Langdon & Seah Sdn Bhd Juru Ukur Bahan Malaysia JUBM Sdn Bhd KDN PP10466/05/2013(032500) JUBM and Langdon Seah Construction Cost Handbook MALAYSIA 2014

Malaysia Handbook 2014

Embed Size (px)

DESCRIPTION

Costing

Citation preview

Page 1: Malaysia Handbook 2014

Langdon & Seah Sdn BhdJuru Ukur Bahan MalaysiaJUBM Sdn BhdKDN PP10466/05/2013(032500)

JUBM and Langdon SeahConstruction Cost Handbook

MALAYSIA2014

Page 2: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF al MCADIS

The following handbook of information relating to theMalaysian construction industry has been compiled by:

Langdon & Seah Sdn Bhdin collaboration withJuru Ukur Bahan Malaysia & JUBM Sdn Bhd

2, Jalan PJU 5/15Kota Damansara47810 Petaling JayaSelangor Darul Ehsan

Telephone : (6 03) 6156 9000Fax : (6 03) 6157 8660Email : infogmy.LangdonSeah.comWebsite : http ://www. Lan gdon Seah .com

Langdon & Seah Sdn Bhd

All rights reserved. No part of this publication may bereproduced or copied in any form without prior writtenpermission from Langdon & Seah Sdn Bhd.

The information contained herein should be regarded asindicative and for general guidance only. Whilst everyeffort has been made to ensure accuracy, no responsi-bility can be accepted for errors and omissions, howevercaused.

Unless otherwise stated, costs reflected in thishandbook are Malaysian costs at 4th Quarter 2013.

LangdanSeah Langdon &Seah Sdn Bhd (520443-H)AN AFFIUATE OF al ARCADIS

Juru Ukur Bahan MalaysiaJUBM Sdn Bhd (27638-X)

KDN . PP10466/05/2013 (032500)For private circulation to staff and business associates only.

Printed: February 2014by

Sky Press Sdn Bhd (KDN: PQ1780/4522)No.15, Jalan PBS 14/3,

Taman Perindustrian Bukit Serdang,43300 Seri Kembangan, Selangor Darul-Ehsan

1

Page 3: Malaysia Handbook 2014

./TABLE OF CONTENTS

Page No.Table of Contents 2

About Us 4

Calendars 12

1. CONSTRUCTION COST DATA

Construction Cost Specification 14

Kuala Lumpur Construction Cost Trend 16Construction Costs for Kuala Lumpur 18

Construction Costs for Johor Bahru 20Construction Costs for Penang 22Construction Costs for Kota Kinabalu 24Construction Costs for Kuching 26

Construction Costs for Selected Asian Cities 28Major Rates for Malaysia 34Major Rates for Selected Asian Cities 36ACMV Costs for Various Designs &

Developments in Kuala Lumpur 42M&E Costs for Selected Asian Cities 44

Unit Costs for Ancillary Facilities for Kuala Lumpur 50

Fit-Out Costs for Kuala Lumpur 52

2. GENERAL CONSTRUCTION DATA

JUBM - Langdon & Seah Building Works CompositeTender Price Index (BWCTPI) 54

JKR Tender Price Index 55Value of Construction Work Done 56Performance of Construction Sector 57Estimating Rules of Thumb 58Technical Specifications 60Average Unit Prices 62Unit Price Index 64Construction Sector Indicators 65Commodities Price Trend (Jan to Dec 2013) 66

Malaysia Construction Sector - Employment & GDP 68

Progress Payments 69

3. PROPERTY

ResidentialHotelOfficeShopping ComplexShopIndustrial

727476788081

2 TABLE CF OCI \ 'TENTS

Page 4: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF IA ARCADIS

Page No.

4. FINANCIAL

Financial Definitions & Formulae 84Mortgage Repayment Table 85Malaysia Balance of Trade 86Consumer Price Index 87Prime Rates & Base Lending Rates 88Interest Rates : Banking Institutions 89Currency Chart 90Exchange Rates 91

5. OTHER INFORMATION

Utility Costs for Selected Asian Cities 94Weight & Measures 96Conversion Guide 98Public Holidays 100Directory of Offices 106Telephone Directory (Malaysia) 114

TABLE OF CCNTENTS 3

Page 5: Malaysia Handbook 2014

ABOUT US

Mill iiii iii ii 1,IG KONGP

r9ftPIMPIN 1;::ErEffh0.63 ..MNAA'''j

1111, HAMALAYSIA j1_ ......-)NE LangdonSeahffig, i..........

PH PP NES

val P S NGAP°RE _/. 4::::.: 'NDONES A

011.11111.110AN AFFILIATE OF l a ARCADIS

-U-1"Langdon & Seah Sdn Bhd is one of the largest andlongest established Quantity Surveying practices in thecountry. Established in 1947 and involved in many majorprojects implemented since independence, Langdon &Seah is recognized as a market leading constructionspecialist with an extensive cost database.

Langdon & Seah is affiliated with collaborative partners,JUBM Sdn Bhd and Juru Ukur Bahan Malaysia, togetherforming the Langdon Seah - JUBM group, which offersa multi-disciplinary construction cost consultancyservice and provides integrated solutions to its clientele.

The Langdon Seah - JUBM group employs more than300 professional staff throughout Malaysia working fromfive offices in Kuala Lumpur, Penang, Johor Bahru, KotaKinabalu and Kuching.

Langdon & Seah Sdn Bhd is also a member of theLangdon & Seah Group, a regional, independent,multidisciplinary construction consultancy with resourcesof more than 3,400 staff based in 39 offices locatedacross Asia.

For over 60 years, the Langdon Seah - JUBM group hasbeen proactively providing world-class constructionconsulting services for all types of buildings andinfrastructure projects and developing our competenciesfurther in project management, legal support andmanagement consultancy services.

ARCAD1SThe Langdon Seah - JUBM group is also an affiliate ofArcadis NV, an international company providing consul-tancy, design, engineering and management services inthe fields of Infrastructure, Water, Environment andBuildings operating in more than 355 offices across 40countries worldwide.

4 ABCUT US

Page 6: Malaysia Handbook 2014

Our People

LangdonSeahAN MFIUATE OF RI MCADIS

The Langdon Seah - JUBM group's pride however willalways be in its greatest asset: its people.

We have a dedicated staff resource of 320 (as atDecember 2013) forming the backbone of our client -focused service delivery.

We ensure a high level of professional services byinstilling and encouraging a culture of continuouslearning and professional development for all staff,regardless of their roles and positions in the company.

As such, we developed a structured and comprehensiveframework of training in both technical as well as softskills; providing sponsorship and allowing time off forContinuous Professional Development (CPD) trainingfor professional progress.

We believe in our people and they reciprocate bydelivering successful solutions for our clients.

Integrity

At Langdon Seah - JUBM group, integrity is an importantcore value of our practice.

Integrity refers to the high ethical standards we apply inthe execution of our daily business processes andactivities, our relationship with clients, business partnersand employees, and our involvement with the public, thegovernment bodies and all her agencies as well as thelaws of the country.

In line with our affiliation with ARCADIS NV, we thusimplement as part of our company policy the ARCADISGeneral Business Principles (AGBP) in the developmentand implementation of our commitment to integrity.

The AGBP guides our business decisions and actionsthroughout all management levels and applies equally tocompany actions and to individual behaviour of all ouremployees in conducting our business.

The AGBP is available for viewing athttp://www.arcadis.com/General_Business_Principles.aspx

(Cont'd)

ABEIJT US 5

Page 7: Malaysia Handbook 2014

ABOUT US(Cont'd)

International Standards

Quality Management System1,51.ECGUIDE621.3

PA. 0502121.3.301

Cedified to ISO 9001 : 2008Cert. No. : AR05951 AR0598 / AR0599

The Langdon Seah - JUBM group consistently pushesits levels of professional services to higher level byimplementing a Quality Management System based onthe ISO 9001 International Standards.

The company received accreditation from the Standard& Industrial Research Institute of Malaysia (SIRIM) inMay 1995; the first Quantity Surveying consultancy tosuccessfully attain certification.

Our Quality Management System ensures highstandards of service performance, improved productivityand efficiency, increased competitive advantage andhigh levels of confidence in our capabilities by ourclients.

We have since upgraded the Quality ManagementSystem to the new MS ISO 9001:2008 Standards andwill continue to improve so as to achieve our vision ofbeing the first point of reference for our clients.

CERTIFICATE WeiiaM

Wx_

Environmental ManagementSystem

The Langdon Seah - JUBM groupis committed in reducing the impacton the environment, as well ashealth and safety of its staff andcommunity insofar as possible in allareas where the company isinvolved in.

As such, we continue to enhance our Environmental,Health & Safety Policy on all aspects of our businesswhich impacts on the environment, health and safety aswell as conforming to the relevant laws in the country.

We strive to continually apply and implement the bestavailable techniques and methodologies under the EHSPolicy to achieve clearly quantifiable and practicalobjectives of the company.

Forming the core of our EHS Policy is the ISO 14001Environmental Management System; another industryfirst for Langdon Seah - JUBM group, achieved onFebruary 2009.

6 ABCUT US

Page 8: Malaysia Handbook 2014

Our Projects

LangdonSeahAN MFIUATE OF RI MCADIS

As the leading cost construction consultancy in thecountry, Langdon & Seah has been involved with a longlist of major construction projects since its setting upmore than 60 years ago.

Langdon Seah - JUBM group provides its services tonearly all market segments in the construction industryfrom religious buildings to residential homes, hospitalityto corporate headquarters, mixed use developments tomaster planning.

The diverse range of project experience providesLangdon Seah - JUBM group with a rich and extensiveconstruction cost database. This enables the companyto handle the simplest to the most complex projectsentrusted by clients who recognize our value anddynamism.

MPIVIixed bevelopment -(Commercial, Retail & Residential)Kuala Lumpur Pavilion 2008

Hilton Hotel &Le Meridien HotelKuala Lumpur2004

-Kuala LumpurSentra! SlattI

-

t.iSzyay\LeioclaLum

Legoland Malaysia, Johor 2012

(Cont'd)

ABEIJT US 7

Page 9: Malaysia Handbook 2014

ABOUT US(Cont d)

A Selection of

Our Projects

Commercial

1. Menara Telekom, Kuala Lumpur 2002

2. CIMB New Headquarters Kuala Lumpur 2011

3. PJ8, Office Block & Serviced Apartment,Selangor 2009

4. Menara Maybank, Kuala Lumpur 1989

Ret ai I

5. Avenue K, Kuala Lumpur 2011

6. Alamanda, Putrajaya 2004

7. KLP Fashion Avenue, Kuala Lumpur 2012

8. Sunway Pyramid (Phase 2), Selangor 2007

9. Louis Vuitton, Kuala Lumpur 2006

Residential10. Iringan Hijau, Kuala Lumpur 2010

11. The Pearl Stonor, Kuala Lumpur 2010

12. 2 Hampshire Condominiums,Kuala Lumpur 2008

13. Sen Hening Residence, Kuala Lumpur 2007

14. Palazzio Sunway Condominiums,Kuala Lumpur 2011

15. The Plaza Condominiums, Kuala Lumpur 2007Source:TR Hamzah Yeang Sdn BIld

16. Sri Bukit Persekutuan, Kuala Lumpur 2006

Hospitality, Sports & Leisure

17. Legoland Malaysia, Johor 2012

18. Belum Rainforest Resort (Phase 1),Pulau Banding 2009

19. Auditorium & Experimental Theatre,Putrajaya 2005

20. Sunway Lagoon Resort Hotel, Selangor 1996

21. Penang Indoor Stadium & Aquatic Centre 1997

22. Equestrian Park, Putrajaya 2006

8 ABOUT US

Page 10: Malaysia Handbook 2014

7

/...- _.4.-- . -." ..._....._,_,;,.........a.anomimrff

.... 1.... ....r. . 6

LangdonSeahAN MFIUATE OF R1 MCADIS

(Cont'd)

PECIJT US 9

Page 11: Malaysia Handbook 2014

ABOUT US(Cont'd)

A Selection of

Our Projects

Private Healthcare23. Kajang Specialist Centre, Selangor 2005

24. Sunway Medical Centre, Selangor 1998

Private Educational25. Universiti Teknologi Petronas, Perak 2003

26. Sunway Monash University, Selangor 2007

27. Lim Kok Wing University, Selangor 2004

Transport & Infrastructure28. Electrified Double Track-Padang Besar

to lpoh (Station Building) 2014

29. Kelana Jaya LRT Line Extension,Kuala Lumpur 2014

30. Kuala Lumpur Sentral Station 2001

31. Kompleks Bunga Raya, KLIA 1998

32. Integrated Water Supply, Kuala Lumpur 2008

Industrial33. PML Production Facility, Selangor 2011

34. Giant Distribution Centre (Sepang),Selangor 2009

35. Star Publications Office & NewspaperPrinting Factory, Selangor 2000

36. Perodua - Second National Car Plant,Selangor 1994

Religious Buildings37. Masjid Besar Sandakan, Sabah 1988

38. Lutheran Bible Training Institute,Selangor 2010

Public39. Johor State Assembly Building, Johor 2007

40. Ministry of Education Teacher's Quarters,Malaysia 2003

41. Bangunan UMNO (Pekan), Pahang 2007

42. CItizenship and Immigration Canada (CIC)Annexe of Canadian High Commission,Kuala Lumpur 2004

43. Federal Government Administrative Centre,Putrajaya 2010

44. IBS Housing, Putrajaya 2011

31

-

mhr,pqmffiwg37

10 ABCUT US

Page 12: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF RI ARCADIS

39

V4rir".1 rPQ

44111.

PECIJT US 11

Page 13: Malaysia Handbook 2014

12

CA

LEN

DA

RS

2014T

W

12

34

56

O 11

12 137 18

JAN

19 20 2122 23 24 25

26 27 28 29 30 31

1

23

56789 10

tb415

16 17 18 19 20 2122

23 24 25 26 27 28

30291623

31

4

178

24 2519

26

12

34

5

67

8Oki

12

13 14A8 19

20 223

26

27 28 29 30

12

45

67y

11 12IVA

618 19

23

25 26 27 28 29 30

310172431

18152229

23

4

911j

16

1:23j30

12

34

5

67

89

1011

12

13 14 j 618 19

20 2126

27 28 29 30 31

12

34

56

89

1011

12 15

17 1819 20

24 25

26 27 28 29 30 31

311

2

34

56

78

9

10 1AI: if-15 16

17 11

2122 23

24 25 26 27 28 29 30

301

23

45

67

8

9 1015

16 17N22

23 24 25 26 27 28 29

71421287142128

12

89

152229 30

12

89

152229 30

31031031 T-.

678try 1520 21

22

27 28 29

56

7

N142128

45

6

12 1319 2026 27

45

6

II12 1327 20

20151

2

45

11 124AN

6318 19

21

25 26 27 28 29 30

31017

2431

12

34

89

0 11

15 167 18

22 2325

Mi...41.M

MM

IIIMM

IR-r

12

34

31

56

78

910

113

45

6

121318

102

2cApa

192

2517 18

26 27 28 2930

24 25 26 27

12

34

30 31

56

78

910

112

34

5

12 13 1415111718

910

2

19 2025

1617iN

26 27 28 2930 31

23 24 25 26

12

31

23

4

45

108

910

11

415 16

1715

68

189

2324

22 23 225 26 27 28

29 3031

29 30

56

71

23

45

67

12 1314

89

1011

1213 14

19 2021

151

11174

18 1920 21

26 2728

2225 26

27 28

2930 31

FS

i1

21

23

45

6

78

97

89

1011

12 1316

14 15Ju l20

Y2

2321

2227

28 29 3028 29

3012

34

5

67

89

1011

12

1

67

8513 14 S

EE

>8 19

2220 21

25 26

27 28 2927 28 29 30

56

71

23

45

12 1314

67O

M12

V 21

13 1418 19

2820 21

26

27 28 29 30

CA

LEN

CA

RS

Page 14: Malaysia Handbook 2014

CONSMUCTION COST DATA

Construction Cost Bpecification

Kuala Lumpur Construction Cost Trend

Construction Costs for Kuala Lumpur

Construction Costs for Johor Bahru

Construction Costs for Penang

Construction Costs for Kota Knabalu

Construction Costs for Kuching

Construction Costs for lectedAsian Cities

Major Rates for 1V1alaysia

IVlaj or Rates for lected Asian Oties

ACMV Costs for Various Designs &Developments in Kuala Lumpur

M&E Costs for lected Asian Oties

Unit Costs for Ancillary Facilitiesfor Kuala Lumpur

Fit-at Costs for Kuala Lumpur

Page 15: Malaysia Handbook 2014

-B

UIL

DIN

G T

YP

EO

UT

LIN

E S

PE

CIF

ICA

TIO

N4,

-

g 1- u) w 2 0 o

Apa

rtm

ent,

high

ris

e, a

vera

ge s

tand

ard

Apa

rtm

ent u

nits

with

fit-

out,

incl

udin

g ai

r-co

nciti

onin

g, k

itthe

n ca

bine

ts a

nd h

ome

appl

ianc

Qs,

but

exc

ludi

ng d

ecor

ativ

e lig

ht fi

tting

s an

d lo

ose

furn

iture

.(M

alay

sia

only

) 6-

12 u

nits

per

,flo

or, 4

6rr?

- 8

3rr?

per

uni

t

AD

arim

ent,

high

ris

e, h

igh

end

Apa

rimei

l uni

ts w

ith g

ood

cpal

ity fi

t-ou

i, in

clud

ing

air-

conc

ition

ing,

kik

:leen

cab

inet

san

d ho

me

appl

ianc

es, b

ut e

xclu

ding

dec

orat

ive

light

fitti

ngs

and

loos

e fu

rnitu

re.

Ter

race

d ho

uses

, ave

rage

sta

ndar

dH

OU

SQ

G w

ith fi

t-ou

t, in

duci

ng a

h--c

ondi

tioni

ng, k

itche

n ca

ldne

ts a

nd h

orre

app

fianc

Qs,

but e

xclu

di n

g de

cora

tive

light

fitti

ngs,

loos

e fu

rnitu

re, g

arde

n an

d pa

rkin

g.

Det

adie

d ho

usQ

s, h

igh

end

HO

US

QG

with

goo

d cp

ality

fit-

out,

indu

cing

air-

conc

ition

ing,

kitt

hen

cald

nets

and

hom

eap

plia

ncQ

s, tu

t exc

lud

ing

deco

rativ

e lig

ht fi

tting

s, lo

ose

furn

iture

, gar

den

and

park

ing.

