Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
© Outotec – All rights reserved
Managing Installed Base
to Unlock Service Opportunities
PDT Europe I October 18, 2017
Sami Grönstrand & Helena Gutiérrez
© Outotec – All rights reserved
Intro &
Business Challenge
Conclusions &
Next steps
Project
Data
gathering
Data input &
publishing
Architecture &
System
Development
Process &
governance
Contents
© Outotec – All rights reserved
History
© Outotec – All rights reserved
Wide global
supplier network.
Manufacturing
almost completely
outsourced
R&D, sales and service centers in
34countries
Deliveries to more than
80 countries
2016
Total sales
EUR 1.1 bn
Services sales
EUR 0.5 bn
4,200employees
824Patent families
7400 Patents
24 Product Lines
90Products
730Product Models
Listed on the Nasdaq Helsinki
stock exchange since 2006
Outotec today
2020 targets:
Sales growth
faster than market
Services Sales
growth > 10%
annually
aEBIT 10%
© Outotec – All rights reserved
We have
• Equipment at over 3500 sites
• Technical data of past installations and projects in multiple databases and systems
• Enovia PDM for new delivery structures
• SAP ERP for transactional data
• Dynamics CRM for customer insight and salesopportunities management
• Data eg. Bills of Material NOT CONNECTED TO CONTEXT, eg. Plant structure & operating conditions.
The business challenge of Installed Base
We need
• To connect the data in different silos
• A process to gather, enrich and manage data
• One common system consolidating Installed Base data -technical and commercial
• Accessible ”anywhere, any time” – also when offline
• People trained and supported in operative daily work
Connect the dots for closing the loop and unlock the business potential!
© Outotec – All rights reserved
Initial Data
gathering
Architecture &
System Development
Data input &
publishing
Process &
governance
Project scope
© Outotec – All rights reserved
Data gathering
ON-SITE DATA
VALIDATION
Validate/correct
data on template to
equipment level.
HAND-OVER TO
CENTRAL IB
Validated templates
under revision control
waiting to be uploaded
to core systems.
SITES SELECTION
25 sites were selected
based on near term
business potential.
INITIAL DATA
GATHERING
Excel Template with
existing data for
validation by market
area.
25 sites were selected based on business potential. Basic data gathering by market areas through excel templates
Data gathering
© Outotec – All rights reserved
Data gathering
PLANT DATA MODEL ADJUSTMENTS TO
CORE SYSTEMS
INSTALLED BASE
SERVICE
PORTAL DEVELOPMENT
Define the data structure, select and design publishing platform, adjust core systems to
Installed base data model and consolidate data into a user-friendly Installed Base Portal.
CRM
PDM
ERPInstalled Base Service
Architecture & System Development
© Outotec – All rights reserved
Plant
Module
Equipment
Plant unit
PRIMARY
CRUSHING
SECONDARY
CRUSHING
CONDITIONING
Cu
REGRINDING
Cu CLEANING
Cu ROUGHING
Mo ROUGHING
Mo
REGRINDING
Mo CLEANING
Feed
ZC02
ZF10
ZF20
ZG20
ZF21
ZF30
ZG30
ZF31
ZC01
Cu concentrate Mo concentrate
Tailings
GRINDING
ZG10
Plant Structure
Duty Specification
1st Rougher Flotation Cells
Pulp flow rate, max 8000 m³/hPulp flow rate, min 4500 m³/hSolid content w/w, max 30%Feed Grade 6,0 % CuConcentrate Grade 10,0 % CuAir Feed rate, Max 12 m3/minMass pull per cell (max) 5 %Mohs hardness 4,5Bond abrasion index 0,37Anticipated Mine Life 25 years
Volume, effective 160 m3Installed power, min 120 kWDiameter, external 5000 mmHeight, Machine Total 8000 mmMaintenance headroom, max 3000 mm Capacity, overhead crane 15 000 kg
Seismic zone UBC 4ATEX area NOSplit for Container Yes
© Outotec – All rights reserved
Product Project Site
As-Sold As- Engineered As-Manufactured As-MaintainedAs-defined
Product
Portfolio
Project
Portfolio
Installed base
Portfolio
As-Built
Information Enrichment
MDPT
Product delivery Installed BaseProduct
Sell / DelSol DelSer
As-Delivered
Information Enrichment
Towards a closed loop process
© Outotec – All rights reserved
Plant
Module
Equipment
Plant unit
Product Instance
Equipmentspecification
Plant Instance
Equipment BOM
ECAD
MCAD
Process Simulation
BIM
Product deliveryProduct Installed Base
Plant
Module
Equipment
Plant unit
Plant Product
Equipment Product
Plant
Module
Equipment
Plant unit
Plant IB
Product Instance
Equipment SBOM
Process Control
ECAD
MCAD
Process Simulation
EAM
FEM
EAM
Enriching the Model through the Lifecycle
EAM
© Outotec – All rights reserved
Core data sources
CRM PLM ERP
Consolidated knowledge
service
Consolidated data exposed via multiple
microservices enabling agile solution development
User targeted solutions
Apps optimized for daily work
SharePoint
Enriching data sources
Market IntelligenceLegacy
documents
Installed Base ServiceIntegration
service
Reporting
serviceData service
Search
service
Metadata
service
Machine
learning
service
Document
service
Power BIInstalled
Base Portal
Other
applications
Authoring Applications
MCAD ECADFEM Office toolsProcess SimulationCFD
Consolidating data with an Installed Base Service
© Outotec – All rights reserved
• IB structure available in CRM
• Site is created in CRM and replicated to Enovia
Changes to CRM
• Service transactions now connected to IB structure
• IB structure available in ERP
Changes to ERP
Adjusting core systems
• Plant structure is created and Builds are
connected in Enovia
Changes to PDM
© Outotec – All rights reserved
Visualizing data in a user-friendly IB portal
Dimension buttons
Main search box
Left pane contains structure Middle pane contains details on
the selected items from the left
Right pane shows
connections or links
Record a change, request additional
structure or submit feedback
Detailed dediicated views to data
© Outotec – All rights reserved
Data input and publishing
CRM
New data Model
ERP PDM
Changes to core
systems
Data gathering
Data Migration
Core
systems
Legacy
systems
Core
systems
Gathered
Data
EBXData visualization in portal
IB portalIB Service
Excel
© Outotec – All rights reserved
Process & governance
IB team
IB Portal
Request Analysis
Field services
IB Portal
Change notification
IB team
Data publishing
Core systems
Field services Product Line / IB team
Data validation
IB PortalIB Portal
Change request
© Outotec – All rights reserved
Intro &
Business Challenge
Conclusions &
Next steps
Contents
Project
Data
gathering
Data input &
publishing
Architecture &
System
Development
Process &
governance
© Outotec – All rights reserved
Bimodal IT:
Start fast, but remember to finish!
© Outotec – All rights reserved
Systems are ready!
Are people ready?
© Outotec – All rights reserved
We one step closer to a Digital Twin …
… and two steps closer to unlocking opportunities!
QUESTIONS?
THANKS FOR YOUR ATTENTION