Upload
clare-hinton
View
43
Download
1
Embed Size (px)
DESCRIPTION
Manage-2000. What should we be doing?. What should we be doing? Daily. Data Backup!!!!! /roi/XXX.MAIN /roi/TERMINALS.x.x /usr/udxx /opt/VSI-FAX/ Other data required for your install. (For example Reform ./FORMS) SB1 or UPDATE.SYSTEM Performs system cleanup. - PowerPoint PPT Presentation
Citation preview
Manage-2000
What should we be doing?
What should we be doing? Daily
Data Backup!!!!!– /roi/XXX.MAIN– /roi/TERMINALS.x.x– /usr/udxx– /opt/VSI-FAX/– Other data required for your install. (For example Reform
./FORMS) SB1 or UPDATE.SYSTEM
– Performs system cleanup.– Updates performance counters– Performs auto purges– Produces system status reports.
What should we be doing? Monthly
RESIZE.FILES– “The IBM/UniData RDBMS does not abort if a file
is created too small to hold all the data necessary. However, if a file is too small or too large, degradation of response time takes place. Therefore it is to the user's advantage to make the sizes of the files as close as possible to the actual size needed”
What should we be doing? Monthly
Database Audits– DB.AUDIT.ALL Runs the following audits:
DB.AUDIT.AP - Verify the AP and VEN files are in balance DB.AUDIT.AR - Check chain linkages and balances in accounts receivable (AR)
files DB.AUDIT.IM - Cross check IM and IPL files DB.AUDIT.IT - Inventory transaction file detail integrity check DB.AUDIT.LOT - Audit lot tracing (LOT) data for errors DB.AUDIT.MTO - Integration integrity check of material transfer items DB.AUDIT.PLO - Integration and sync check of PLO, IPL order files DB.AUDIT.PUR - Integration integrity check of POH, POD, IPL files DB.AUDIT.SOP - Audit sales order processing (SOP) files for database errors DB.AUDIT.WP - Integrity check of WP, WP.GROUP, PL, IPL files DB.AUDIT.WPO - Integrity check of WP operations with WC files
– DB.AUDIT.SA - Audit sales analysis (SA) file database errors (report only - NO update option)
What should we be doing? Monthly
Reboot.– Mr Hazelton will tell you that both NT and UNIX
boxes should be rebooted once a month.
What should we be doing? Monthly
SPE – Its getting slow.– Purge old SPE jobs. The size of the list is directly
related to how fast SPE opens.
Monthly Backup Set – You never know when someone will want ‘data as of the end of the month’
Disaster Recovery Kit – What goes in the bag?
OS Install Media– Your OS (Windows/UNIX)– Your Backup Software
Manage-2000 Install Media– UniData– Manage-2000– Redback– A2K
Hardware Recovery CD– Server Drivers.– If you download “updates” you may consider burning these to a CD
also.
Disaster Recovery Kit – What goes in the bag?
Documentation– Auth Codes– CD Keys– Serial Numbers
Phone Numbers / Contacts– Your not going to have access to your server. Put this
information in your kit. Backup Tapes, or information on how / where to get
your backup tapes. Ideally if your storing your tapes at the Bank, a copy of your Kit should be located there also.