0 o z

_1 <W

ac)

EE

,u_ u_

20

2 0 (-)

Mec

iunl

high

ris

e O

ffiC

QG

, ave

rage

sta

ndar

dR

C s

truc

ture

, cur

tain

wel

l, in

duci

ng p

ublic

are

a fit

-oui

, ten

ant a

rea

with

rai

sed

floor

/ca

rpet

, pai

nted

wal

l and

fals

e ce

iling

.(M

alay

sia

only

) A

vera

ge s

tand

ard

offic

Qs

excl

ude

tena

nt M

out

Hig

h ris

e of

ficQ

s, p

rest

ige

cpaf

ity

Cut

of-t

own

shop

ping

cen

tre,

ave

rage

sta

ndar

dIn

duci

ng p

ublic

are

a fit

-oui

and

M&

E, b

ut e

xclu

ding

sho

p fit

-oui

.R

etai

l mal

ls, h

igh

end

(1) -I 77 c o =I 0 z

u) w w 1- 0 iB

udge

t hot

els

- 3-

star

, nid

mar

ket

Bus

ines

s ho

tels

- 4

/5 -

star

Luxu

ry h

otel

s -

5-st

ar

1)

inte

rior

deco

ratio

n2)

Fur

nitu

re (

fixed

and

rro

vabl

e)3)

Spe

cial

ligh

t fitt

ings

(ch

ande

liers

, etc

.)4)

Cpe

ralin

g S

uppf

iQs

and

apip

-net

(C

S&

E)

excl

uded

.c-

-) 2 -1 o n v.,

_, < cc 1- w E z

inci

astr

ial u

nits

, she

ll on

ly (

Con

vent

iona

l sin

gle

stor

eyfr

amed

uni

ts)

RC

str

uctu

re w

ith s

teel

roo

f and

M&

E to

rna

in c

istr

ibut

ion,

but

exc

ludi

ngai

r-co

nciti

onin

g, h

eatin

g an

d lig

htin

g.

°met

ated

tact

ntiQ

,, lo

w r

ise,

ligh

t ,A

eigh

t ind

ustr

y "R

C s

truc

ture

, ind

ucin

g sm

all o

ffico

wfth

sirr

ple

fit-o

ui a

nd M

&E

, but

exc

ludi

ngai

r-co

nciti

onin

g an

d he

alin

g.

Page 16: Malaysia Handbook 2014

co cc Lu I I- 0

Und

ergr

ound

base

men

t car

par

k (<

3 le

vels

)R

C s

truc

ture

, nat

ural

ven

tilat

ion,

no

faca

de e

ndos

ure.

Mul

ti st

orey

car

par

ks, a

bove

gro

und

(<4

leve

ls)

Sth

ods

(prim

ary

and

seco

ndar

y)R

C s

truc

ture

with

ste

el r

oof a

nd M

&E

to m

ein

dstr

ibut

ion,

but

exc

ludi

ng a

ir-co

nciti

onin

g, h

eatin

g an

d lig

htin

g.(M

alay

sia

only

) S

thod

s w

ith s

tand

ard

gove

rnm

ent p

rovi

sion

s.

Stu

dent

s' r

Qsi

denc

esIn

duci

ng fi

t-ou

t, lo

ose

furn

iture

and

air-

conc

ition

ing.

(Mal

aysi

a on

ly)

Stu

dent

hos

tels

to u

nive

rsity

sta

ncla

ml.

Spo

rts

dubs

, rru

lti p

urpo

se s

port

s/le

isur

e ce

ntrQ

s (c

kysp

orts

) w

ith a

/c a

nd in

duci

ng F

F&

E

Dry

spo

rts

(no

swirr

ning

poo

l) an

d ar

e fo

r 'le

isur

e ce

ntre

' typ

e sc

hem

s in

clud

ing

.

mai

n sp

orts

hal

l, an

d lla

ry s

port

s fa

dliti

Qs,

than

ging

and

sho

wer

s, r

esta

uran

t/caf

e,ba

r, e

tc. C

osts

incl

ude

Fur

nitu

re, R

tting

s an

d E

wip

rnen

t (F

F&

E).

Gen

eral

hos

pita

lE

xduc

ing

mec

icd

and

oper

atin

g ew

iprn

ent.

Not

es:

1. T

he c

osts

for

the

rQsp

ectiv

e ca

tego

riQs

give

n ab

ove

are

aver

ages

bas

ed o

n fix

ed p

ice

com

petit

ive

tend

ers.

It r

rust

be

unde

rsto

od th

at th

e ac

tual

cos

tof

a b

uilc

ing

will

dep

end

upon

the

dQsi

gn a

nd m

any

othe

r fa

ctor

s an

d tr

ey v

ary

from

the

figur

es s

how

n.

2 T

he c

osts

per

squ

are

rret

re a

re b

ased

on

Con

stru

ctio

n R

oor

Are

as (

CR

A)

rrea

sure

d to

the

outs

ide

face

of t

he e

xter

nal w

alls

/ ext

erna

l per

imet

erin

clud

ing

lift s

hafts

, sta

irwel

ls, b

alco

niQ

s, p

ant r

oom

s, w

ater

tank

s an

d th

e lik

e.

a A

ll bu

ilcin

gs a

re a

ssum

ed to

hav

e no

bas

emer

its (

exce

pt o

ther

wis

e st

ated

) an

d ar

e W

ilt o

n fla

t gro

und,

with

nor

mal

sdl

and

site

con

ditio

n.T

he c

ost e

xduc

lQs

site

form

atio

n w

orks

, ext

erna

l wor

ks, l

and

cost

, pro

fess

iona

l feQ

s, fi

nanc

e co

sts,

lega

l exp

ense

s an

d co

nstr

uctio

n co

st fl

uctu

atio

ns.

4. T

he s

tand

ard

for

each

cat

egor

y of

bui

icin

g va

riQs

from

reg

ion

to r

egio

n an

d do

not

nec

essa

ry fd

low

that

of e

ach

othe

r.

5. A

ll co

sts

are

in L

E$/

rrf2

unl

ess

othe

rwis

e st

ated

. Ruc

tuat

ion

in e

xcha

nge

ratQ

c tr

ey le

ad to

cha

ngQ

s in

con

stru

ctio

n co

sts

expr

esse

d in

U.S

dol

lars

.C

e3

Page 17: Malaysia Handbook 2014

1 CONSTRUCTION COST DATA

KUALA LUMPUR CONSTRUCTIONCOST TREND 2003 - 2013

Domestic

RM/m2

4,000

3,500

3,000

2,500

2,000

1,500

1,000

500

0

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Bungalows (mass housing)

Terraced houses

Average standard apts, high rise

Low cost fiats, low rise (<6 levels)

Office /Commercial

RM/m2

4,500

4,000

3,500

3,000

2,500

2,000

1,500

1,000

500

0

Detached houses and bungalows

Luxury apts, high rise

Low cost fiats, high rise(<15Ievels)

Low cost housing

----....

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Average standard offices, high rise

Prestige offices, high rise

Shopping Centres

All cost are at an average level unless otherwise stated

16 (METRE-RCN OCST DATA

Page 18: Malaysia Handbook 2014

Industrial

R Wm2

2,400

1,800

1,200

600

Hotels

Rwm2

9,000

8,000

7,000

6,000

5,000

4,000

3,000

2,000

1,000

0

LangdonSeahAN MFIUATE OF RI MCADIS

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Light duty fiatted factoriesHeavy duty fiatted factories and warehouses

Single storey conventional factory of structural stedwork

Owner operated factories, low rise

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Resort Hotel inclusive of F.F.&E.

3-star budget hotels, ditto

5-star luxury hotels, ditto

All cost are at an average level unless otherwise stated

(ThISTRUCTIO MST DATA 17

Page 19: Malaysia Handbook 2014

RM

/m2

BU

ILD

ING

SE

RV

ICE

ST

OT

AL

DO

ME

ST

IC

Bun

galo

w (

mas

s ho

usin

g)1,

472

2,00

090

31,

000

2,37

53,

000

Det

ache

d ho

usQ

s an

d bu

ngal

ows

2,23

12,

734

809

1,00

03,

039

3,73

4T

erra

ced

hous

Qs

748

1,02

116

827

891

61,

299

Ave

rage

sta

ndar

d ap

artr

nerit

s, h

igh

rise

1,00

91,

507

299

441

1,29

819

48,

Luxu

ry a

part

men

ts, h

igh

rise

2,'1

272,

843

793

900

3,12

53,

743

Low

cos

t hou

sing

415

451

9913

151

5,41.9

LOW

cost

flat

s, lo

w r

ise

(<6

leve

ls)

550

600

150

200

700

800

Low

cos

t fla

ts, h

igh

rise

(<15

leve

ls)

600

700

200

250

800

950

OF

FIC

E /

CO

MM

ER

CIA

L

Ave

rage

sta

ndar

d of

ficQ

s, h

igh

rise

1,51

91,

673

940

1,15

52,

459

2,82

9P

rest

ige

offic

es, h

igh

rise

2,14

23,

171

1,40

21,

600

3,54

44,

771

Sho

pidn

g ce

ntrQ

s1,

870

2,34

583

01,

155

2,70

03,

500

HO

TE

LSR

esor

t hot

els,

indu

sive

of F

.F.&

E.

3,19

23,

376

1,25

01,

565

4,44

24,

941

3-st

ar b

udge

t hot

els,

di-t

o3,

325

4,21

677

01,

444

4,09

55,

660

5-st

ar lu

xury

hot

els,

ditt

o6,

017

7,10

81,

875

2,00

07,

892

9,10

8

Page 20: Malaysia Handbook 2014

IND

US

TR

IAL

Ligh

t (ill

y fla

tted

fact

oriQ

s88

490

253

069

31,

415

1,59

5H

eavy

dut

y fla

tted

fact

oriQ

s an

dlne

ireho

usQ

s1,

145

1,19

859

375

11,

739

1949

,

Sng

le s

tore

y co

nven

tiona

l fac

tory

of

stru

ctur

al s

teeM

ork

949

1,12

736

252

01,

312

1,64

7O

mer

ope

rate

d fa

ctor

iQs,

low

iise

1,27

01,

377

483

583

1,75

31,

%0

OT

HE

RS

Bas

emen

t car

par

ks (

<3

leve

ls)

1,09

81,

400

368

600

1,46

52,

000

Ele

vate

d ca

r pa

rks

(<4

leve

ls)

647

825

210

299

856

1,11

4R

i rra

ry a

nd S

econ

clar

y sc

hool

s71

281

318

921

090

11,

023

Stu

dent

hos

tels

914

984

242

299

1,15

51,

273

Spo

rts

dubs

indu

cing

F.F

.&E

.1,

834

1946

,54

064

12,

374

2,58

7

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

(10%

) bu

t exc

lusi

ve o

f con

tinge

ncie

s.

Page 21: Malaysia Handbook 2014

RM

/m2

BU

ILD

ING

SE

RV

ICE

ST

OT

AL

DO

ME

ST

IC

Bun

galo

w (

mas

s ho

usin

g)2,

200

2,97

030

033

52,

500

3,30

5C

etad

-ed

hous

es a

nd b

unga

low

s2,

025

2,53

067

584

52,

700

3,37

5T

erra

ced

hous

Qs

1,05

01,

400

8012

01,

130

1,52

0

Ave

rage

sta

ncia

rcl a

part

men

ts, h

igh

rise

1,18

01,

605

250

425

1,43

02,

030

Luxu

ry a

part

men

ts, h

igh

rise

2,07

02,

760

690

875

2,76

03,

635

Low

cos

t hou

sing

415

451

100

130

515

581

Low

cos

t fla

ts, l

ow r

ise

(<6

leve

ls)

550

600

150

200

700

800

Low

cos

t fla

ts, h

igh

rise

(<15

leve

ls)

600

700

200

250

800

950

OF

FIC

E/C

OM

ME

RC

ML

Ave

rage

sta

ncia

rcl o

fficQ

s, h

igh

rise

1,30

01,

600

775

1,10

02,

075

2,70

0P

rest

ige

offic

Qs,

hig

h ris

e1,

900

3,01

01,

465

1,52

03,

365

4,53

0S

hopp

ing

cent

res

1,36

51,

650

710

880

2,07

52,

530

HO

TE

LS

3,18

03,

360

1,37

01,

710

4,55

05,

070

l'eso

rt h

otel

s, in

dusi

ve o

f F.F

.&E

.

3-st

ar b

udge

t hot

els,

ditt

o3,

160

4,00

573

01,

370

3,89

05,

375

5-st

ar lu

xury

hot

els,

citt

o5,

715

6,75

01,

785

1,90

07,

500

8,65

0

Page 22: Malaysia Handbook 2014

IND

US

TR

IAL

Ligh

t (ill

y fla

tted

fact

oriQ

s88

090

058

075

01,

460

1,65

0H

eavy

(ill

y fla

tted

fact

oriQ

s an

d w

areh

ousQ

s1,

140

1,19

065

082

01,

790

2,01

0

Sng

le s

tore

y co

nven

tiona

l fac

tory

of

stru

ctur

al s

teeh

nork

945

1,12

539

557

01,

340

1,69

5O

mer

ope

rate

d fa

ctor

iQs,

low

ris

e1,

265

1,37

053

064

01,

795

2,01

0

OT

HE

RS

Bas

emen

t car

par

ks (

<3

leve

ls)

865

960

290

305

1,14

51,

265

!Ele

vate

d ca

r pa

rks

(<4

leve

ls)

670

795

200

245

870

1,04

0R

irnay

and

Sec

onda

ry s

choo

ls64

577

016

020

080

597

0S

tude

nt h

oste

ls92

01,

015

230

255

1,15

01,

270

Spo

rts

dubs

indu

cing

F.F

.M1,

745

1,85

051

561

02,

260

2,46

0

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

(10%

) bu

t exc

lusi

ve o

f con

tinge

ncie

s.

Page 23: Malaysia Handbook 2014

RM

/m2

BU

ILD

ING

SE

RV

ICE

ST

OT

AL

DO

ME

ST

IC

Bun

galo

w (

mas

s ho

usin

g)1,

100

1,45

045

575

01,

555

2,21

0D

etac

hed

hous

Qs

and

bung

alow

s1,

780

1920

,87

095

02,

650

2,87

0T

erra

ced

hous

es68

097

011

025

079

01,

220

Ave

rage

sta

ndar

d ap

artr

nerit

s, h

igh

rise

890

1,10

028

533

01,

175

1,43

0

Luxu

ry a

part

men

ts, h

igh

rise

1,10

01,

800

450

725

1,55

02,

525

Low

cos

t hou

sing

430

470

7585

505

555

Low

cos

t fla

ts, l

ow r

ise

(<6

leve

ls)

525

520

155

185

680

705

Low

cos

t fla

ts, h

igh

rise

(<15

leve

ls)

610

600

180

220

790

820

OF

FIC

E /

CO

MM

ER

CIA

L

Ave

rage

sta

ndar

d of

ficQ

s, h

igh

rise

1,10

01,

375

900

1,10

02,

000

2,47

5P

rest

ige

Offi

CQ

G, h

igh

rise

1500

1,90

01,

250

1,50

02,

850

3,40

0S

hopp

ing

cent

rQs

1200

1,40

072

085

019

20,

2,25

0

HO

TE

LS

Res

ort h

otel

s, in

clus

ive

of F

.F.&

E.

2,20

02,

500

1500

1,30

03,

200

3,80

03-

star

bud

get h

otel

s, (

itto

2,70

03,

300

960

1,45

03,

660

4,75

05-

star

luxu

ry h

otel

s, d

itto

4,30

05,

200

1500

1,80

05,

800

7,00

0

Page 24: Malaysia Handbook 2014

IND

UST

RIA

L

Lig

ht c

kity

fla

tted

fact

oriQ

s62

080

050

063

01,

120

1,43

0H

eavy

cki

ty f

latte

d fa

ctor

iQs

andl

nere

hous

Qs

650

800

580

700

1230

1,50

0Sn

gle

stor

ey c

onve

ntio

nal f

acto

ry o

fst

ruct

ural

ste

ehno

rk51

068

050

056

01,

010

1,24

0O

mer

ope

rate

d fa

ctor

iQs,

low

ris

e54

082

040

060

094

01,

420

OT

HE

RS

Bas

emen

t car

par

ks (

<3

leve

ls)

650

800

270

300

920

1,10

0E

leva

ted

car

park

s (<

4 le

vels

)46

059

522

030

068

089

5R

imay

and

Sec

onda

ry s

thoo

ls57

565

016

020

073

585

0St

uden

t hos

tels

650

740

195

240

845

980

Spor

ts d

ubs

indu

cing

F.F

.&E

.1,

300

1,55

050

065

01,

800

2,20

0

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of

prel

imin

arie

s (1

0%)

but e

xclu

sive

of

cont

inge

ncie

s.

Page 25: Malaysia Handbook 2014

RM

/m2

BU

ILD

ING

SE

RV

ICE

ST

OT

AL

DO

ME

ST

IC

Bun

galo

w (

rnas

s ho

usin

g)1,

510

1,61

042

053

01,

930

2,14

0D

etac

hed

hous

Qs

and

bung

alow

s2,

290

2,80

699

01,

224

3,29

04,

030

Ter

race

d ho

usQ

s77

01,

040

295

340

1,05

51,

380

Ave

rage

sta

ndar

d ap

artr

nerit

s, h

igh

rise

1,04

01,

540

355

420

1,39

51,

%0

Lmur

y ap

artm

ents

, hig

h ris

e2,

400

2,92

692

51,

050

3,32

53,

976

Low

cos

t hou

sing

420

450

120

165

540

615

Low

cos

t fla

ts, l

ow r

ise

(<6

leve

ls)

530

590

165

185

695

775

Low

cos

t fla

ts, h

igh

rise

(<15

leve

ls)

610

670

210

220

820

890

OF

FIC

E /

CO

MM

ER

CIA

L

Ave

rage

sta

ndar

d O

ffiC

QG

, hig

h ris

e15

401,

750

860

990

2,40

02,

740

Pre

stig

e of

fices

, hig

h ris

e2,

190

3,24

21,

435

1,63

83,

625

4,88

0S

hopp

ing

cent

rQs

1,57

02,

140

860

990

2,43

03,

130

HO

TE

LSR

esor

t hot

els,

indu

sive

of F

.F.&

E.

3,28

03,

470

1,16

01,

420

4,44

04,

890

3-st

ar b

udge

t hot

els,

citt

o3,

990

4,45

01,

420

1,56

55,

410

6,01

55-

star

luxu

ry h

otel

s, d

itto

6,18

07,

300

2,29

02,

432

8,46

09,

732

Page 26: Malaysia Handbook 2014

IND

UST

RIA

L

Lig

ht d

uty

flat

ted

fact

oriQ

s91

098

042

052

01,

330

1,50

01-

leaw

ckf

ty f

latte

d fa

ctor

ies

and

war

ehou

sQs

1,16

01,

230

495

560

1,65

51,

790

Sngl

e st

orey

con

vent

iona

l fac

tory

of

stru

ctur

al s

teel

wor

k98

01,

210

355

420

1,33

51,

630

Om

er o

pera

ted

fact

oriQ

s, lo

w r

ise

1,31

01,

470

420

505

1,73

01,

975

OT

HE

RS

Bas

emen

t car

par

ks (

<3

leve

ls)

990

1,16

024

529

51,

235

1,44

5H

evat

ed c

ar p

arks

(<

4 le

vels

)67

084

018

522

085

51,

060

Rim

ay a

nd S

econ

dary

sth

ools

830

230

365

950

1,19

5St

uden

t hos

tels

950

1,02

025

529

51,

205

1,30

5Sp

orts

dub

s in

duci

ng F

.F.M

1,87

02,

000

705

860

2,57

52,

860

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

(10%

) bu

t exc

lusi

ve o

f con

tinge

ncie

s.

