Owner San Francisco Public Utilities Commission San Francisco Water Department General Contractor Western Water Constructors Geotechnical Engineer URS Corporation Design A 30,000 square foot area was treated with compaction grouting to depths of 30 feet below ground surface. The compaction grouting was performed in ascending stages, starting at the bottom of the hole and working upward, with individual stage lengths of two feet in height. The objective was to densify loose liquefiable soils to Cone Penetration Test (CPT) tip resistance values of 120 tsf. Specifications called for a grout pump with variable rates of 0.2 to 3.0 cubic feet per minute at pressures of up to 1,000 psi. Project design specified that the downhill perimeter of the site have compaction grouting in a 4 ft triangular arrangement. The remainder of the site was contractor designed to have compaction grouting in a 6.5 ft square pattern. A soil mixed / concrete shaft buttress wall was installed near the Lake Merced inlet pipes. Malcolm Drilling Company Ground Improvement Division San Francisco, California Lake Merced Pump Station Improvement Overview The San Francisco Public Utilities Commission and Water Department needed to replace the existing Lake Merced Pump Station with a more modern facility, while maintaining operations of the existing station. Historical records in addition to a geotechnical investigation indicated the site was susceptible to seismic-induced lateral spreading, liquefaction, and settlement. A ground improvement solution was required to provide proper foundation for the new structures as well as protection for the inlet pipes off of Lake Merced. Ground Conditions Geotechnical investigations determined that the site was overlain by 2 to 10.5 ft of sandy fill. Loose to medium dense sand and silty sand (Colma Formation) was below the fill. Groundwater was found between 9.5 and 14.5 ft below ground surface, depending on the water level of Lake Merced. In addition, during construction of the original facility, the downhill lake side of the site was backfilled with riprap including concrete rubble, rebar, and wood. Compaction Grouting Soil Mixing Secant Piles

Malcolm Drilling Company Compaction Grouting Ground ...Malcolm Drilling Co. Inc. (MDCI) installed over 1,600 individual compaction grouting points at the operating Lake Merced water

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Owner

    San Francisco Public Utilities Commission

    San Francisco Water Department

    General Contractor

    Western Water Constructors

    Geotechnical Engineer

    URS Corporation

    Design

    A 30,000 square foot area was treated with compaction grouting to depths of 30 feet below ground surface. The compaction grouting was performed in ascending stages, starting at the bottom of the hole and working upward, with individual stage lengths of two feet in height. The objective was to densify loose liquefiable soils to Cone Penetration Test (CPT) tip resistance values of 120 tsf. Specifications called for a grout pump with variable rates of 0.2 to 3.0 cubic feet per minute at pressures of up to 1,000 psi. Project design specified that the downhill perimeter of the site have compaction grouting in a 4 ft triangular arrangement. The remainder of the site was contractor designed to have compaction grouting in a 6.5 ft square pattern. A soil mixed / concrete shaft buttress wall was installed near the Lake Merced inlet pipes.

    Malcolm Drilling Company Ground Improvement Division

    San Franc isco , Cal i forn ia Lake Merced Pump Stat ion Improvement Overview

    The San Francisco Public Utilities Commission and Water Department needed to replace the existing Lake Merced Pump Station with a more modern facility, while maintaining operations of the existing station. Historical records in addition to a geotechnical investigation indicated the site was susceptible to seismic-induced lateral spreading, liquefaction, and settlement. A ground improvement solution was required to provide proper foundation for the new structures as well as protection for the inlet pipes off of Lake Merced.

    Ground Conditions

    Geotechnical investigations determined that the site was overlain by 2 to 10.5 ft of sandy fill. Loose to medium dense sand and silty sand (Colma Formation) was below the fill. Groundwater was found between 9.5 and 14.5 ft below ground surface, depending on the water level of Lake Merced. In addition, during construction of the original facility, the downhill lake side of the site was backfilled with riprap including concrete rubble, rebar, and wood.

    Compaction Grouting Soi l Mixing

    Secant Pi les

  • Construction

    Malcolm Drilling Co. Inc. (MDCI) installed over 1,600 individual compaction grouting points at the operating Lake Merced water pump station site. MDCI batched the grout onsite and utilized twin grout pumps that have a grout pumping piston no greater than 4-inches in diameter through a 2-inch diameter delivery line. Compaction grouting points were drilled with a Klemm 807 and Bauer RG 19. MDCI also installed a soil cement secant buttress wall with a Bauer RG 23 and Bauer BG 40, providing a complete ground improvement package.

    Quality Assurance

    MDCI maintained an extensive QA/QC program, recording the following parameters: injection pressure at the pump, injection pressure at the hole collar, injected volume per stage, and grout termination criteria per stage (pressure, heave, or volume). Post-grouting CPT tests were performed to verify that the design criteria for densification was met.

    Malcolm Drilling Company Ground Improvement Division

    Compaction Grouting Soi l Mixing

    Secant Pi les

    Ground Improvement Division

    3524 Breakwater Avenue, Suite 108

    Hayward, California 94545

    Tel: (510) 780-1167

    Corporate Office

    92 Natoma Street, Suite 400

    San Francisco, CA 94105

    Tel: (415) 901-4400

    San Francisco

    3503 Breakwater Court

    Hayward, CA 94545

    Tel: (510) 780-9181

    Los Angeles

    4926 North Azusa Canyon Road

    Irwindale, CA 91706

    Tel: (626) 338-0035

    Seattle

    8701 South 192nd Street

    Kent, WA 98031

    Tel: (253) 395-3300

    Salt Lake City

    10 West 100 South, Suite 703

    Salt Lake City, UT 84101

    Tel: (801) 359– 2757

    San Diego

    16885 West Bernardo Drive, Suite 100

    San Diego, CA 92127

    Tel: (858) 753-0707

    Las Vegas

    2365B Renaissance Drive

    Las Vegas, NV 89119

    Tel: (702) 650-2922

    San Franc isco , Cal i forn ia Lake Merced Pump Stat ion

    San Francisco, CaliforniaLake Merced Pump StationCompaction GroutingSoil MixingSecant PilesCompaction GroutingSoil MixingSecant PilesSan Francisco, CaliforniaLake Merced Pump Station

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False

    /CreateJDFFile false /Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles false /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> ]>> setdistillerparams> setpagedevice