. FCOA not applicable to JKH final payment.

4. Delivery Order (DO) or any documents used as evidence of acceptance must be signed by TM (requester) before supplier can upload into SUS online invoicing.

5. SUS Supplier must submit scanned copies of mandatory supporting documents via SUS Portal.

Mandatory Supporting Documents

Page 13: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

13

6. Non-SUS Supplier must submit hardcopy of mandatory supporting documents directly to Finance SSO office.

7. A copy of completed/signed checklist form shall be given by TM to supplier for payment claim.

8. Checklist form and related documents shall be kept in save custody by Project Manager/user/Cost Centre for a period of seven (7) years.

9. For purchasing of non-contracted items or services, the checklist form is not a compulsory. Suppliers will be required to submit original invoice, delivery order and acceptance certificate (if relevant).

10. The implementation of mandatory supporting documents is applicable to TM and subsidiaries (all users of TM’s SAP SRM).

11. For regional purchasing group, the mandatory supporting documents should refer to the contractual category of commodity.

Mandatory Supporting Documents

Page 14: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

14

Checklist Form for IT/IP/Content/CATx

Checklist form must be signed by

TM to substantiate that user/cost centre

has received & verified all the documents

as stipulated in the contract.

A copy of checklist must be given

to supplier for payment claim

User/Project Manager must update

The list of supporting documents

Based on contractual requirement

Page 15: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

15

Custodian of Supporting Documents

Page 16: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

16

Custodian of Supporting Documents cont.

Page 17: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

17

Custodian of Supporting Documents cont.

Page 18: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

18

Certificate of Acceptance (COA) and Final Certificate of Acceptance (FCOA)

Page 19: Mandatory Supporting Documents for Supplier Payment Claim · Mandatory supporting documents required for supplier payment claim. 2. Checklist form for documentation verification by

thank you

•Panel Poster •Bunting •Poster