Page 27: Malaysia Handbook 2014

RM

/m2

BU

ILD

ING

SE

RV

ICE

ST

OT

AL

DO

ME

ST

IC

Bun

galo

w (

rras

s ho

usin

g)1,

100

1,25

046

560

01,

565

1,85

0D

etac

hed

hous

Qs

and

bung

ams

1,70

02,

800

810

950

2,51

03,

750

Ten

-ace

d ho

usQ

s97

01,

020

165

200

1,13

51,

220

Ave

rage

sta

ndar

d ap

artm

ents

, hig

h ris

e1,

120

1,25

029

540

01,

415

1,65

0

Luxu

ry a

part

men

ts, h

igh

rise

1,58

01,

650

850

1,00

02,

430

2,65

0Lo

w c

ost h

ousi

ng57

065

012

015

069

080

0Lo

w c

ost f

lats

, low

ris

e (<

6 le

vels

)79

085

016

520

095

51,

050

Low

cos

t fla

ts, h

igh

rise

(<15

leve

ls)

840

920

170

250

1,01

01,

170

OF

FIC

E /

CO

MM

ER

CIA

L

Ave

rage

sta

ndar

d of

fices

, hig

h ris

e1,

540

1,85

094

01,

100

2,48

02,

950

Pre

stig

e O

ffiC

QG

, hig

h ris

e1,

830

3,00

01,

600

1,68

03,

430

4,68

0S

hopi

dng

cent

rQs

1,73

01,

860

820

1,00

02,

550

2,86

0

HO

TE

LSR

Qso

rt h

otel

s, in

dusi

ve o

f F.F

.&E

.2,

850

3,34

01,

420

1,70

04,

270

5,04

03-

star

bud

get h

otel

s, d

i-to

3,06

03,

340

1,62

01,

770

4,68

05,

110

5-st

ar lu

xury

hot

els,

(itt

o4,

900

7,00

02,

480

2,55

07,

380

9,55

0

Page 28: Malaysia Handbook 2014

IND

US

TR

IAL

Ligh

t dity

flat

ted

fact

orie

s1,

020

1260

365

400

1,38

51,

660

Hea

vy d

ity fl

atte

d fa

ctor

iQs

and

war

ehou

sQs

1,08

01,

270

425

500

1,50

51,

770

Sng

le s

tore

y co

nven

tiona

l fac

tory

of

stru

ctur

al s

teel

wor

k85

097

030

043

01,

150

1,40

0O

mer

ope

rate

d fa

ctor

iQs,

low

ris

e1,

100

1,29

045

053

015

501,

810

OT

HE

RS

Bas

emen

t car

par

ks (

<3

leve

ls)

1,11

01,

350

380

400

1,49

01,

750

!Ele

vate

d ca

r pa

rks

(<4

leve

ls)

860

950

230

250

1,09

01,

200

Rim

ary

and

Sec

onda

ry s

thod

s98

01,

100

220

350

1200

1,45

0S

tude

nt h

oste

ls1,

190

1,33

025

031

01,

440

1,64

0S

port

s du

bs in

ducl

n&

F-1

1M.

1,83

01,

950

730

880

2,56

02,

830

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

(10%

) bu

t exc

lusi

ve o

f con

tinge

ncie

s

CO

2

Page 29: Malaysia Handbook 2014

SVri

l 2>

0w

0>

z z-1

0c

rTi- 0 zo 0 cn 0 D

J

W 0 CI

00 CD C C) 0 0 0 >

KU

ALA

LUM

PU

RB

AN

GK

OK

BR

UN

EI

JAK

AR

TA

°M

AN

ILA

@S

ING

AP

OR

EA

DO

ME

ST

IC41

0

980

285

955

-61

0

- 1,

175

-41

0-

1,17

0

694

1,01

0

505

852

-88

4-

1,19

9-

631

- 1,

041

804

993

520

791

- 1,

104

- 1,

293

-82

0-

640

-72

0

8a)

-1,

0:0

340

-44

092

0 -

1,12

0

880

1,20

062

0

1,30

0

-94

0

- 1,

250

-7(

X)

- 1,

410

1560

2,3W

2,(a

)2,

520

- 1,

760

- 3,

520

2,24

0-

3,3W

Apa

rtrr

ents

, hig

h ris

e, a

vera

ge s

tand

ard

Apa

rtm

ents

, hig

h ris

e, h

igh

end

Ter

raed

hou

ses,

ave

rage

sta

ndar

d

Det

ache

d ho

uses

, hgh

end

OF

FIC

E /

CO

MM

ER

CIA

L77

0

1,11

0

845

685

-88

5-

1,49

5

- 1,

095

-82

5

663

884

663

868

-82

0-

1,13

6-

865

-93

1

804

1,13

7

780

1,C

29

- 1,

104

- 1,

437

- 1,

080

- 1,

329

630

-70

0

930

- 1,

040

540

-60

0

600

-65

0

840

1,28

075

0

1,10

0

-89

0-

1,39

0-

880

- 1,

140

2,00

0

2,20

0

2,2C

0

2,3W

- 2,

200

- 2,

440+

- 2,

360

- 2,

6C0

Mec

iurn

/hig

h ris

e of

ficQ

s, a

vera

ge s

tand

ard

Hig

h ris

e of

fices

, pre

stig

e qu

ality

Cut

-of-

tow

sho

pdng

cen

tre,

aver

age

stan

dard

Rst

ail m

alls

, hig

h en

d

HO

TE

LS

1,28

5

2,22

5

2,47

5

- 1,

775

- 2,

570

- 2,

855

1,19

9

1,51

5

1,76

7

- 1,

325

- 1,

736

- 1,

893

1,52

0

2,14

4

2,20

1

- 1,

820

- 2,

444

- 2,

501

1,10

0 -

1,30

0

1,50

0 -

1,70

01

,6W

- 1

,800

1,20

0

1,29

5

1,60

0

- 1,

350

- 1,

390

- 1,

670

2,48

0

3,16

0

3,16

0

- 2,

680

- 3,

600

- 3,

600

Bud

get h

otel

s -

3 st

ar, r

rid r

rark

et

Bus

inQ

cs h

otel

s -

4/5

star

lam

ry h

otel

s -

5 st

ar

Page 30: Malaysia Handbook 2014

IND

US

TR

IAL

410-

515

550

-61

5

521

-53

1

NiA

371

-67

1

505-

805

290-

320

320-

350

445-

455

490-

510

840-

1,0

80

N/A

Inck

etria

l uni

ts, s

hell

only

. (C

onve

ntio

nal

sing

le s

tore

y fr

arre

d un

its).

Om

er o

pera

ted

fact

oriQ

s, lo

w r

ise,

ligh

tw

eigh

t inc

ketr

y

OT

HE

RS

Und

ergr

ound

/bas

erre

nt c

ar p

arks

(<

3 le

vels

)46

0 -

625

568

-75

7N

/A45

0 -

550

500

-55

01,

080

- 1,

480

Mul

ti st

orey

car

par

ks, a

lcov

e gr

ound

(<

4 le

vels

)27

0 -

350

189

-31

641

2 -

712

290

-32

045

0 -

500

760

- 1,

080$

Sho

ols

(pim

ay &

seco

ndar

y)29

0 -

320

NiA

603

-90

3N

/A68

0 -

750

N/A

Stu

dent

s' r

Qsi

clen

cQs

360

-40

0N

iA70

5 -

1,00

5N

/A70

0 -

800

1,84

0 -

2,00

0

Spo

rts

dubs

, rru

lti p

urpo

se s

port

s/le

isur

e74

5 -

810

NiA

1,62

2 -

1,92

21,

000

- 1,

500

1,20

0 -

1,45

02,

290

- 2,

440

cent

rQs

(cey

spo

rts)

with

a/c

and

incl

udin

gF

F&

EG

ener

al h

ospi

tals

- p

ublic

sec

tor

1,11

5 -

1,37

0N

iA1,

823

- 2,

123

N/A

1,35

0 -

1,50

03,

160

- 3,

320

Exc

hang

e R

ate

Wed

: U

S$1

=R

Ma1

9B

AH

T 3

1.69

B$

1.24

IDR

11,

400

PH

P 4

3.20

S$

1.25

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

but e

xclu

sive

of c

ontin

genc

ies.

" R

ates

exc

lude

VA

T.

1:13 =

# R

ates

are

net

t of V

AT

.g

e R

ates

incl

ude

12%

VA

T.

9,12

Rat

es a

re n

ett o

f GS

T.

Ce3

+In

clud

es r

aise

d flo

or a

nd c

eilin

g to

tena

nted

are

as b

ut e

xclu

des

offic

e ca

rpet

s (n

orm

ally

und

er te

nant

's fi

t-ou

t).

81:

13C

D

$ O

pen

on a

ll si

des

with

par

apet

.

Page 31: Malaysia Handbook 2014

US

$/m

2

> 0

'6cn

0 g z cn

0H c

cn 0 0 cn cn 0 n m ci

0 0 Z 0 z 0 0 -I 0 >

IND

IA"

SE

OU

L#H

O C

HI M

INH

#H

ON

G K

ON

GM

AC

AU

$

DO

ME

ST

IC47

5 -

550

725

-87

032

5 -

350

430

-45

5

1,22

5 -

1,50

0

1,50

0 -

1,81

5N

/A

2,26

0 -

3,45

0

580

-70

074

5 -

875

385

-44

545

5 -

555

2,88

0 -

3,42

0

3,90

0 -

4,55

0

3,95

0 -

4,60

0

5,30

0 -

5,85

0

1,88

0 -

2,30

0

2,62

0 -

4,01

0

3,22

0 -

3,83

0

3,92

0 -

5,26

0

Apa

rtrn

erits

, hig

h ris

e, a

vera

ge s

tand

ard

Apa

rtm

ents

, hig

h ris

e, h

igh

end

Ten

-ace

d ho

usQ

s, a

vera

ge s

tand

ard

Det

athe

d ho

usQ

s, h

igh

end

OF

FIC

E/C

OM

ME

RC

ML

360

-39

045

0 -

480

350

-38

0

500

-52

5

1,18

0 -

1,54

0

1,40

0 -

1,86

0

1,13

5 -

1,77

0

1,36

0 -

2,17

5

690

-81

0

800

- 1,

050

500

-60

0

650

-85

0

2,88

0 -

3,42

0

3,63

0 -

4,40

0

2,88

0 -

3,42

0

3,95

0 -

4,55

0

2,17

0 -

2,80

0

2,80

0 -

3,07

0

2,04

0 -

3,07

0

3,22

0 -

3,95

0

Mec

lurn

/hig

h ris

e of

ficQ

s, a

vera

ge s

tand

ard

Hig

h ris

e of

fices

, pre

stig

e cp

ality

Cut

-of-

tow

n sh

oppi

ng c

entr

e,av

erag

e st

anda

rd

Ret

ail m

alls

, hig

h en

d

HO

TE

LS

675

-75

0

1,05

0 -

1,25

0

1,34

0 -

1,47

5

1,63

0 -

1,99

5

2,36

0 -

4,08

0

2,71

5 -

4,42

5

1,00

0 -

1,30

0

1,30

0 -

1,50

0

1,65

0 -

1,90

0

3,75

0 -

4,00

0

3,95

0 -

4,55

0

4,55

0 -

5,25

0

2,88

0 -

3,27

0

3,92

0 -

4,76

0

4,76

0 -

6,01

0

Bud

get h

otel

s -

3 st

ar, r

rid m

arke

t

Bus

inQ

cs h

otel

s -

4/5

star

Luxu

ry h

otel

s -

5 st

ar

Page 32: Malaysia Handbook 2014

GO

IND

US

TR

IAL

Indu

stria

l uni

ts, s

hell

only

. (C

onve

ntio

nal

sing

le s

tore

y fr

arre

d un

its).

avne

r op

erat

ed fa

ctor

iQs,

low

ris

e, li

ght

275

-33

0

295

-35

0

660

-81

0

N/A

350

-46

0

350

-46

0

N/A

2,22

0 -

2,78

0

N/A

N/A

Inei

ght i

ndus

try

OT

HE

RS

Und

ergr

ound

/bas

emen

t car

par

ks (

<3

leve

ls)

230

-25

097

0 -

1,02

558

0 -

680

2,12

0 -

2,63

015

60 -

158

0

Mul

ti st

orey

car

par

ks, a

lmve

gro

und

(<4

leve

ls)

180

-20

054

5 -

670

330

-39

51,

260

- 1,

470

950

- 1,

290

Sho

ds (

pim

ary

&se

cond

ary)

225

-25

01,

810

- 1,

930

435

-46

02,

450

- 2,

600

1,88

0 -

2,25

0

Stu

dent

s' r

esid

encQ

s25

0 -

280

1,08

0 -

1,15

045

5 -

580

2,05

0 -

2,45

01,

500

- 1,

750

Spo

rts

dubs

, rru

lti p

urpo

se s

port

s/le

isur

ece

ntre

s (c

ey s

port

s) v

l..ith

a/c

and

incl

udin

g

500

-52

51,

470

- 1,

540

695

-77

53,

550

- 4,

050

[VA

FF

&E

Gen

eral

hos

pita

ls -

pub

lic s

ecto

r55

0 -

600

N/A

N/A

4,85

0 -

5,45

0N

/A

Exc

hang

e R

ate

Wed

: U

S$1

=IN

R63

.00

KR

VV

1,11

0V

ND

21,

120

HK

$ 7.

80M

OP

7.9

9

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

but e

xclu

sive

of c

ontin

genc

ies.

ail- =

*R

ates

are

bas

ed o

n pr

ojec

ts in

Ban

galo

re a

nd a

re n

ett o

f VA

T a

nd S

ervi

ce T

ax. M

umba

i cos

ts a

re g

ener

ally

8%

hig

her.

g ec

i#

Rat

es a

re n

ett o

f VA

T.

m I=

9,12

_ $

Rat

es a

re e

xclu

sive

of a

ny m

anag

emen

t con

trac

t fee

.D

= Ce3

g? q1

12.9

Page 33: Malaysia Handbook 2014

US

VM

2

> (/)

g

Z C

n0

DJ

rTi

cn0 0 cn cn 0 cn m ci

( )

(/) Z 0 0 C/) -I >

SH

AN

GH

AI"

CHONGQING/

CHENGDU*

SHENZHEN/

GUANGZHOU*

SH

EN

YA

NG

"D

ALI

AN

"B

EIJ

ING

"

DO

ME

ST

IC73

5 -

815

1,79

5 -

1,96

049

0 -

525

735

-81

5

540

-68

5

865

- 1,

140

425

-52

058

5 -

685

565

-62

0

935

- 1,

035

425

-47

058

0 -

640

570

-65

5

945

- 1,

060

425

-49

057

0 -

620

620

-72

0

1,17

5 -

1,29

045

5 -

520

620

-68

5

670

-73

5

1,65

0 -

1,87

549

0 -

570

735

-81

5

Apa

rtrn

erits

, hig

h ris

e, a

vera

ge s

tand

ard

Apa

rtm

ents

, hig

h ris

e, h

igh

end

Ter

race

d ho

usQ

s, a

vera

ge s

tand

ard

Det

athe

d ho

usQ

s, h

igh

end

OF

FIC

E/C

OM

ME

RC

ML

980

- 1,

305

1,30

5 -

1,63

0

IN/A

1,38

5 -

1,79

5

895

- 1,

060

1,14

0 -

1,55

070

0 -

915

1,22

5 -

1,63

0

820

-90

5

1,12

5 -

1,24

578

0 -

860

1,15

0 -

1,27

0

895

-98

0

1,22

5 -

1,38

573

5 -

815

1,22

5 -

1,38

5

930

-99

5

1,27

0 -

1,34

081

5 -

915

1,25

5 -

1,42

0

980

- 1,

305

1,30

5 -

1,63

073

5 -

980

1,30

5 -

1,79

5

Mec

lurn

/hig

h ris

e of

ficQ

s, a

vera

ge s

tand

ard

Hig

h ris

e of

fices

, pre

stig

e qu

ality

CU

-of-

tom

sho

ppin

g ce

ntre

,av

erag

e st

anda

rd

Ret

ail m

alls

, hig

h en

d

HO

TE

LS

1,06

0 -

1,30

5

1,79

5 -

2,44

5

2,44

5 -

2,93

5

1,06

0 -

1,30

5

1,96

0 -

2,44

5N

/A

1,06

0 -

1,17

0

1,71

0 -

1,89

0

2,33

5 -

2,57

5

1,07

5 -

1,19

0

1,63

0 -

2,12

0N

/A

1,11

0 -

1,20

5

1,87

5 -

2,12

0N

/A

1,06

0 -

1,30

5

1,79

5 -

2,28

5

2,28

5 -

2,93

5

Bud

get h

otel

s 3

star

, rrid

rra

rket

Bus

inQ

cs h

otel

s -

4/5

star

Luxu

ry h

otel

s 5

star

Page 34: Malaysia Handbook 2014

IND

US

TR

IAL

570

-65

549

0 -

655

530

-58

5N

VA

NV

A57

0 -

655

Indu

stria

l uni

ts, s

hell

only

. (C

onve

ntio

nal

sing

le s

tore

y fr

amed

uni

ts).

avne

r op

erat

ed fa

ctor

ies,

low

ris

e, li

ght

NiA

N/A

NiA

NiA

NiA

NiA

Inei

ght i

ndus

try

OT

HE

RS

Und

ergr

ound

base

rren

t car

par

ks (

<3

leve

ls)

815

- 1,

140

N/A

540

-86

562

0 -

685

NiA

735

-81

5

Mul

ti st

orey

car

par

ks, a

bove

gro

und

(<4

leve

ls)

410

-57

037

5 -

440

385

-42

537

5 -

410

390

-41

041

0 -

490

Sto

ols

(pirr

ary

& s

econ

dary

)57

0 -

735

N/A

425

-47

0N

iAN

iA57

0 -

735

Stu

dent

s' r

Qsi

denc

Qs

410

-57

0N

/A27

0 -

300

NiA

NiA

410

-57

0

Spo

rts

dubs

, rru

lti p

urpo

se s

port

s/le

isur

ece

ntrQ

s (d

ry s

port

s) w

ith a

/c a

nd in

duci

ng1,

060

- 1,

305

N/A

800

-88

5N

iAN

iA98

0 -

1,30

5

FF

&E

Gen

eral

hos

pita

ls -

pub

lic s

ecto

r1,

630

- 2,

120

N/A

NiA

NiA

NiA

1,30

5 -

1,63

0

Exc

hang

e R

ate

Wed

: U

S$1

=R

MB

6.1

3R

iVB

6.1

3P

UB

6.1

3R

AA

B 6

.13

RM

B 6

.13

RM

B 6

.13

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, i

nclu

sive

of p

relim

inar

ies

but e

xclu

sive

of c

ontin

genc

ies.

" H

ouse

s ar

e bu

ilt to

she

ll an

d co

re s

tand

ard

only

, whe

re a

ll te

nant

or

occu

pant

are

as a

re u

nfirn

ishe

d.

Page 35: Malaysia Handbook 2014

RM

KU

ALA

LUM

PU

RP

EN

AN

GJO

HO

R B

AH

RU

KO

TA

KIN

AB

ALU

KU

CH

ING

1E

xcav

atin

g ba

sem

ent

2m d

eep

rrP

iao

- 2a

012

.5-

iao

iao

-23

.5ia

oia

o2

Exc

avat

ing

for

foot

ings

1.5m

dee

prr

ts18

.0-

2a0

13.0

-21

.816

.0 -

23.5

20.0

18.0

3 R

emov

e ex

cava

ted

mat

eria

ls o

ff si

terr

P20

.0-

25.0

12.0

-25

.015

.0 -

25.0

2a0

18.0

4 H

ardc

ore

bed

blin

ded

with

fine

mat

eria

lsrr

P60

.0-

70.0

50.0

-70

.090

.0 -

120

.010

0.0

90.0

5 M

ass

conc

rete

gra

de 1

5rr

ts27

0.0

- 29

0.0

225.

