Male Circumcision Procurement and Supply Chain Management:Progress Report
Country Update Meeting, Arusha, TanzaniaJune 8-10, 2010
Dr. Sameer SakallahSenior Technical Advisor, SCMS
PEPFARImplementing
Partner
Kit Development Process
PEPFARImplementing
Partner
Kit Development Update
• Kits provided by SCMS were not designed by SCMS
• Kits, pharmaceuticals and supplementary supplies (Modules) have been selected and specified by consensus reached between many organisations:
PEPFAR TWG (OGAC, USAID, CDC, NIH, DOD), WHO, UNAIDS, PSI, JHPIEGO, Gates Foundation, Clinton Foundation, FHI, MSI, ACHAP, EngenderHealth, C-Change, USAID HPI, JHUCCP, RHSP, OR, USCF
PEPFARImplementing
Partner
Kit Development Update … cont.
• SCMS was asked to take the lead in MC kit development, procurement and supply chain management
• Kit composition cannot be substituted or replaced:• SCMS did not design the kits
• Any change will make the kit a new product
• Standardization … better supply chain management … better pricing
PEPFARImplementing
Partner
Kit Development Update … cont.
1. Re-usable Kit Option 1 for forceps guided procedure
2. Re-usable Kit Option 2 for sleeve resection and dorsal slit procedures
3. Disposable Kit Option 3 for forceps guided procedure
PEPFARImplementing
Partner
Kit Development Update … cont.
• Each kit contains all material needed to perform one MC operation
• Pharmaceuticals (e.g. iodine, Paracetamol, Marcaine, etc.) cannot be included in these kits but are available in bulk separately
PEPFARImplementing
Partner
Additional Supplies
1. Module 1. Infection Prevention & Waste Management
2. Module 2. Equipment
3. Module 3. Emergency Supplies
Kits, Pharmaceuticals and Modules and all their components are detailed in SCMS online catalog (eCatalog).
PEPFARImplementing
Partner
Kit Development Process: Disposable Kit Option 3 for forceps guided procedure
STEP 1. Sourcing, Vendor Qualification, Price Quotation
• Survey potential viable manufacturers
• Vendor Qualifications: capability, financial stability, etc.
• Price Quotation (based on an actual order)
PEPFARImplementing
Partner
Disposable Kit Option 3 …. Cont.
STEP 2. Multi Vendor Selection
• Request complete usable samples
• Documentation
• Commodity Manufacturing Source
• Sample kit production: 2 complete, usable kit
PEPFARImplementing
Partner
Disposable Kit Option 3 …. Cont.
STEP 3. Quality Check
• Sterility Check
• Component Quality
• Site visits
PEPFARImplementing
Partner
Disposable Kit Option 3 …. Cont.
STEP 4. Vendor(s) Selection & Price negotiation
• Price is based on actual order
• No procurement history
• Customized product (cannot be returned)
• Pooled orders a future possibility
PEPFARImplementing
Partner
Disposable Kit Option 3 …. Cont.
STEP 5. Kit Manufacturing
• Manufacturing Initial Lead Time is 3 months
• Quality check: will perform sterility checks on each batch
• Vendors under contract agree not to change suppliers without notice
PEPFARImplementing
Partner
Development of Kit Option 3: Results
• Initial vendors identified: 8
• Vendors submitting bids: 5
• Vendors submitting sample kits: 5
• Vendors passing sterility test: 2
• Final vendor count: 1
PEPFARImplementing
Partner
SCMS Delivers BEST VALUE
• Vendor physical and financial qualifications
• Cannot always guarantee lowest price (although we try hard!!)
• Specifications
• Strict compliance with quality requirements
• Manufacturing facility visits
• Batch testing
PEPFARImplementing
Partner
Development of Kit Options 1 and 2(Re-usable Kits)
• Will have to go through the same process
• Must have an actual order to negotiate price
• Will work with countries to help pool orders
• Availability estimated around the end of this year.
PEPFARImplementing
Partner
Country Updates
• Zimbabwe: 30,000 kits in manufacturing stage
• Zambia: 10,000 kits ordered• Rwanda: first order of 5,000 kits being
processed• Swaziland: order expected soon for first
batch of 200,000 kits• Kenya: purchase of disposable kits
currently under review
PEPFARImplementing
Partner
How can SCMS help?
• One stop shop• Procurement and delivery• Logistics• Supply Chain Management• Forecasting / Quantification• Warehousing and distribution• Technical assistance • Global collaboration for long-term, local
and international solutions
PEPFARImplementing
Partner
USAID Contacts
Mike Hope [email protected]
Dr. Emmanuel [email protected]
Global Health Bureau
Office of HIV/AIDS
USAID
Washington, DC
PEPFARImplementing
Partner
SCMS Contacts
• Program Related Inquiries
David Jamieson, Deputy Director [email protected]
Dr. Sameer Sakallah, Senior Technical [email protected]
Aliza Pressman, Program [email protected]
• Procurement Inquiries
Elisha Kitula, Procurement [email protected]
SCMS
1616 Fort Myer Drive,12th Floor
Arlington, VA 22209, USA
Telephone 001-571-227-8600
PEPFARImplementing
Partner
Thank You