This project includes updating about 6 miles of transmission line. About 5 miles of the line will be rebuilt in AEP Ohio’s existing right-of-way corridor; however, in some cases, easements may need to be supple- mented and updated. The remaining mile of transmission line will require construction in new areas. AEP Ohio requests input on the proposed study segments to determine a route for the new section of line. The existing transmission line was built in the 1930s and must be updated in order to meet the region’s growing demand for electricity. Updating the transmission line with modern equipment improves the electric service reliability, reduces the likelihood of extended power outages and speeds recovery time when outages do occur. The transmission line runs through Brown Township in Carroll County between Malvern and Minerva. WHAT WHY WHERE PROJECT SCHEDULE PROJECT ANNOUNCEMENT & VIRTUAL OPEN HOUSE Early 2018 RIGHT-OF-WAY COMMUNICATIONS BEGIN Early 2018 TRANSMISSION LINE CONSTRUCTION Summer 2018 - Late 2019 PROJECT COMPLETE Late 2019 *Timeline subject to change. *Timeline subject to change. 2018 2020 2019 MALVERNMINERVA 69 KV TRANSMISSION LINE REBUILD PROJECT AEP Ohio plans to improve electric service reliability in northeast Ohio. The Malvern-Minerva 69 kV Transmission Line Rebuild Project includes updating about 6 miles of transmission line in Brown Township in Carroll County. The project modernizes the transmission infrastructure to improve reliability and ensure dependable energy service for local customers.

Malvern-Minerva Factsheet V3 - American Electric Power · This project includes updating about 6 miles of transmission line. About 5 miles of the line will be rebuilt in AEP Ohio’s

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Malvern-Minerva Factsheet V3 - American Electric Power · This project includes updating about 6 miles of transmission line. About 5 miles of the line will be rebuilt in AEP Ohio’s

This project includes updating about 6 miles

of transmission line. About 5 miles of the line

will be rebuilt in AEP Ohio’s existing

right-of-way corridor; however, in some

cases, easements may need to be supple-

mented and updated. The remaining mile of

transmission line will require construction in

new areas. AEP Ohio requests input on the

proposed study segments to determine a

route for the new section of line.

The existing transmission line was built in the

1930s and must be updated in order to meet the

region’s growing demand for electricity.

Updating the transmission line with modern

equipment improves the electric service

reliability, reduces the likelihood of extended

power outages and speeds recovery time when

outages do occur.

The transmission line runs through Brown

Township in Carroll County between Malvern

and Minerva.

WHAT WHY WHERE

PROJECT SCHEDULE

PROJECT ANNOUNCEMENT & VIRTUAL OPEN HOUSEEarly 2018

RIGHT-OF-WAY COMMUNICATIONS BEGINEarly 2018

TRANSMISSION LINE CONSTRUCTIONSummer 2018 - Late 2019

PROJECT COMPLETELate 2019

*Timeline subject to change.*Timeline subject to change.

2018 20202019

MALVERNMINERVA69 KV TRANSMISSION LINE REBUILD PROJECT

AEP Ohio plans to improve electric service reliability in northeast Ohio. The

Malvern-Minerva 69 kV Transmission Line Rebuild Project includes updating

about 6 miles of transmission line in Brown Township in Carroll County. The

project modernizes the transmission infrastructure to improve reliability

and ensure dependable energy service for local customers.

Page 2: Malvern-Minerva Factsheet V3 - American Electric Power · This project includes updating about 6 miles of transmission line. About 5 miles of the line will be rebuilt in AEP Ohio’s

MALVERNMALVERN

MINVERVAMINVERVA

68

20

32

183

43

CITRUS RD NW

CITRUS RD NW

BLADE RD NW

BLADE RD NW

CANTON

RD NW

CANTON

RD NW

ROBERTSVILLEROBERTSVILLE

LAKE MOHAWKLAKE MOHAWK

PEKINSUBSTATION

AEP OHIO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

01/21/201901/21/2019

AEP Ohio will build new steel, single pole structures that will be about 85-feet tall. The structures will be located in an approximate 50-foot wide right-of-way corridor.

Typical Structure Height: Approximately 85 feetRight-of-Way Width: Approximately 50 feet

TYPICAL STRUCTURES

AEP Ohioc/o Maggie Beggs8600 Smiths Mill RoadNew Albany, OH 43054

@ [email protected]

(380) 205-5178

AEPOhio.com/Malvern-Minerva

MALVERN MINERVA 69 KV TRANSMISSION LINE PROJECT

SUBSTATIONTRANSMISSION LINE TO BE REBUILT

TRANSMISSION LINE TO BE REMOVED

PROPOSED STUDY SEGMENTS

TRANSMISSION LINE UNDER CONSTRUCTION

SUBSTATIONUNDER CONSTRUCTION

N