0-2

90.0

265.

033

0.0

320.

06

Rei

nfor

ced

conc

rete

gra

de 3

0rr

P27

0.0

- 30

0.0

230.

0-2

95.0

300.

039

5.0

365.

0

7 M

ild s

teel

rod

rei

nfor

cem

ent

kg3.

7-

4.2

2.4

-4.

03.

8 -

4.2

4.0

3.8

8 H

igh

tens

ile r

od r

einf

orce

men

tkg

3.7

-4.

22.

4-

4.0

3.8

-4.

24.

03.

89

Saw

n fo

rmw

ork

to s

offit

s of

sus

pend

edsl

abs

m2

40.0

-50

.025

.0-

38.0

45.0

40.0

42.0

10 S

awn

form

wor

k to

col

umns

and

wal

lsne

P40

.0-

50.0

25.0

-38

.045

.040

.042

.0

11 1

12.5

mm

thic

k br

ick

wal

lsm

240

.0-

50.0

33.0

-60

.050

.043

.544

.0

12 "

Klip

lok

Col

orbo

nd"

0.64

mm

pro

filed

ste

el

shee

ting

m2

55.0

-60

.060

.0-

85.0

95.0

96.0

*91

.0

13 A

lum

iniu

m c

asem

ent w

indo

ws,

sin

gle

glaz

edm

235

0.0

- 50

0.0

216.

0-

425.

029

5.0

- 38

0.0

250.

0 -

350.

036

0.0

Page 36: Malaysia Handbook 2014

14. S

truc

tura

l ste

elw

ork

- be

ars,

sta

nd-li

ons

and

the

like

kg6.

5 -

ao6.

0 -

9.0

aso

6.5

-7.

07.

5

15. S

teel

wor

k -

angl

Qs,

than

nels

, fla

ts a

ndth

e lik

ekg

6.5

-ao

6.0

-9.

0as

o6.

5-

7.0

7.5

16. 2

5mrn

cem

ent a

nd s

and

(1:3

) pa

ving

m2

iao

- 25

.012

.0 -

MO

20.0

-25

.025

.022

.0

17. 2

0-rr

n ce

men

t and

san

d (1

:4)

plas

ter

tow

alls

m2

iao

- 25

.012

.0 -

26.0

MO

-32

.025

.020

.0

1a G

eran

ic ti

lQG

bed

ded

to fl

oor

scre

ed

(mea

sure

d se

pa-a

tely

)

m2

50.0

- 7

0.0

30.0

-68

.055

.0 -

65.0

MO

86.0

19. 1

2mrn

fibr

ous

plas

terb

oard

cei

ling

linin

gm

230

.0 -

45.

019

.0 -

320

40.0

-50

.050

.058

.0

20. T

wo

coat

s of

em

ulsi

on p

aint

topl

aste

red

surf

acQ

sm

2as

-4.

52.

5 -

a24.

5 -

5.5

aso

120

Ave

rage

exp

ecte

d p-

elirr

inar

iQs

%6.

0 -

120

3.0

-5.

06.

0 -

ao5.

0-

7.0

10.0

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, e

xclu

sive

of c

ontin

genc

ies

and

prel

imin

arie

s."

Rat

es is

for

"Klip

lok

Col

orbo

nd"

0.54

mm

pro

filed

ste

el s

heet

ing.

Page 37: Malaysia Handbook 2014

KU

ALA

LUM

PU

RR

MB

AN

GK

OK

*B

AH

TB

RU

NE

IB

$JA

KA

RT

AID

R'0

00M

AN

ILA

PH

PS

ING

AP

OR

E@

S$

1. E

xcav

atin

g ba

sem

ent

2m d

eep

rrP

18 -

2215

03.

6030

350

16.5

0

2. E

xcav

atin

g fo

r fo

otin

gs1.

5m d

eep

rrP

18 -

2215

03.

2040

300

16.5

0

3. R

emov

e ex

cava

ted

mat

eria

ls o

ff si

tern

s20

-25

120

335

250

45 -

50

4. H

ardc

ore

bed

blin

ded

with

fine

mat

eria

lsrr

P60

-70

600

4333

03,

000

50

5. M

ass

conc

rete

gra

de 1

5rr

P27

0 -

290

2,20

012

490

03,

800

202^

6. R

einf

orce

d co

ncre

te g

rade

30

rns

270

- 30

02,

700

130

1,05

05,

000

155

- 17

0

7. M

ild s

teel

rod

rei

nfor

cem

ent

kg3.

70 -

4.20

28.5

01.

1012

481.

60 -

1.7

5

8. H

igh

tens

ile r

od r

einf

orce

men

tkg

3.70

-4.

2027

.50

1.10

1249

1.60

- 1

.75

9. S

awn

form

wor

k to

sof

fits

of s

uspe

nded

sla

bsrn

240

-50

480

1515

090

040

-45

10. S

awn

form

wor

k to

col

umns

and

wal

lsrr

P40

-50

480

1515

085

040

-45

11. 1

12.5

mm

thic

k br

ick

wal

lsrr

P40

-50

850

17.5

015

0N

YA

30 -

35

12. "

Klip

lok

Col

orbo

nd"

0.64

mm

pro

filed

ste

el

shee

ting

rn2

55 -

601,

200

5822

095

043

13. A

lum

iniu

m c

asem

ent w

indo

ws,

sin

gle

glaz

edrn

235

0 -

500

7,00

016

0 -

210

1,10

09,

500"

290

14. S

truc

tura

l ste

elw

ork

- be

ams,

sta

nchi

ons

and

the

like

kg6.

50 -

8.0

055

3.50

2511

54.

80 -

5.8

0

15. S

teel

wor

k -

angl

es, c

hann

els,

flat

s an

d th

e lik

ekg

6.50

- 8

.00

553.

2025

105

4.80

- 5

.80

16. 2

5mm

cem

ent a

nd s

and

(1:3

) pa

ving

rn2

18 -

2520

09

5535

011

Page 38: Malaysia Handbook 2014

17. 2

Orm

n ce

men

t and

san

d (1

:4)

pest

er to

wal

lsm

218

-25

200

865

350

15.5

0

1a C

eran

ic ti

lQG

bed

ded

to fl

oor

scre

ed

(rre

asur

ed s

epar

atel

y)

m2

50 -

7012

00,

3014

01,

200

65.5

0

19. 1

2nirn

fibr

ous

plas

terb

oard

cei

ling

linin

gm

230

-45

800

2613

0$1,

300

30

20. T

v.o

coat

s of

em

ulsi

on p

aint

to p

este

red

surf

acQ

srn

23.

50 -

4.5

018

05

2540

0as

o - 4

.00

6 -

1212

- 1

75

- 8

6 -

108

- 15

13 -

17

A v

e r

a g

e e

xpec

ted

pref

irrin

ariQ

s

The

abo

ve c

ost a

re b

ased

on

lum

p su

m fi

xed

pric

e co

ntra

ct r

ate

excl

usiv

e of

pre

limin

arie

s an

d co

ntin

genc

ies

unle

ss o

ther

wis

e st

ated

."

Rat

es a

re n

ett o

f VA

T.

e R

ates

are

net

t of G

ST

.$

9mm

gyp

sum

boa

rd.

" A

lum

iniu

m w

ith a

nodi

zed

finis

h; 6

mm

thic

k.R

ate

for

lean

con

cret

e bl

indi

ng.

Page 39: Malaysia Handbook 2014

IND

IA*

SE

OU

L'H

O C

HI M

INH

^B

EIJ

ING

HO

NG

KO

NG

MA

CA

UIN

RK

RW

VN

D 0

00)

RM

BH

K$

MO

P

1. E

xcav

atin

g ba

sem

ent

2m d

eep

ri-P

145

1,85

064

-70

2217

011

0

2. E

xcav

atin

g fo

r fo

otin

gs1.

5m d

eep

rris

165

1,85

070

-77

2716

013

0

3. R

emov

e ex

cava

ted

mat

eria

ls o

ff si

teri-

PN

VA

9,70

066

-72

3323

0$80

4. H

ardc

ore

bed

blin

ded

with

fine

mat

eria

lsri-

P3,

450

28,5

0033

0 -

365

155

800

850

5. M

ass

conc

rete

gra

de 1

5rn

34,

750

62,4

001,

315

- 1,

500

525

1,00

01,

000

6. R

einf

orce

d co

ncre

te g

rade

30

rrP

5,60

075

,500

1,73

0 -

1,90

057

11,

200

1,05

0

7. M

ild s

teel

rod

rei

nfor

cem

ent

kg61

1,12

021

.0 -

23.2

5.10

10.2

010

8. H

igh

tens

ile r

od r

einf

orce

men

tkg

631,

145

21.0

-22

.95.

1010

.20

10

9. S

awn

form

wor

k to

sof

fits

of s

uspe

nded

sla

bsri-

P52

525

,200

178

-19

568

320

250

10. S

awn

form

wor

k to

col

umns

and

wal

lsri-

P55

025

,200

225

-25

058

320

250

11. 1

12.5

mm

thic

k br

ick

wal

lsrn

281

043

,000

164

-17

570

300

280

12. "

Klip

lok

Col

orbo

nd"

0.64

mm

pro

filed

ste

el

shee

ting

ri-P

1,25

037

,900

475

-52

0N

VA

800

NV

A

13. A

lum

iniu

m c

asem

ent w

indo

ws,

sin

gle

glaz

edrn

24,

800

310,

000

2,55

0 -

2,80

078

0+2,

500

2,10

014

. Str

uctu

ral s

teel

wor

k -

beam

s, s

tanc

hion

s

and

the

like

kg95

1,45

029

.8 -

33.0

1133

35

15. S

teel

wor

k -

angl

es, c

hann

els,

flat

s an

d th

e lik

ekg

951,

500

33.0

-36

.210

3535

16. 2

5mm

cem

ent a

nd s

and

(1:3

) pa

ving

ri-P

360

3,05

051

-55

2512

010

0

0 0 Z (/) 0

cn 015 Z

cn0 0

m 0-1 0

o cn rTi

cn

Page 40: Malaysia Handbook 2014

17. 2

Orm

n ce

men

t and

san

d (1

:4)

plas

ter

to w

alls

m2

295

8,50

070

-77

2613

012

0

laG

eran

ic ti

I Q

s be

dded

to fl

oor

scre

ed

(rre

asur

ed s

epar

atel

y)

rn2

1,25

063

,000

230

-25

513

033

050

0

19. 1

2rrm

fibr

ous

plas

terb

oard

cei

ling

linin

gm

295

025

,500

298

-62

515

050

045

0

20. T

wo

coat

s of

em

ulsi

on p

aint

to p

last

ered

surf

acQ

sm

216

07,

750

67 -

7232

5012

0

Ave

rage

exp

ecte

d pr

elim

inar

iQs

7 -

116

- 11

8 -

128

- 10

10 -

15

6 -

12

The

abo

ve c

osts

are

bas

ed o

n lu

mp

sum

fixe

d pr

ice

cont

ract

rat

e ex

clus

ive

of p

relim

inar

ies

and

cont

inge

ncie

s un

less

oth

erw

ise

stat

ed.

" R

ates

are

sup

ply

& fi

x ba

sed

on p

roje

cts

in B

anga

lore

and

are

net

t of V

AT

and

ser

vice

Tax

. Mum

bai c

osts

are

gen

eral

ly 8

% h

ighe

r.#

Rat

es in

clud

e la

bour

cos

ts a

nd a

re n

ett o

f VA

T.

Rat

es a

re n

ett o

f VA

T.

$ R

ate

incl

udin

g du

mpi

ng c

harg

es.

+ R

ate

for

doub

le g

laze

d w

indo

w.

Page 41: Malaysia Handbook 2014

SH

AN

GH

AI

RM

B

CH

ON

GQ

ING

/C

HE

NG

DU

RM

B

SH

EN

ZH

EN

/G

UA

NG

ZH

OU

RM

BS

HE

NY

AN

GR

MB

DA

LIA

NR

MB

-6>

g

00 0 Z

1. E

xcav

atin

g ba

sem

ent

2m d

eep

rrP

3018

2522

29

2. E

xcav

atin

g fo

r fo

otin

gs1.

5m d

eep

rns

2540

2025

33(/

)3.

Rem

ove

exca

vate

d m

ater

ials

off

site

rrP

105

4568

3530

4. H

ardc

ore

bed

blin

ded

with

fine

mat

eria

lsrr

P16

813

017

015

017

0C

5. M

ass

conc

rete

gra

de 1

5rn

s40

036

045

041

042

00

6. R

einf

orce

d co

ncre

te g

rade

30

rrP

500

400

500

500

500

7. M

ild s

teel

rod

rei

nfor

cem

ent

kg5

5.50

65.

705.

700

Z8.

Hig

h te

nsile

rod

rei

nfor

cem

ent

kg5

5.50

65.

505.

70cn

09.

Saw

n fo

rmw

ork

to s

offit

s of

sus

pend

ed s

labs

rrP

7065

5580

820

10. S

awn

form

wor

k to

col

umns

and

wal

ls

11. 1

12.5

mm

thic

k br

ick

wal

ls

rrP

rn2

70 80"

65 50

55 60

80 70

82 70

m o-I

12. "

Klip

lok

Col

orbo

nd"

0.64

mm

pro

filed

ste

el

shee

ting

rn2

NV

AN

VA

NV

AN

VA

NV

A

13. A

lum

iniu

m c

asem

ent w

indo

ws,

sin

gle

glaz

edrn

265

075

0+55

070

0+70

0+cn

14. S

truc

tura

l ste

elw

ork

- be

ams,

sta

nchi

ons

and

the

like

kg12

1010

1112

15. S

teel

wor

k -

angl

es, c

hann

els,

flat

s an

d th

e lik

ekg

1010

1011

.32

12

16. 2

5mm

cem

ent a

nd s

and

(1:3

) pa

ving

rrP

3529

2025

37cn

Page 42: Malaysia Handbook 2014

17. a

rrm

cem

ent a

nd s

aid

(1:4

) pl

aste

r to

wal

lsrn

228

2220

26ao

1 a

Ger

anic

ti IQ

G b

edde

d to

floo

r sc

reed

m2

160

130

130

165

140

(rre

asur

ed s

epar

atel

y)

19. 1

2rrm

fibr

ous

plas

terb

oard

cei

ling

linin

grn

217

015

018

012

014

0

20. T

wo

coat

s of

em

ulsi

on p

aint

to p

last

ered

surf

acQ

sm

235

3025

3032

Ave

rage

exp

ecte

d pr

elirr

inar

iQs

3 -

85

- 10

5 -

105

- 10

5 -

10

The

abo

ve c

osts

are

bas

ed o

n lu

mp

sum

fixe

d pr

ice

cont

ract

rat

e ex

clus

ive

of p

relim

inar

ies

and

cont

inge

ncie

s un

less

oth

erw

ise

stat

ed.

" R

ate

for

120m

m th

ick

conc

rete

blo

ck w

alls

.+

Rat

e fo

r do

uble

gla

zed

win

dow

.

Page 43: Malaysia Handbook 2014

1 CONSTRUCTION COST DATA

ACMV COSTS FOR VARIOUS DESIGNS &DEVELOPMENTS IN KUALA LUMPURACMV : Air Conditioning & Mechanical Ventilation System

500

400 -

300 -

200 -

100-

0

RM/m2 of Construction Floor Area

400

350360

260250

210

Central Variable Central Constant Central VariableAir Volume Air Volume Refrigerant Volume

RM/m2 of Construction Floor Area500

400- 391

300 310

200

100

0

450 450

350

190

1100

280280 278

200

90

60

2 .2 g75

T13,1;2TD_

Or' -0, 0 a>o as0 Ei 3 ro

= u_ E oE 0< = (T. )

c c oC . )

42 (METRE-RCN OCST DATA

Page 44: Malaysia Handbook 2014

8000

6000 -

4000

2000

0

v'ffy_

RM/Tonne of Refrigeration

LangdonSeahAN MFIUATE OF RI ARCADIS

10000

7500

5000

2500

0

Central VariableAir Volume

Central Constant Central VariableAir Volume Refrigerant Volume

RM/Tonne of Refrigeration

7600

1116500

8400

7500

5000

4600

2000 2000

1300 1200

8500

6600

7500

6200

o.0

. 5ECD-0

17,0<

.2 0CI) EE oE0

MNSTRETICN MST DATA 43

Page 45: Malaysia Handbook 2014

KU

ALA

LUM

PU

RR

M/m

2B

AN

GK

OK

@B

AH

T/m

2B

RU

NE

IB

$1m

2JA

KA

RT

IDR

'000

/m2

MA

NIL

AS

PH

P/m

2S

ING

AP

OR

E^

S$1

m2

ME

CH

AN

ICA

L S

ER

VIC

ES

afiC

QG

355

- 46

04,

500

-4,

900

181

- 22

678

0-

920

3,00

0-

4,30

018

0-

290

Indu

stria

l*60

-90

1,55

0-

1,59

023

-39

240

-56

065

0-

1,50

035

- 13

01-

btel

s29

5-

460

4,80

0-

5,20

029

2-

336

780

- 1,

050

3,00

0-

6,50

015

0-

325

Sho

ppin

g C

entr

Qs

295

- 41

04,

600

-4,

900

207

- 24

669

0-

830

2,12

5-

4,50

017

0-

295

Apa

rtm

ents

205

- 29

04,

500

-4,

600

214

- 24

669

0-

900

600

-3,

000

100

- 19

0E

LEC

TR

ICA

L S

ER

VIC

ES

225

- 46

53,

300

-3,

500

233

- 29

263

0-

840

3,30

0-

6,00

017

5-

290

afiC

QG

Indu

stria

l-14

0-

157

1,95

0-

2,09

019

4-

233

350

-55

02,

000

-3,

500

55-

145

1-bt

els

260

- 60

03,

850

-4,

350

292

- 38

163

0-

890

4,70

0-

9,00

020

0-

385

Sho

ppin

g C

entr

Qs

200

- 27

52,

600

-3,

050

221

- 31

755

0-

700

3,06

0-

6,00

017

0-

330

Apa

rtm

ents

85-

215

2,99

0-

3,52

025

2-

317

630

-84

03,

900

-6,

300

110

- 25

0H

YD

RA

ULI

C S

ER

VIC

ES

25-

5579

0-

950

16-

3915

0-

230

900

-2,

000

30-

60af

iCQ

G

Indu

stria

l36

-45

750

-79

011

-19

90-

160

700

-1,

300

20-

401-

btel

s17

5-

240

1,50

0-

1,75

061

-84

630

-91

01,

950

-4,

000

100

- 19

5

Sho

ppin

g C

entr

Qs

25-

3081

0-

950

12-

4115

0-

230

595

-1,

400

50-

90

Apa

rtm

ents

18-

451,

205

-1,

420

38-

6063

0-

900

1,40

0-

2,60

080

- 16

0N

Page 46: Malaysia Handbook 2014

FIR

E S

ER

VIC

ES

Offi

cQs

60 -

8079

0 -

860

32-

3921

0 -

310

650

-1,

200

35 -

60In

dust

rial

45 -

6573

0 -

750

12-

1990

-16

060

0 -

900

25 -

55H

otel

s65

-95

790

-89

026

-49

210

-31

065

0 -

1,10

030

-60

Sho

p O

ng C

entr

Qs

65 -

8679

0 -

850

32-

6621

0 -

250

550

-90

040

-60

Apa

rtm

ents

20 -

2579

0 -

890

26-

5221

0 -

250

600

-1,

300

25 -

55LI

FT

S /

ES

CA

LAT

OR

SO

fficQ

s88

- 4

001,

100

-1,

150

9-

3233

0 -

900

1,60

0 -

2,90

070

- 1

80In

dust

rial

54 -

190

NV

A4

-19

NV

AN

VA

45 -

115

Hot

els

85 -

370

1,10

0 -

1,19

012

-45

330

-84

01,

800

-3,

000

55 -

120

Sho

ppin

g C

entr

Qs

85 -

110

230

-49

012

-36

250

-67

059

5 -

2,00

060

- 1

00A

part

men

ts63

- 1

0550

0 -

580

11-

2632

0 -

670

800

-1,

800

45 -

125

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, e

xclu

sive

of c

ontin

genc

ies

unle

ss o

ther

wis

e st

ated

."

Gen

eral

ly w

ithou

t air

cond

ition

.""

Exc

lude

s sp

ecia

lpo

wer

sup

ply.

@ B

ased

upo

n ne

tt en

clos

ed a

rea

and

nett

of V

AT

.#

All

rate

s ar

e ne

tt of

VA

T. R

ates

for

Ele

ctric

al S

ervi

ces

are

excl

udin

g ge

nset

. Rat

es fo

r H

ydra

ulic

Ser

vice

s ar

e ex

clud

ing

ST

P.

Rat

es fo

r M

echa

nica

l Ser

vice

s re

fers

to A

CM

V R

ates

onl

y.R

ates

are

net

t of G

ST

and

are

exc

ludi

ng B

AS

.$

Tra

nsfo

rmer

, inc

lude

d in

Ele

ctric

al S

ervi

ces.

Page 47: Malaysia Handbook 2014

SE

OU

L@K

RW

('000

)/rn

2IN

DIA

#IN

R/r

n2H

O C

HI M

INH

VN

D('0

00)/

rn2

BE

IJIN

GR

MB

/rn2

HO

NG

KO

NG

HK

$/rn

2M

AC

AU

MO

P/r

n 2

9.0 m 0 0 cn 0 H m cn 0 rTi

ME

CH

AN

ICA

L S

ER

VIC

ES

219

91

210

148

94

- 29

0-

159

- 34

0-

245

- 17

3

3,80

0

1,75

0

4,75

0

3,70

0

2,10

0

-5,

400

-3,

100

-5,

200

-4,

850

-2,

650

1,66

5 -

2,37

3N

VA

NV

A

NV

A

1,33

0 -

1,82

2

760

170

910

790

140

- 1,

000

-28

0-

1,11

0-

950

-38

0

1,80

010

0

2,00

0

2,10

075

0

-2,

500

-20

0-

2,50

0-

2,60

0-

1,55

0

NV

A

NV

A

2,10

0 -

2,50

0

1,80

0 -

2,40

065

0 -

800

Offi

cQs

Indu

stria

r

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

ELE

CT

RIC

AL

SE

RV

ICE

S

270

125

375

215

140

- 39

5-

165

- 49

0-

250

- 18

0

3,40

0

2,00

0

3,80

0

3,20

0

1,50

0

-4,

750

-3,

350

-5,

200

-4,

300

-2,

250

2,00

5 -

2,39

0N

VA

NV

A

NV

A

1,76

8 -

2,23

3

460

320

705

481

253

-67

0-

450

-89

8-

663

-38

6

1,55

055

0

1,80

0

1,70

0

1,00

0

-2,

300

-80

0-

2,50

0-

2,30

0-

1,55

0

NV

A

NV

A

2,10

0 -

2,50

0

2,10

0 -

2,30

075

0 -

1,00

0

Offi

cQs

Incl

ustr

iar

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

HY

DR

AU

LIC

SE

RV

ICE

S

33 21 70 29 49

-57

-32

- 11

0-

57-

75

600

400

3,20

087

5

1,40

0

-90

0-

700

-4,

800

-1,

600

-1,

950

275

-52

4

NV

A

NV

A

NV

A

536

-53

4

95 95

370

140

170

-14

0-

140

-48

0-

200

-23

0

350

200

900

350

650

-45

0-

300

-1,

200

-45

0-

1,00

0

NV

A

NV

A

1,00

0 -

1,20

035

0 -

450

650

-80

0

Offi

cQs

Indu

stria

l

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

Page 48: Malaysia Handbook 2014

FIR

E S

ER

VIC

ES

afiC

QG

42-

6895

0-

1,25

064

5 -

1,07

018

0-

265

500

-65

0N

VA

Indu

stria

l28

-32

450

-60

0N

VA

150

-22

530

0-

400

NV

A

I-bt

els

58-

911,

100

-1,

400

NV

A22

0-

375

500

-70

070

0 -

900

Sho

ppin

g C

entr

Qs

44-

7290

0-

1,05

0N

VA

220

-37

550

0-

650

500

-60

0-

6850

0-

600

440

-55

470

-13

510

0-

150

150

-20

0A

part

men

ts33

LIF

TS

/ E

SC

ALA

TO

RS

afiC

QG

49-

6475

0-

950

590

- 1,

125

294

-57

770

0-

1,20

0N

VA

Indu

stria

l16

-25

500

-65

0N

VA

145

-40

055

0-

750

NV

A

I-bt

els

118

- 17

51,

100

-1,

600

NV

A23

2-

520

550

-85

060

0 -

800

Sho

ppin

g C

aitr

Qs

59-

841,

150

-1,

500

1,20

0 -

1,70

032

7-

520

850

-1,

000

450

-70

0

Apa

rtrn

erits

29-

4170

0-

900

670

-97

017

5-

299

450

-85

045

0 -

600

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, e

xclu

sive

of c

ontin

genc

ies

unle

ss o

ther

wis

e st

ated

."

Gen

eral

ly w

ithou

t air

cond

ition

.""

Exc

lude

s sp

ecia

lpo

wer

sup

ply.

e R

ates

are

net

t of V

AT

.#

Rat

es a

re b

ased

on

proj

ects

in B

anga

lore

and

are

net

t of V

AT

and

Ser

vice

Tax

. Mum

bai c

osts

are

gen

eral

ly 8

% h

ighe

r.

9,

CO

2

Page 49: Malaysia Handbook 2014

SH

AN

GH

AI

RM

B/m

2

SH

EN

ZH

EN

/G

UA

NG

ZH

OU

RM

B/m

2

CH

ON

GQ

ING

/C

HE

NG

DU

RM

B/m

2S

HE

NY

AN

GR

MB

/m2

DA

LIA

NR

MB

/m2

-69.

0 m 0 0 cn 0 H m cn 0 rTi

CD

0 C 0 -I 0 0 ci >

ME

CH

AN

ICA

L S

ER

VIC

ES

I

761

-96

617

3 -

299

971

- 1,

265

1,05

0 -

1,10

331

0 -

410

715

-97

014

0 -

250

1,00

0 -

1,25

066

0 -

890

115

-35

5

700

- 1,

000

150

-25

0

750

- 1,

200

600

- 1,

000

100

-30

0

600

- 70

0N

/A

700

- 80

060

0 -

900

100

- 30

0

600

- 70

0N

VA

700

- 80

060

0 -

700

100

- 30

0

Offi

c Q

s

Incl

ustr

iar

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

ELE

CT

RIC

AL

SE

RV

ICE

S59

3 -

651

305

-43

1

651

-83

052

0 -

651

252

-36

8

495

-71

529

5 -

415

635

-85

545

0 -

610

260

-41

5

450

-70

030

0 -

400

550

-80

045

0 -

700

250

-35

0

450

- 65

0N

/A

700

- 90

050

0 -

600

300

- 40

0

470

- 69

0N

VA

720

- 92

052

0 -

620

220

- 32

0

Offi

cQs

Incl

ustr

iar

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

HY

DR

AU

LIC

SE

RV

ICE

S11

0 -

163

89 -

131

368

-48

813

7 -

184

168

-22

6

115

-15

580

-10

536

5 -

460

105

-14

013

5 -

240

70 -

130

70 -

120

300

-40

070

-13

012

0 -

200

30 -

120

NV

A

200

- 30

012

0 -

170

100

- 20

0

70 -

120

NV

A

200

- 30

012

0 -

170

100

- 15

0

Offi

cQs

Indu

stria

l

Hot

els

Sho

ppin

g C

entr

Qs

Apa

rtm

ents

Page 50: Malaysia Handbook 2014

FIR

E S

ER

VIC

ES

Offi

cQs

220

-30

021

0 -

325

180

-25

015

0 -

230

150

- 23

0In

dust

rial

150

-25

013

0 -

250

150

-25

0N

VA

NV

A

Hot

els

280

-38

026

0 -

386

200

-33

013

0 -

230

150

- 23

0S

hopp

ing

Cen

trQ

s25

0 -

380

230

-34

522

0 -

330

50 -

150

150

- 20

0A

part

men

ts50

-10

060

-11

550

-10

050

- 1

3060

- 1

50LI

FT

S /

ES

CA

LAT

OR

SO

fficQ

s28

0 -

550

275

-45

035

0 -

600

300

- 55

030

0 -

550

Indu

stria

l13

5 -

390

140

-40

515

0 -

350

NV

AN

VA

Hot

els

220

-49

522

5 -

435

300

-50

030

0 -

500

250

- 35

0S

hopp

ing

Cen

trQ

s32

5 -

495

305

-43

030

0 -

450

140

- 23

015

0 -

250

Apa

rtm

ents

165

-32

511

4 -

250

140

-25

012

0 -

250

120

- 20

0

The

abo

ve c

osts

are

at 4

th Q

uart

er 2

013

leve

ls, e

xclu

sive

of c

ontin

genc

ies

unle

ss o

ther

wis

e st

ated

."

Gen

eral

ly w

ithou

t air

cond

ition

.""

Exc

lude

s sp

ecia

lpo

wer

sup

ply.

Page 51: Malaysia Handbook 2014

1 CONSTRUCTION COST DATA

UNIT COSTS FOR ANCILLARY FACILITIESFOR KUALA LUMPUR

DESCRIPTION UNIT RM

PLAYGROUND EQUIPMENTOutdoor playground equipment

comprising various activities and

safety mat

Minimum recommended area:

13.97m x 13.61m

Age group: 4 to 12

Child Capacity: 20 - 30" Price varies according to equipment

and design.

SAUNASSauna room for 4 - 5 people complete

with timber finishes, stainless steelheater with built-in control panel andall accessories

Size: 5' x 5' x 6'6"

STEAM BATHSSteam bath for 5 - 6 people complete

with steam generator, tempered glass

door, ceramic wall tiles, water

proofing system, lighting and all

accessories

Size: 5' x 5' x 7'6"

GOLF COURSES

(Based on "Average Cost Model" ofan 18 hole golf course in Asia).

Including fairway construction andrough hydro seeding.

GOLF SIMULATORComplete golf simulation system

complete with projector, high impactprojection screen, artificial grass

putting turf, putting green

per set 40,000

perroom 12,000

perroom 18,500

per hole 2,552,000

per set 275,000

50 CONSTRUCTION COST DATA

Page 52: Malaysia Handbook 2014

CONSTRUCTION COST DATA

LangdonSeahAN MFIUATE OF IA ARCADIS

DESCRIPTION UNIT RM

SQUASH COURTSSingle court with glass back wallincluding associated mechanical andelectrical services but excluding anypublic facilities (enclosing structurenot included)

TENNIS COURTS

Single court on grade with acrylicsurfacing complete excluding chainlink fence

SWIMMING POOLSSize: 25m x 10.5m

Depth: approx. 1.2m to 1.8m

Outdoor swimming pool built on

ground, fully tiled, completed with 5m

wide deck and associated equipment

Extra for heating equipment (solar)

Extra for ozone system

Size: 25m x 10.5m

Depth: approx. 1.8m to 3.0m

Indoor swimming pool built with

suspended structure (enclosing

structure not included) fully tiled andcompleted with 5m wide deck,

including mechanical ventilation andassociated equipment

Extra for heating equipment (solar)

Extra for ozone system

per court 56,200

per court 69,000

Per pool 822,250

per pool 172,500

per pool 241,500

per pool 1,201,750

per pool 287,500

per pool 345,000

Page 53: Malaysia Handbook 2014

1 CONSTRUCTION COST DATA

FIT-OUT COSTS FOR KUALA LUMPUR

DESCRIPTION RM/m2

HOTELSPublic Area (Front of House):

3 - star Hotel

4 - star Hotel

5 - star Hotel

Guest Rooms:

3 - star Hotel

4 - star Hotel

5 - star Hotel

Notes:

1. Includes furniture, floor, wall and ceiling finishes, drapery,sanitary fittings and light fittings.

2. Excludes partitioning, M&E works, chandelier, building shell,

operational items and equipment (e.g. bed, cutlery crockery,

linen, television, refrigerator etc.), opening expenses, stage

equipment and computer systems.

2,480 - 3,3803,270 - 4,070

4,070 - above

1,240 - 1,760

1,690 - 2,680

2,600 - above

OFFICESGeneral OfficeExecutive Office

Prestige Office

Notes:

1. Local furniture allowed for general offices.2. Includes furniture, partitioning, minor alteration to fire services,

air-conditioning and suspended ceiling to suit layout.

3. Excludes telephones, Local Area Network, office equipment

(e.g. computers, photocopies, fax machines,UPS, etc).

480 - 650

650 - 1,050

1,050 - above

RESTAURANTSGeneral dining restaurantFine dining restaurant

Notes:

1. Includes furniture, floor, wall and ceiling finishes, minoralteration to air-conditioning and fire services installation to

suit layout, exhaust for kitchen but excludes exhaust flue,operational items (e.g. cutlery, crockery, linen, utensils, etc.).

2,030 - 3,730

5,650 - above

52 CONSTRUCTION COST DATA

Page 54: Malaysia Handbook 2014

GENERAL CONSTRUCTION DATA

JUBM- Langdon & ah Building WorksComposite Tender Price Index (BWCTPI)

JKR Tender Price Index

Value of Construction Work Done

Performance of Construction actor

Esti mat ng %les of Thumb

Technical 93ecifications

Average Unit Prices

Unit Price Index

Construction actor Indicators

Commodities Price Trend(Jan to Dec 2013)

Malaysia Construction actor- Employment & GDP

Rogress Payments

Page 55: Malaysia Handbook 2014

2 GENERAL CONSTRUCTION DATA

JUBM - LANGDON & SEAN BUILDING WORKSCOMPOSITE TENDER PRICE INDEX (BWCTPI)

0 CO

<s!L.0

CO

ci ci cico CO CD

tN

(uowpadd)

PLO? L

LOZ PO

LOZ 00

o 08 ZO

LOZ L

LOZ PO

LOZ 00

LOZ ZO

LOZ L

L LOZ

L LOZ 00

L LOZ 00

L LOZ L 0

LOZ PO

L OE SO

LOZ ZO

LOZ L

600? PO

600Z SO

600Z 00

600? L

800? PO

8000 SO

800Z 00

800? L

LOOZ

900?

800?

1700?

£00?

54 CfNEWL OONSTRETICII DATA

Page 56: Malaysia Handbook 2014

TE

ND

ER

PR

ICE

IND

EX

=M

I

Yea

r1/

22/

2

2003

249.

9724

6.81

2004

243.

6928

8.59

2005

3120

931

256

I

2006

393.

6441

262

2007

415.

4442

6.13

2008

441.

6845

8.76

2009

427.

1439

6.95

2010

410.

1839

8.59

2011

408.

4941

1.36

2012

4a).

4942

9.32

2013

415.

24N

/A

Ten

der

Pric

e In

dex

500

450

400

350

-

300

250

200

-

150

-

100

-

50

0C

DC

DC

D 01

5 CD 01

01 CD

CD 01

C 0

CD

CD 01

CD

CD 01

LO

CD

CD 01

CO

CD

CD 01

CD

CD 01

CD

CD 01

01 CD

CD 01

CD

CD 01

.- 5 01

01 CD 01

C 0

CD 01

Bas

e Y

ear

= 1

980

Sou

rce:

Con

trac

t and

Qua

ntity

Sur

vey

Bra

nch,

Pub

lic W

orks

Dep

artm

ent (

JKR

), M

alay

sia

,,..

1

,..°

1:13

Page 57: Malaysia Handbook 2014

Qua

rter

/ Y

ear

Res

iden

tial

Non

-res

iden

tial

Civ

ilS

peci

al T

rade

Tot

alB

uild

ings

Bui

ldin

gsE

ngin

eerin

gR

M m

illio

n(%

)R

M m

illio

n(%

)R

M m

illio

n(%

)R

M m

illio

n(%

)R

M m

illio

n(%

)

01/2

009

3,59

223

15,

738

36.9

4,83

530

.31,

367

9.6

15,5

3210

0.0

C2/

2009

3,58

923

06,

201

39.7

4,31

627

.61,

531

9.8

15,6

3610

0.0

Q3/

2009

3,15

521

.26,

323

42.5

4,19

628

.21,

191

8.0

14,8

6510

0.0

04/2

009

2,76

219

.86,

058

43.3

3,85

927

.61,

303

9.3

13,9

8110

0.0

01/2

010

C2/

2010

Q3/

2010

04/2

010

GI/2

011

C2/

2011

Q3/

2011

04/2

011

Q1/

2012

C2/

2012

Q3/

2012

04/2

012

Q1/

2013

C2/

2013

Q3/

2013

2,89

620

.32,

904

182

3,21

521

.63,

293

21.1

3,49

122

.53,

775

25.1

4,18

026

.14,

610

26.1

4,88

527

.65,

162

25.4

5,06

124

.85,

760

26.0

5,41

326

.36,

484

28.5

6,25

327

.4

6,29

344

.17,

210

45.1

6,60

944

.46,

979

44.6

6,57

842

.46,

513

43.3

6,16

638

.55,

958

33.7

6,80

738

.47,

086

34.8

7,15

835

.16,

431

29.0

6,71

432

.67,

123

31.4

7,86

934

.4

3,67

525

.84,

462

27.9

3,57

624

.04,

030

25.8

4,36

328

.13,

530

23.5

4,35

527

.26,

057

34.3

5,11

928

.97,

050

34.6

7,20

135

.38,

835

39.8

7,60

336

.98,

025

35.3

7,66

733

.6

1,40

61,

416

1,48

91,

339

1,08

71,

222

1,33

51,

036

9.8

8.9

10.0

8.6

7.0

8.1

8.3

5.9

915

5.2

1,05

25.

298

24.

81,

165

5.2

884

4.3

1,08

64.

81,

062

4.6

14,2

7015

,992

14,8

8915

,641

15,5

1915

,041

16,0

3717

,661

100.

010

0.0

100.

010

0.0

100.

010

0.0

100.

010

0.0

17,7

2610

0.0

20,3

4910

0.0

20,4

0110

0.0

22,1

9110

0.0

20,6

1310

0.0

22,7

1710

0.0

22,8

5210

0.0

Sou

rce:

Qua

rter

ly C

onst

ruct

ion

Sta

tistic

s, D

epar

tmen

t of S

tatis

tics

Mal

aysi

a

Page 58: Malaysia Handbook 2014

(%)

40.0

0 -

35.0

0-

30.0

0-

25.0

0-

20.0

0-

15.0

0-

10.0

0-

5.00

-

0.00

Nb.

of

Abj

ect

Val

ue o

f0:

inst

ruct

ion

Don

e (P

M00

0)

15,5

19,4

48

15,0

40,3

16,0

37,2

13

17,6

61,1

41

Per

cent

age

Cha

lge

(%)

(CoQ

) (W

O

- 0.

88.

8

- 3.

1-

6.0

6.6

7.7

10.1

12.9

C2

N

03

7,76

6

7,64

8

8,25

9

8,78

1

o'cl

j C2

N

03

8,58

5

8,81

8

8,86

2

9,32

4

17,7

25,9

06

20,3

48,8

55

20,4

01,3

33

22,1

90,7

36

0.4

14.2

14.8

35.3

0.3

27.2

8.8

25.6

co01

'cS

C2

Q3

8,71

9

9,39

2

9,75

3

20,6

13,4

11

22,7

17,5

00

22,8

51,6

29

- 7.

116

.3

10.2

11.6

0.6

12.0

(5.0

0) -

(10.

00)

-

01

Per

cent

age

Cha

nge

(%)

(QoQ

)

Per

cent

age

Cha

nge

(%)

(YoY

)

11 0

344

01

2011

Sou

rce:

Qua

rter

ly C

onst

ruct

ion

Sta

tistic

s, D

epar

tmen

t of S

tatis

tics

Mal

aysi

a

2012

2013

(/)

171

171

0 D

J-I

71

0 0

DJ

DJ 0 0 0 0 cn 0

Page 59: Malaysia Handbook 2014

2 GENERAL CONSTRUCTION DATA

ESTIMATING RULES OF THUMB

Composition of Concrete (per m31

Mix Cement Sand Aggregate1:3:6 216kg 0.45m3 0.90m31:2:4 308kg 0.43m3 0.86m31:1:2 540kg 0.38m3 0.75m3

Weight of Concrete Items

Item WeightConcrete 2,400 kg/rn3Cement 1,441 kg/rn3Sand 1,600 kg/rn3Aggregate 1,350 kg/rn3Steel 7,843 kg/rn3

Average LoadsVolume

Lorry 10.0 rn3

Concrete truck (24 ton) 5.5 rn3

Barge 200 - 1,450 rn3

Dimensions for Standard Parking Space, Loading/Unloading Bays and Lay-bys

MinimumLength Width Headroom

Private Cars, Taxisand Light Vans

5 rn 2.5 rn 2.4 rn

Coaches and Buses 12 rn 3.0 rn 3.8 rn

Lorries 11 rn 3.5 rn 4.1 rn

Container Vehicles 16 rn 3.5 rn 4.5 rn

Minimum headroom means the clearance between thefloor and the lower most projection from the ceilingincluding any lighting units, ventilation duct, conduitsor similar.

58 CfNERALCENSTFUCTICN DATA

Page 60: Malaysia Handbook 2014

Structure Design - Concrete Ratios

LangdonSeahAN MFIUATE OF RI MCADIS

The following is a range of concrete ratios for buildingsuperstructure design:

Concrete/floor area 0.3 m3/m2 to 0.6 m3/m2Formwork/floor area 2.2 m2/m2 to 3.0 m2/m2Reinforcement/concrete vol. 160 kg/m3 to 250 kg/m3

Average External Wall/Floor Ratio

Residential Apartments 1.0 m2/m2Office, Hotel 0.4 m2/m2Industrial 0.4 m2/m2

Average Internal Wall/Floor Ratio

Residential Apartments 1.0 m2/m2Office 0.5 rn2/m2

Hotel 1.5 rn2/m2

Air - Conditioning

Average 0.05 tonne/m2 of floor area

The above ratios are indicative and for reference purposesonly. They do not account for buildings with special shapes,configurations or particular small foot prints.

Indicative Dimensions for Sports Grounds

Length WidthTennis Court 40 m 20 mSquash Court 13 m 6 mBasketball Court 38 m 23 mVolleyball Court 30 m 20 mBadminton Court 20 m 10 mRink 61 m 26 mSoccer Playing Feld 110 - 120 m 70 - 80 mFutsal 25 - 42 m 15 - 25 m

The above dimensions are for a single court with appropriateclearance. No spectator seating or support area has beenallowed.

CfNERALCENSTFUCTICN DATA 59

Page 61: Malaysia Handbook 2014

60 NERAL CONSTRUCTION DATA

2 GENERAL CONSTRUCTION DATA

TECHNICAL SPECIFICATIOWTable for Standard BRC Fabrics

co

zc- ccgE

Ts EE

Eco

coo E

EE

co COco0

EE

co2

87-m(?)@OP8 Sg'4,13@cci7fcricric\IN,c5 505007f cricri ccio7fcric\i,

PcgMMse MMMMM

@?2MMSe c7S§§§cU OHM

2co

2 0000m000 0000000 000000O cci cci LC 7f 5

CC

E-U) 0

0, cmop 0'I- CO,r co

COMorY

0co CC

8 8 8 8 8 8 8 8 8 8 8 8 8

00000 000 00 00000 c)c)c)c)c)c)5 05 cd cci 0 7f c\I ci 05 cd cci ci 05 cd cci LC

< << << MM MMMM 00000

U)*1)U) 0) 00 r- co Lo +2 o) co co71- MMMMMMM C) C) C) C) C) C)

Page 62: Malaysia Handbook 2014

Weight Tables for Mild Steel Round Bar &High Tensile Deformed Bar

LangdonSeahAN MFIUATE OF RI MCADIS

Std. Size (mm) Cross Unit No. of Pcs. WeightHigh Yield Mild Steel Sectional Weight 12m Length Per BundleDeformed Round Area (mm2) (kg/m) Per Bundle (MT)

D6 06 2a3 0.222 376 1.002

D8 08 50.3 0.395 210 0.995

D9 09 63.6 0.499 168 1.006

D10 010 78.5 0.616 138 1.020

D12 012 1131 0.888 96 1.023

D16 016 231.1 1.579 54 1.023

D20 020 314.2 2466 34 1.006

D22 022 380.1 2984 28 1.003

D25 025 490.9 3854 22 1.017

D28 028 615.8 4.834 18 1.044

D32 032 804.2 6.313 14 1.061

D35 035 9621 7.553 12 1.088

D38 038 1,134.1 8.9o3 lo 1.068

D 40 1,256.6 9.864 9 1.065

" High Yield Deformed Bar Standard Length : 12 metres straight." Mild Steel Round Bar Standard Length : 12 metres straight or

12 metres once folded.

" Special cut length can be produced from 6m to 15m on acertain min. quality per size per order upon request.

CfNERALCINSTFUCTICN DATA 61

Page 63: Malaysia Handbook 2014

Fue

l Oil

RM

/Litr

eB

itum

enR

M/M

etric

Ton

2013

Med

ium

80/1

00 P

enet

ratio

n

Aut

omat

ive

Gas

Oil

RM

/Litr

eS

and

RM

/Met

ric T

onC

emen

tR

M/5

0 kg

Bag

Die

sel R

etai

l Pric

eR

iver

San

dO

rdin

ary

Por

tland

Ftg

onA

BC

AB

CA

BC

AB

CA

BC

Jan

2.14

2.26

N/A

2,43

0W2,

555.

W2,

525.

W1.

801.

801.

8040

.70

36.6

637

.67

17.2

817

.38

lass

Feb

2.20

2.32

N/A

2,43

0W2,

555.

W2,

525.

W1.

801.

801.

8041

.17

36.6

637

.67

1722

17.3

8la

ssM

ar2.

162.

28N

/A2,

3W.W

2,55

5.W

2,53

5.W

1.80

1.80

1.80

41.1

736

.66

37.6

717

.13

17.3

8la

ssP

sor

2.05

2.17

N/A

2,3W

.W2,

555.

W2,

535.

W1.

801.

801.

8041

.17

36.6

637

.67

17.1

117

.38

lass

May

2.03

2.15

N/A

2,3W

.W2,

503W

2,43

0.W

1.80

1.80

1.80

41.1

736

.66

37.6

717

.19

17.3

8la

ssJu

n2.

1222

4N

/A2,

330W

2,55

5.W

2,43

0.W

1.80

1.80

1.80

41.3

036

.66

37.6

717

.32

17.3

8la

ssJu

l2.

1222

4N

/A2,

330W

2,55

5.W

2,43

0.W

1.80

1.80

1.80

41.3

036

.66

37.6

717

.48

17.3

8la

ssA

ug2.

152.

27N

/A2,

250.

W2,

555.

W2,

430.

W1.

801.

801.

8041

.30

36.6

637

.67

17.4

617

.59

lass

Sep

2.16

2.28

N/A

2,33

0.W

2,55

5.W

2,41

0.W

1.80

1.80

1.80

41.3

036

.66

37.6

717

.64

17.5

916

.95

Cct

2.12

224

N/A

2,3W

.W2,

555.

W2,

400.

W2.

W2.

002.

0041

.51

36.6

637

.67

17.6

817

.59

16.9

5

Nov

2.12

224

N/A

2,3W

.W2,

550.

W2,

420.

W2.

W2.

002.

0041

.71

36.6

637

.67

17.6

817

.59

16.9

5

Dec

2.11

1

223

N/A

2,3W

.W2,

550.

W2,

420.

W2.

W2.

002.

0041

.91

36.6

637

.67

17.6

317

.59

16.9

5

Reg

ion:

A =

Cen

tral

Pen

insu

lar

Mal

aysi

a; B

= K

da K

naba

lu: C

= K

uchi

ng

Sou

rce:

Spe

dal R

elea

se 1

, For

Ovi

I E

ngin

eerin

g W

orks

, Dep

artm

ent o

f Sta

tistic

s, M

alay

sia

0 0 0 0

Page 64: Malaysia Handbook 2014

Agg

rega

tes

RM

/Met

ric T

on

2013

Gra

nite

10m

m(3

/21)

Gra

nite

20m

m(3

/4"

)G

rani

te 4

0mm

(11/

2")

Cru

sher

run

Reg

ion

AA

AA

Jan

29.1

240

.50

2a58

25.5

158

.50

3323

27.8

949

.50

21.3

022

.76

40.7

518

.50

Feb

29.1

240

.50

25.7

825

.51

58.5

032

/327

.89

49.5

021

.30

22.7

640

.75

18.5

0

Mar

29.1

240

.50

25.7

825

.51

58.5

032

/327

.98

49.5

021

.30

22.7

640

.75

18.5

0

Acr

29.1

240

.50

25.7

825

.51

58.5

032

/327

.98

49.5

021

.30

22.8

140

.75

18.5

0

May

2930

40.5

025

/825

.56

58.5

032

/327

.98

49.5

021

.30

22.8

840

.75

18.5

0

Jun

29.2

341

.00

25/8

25.5

658

.50

32/3

27.8

550

.75

21.3

022

.71

41.2

518

.50

Jul

29.2

341

.00

25/8

2553

58.8

032

/327

.85

5200

21.3

022

.71

41.7

518

.50

Aug

29.2

341

.00

25.9

825

5358

.80

32/3

27.8

552

0021

.63

22.7

141

.75

18.5

0

Sep

29.2

641

.00

25.9

825

5358

.80

32/3

27.9

652

0021

.63

22.4

441

.75

18.5

0

Od

29.2

641

.00

25.9

825

5359

.40

32/3

27.9

652

.00

21.6

322

4741

.75

18.5

0

Nid

/29

.29

41.0

025

.98

2553

59.4

032

/328

.02

52.0

021

.63

22.5

041

.75

18.5

0

Dec

29.3

841

.00

25.9

825

5359

.40

32/3

28.1

152

.00

21.6

322

.50

41.7

518

.50

Reg

ion:

A =

Cen

tral

Pen

insu

lar

Mal

aysi

a; B

= K

da K

naba

lu: C

= K

uchi

ng

Sou

rce:

Spe

dal R

elea

se 1

, For

avi

I E

ngin

eerin

g W

orks

, Dep

artm

ent o

f Sta

tistic

s, M

zday

sia

Page 65: Malaysia Handbook 2014

VIVO NOLOCIHISNOO1VHaNaO 179

W?gcrckig-ik

0) r).) r).) r).)

$$$$$$$$$$$ cr, CO

0) 0) 0) 0) 0) 0) 00 0

Bricks & Wall

Glass

Ceiling Materials

Roofing Materials

F '13 ,Zsf Timber iv iv .4,

- V r).) 0 CA) 0 0) CA) CA) cr,

0) 0) - - 0 0 0 0 0 0 0 0

888888888SSg ivivbbbbbbObb

Plywood

Sanitary Fittings

Floaoll Tr&

Plumbing Materials

ssss s Steel &

V a, -.4 1-)4 V, Metal Sections

Paints

X3GNI 3OIEld lINfl

viva NO110111:11SNOO 1V1:13N30

Page 66: Malaysia Handbook 2014

Inde

x

150

140

130

120

11 0

1 0

0

9 0

80

Oth

er a

rtic

Rs

of c

oncr

ete,

cem

ent a

nd p

last

er-M

- B

asic

iron

and

ste

el p

rodu

cts

-a-

Pro

duct

Rn

of c

onst

ruct

Rn

rela

ted

prod

ucts

WA

A'AIW

AO

rirM

_-

.011

11,M

ILW

AR

TFA

,W

ialik

Vitf

fiV

IW

rTA

STE

Num

ber

- H

ousn

g A

ppro

vals

) (n

um e

r)R

M M

illR

n-

Loan

s A

ppro

ved

for

Con

stru

cton

Sec

tor

(RM

ask

s))

- 3,

500

35,0

00

30,0

00 -

25,0

00 -

20,0

00 -

15,0

00

10,0

00

5,00

0

- 3,

000

- 2,

500

- 2,

000

1,50

0

1,00

0

500

II

II

II

II

II

II

II I

IIIII

A2

gs(1

A,

2gs

k20

1220

13

Pro

duct

ion°

(In

dex)

Hou

sing

App

rova

ls"

(num

ber)

Loan

sA

ppro

val f

orC

onst

ruct

ion

Sec

tor

(RM

mill

ion)

2013

Oth

er A

rtic

les

of C

oncr

ete,

Cem

ent &

Pla

ster

Bas

ic Ir

onan

dS

teel

Pro

duct

s

Con

stru

ctio

nR

elat

edP

rodu

cts

Jan

119.

010

7.8

124.

914

,800

2,02

7Fe

b10

2.7

91.7

1120

12,4

661,

585

Mar

1225

1123

130.

419

,454

2,12

4

kir

121.

111

1.5

128.

822

,270

1,52

4

May

114.

310

8.9

128.

611

,976

2,75

2Ju

n10

9.1

1128

130.

213

,977

1,86

0Ju

l12

2.1

1124

131.

89,

964

1,36

6

Pug

117.

911

2613

1.0

18,1

403,

291

Sep

107.

310

5.1

126.

417

,844

1,70

4

114.

2 J.

105.

3I.

134.

0N

/AII

1,37

1

Not

e: °

All

rate

s ar

e ba

sed

on th

e ne

w In

dust

rial p

rodu

ctio

n In

dex

(200

5 =

100

)."

No.

of h

ousi

ng u

nits

by

priv

ate

deve

lope

rs a

ppro

ved

for

cons

truc

tion

by th

eM

inis

try

of H

ousi

ng a

nd L

ocal

Gov

ernm

ent i

n P

enin

sula

r M

alay

sia.

Sou

rce:

Mon

thly

Sta

tistic

al B

ulle

tin, N

ovem

ber

2013

, Cen

tral

Ban

k of

Mal

aysi

a.

Page 67: Malaysia Handbook 2014

2 GENERAL CONSTRUCTION DATA -

COMMODITIES PRICE TREND (JAN TO DEC 2013)

NickelUSD/Tonne

19,000

18,000

17,000

16,000

15,000

14,000

13,000Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Copper (Grade A)USD/Tonne

8,500

8,300

8,100

7,900

7,700

7,500

7,300

7,100

6,900

6,700

6,500Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

66 CfNERAL CMSTFUCTICN DATA

Page 68: Malaysia Handbook 2014

Aluminium

LangdonSeahAN MFIUATE OF RI MCADIS

Jan Feb Ma Ap May Jun Jul Aug Sep Oc Nov Dec

Year2013

Aluminium

Monthly

Copper Nickel(Grade A)

Average (USD / Tonne)

Jan 2,037.43 8,048.27 17,455.00

Feb 2,052.85 8,069.55 17,72350Mar 1,91248 7,661.58 16,722.50

APr 1,855.95 7,202.57 15,62810May 1,829.95 7,228.07 14,945.00

Jun 1,815.73 7,003.38 14,263.25

Jul 1,767.09 6,892.04 13,699.35

kg 1,814.14 7,181.50 14,274.29

Sep 1,759.79 7,160.79 13,77286at 1,811.72 7,188.02 14,063.04

Nov 1,748.62 7,065.71 13,721.19

Dec 1,738.18 7,202.15 13,907.75

Source: London Metal Exchange

CfNERALCENSTFUCTICN DATA 67

Page 69: Malaysia Handbook 2014

2 GENERAL CONSTRUCTION DATA

MALAYSIA CONSTRUCTION SECTOR- EMPLOYMENT & GDP

Employment ('000)

,250 -

,200 -

,150 -

2010 2011 2012 2013*

Employment for Construction Sector

-4- Contribution to Total Employment

- 9.50

- 9.40

- 9.30

- 9.20

- 9.10

- 9.00

8.90

GDP (RM million)

35,000 - - 4.50

30,000 - 4.00

3.5025,000 -

3.00

20,000 - - 2.50

15,000 - - 2.00

1.5010,000 -

1.00

5,000 - - 0.50

0 0 M2010 2011 2012 2013* 2014**

Year

Gross Domestic Product (GDP) for Construction Sector

Contribution to Total GDP

Note: " Estimate by Ministry of Finance Malaysia"" Forecast by Ministry of Finance Malaysia

Source: Economic Report 2013/2014,Ministry of Finance, Malaysia

68 GENERAL CONSTRUCTION DATA

Page 70: Malaysia Handbook 2014

Pro

gres

s C

laim

s (%

)

100

80 60 40 20

2040

6080

100

Con

trac

t Per

iod

(%)

The

follo

win

g gr

aph

and

tabl

e ar

e an

indi

catio

n of

the

rate

of e

xpen

ditu

refo

r co

nstr

uctio

n pr

ojec

ts.

The

rat

e of

exp

endi

ture

is a

n av

erag

e ra

te a

nd w

ill v

ary

from

pro

ject

topr

ojec

t whe

n sp

ecifi

c pr

ojec

t circ

umst

ance

s ar

e ta

ken

into

acc

ount

.

No

acco

unt h

as b

een

mad

e fo

r re

tent

ion.

Con

trac

tP

erio

d

5% 10')/

0

15%

20)/

0

25%

imar

k35

%

Cum

ulat

ive

Pro

gres

sC

laim

s

Con

trac

tP

erio

dC

umul

ativ

eP

rogr

ess

Cla

ims

Con

trac

tP

erio

dC

umul

ativ

eP

rogr

ess

Cla

ims

2%40

')/0

36%

75%

82%

5%45

%43

%80

')/0

87%

8%gr

k50

%85

%13

%55

%57

%90

%95

%18

%60

%64

%95

%98

%24

%65

%7(

rk10

0%10

0%30

%70

%76

%

Page 71: Malaysia Handbook 2014

2 GENERAL CONSTRUCTION DATA

70 CfNERAL CMSTFUCTIal DATA

Page 72: Malaysia Handbook 2014

Fbsidential

Hotel

Office

Riopping Complex

Slop

Industrial

Page 73: Malaysia Handbook 2014

Res

iden

tial

Q3

2013

p

VV

P K

uala

Lur

rpm

1AP

Put

raja

yaV

P L

abua

n

Sel

ango

rJo

hor

Pul

au P

inan

gP

erak

Neg

eri S

errid

lan

Mel

aka

Ked

ah

Pah

ang

Ter

engg

anu

Kel

anta

nP

erlis

Sab

ahS

araw

ak

Exi

stin

g S

tock

(uni

t)

424,

324

4,78

511

,737

1,35

4,55

470

2,10

1

371,

699

404,

929

238,

803

161,

cFP

275,

648

223,

494

81,6

7458

,140

21,7

4415

0,34

321

0,31

3 9M

ALA

YS

IA

Inco

min

g S

uppl

(uni

t)

50,6

561,

501

349

146,

147

116,

859

57,1

2938

,931

58,4

2320

,498

42,6

5530

,529

24,7

7217

,123

3,71

642

,052

23,5

44

74,88imigg

Pro

ject

ion

of C

umul

ativ

e S

uppl

y fo

r H

igh

End

Con

dom

iniu

ms

Num

ber

of U

nits

50,0

00-

40,0

00 -

30,0

00 -

20,0

00 -

10,0

00 -

II1

11

11

11

11

120

0920

1020

11 1

H20

12 2

H20

12 1

H20

13 (

e) 2

H20

13()

2014

()0

II

Ban

gsar

/A

mpa

ng H

ilir

/M

ont'

Kia

ra /

KL

City

Dam

ansa

raU

-Tha

ntS

ri H

arta

mas

Hei

ghts

Not

e: (

e) =

est

imat

e; (

f) =

fore

cast

p =

pre

limin

ary

Sou

rce:

Res

iden

tial P

rope

rty

Sto

ck R

epor

t, 3r

d Q

uart

er 2

013,

by

Val

uatio

n &

Pro

pert

y S

ervi

ces

Dep

artm

ent &

Kni

ght F

rank

Page 74: Malaysia Handbook 2014

GO

Sel

ecte

d S

econ

dary

Hou

sing

Mar

ket P

rices

in th

e K

lang

Val

ley

RM

/s1

750

650

550

450

350

250

TT

DI

Ban

dar

Uta

ma

Buk

it Je

Mon

gK

ota

Kem

unin

gB

anda

r K

inra

ra

2005

2006

2007

2008

2009

2010

2011

2012

2013

MI

RM

306

RM

314

RM

349

RM

355

RM

387

RM

454

RM

583

RM

620

RM

693

Ban

dar

Uta

rna

RM

280

RM

290

RM

292

RM

303

RM

333

RM

400

RM

480

RM

508

RM

596

Buk

it Je

luto

ngR

M 2

00R

M 2

09R

M 2

20R

M 2

32R

M 2

48R

M 2

57R

M 3

24R

M 3

32R

M 3

59

Kot

a K

ernu

ning

RM

197

RM

211

RM

217

RM

218

RM

226

RM

261

RM

289

RM

325

RM

360

Ban

dar

Kin

rara

RM

205

RM

215

RM

220

RM

228

RM

265

RM

288

RM

365

RM

381

RM

469

Sou

rce:

WT

W In

tern

atio

nal a

nd K

nigh

t Fra

nk

Ask

ing

Pric

es a

nd R

enta

ls o

fE

xist

ing

Hig

h E

nd C

ondo

min

ium

s (1

H 2

013)

Loca

liin

g G

ross

Ren

t Ask

ing

Sel

ling

Pri

(RM

psf

/mon

th)

(RM

psf

)

KL

city

*ao

o -

5.50

700

- 1,

650

IA

rrpa

ng H

ilir

/ U-l

harr

t20

0 -

4.00

500

- 1,

100

Dar

rans

ara

Hei

ghts

**25

0 -

4.00

650

-95

0

Ken

ny H

ills

200

- as

o50

0 -

900

Ban

gsar

250

- 4.

5050

0 -

1,10

0

Mon

t Kar

a***

250

- as

o45

0 -

750

Not

es:

"E

xclu

des

The

Bin

jai O

n T

he P

ark

""In

clud

es T

win

s @

Dam

ansa

ra H

eigh

tsE

xclu

des

Ver

ve S

uite

s w

hich

com

pris

es m

ainl

y fu

llyfu

rnis

hed

smal

l uni

ts

Page 75: Malaysia Handbook 2014

Hot

elE

xist

ing

Sto

ckIn

com

ing

Sup

ply

Q3

2013

P(R

oom

)(R

oom

)

1AP

Kua

la L

ump,

32,4

942,

234

1AP

Put

raja

ya78

30

1AP

I ah

l Jan

1,54

732

4

Sel

ango

r15

,003

127

Joho

r21

,148

5,62

0P

ulau

Pin

ang

14,7

672,

110

Per

ak12

,325

1,3

Neg

eri S

ent(

' lan

5,82

297

5M

elak

a10

,785

2,65

6K

edah

10,9

3820

7

Pah

ang

22,2

3645

3

Ter

engg

anu

6,83

998

6K

elan

tan

4,26

834

3P

erlis

888

97S

abah

15,%

81,

048

Sar

awak

16,1

771,

014

MA

LAY

SIA

p =

pre

limin

ary

Sou

rce:

Lei

sure

Pro

pert

y S

tock

Rep

ort,

3rd

Qua

rter

201

3 by

Val

uatio

n &

Pro

pert

y S

ervi

ces

Dep

artm

ent

988

19,2

57A

m

Ave

rage

Occ

upan

cy R

ate

of H

otel

s by

Sta

r R

atin

g

70.0

65.0

60.0

55.0

50.0

45.0

40.0

-5-s

tar

-4-s

tar

-3-s

tar

CO

71.

LOC

DN

-C

O07

0C

VC

OC

O0-

0000

000

CO

0000

0000

0000

CV

CV

C%

1C

VC

VC

VC

VC

VN

CV

CV

NE

, 8

P =

Pre

dict

ion

0

Page 76: Malaysia Handbook 2014

Tou

rist A

rriv

als

& R

ecei

pts

to M

alay

sia

RM

Mill

ion

70,0

00-

60,0

00-

50,0

00-

40,0

00-

30,0

00

I20

,000

-10

,000

-

Rec

eipt

s (R

M m

il)

-0-

Arr

ival

s (M

il)

1111

1111

Mill

ion

- 30

- 25

- 20

- 15

- 1

0

- 5

Ave

rage

Roo

m R

ates

for

5-st

ar &

4-s

tar

Hot

els

in K

uala

Lum

pur

City

Cen

tre

arar

RM

/Nig

htR

M/N

ight

1H 2

008

200

370

2H 2

008

202

377

1H 2

009

210

388

2H 2

009

208

380

1H 2

010

209

345

2H 2

010

216

347

1H 2

011

209

339

2H 2

011

214

343

1H 2

012

205

344

2H 2

012

212

351

1H 2

013

207

348

-01

CI

71-

LON

-00

0.1

00

00

00

00

00

00

0101

0101

0101

0101

0101

01

Sou

rce:

Tou

rism

Mal

aysi

aS

ourc

e: K

nigh

t Fra

nkC

O2

Page 77: Malaysia Handbook 2014

Maj

or O

ffice

Inve

stm

ent S

ales

in J

une

2012

to J

une

2013

App

rox

Letta

ble

Are

a (S

F)

RM

psf

Tow

er 6

, Ave

nue

5, 1

1-le

Hor

izon

Pna

% 2

, Ban

gsar

Sou

th14

6,00

0 (1

)70

0 (1

)

Tow

er 1

, Ave

nue

7, T

he H

oriz

on P

na%

2, B

angs

ar S

outh

231,

000

(1)

750(

1)

Rop

osed

Ton

er3,

PJ

Sent

ra]

Pria

se 1

, Pet

afin

g Ja

ya(2

)28

1,45

585

0

Eas

t Wng

of

The

Ico

n @

Tun

Raz

ak, J

aw T

un R

azak

267,

907

844

(

M9n

aa P

MI,

Jal

an C

haig

kat C

eylo

n10

4,01

157

7

Tow

er 3

, Ave

nue

7, T

he H

oriz

on, B

angs

ar S

outh

169,

040

N/A

Boc

k 1,

Ton

er 7

, Ave

nue

3, T

hel-b

lizon

Pna

se 1

,71

,552

894

Ban

gsar

Sou

th

Not

es:

(1)

Bas

ed o

n es

timat

ed g

ross

floo

r ar

ea(2

) T

he p

ropo

sed

Gra

de A

offi

ce b

uild

ing

with

LE

ED

Gol

d st

atus

, GB

Iac

cred

itatio

n an

d M

SC

com

plia

nt w

ill c

ompr

ise

betw

een

27 a

nd 3

0 flo

ors

of s

trat

a of

fice

spac

e.(3

) T

he tr

ansa

ctio

n in

clud

es th

e R

oof T

op o

f bot

h E

ast a

nd W

est W

ings

toge

ther

with

301

car

par

k ba

ys.

Sou

rce:

Kni

ght F

rank

Ask

ing

Ren

tals

for

Sel

ecte

d G

rade

A o

ffice

as

at 1

H20

13

RM

pst

/mon

th12

.0

10.0

8.0

6.0

4.0

2.0

0.0

10.5

1

8.3

8.5

8.5

8.5

9.0

.57.

0 7.

7.

Page 78: Malaysia Handbook 2014

Kua

la L

umpu

r G

rade

A O

ffice

Ove

rall

Ren

tal V

s. V

acan

cy R

ates

RM

/d/m

onth

Vac

ancy

%10

.00

- 30

%

8.00

/...-\

25%

4.00

2.00

1

\20

%

5%15%

6.00

0.00

0/0

55

55

55

55

55

5G

rade

A N

et E

ffect

ive

Ren

t (R

Mps

I)-'-

Vac

ancy

Sou

rce:

Com

mer

cial

Pro

pert

y S

tock

Rep

ort,

3rd

Qua

rter

201

3 by

Val

uatio

n &

Pro

pert

y S

ervi

ces

Dep

artm

ent a

nd C

ushm

an &

wak

efie

ld

Pur

pose

Bui

lt O

ffice

Exi

stin

g S

tock

Occ

upan

cy R

ate

Inco

min

g S

uppl

y1,

-Q

3 20

13P

Tot

al S

pace

(m

2)(%

)(m

2)

II V

\A' K

uala

Lur

rpm

I7,

52.2

,308

78.8

1260

,766

1AP

PuM

aya

1,97

7,50

795

.215

3,21

81A

P L

abua

n66

,157

80.4

29,0

22

Sel

ango

r3,

011,

685

73.9

393,

284

994,

318

75.5

113,

783

Ana

ngI

1,06

4,11

980

.627

,556

Per

ak52

.9,0

7194

.916

,908

Nag

eri S

errd

lan

291,

124

92.0

24,5

86N

.laka

386,

756

80.1

19,5

0832

0,23

591

.62,

267

111'

1P:1

:11Z

rII

Pal

Ksc

113a

hng

336,

209

85.1

84,7

68

Ter

engg

anu

329,

334

98.1

7,67

9

PK

eerli

airs

itan

371,

868

109,

025

97.2

100.

012

,435

22,0

13S

abah

674,

554

88.8

57,4

90

',Sar

awak

5%55

991

.57,

378

ALA

YS

IAim

18,6

92,8

2911

1.3

p =

pre

limin

ary

Page 79: Malaysia Handbook 2014

Sho

ppin

g C

ompl

ex E

xist

ing

Sto

ckO

ccup

ancy

Rat

e In

com

ing

Sul

"03

201

3PT

otal

Spa

ce (

m2)

(%)

(m2)

00

VV

P K

uala

Lur

rp,

2,40

9,99

683

.545

6,11

2V

VP

Put

raja

ya68

,503

77.3

3,80

5V

VP

Lab

uan

26,0

6398

.30

Sel

ango

r2,

969,

057

83.1

55,8

07Jo

hor

1,68

5,45

771

.565

,960

Pul

au P

inan

g1,

479,

114

68.9

66,3

36P

erak

rz3,

294

87.7

72,3

59N

lege

ri S

errb

lan

q22,

551

82.9

68,8

Mda

ka36

3,79

780

.711

1,44

3K

edah

425,

242

78.3

35,0

65P

ahan

g25

9,31

577

.36,

074

Ter

engg

anu

106,

984

76.7

0K

elai

lan

222,

854

89.5

4,32

0P

erlis

69,6

0594

.84,

093

Sab

ah'n

7,78

288

.114

6,32

6S

araw

ak61

2,02

970

.570

,690

-0 0M

ALA

YS

IA12

,336

,643

79.5

1,16

6,61

9-0

.m.L

p =

pre

limin

ary

Sou

rce:

Com

mer

cial

Pro

pert

y S

tock

Rep

ort 3

rd Q

uart

er 2

013

by V

alua

tion

& P

rope

rty

Ser

vice

s D

epar

tmen

t

Dis

trib

utio

n of

Sho

ppin

g C

ompl

ex in

Mal

aysi

aas

at 0

3 20

13P

Oth

er S

tate

s30

.75%

1111

1WIP

III\

Kua

la L

umpu

r19

.54%

Page 80: Malaysia Handbook 2014

.111

1.

Sho

ppin

g C

ompl

ex's

Exi

stin

g S

tock

& O

ccup

ancy

Rat

e in

Kua

la L

umpu

r &

Sel

ango

r (B

y Lo

catio

n)as

at 0

3 20

13

m2

600,

000

500,

000

400,

000

300,

000

200,

000

100,

000

Exi

stin

g S

tock

-0-O

ccup

ancy

5r,

.T

2 ;a

n2E

n12

, Fa

cor,

a v_

,2,

.En

.fa

Fa0

Tv

E0

0_(j

)fo

'1 C

YE

100

90 80 70 60 50 40

Sho

ppin

g C

entr

es O

pene

d /S

ched

uled

for

Com

plet

ion

in 2

013

Nu

Sent

ra, K

LS

entr

al65

0,00

0E

ncor

p S

tran

d M

all,

Kot

a D

arre

nsar

a30

8,80

0S

etia

Wal

k, P

ucho

ng30

0,00

0

Sky

Par

k @

Ole

City

(P

hase

2),

US

J46

0,00

0T

he R

ace

@O

le O

ty (

Pha

se 2

A),

US

J22

0,00

0T

he M

ain

Rac

e, U

SJ

237,

000

Ban

gi G

atew

ay S

hopp

ng C

ompl

ex, B

anda

r B

aru

Ban

gi 4

75,0

00

Pro

ject

s U

nder

Red

evel

opm

ent /

Ref

urbi

shm

ent

Jaya

Sho

ppin

g C

entr

e, P

etal

ing

Jaya

270,

000

Che

ras

Sen

tra,

Che

ras

Sou

rce:

Kni

ght F

rank

and

Com

mer

cial

Pro

pert

y S

tock

Rep

ort 3

rd Q

uart

er 2

013

by V

alua

tion

& P

rope

rty

Ser

vice

s D

epar

tmen

t

Page 81: Malaysia Handbook 2014

Sho

pE

xist

ing

Sto

ck03

201

3P(u

nit)

1AP

Kua

la L

urrp

m-

23,2

081A

P P

utra

jaya

334

VV

P L

abua

n78

5

Sel

ango

r82

,910

Joho

r69

,527

Piia

uFtn

ang

29,0

11P

erak

46,2

33N

eger

i Ser

rbila

n17

,555

Wak

e18

,189

Kec

iah

26,0

79

Pah

ang

17,0

61

Ter

engg

anu

5,60

7K

elai

tan

8,35

8P

erlis

3,46

1S

alaa

h16

,2)3

0S

aran

ek23

,996

MA

LAY

SIA

388,

574

Inco

min

g S

uppl

y(u

nit)

1,91

2 62 74

14,4

3213

,220

3,08

47,

477

4,34

94,

133

3,65

03,

245

1,5,

32

2,64

980

0

Z39

82,

790

65,8

07

Dis

trib

utio

n of

Exi

stin

g an

d In

com

ing

Sup

ply

of S

hop

inK

uala

Lum

pur

and

Sel

ango

r as

at 0

3 20

13

336;

2.2

3%

4,91

32,1

20 ;

30.6

1%

AId

.47,

560

; 7.2

0%

2,37

6 ; 2

26%

72 ;

0.07

%

11,7

43 ;

EX

isti

ngP

11.1

9%63

1 ; 0

.60%

841

1$11

0;90

1%

Inco

min

gS

uppl

yP96

; 0.6

4%13

8 ; 0

.92%

482

; 3.2

1%

p =

pre

limin

ary

1 P

re-W

ar11

-1 1

/2 S

tore

y1

2-2

1/2

Sto

rey

13-3

1/2

Sto

rey

1 4-

4 1/

2 S

tore

y

1 5-

5 1/

2 S

tore

y16

-6 1

/2 S

tore

yI A

bove

6 1

/2 S

tore

yI L

ock-

Up

I SO

HO

p= p

relin

inar

y

Sou

rce:

Com

mer

cial

Pro

pert

y S

tock

Rep

ort,

3rd

Qua

rter

201

3 by

Val

uatio

n &

Pro

pert

y S

ervi

ces

Dep

artm

ent

Page 82: Malaysia Handbook 2014

Dis

trib

utio

n of

Exi

stin

g an

d In

com

ing

Sup

ply

of In

dust

rial i

nK

uala

Lum

pur

and

Sel

ango

r as

at 0

3 20

13

29,4

68 ;

73%

UP

129

; 0.

32%

...1,

388

; 4%

lela

ilk-

-Exi

stin

gP

52 ;

141.

,151

14; 0

00.

11%

p =

pre

limin

ary

Ter

race

dS

emi-D

etac

hed

Fat

ted

Fac

tory

indu

stria

l Com

plex

Det

ache

d

Indu

stria

lE

xist

ing

Sto

ck! I

ncom

ing

Spi

llQ

3 20

13P

(uni

t)I

(uni

t)

VV

P K

uala

Lur

rpm

5,16

070

VV

P P

utra

jaya

480

VP

Lab

uan

605

0

Sel

ango

r35

,191

3,19

3Jo

hor

13,7

521,

071

Pul

au A

nang

7,82

626

5P

erak

7,40

927

7

Neg

eri S

emi:E

lan

4,39

873

8M

daka

4,14

033

5K

edah

3,24

011

4

Pah

ang

2,87

227

7

Ter

engg

anu

790

48K

elan

tan

474

72

Per

lis18

722

Sab

ah4,

237

1,31

3S

araw

ak4,

542

675

MA

LAY

SIA

a94

,871

8,47

0

p =

pre

limin

ary

Sou

rce:

Indu

stria

l Pro

pert

y S

tock

Rep

ort,

3rd

Qua

rter

201

3 by

Val

uatio

n &

Pro

pert

y S

ervi

ces

Dep

artm

ent.

Page 83: Malaysia Handbook 2014

3 PROPERTY

82 PRCPERTY

Page 84: Malaysia Handbook 2014

Financial Definitions & Formulae

Mortgage Fbpayment Table

Malaysia Balance of Trade

Consumer Price Index

Prime Rates & Base Lending Rates

Interest Rates : Banking Institutions

Currency Chart

Exchange Rates

Page 85: Malaysia Handbook 2014

4 FINANCIAL

FINANCIAL DEFINITIONS

Discount Rate

The rate of return a developer expects when investing in a project.i.e. opportunity cost

Internal Rate of Return (IRR)

The IRR may be defined as the interest rate that equates thepresent value of expected future cash flows to the cost of theinvestment.

The IRR can be compared to the Discount Rate.

Net Present Value (NPV)

The NPV is the present value of all future cash flows, discountedback to today's values at the Discount Rate.

The NPV indicates in today's dollars the profit or loss a developermakes above or below his required profit (based on a nominatedDiscount Rate).

72 Rule

The approximate number of years required to double your capitalcan be calculated by dividing the interest rate into 72.

e.g. If interest rate = 10% p.a.Then 72 10 = 7.2 yearsIt will take approximately 7.2 years to doubleyour capital if it is invested at 10% p.a.

FINANCIAL FORMULAE

Future value of $1

Future value of $1 per period

Sinking fund (the amount required

to be put away periodically to realise

some future sum)

Present value of $1

Present value of $1 per period

Annuity with a PV of $1

(Mortgage bond formula)

FV = PV (1+i)n

FV = PMT [((1+i)n - 1) + i]

PMT = FV [i ((1 +i)n - 1)]

PV = FV [1+ (1+i)n]

PV = PMT [((1+i)n - 1) + (i(1+i)n)]

PMT = PV[(i(1+i)n) + ((1 +i)n - 1)]

PVFVPMT

= present value= future value= payment amount= period (e.g. 10 years with monthly payments,

n=10x 12=120)= interest rate per period

(e.g. 12% p.a. compounded monthly;i = 12% + 12 month = 1% per period)

84 FINANCIAL

Page 86: Malaysia Handbook 2014

MORTGAGE REPAYMENT TABLE

Based on:" 1,000 units of currency" Interest compounded monthly" Equal monthly repayments

LangdonSeahAN MFIUATE OF RI MCADIS

Interestp.a. 5

REPAYMENT (years)

10 15 20

5% 1a87 10.61 7.91 6.60

6% 19.33 11.10 8.44 7.16

7% 19.80 11.61 8.99 7.75

8% 20.28 12.13 9.56 8.36

9% 20.76 12.67 10.14 9.00

10% 21.25 13.22 10.75 9.65

11% 21.74 13.78 11.37 10.32

12% 22.24 14.35 12.00 11.01

13% 22.75 14.93 12.65 11.72

14% 2327 15.53 13.32 12.44

15% 23 79 16.13 14.00 13.17

16% 24.32 16.75 14.69 13.91

17% 24.85 17.38 15.39 14.67

18% 25.39 18.02 16.10 15.43

19% 25.94 18.67 16.83 16.21

20% 26.49 19.33 17.56 16.99

21% 27.05 19.99 18.31 17.78

22% 27.62 2a67 19.06 18.57

23% 2819 21.35 19.82 19.37

24% 2a 77 22.05 20.58 2a 17

25% 29.35 22.75 21.36 2a98

Borrow $1,000,000 to be repaid monthly at 10% p.a.over 10 years.

Repayments = 1,000,000 / 1,000 x $13.22= $13,220 per month

FINANCIAL 85

Page 87: Malaysia Handbook 2014

4 FINANCIAL

MALAYSIA BALANCE OF TRADE

Trade BalanceRM million

190,000 -

170,000 -

150,000 -

130,000 -

110,000 -

90,000 -

70,000

50,000

Import/ExportRM million

- 800,000

700,000

600,000

500,000

400,000

300,000

200,000

00 01 02 03 04 05 06 07 08 09 10 1112"

Trade BalanceImport (RM million)

Export (RM million)

Year

Exports

(RM mil)

Imports

(RM mil)

TradeBalance(RM mil)

2003 397,969 300,207 97,762

2004 481,903 377,129 104,774

2005 539,420 410,529 123,892

2006 590,018 452,726 137,292

2007 605,175 475,687 129,488

2008 663,875 492,076 171,799

2009 552,920 412,565 140,355

2010 641,135 504,384 136,751

2011 699,591 548,026 151,565

2012 703,152 577,538 125,614

2013" 332,600 389,252 43,349

Note: " January to June onlySource: Economic Report 2013/2014,

Ministry of Finance, Malaysia

86 FINANCIAL

Page 88: Malaysia Handbook 2014

CONSUMER PRICE INDEX

% Change in CPI

6.0

5.0

4.0

3.0

2.0

1.0

0.0

LangdonSeahAN MFIUATE OF RI MCADIS

CO CDN- COMO CV CO0000000000000000CSJCSJCSJCSJCV CSJCSJCSJCSJCSJCVYear

Year CPI % Change

2003 83.9 1.12 %

2Do4 86.1 1.44 %

2005 87.7 302%

2CC6 90.9 361 %

2007 92.7 203 %

2008 97.8 5.44 %

2009 98.3 0.58 %

2010 100.0 1.71 %

2011 103.2 319 %

2012 104.9 1.66 %

2013* 107.0 1.95 %

Note: Year 2010 is the Base Year" Average from January to November 2013 only

Source: Department of Statistics, Malaysia

FINANCIAL 87

Page 89: Malaysia Handbook 2014

4 FINANCIAL

PRIME RATES & BASE LENDING RATESas at 4th Quarter 2013

r Country Rate (%)

Australia" 2.50

Brunei 5.50

China** 6.15

Egypr" 9.75

Hong Kong 5.00

India 8.75

Indonesia 7.50

JapanA 1.20

Macau 5.25

Malaysia 6.60

New ZealandAA 9.57

PakistanAAA 10.38

Philippines 4.66

Singapore 5.38

South Africa 9.50

South Korea+ 2.50

Thailand++ 7.51

United Kingdom 0.50

United States of America 3.25

Vietnam+++ 9.00

" Over Night Cash Rate"" 3-Year Benchmark Lending Rate

Overnight Lending Rate^ Long Term Prime Rate % pa" SME Overdraft Rate (Previously Business Base Lending Rate)^^^ Weighted Average Lending Rate+ Call Rate of The Bank of Korea++ Minimum Loan Rate % pa (Average Based on Local Bank)+++ Minimum and in VND per year

Source:Langdon & Seah OfficesCentral Bank of Egypt (www.cbe.org.eg)Reserve Bank of New Zealand (www.rbnz.govt.nz)Bank of England (www.bankofengland.co.uk)Bank of Japan (www.boj.or.jp)State Bank of Pakistan (www.sbp.org.pk)www.investec.co.zawww.fedprimerate.com

88 FINANCIAL

Page 90: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF RI MCADIS

INTEREST RATES: BANKING INSTITUTIONS

Percent Per Annum

9.00 -

8.00 -

4.00

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Commercial Banks : Base Lending Rates

Commercial Banks : Average Lending Rates

Investment Banks : Average Lending Rates

InvestmentBanks

2013 BaseLending

Rates (%)

AverageLending Rates

(%)

AverageLending Rates

(%)

Jai 6.53 4.69 6.85

Feb 6.53 4.72 7.01

Mar 6.53 4.70 6.84

APr 6.53 4.70 6.79

May 6.53 4.61 6.73

Jun 6.53 4.51 6.64

Jul 6.53 4.46 6.60

Aug 6.53 4.54 6.56

Sep 6.53 4.55 6.48

cct 6.53 4.54 6.42

1\bv 6.53 4.56 6.40

Note: December rates are not available at time of publication.Source: Monthly Statistical Bulletin, Central Bank of Malaysia

FINANCIAL 89

Page 91: Malaysia Handbook 2014

Rin

ggit

(RM

)

8.00

-

7.50

-

7.00

-

6.50

-

6.00

5.50

-

5.00

-

4.50

-

4.00

3.50

-

3.00

-

2.50

-

2.00

-

1.50

"'m

om.

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

Yea

rR

M p

er 1

US

DR

M p

er 1

GB

PR

M p

er 1

00 J

PY

RM

per

1 S

GD

RM

per

1 E

UR

O

Page 92: Malaysia Handbook 2014

EXCHANGE RATESas at 1 January 2014

LangdonSeahAN MFIUATE OF RIMCADIS

Country 19 Currency RM1 US $1

Australia dollar 0.3409 1.1202

Bahrain dinar 0.1141 0.3750

Brunei dollar 0.3791 1.2457

China rmb 1.8583 6.1066

Egypt pound 2.1081 6.9274

Eu ropeanCurrency Unit ecu 0.2207 0.7253

Hong Kong dollar 2.3596 7.7539

India rupees 18.7548 61.6312

Indonesia rupiah 3,702.05 12,165.5

Japan yen 31.9600 105.03

Kenya shillings 25.8741 85.026

Lebanon pound 451.961 1,485.2

Malaysia ringgit 1.0000 3.2827

New Zealand dollar 0.3701 1.2162

Pakistan rupee 31.8537 104.67

Philippines peso 13.4782 44.291

Qatar riyal 1.1073 3.6386

Singapore dollar 0.3848 1.2644

South Africa rand 3.1853 10.468

South Korea won 320.93 1,054.63

Sri Lanka rupee 39.765 130.675

Thailand baht 9.9559 32.717

United Arab Emirates dirham 1.1175 3.6723

United Kingdom pound 0.1842 0.6054

United States ofAmerica dollar 0.3043 1.0000

Vietnam dong 6,369.2 20,930.1

Source: www.oanda.com/convert/classic

FINANCIAL 91

Page 93: Malaysia Handbook 2014
Page 94: Malaysia Handbook 2014

OTHER INFORMATION

_

Utility Costs for lected Asian Cities

Weight & Measures

Conversion Guide

Public Holidays

Directory of Offices

Telephone Directory (IVlalaysia)

Page 95: Malaysia Handbook 2014

Exc

hang

eR

ate

CO

UN

TR

YU

S $

1=

ELE

CT

RIC

ITY

(U

S$/

kwh)

Com

mer

cial

/D

omes

ticIn

dust

rial

WA

TE

R (

US

$/m

3)C

omm

erci

al/

Dom

estic

Indu

stria

l

FU

EL

(US

$/lit

re)

Die

sel

Lead

edU

nlea

ded

KU

ALA

LU

MP

UR

RIV

I3.1

9

UN

LEA

DE

D F

UE

L: U

nlea

ded

petr

ol R

on 9

5

0.06

8- 0

.142

0.10

9- 0

.135

0.17

9- 0

.627

0.64

9- 0

.715

0.63

0N

IA0.

660

BE

IJIN

GR

IVIB

6.13

UN

LEA

DE

D F

UE

L: U

nlea

ded

gaso

line

97

0.08

00.

130

0.65

01.

010

1.23

0N

I/A1.

310

GU

AN

GZ

HO

UR

IVIB

6.13

UN

LEA

DE

D F

UE

L: U

nlea

ded

97#

0.13

00.

110/

0.15

00.

320

0.56

014

WN

I/A1.

540

HO

NG

KO

NG

1-K

$ 7.

800.

1W0.

120

0.83

00.

590

1.61

0N

I/A2.

120

ELE

CT

RIC

ITY

: Bas

ed o

n ta

riff s

chem

e of

CLP

Hol

ding

Lirn

ited

ard

is c

harg

ed o

n h-

rron

thly

con

surr

ptio

n. (

Dom

): 0

-40

0 kW

i = U

S$0

.10;

400

- 1

,00C

kWi =

US

$0.1

1;

1,00

0 -

1,80

CkW

i = U

S$0

.13;

1,8

00 -

2,6

00kW

i = U

S$0

.17;

2,6

00 -

3,4

00kW

i - U

S$0

.20;

Abo

ve 3

,400

kW

h =

US

$0.2

1.W

AT

ER

: (D

om):

0 -

12

m3

= F

.O.C

; 12

- 43

m3

= U

S$0

.53/

m3;

43

-62m

3= U

S$0

.83/

m3;

Abo

ve 6

2m3=

US

$1.1

6/m

3.

MA

CA

UIV

OR

7.9

90.

160

0.16

00.

550-

0.66

00.

660

1.68

0N

vA1.

5a)

ELE

CT

RIC

ITY

: Bec

lrici

ty ta

riff a

re c

ompo

sitio

n of

der

mnd

cha

rges

, ccr

surr

ptio

n ch

arge

s, fu

el c

la n

. adj

ustm

ent a

rd g

oven

1n-e

nt ta

x.

WA

TE

R: (

Dor

rO C

onsu

mpt

ion.

US

$0.5

4/rn

3 fo

r 23

m3

or b

elow

, uss

o.ou

rn3

for

29 -

56m

3 ar

d U

S$)

.66/

m3

for

57m

3 or

dov

e; O

ther

cha

rges

(de

perd

im o

n n-

eter

siz

e 15

rarn

- alO

rmn)

;IV

kter

ren

tal =

US

$0.3

4-58

.00/

rrth

; (C

orra

l/1rd

) C

harg

es fo

r or

dina

ry u

rs (

e.g.

Bus

ines

s, g

over

nmen

t bui

ldin

gs, e

zhoo

ls, a

ssod

atio

ns, h

cspE

tals

ard

oth

er's

) on

ly. S

peci

alus

ers

(e.g

. gan

ing

irdus

trie

s, h

otel

s, s

auna

s, g

olf c

ours

, con

stru

ctio

n, p

ubic

infr

astr

uctu

res

ard

othe

r te

npor

ay c

onsu

mpt

ion)

are

exc

lude

d

0.10

1(pe

ak)

SH

AN

GH

AI

RIV

IB6.

130.

050(

ncrm

31)

UN

LEA

DE

D F

UE

L: U

nlea

ded

93#=

US

$1.1

9/lit

re; 9

7#=

US

$1.2

6/lit

re

0.18

6(pe

ak)

0.05

5(nc

rm31

)0.

590

0.82

01

25o

NA

1270

- 1.

350

CH

ON

GQ

ING

RIV

IB6.

130.

080

0.13

0/0.

139

0.57

00.

740

1.2W

NI/A

1.16

0 -

1.30

0

UN

LEA

DE

D F

UE

L: U

nlea

ded

93#=

US

$1.1

6/lit

re; 9

7#=

US

$1.3

CV

litre

Page 96: Malaysia Handbook 2014

BA

NG

ALO

RE

INR

63.

000.

039

- 0.

093

0.10

2 -

0.11

80.

238

- 0.

572

0.95

20.

921

NE

W D

ELH

IIN

R 6

3.00

0.06

2 -0

.113

0.12

4 -

0.14

20.

240

- 1.

087

1.71

7 -

a743

0.84

3

BA

NG

KO

KB

AH

T 3

1.69

0.05

8 -

0.12

40.

084

- 0.

086

0.26

8 -

0.45

60.

300

- 0.

499

0.94

6U

NLE

AD

ED

FU

EL:

Gas

ohol

95

ELE

CT

RIC

ITY

: (D

orn)

For

nor

rrel

tarif

f with

con

sum

ptio

n no

t exc

eedi

ng 1

50kW

-Vrn

onth

.

BR

UN

EI

B$

1.24

0.00

8 -

0.12

00.

058

- 0.

162

0.08

8 -

0.35

50.

492

- 0.

532

0.3C

6

ELE

CT

RIC

ITY

(D

om):

Tar

iff e

ffect

ive

from

1st

Jan

201

2 1-

10kW

-110

c, 1

1-60

kW-1

8c, 6

1-10

0kW

i 12c

, dov

e 10

0kW

-115

c.

HO

CH

I MIN

HV

ND

21,

120

0.11

10.

060

- 0.

170

0.25

0 -

0.54

00.

800

/ 0.4

901.

060

Al r

ates

are

VA

T in

dusi

veE

LEC

TR

ICIT

Y: D

orm

stic

ele

ctrid

ly r

ates

are

app

lied

to th

e 30

1th

KW

dD

ove

wad

s.

WA

TE

R: D

orm

stic

= U

sed

in n

orm

= U

S$0

.21;

Use

d ov

er n

crm

= U

S$0

.50.

FU

EL:

Des

el: D

.0 -

0.0

5% 9

2 U

nlea

ded

Pet

rol a

nd 9

5 U

nlea

ded

Pet

rol a

s at

Oct

cter

201

2.

JAK

AR

TA

IDR

11,

400

0.1W

0.11

90.

412

1.10

10.

482

MA

NIL

AP

HP

43.

200.

210

- 0.

260

0.21

00.

580

- 0.

670

1470

0.97

6

ELE

CT

RIC

ITY

& W

AT

ER

: Act

ual B

lling

: Inc

lude

mis

c. (

Mer

ges

so3h

as

Env

ironm

enta

l Cha

rge,

Cur

renc

y E

xd-e

nge

Rat

e A

djus

tmen

t (C

ER

A),

VA

T, e

tc,

Bec

trid

ly -

(D

om):

19)

kW

-1-

860

MA

I; (C

)mm

/Ind)

: 150

,000

MA

I; W

ater

- (

Dom

): 2

9m3-

41m

3; (

Com

m/1

rd):

4,0

3Orn

3

SE

OU

LK

RW

1 ,0

58.4

00.

C60

0.07

40.

387

1.49

01.

280

N/A

1.23

8

N/A

1.12

7

N/A

1244

0.41

10.

427

N/A

1.13

0 -

1.15

0

N/A

0.57

0

N/A

1.18

8

N/A

1.78

0

ELE

CT

RIC

ITY

: R u

s el

ectr

idly

bas

ic r

ate

(Dom

): U

S$5

.368

Mrt

h +

US

$0.0

8/kW

i (30

0kw

itelc

w in

use

); (

Com

): U

S$4

.637

/mth

+ U

S$0

.066

M-1

(300

ktA

b be

lcw

in u

se).

WA

TE

R: P

lus

wat

er b

asic

rat

e(D

om):

LIS

$0.9

39/m

onth

(w

ithin

30m

3 us

age)

and

(C

om):

US

$77.

39/m

o1h

(with

in 1

ClO

rn3

usag

e)

SIN

GA

PO

RE

S$

1.25

0.21

0A

l rat

es a

re n

ett o

f GS

T.

ELE

CT

RIC

ITY

: Tar

iff is

bas

ed o

n !c

m te

mio

n pc

wer

sup

ply.

0.21

01.

440

1.67

01.

310

N/A

1.85

0

WA

TE

R: D

om &

Nbn

-dom

wae

r ra

te in

dd. c

onse

rvat

ion

tax

&w

ater

-bor

ne fe

e, e

xdd.

san

itary

app

lianm

fee.

Dom

estic

wae

r ra

te is

an

avg

fa' t

he 1

st 4

Orn

3.F

UE

L : D

esel

ard

93

Unl

eade

d pe

trd

as a

t 24

Oct

cber

201

3

Page 97: Malaysia Handbook 2014

5 OTHER INFORMATION

WEIGHT AND MEASURES

Metric Measures and Equivalents

LENGTH

1 millimetre (mm) = 0.0394 in

1 centimetre (cm) = 10 mm = 0.3937 in

1 metre (m) = 100 cm = 1.0936 yd

1 kilometre (km) = 1,000 m = 0.6214 mile

A REA

1 sq cm (cm2) = 100 mm2 = 0.1550 in2

1 sq metre (m2) = 10,000 cm2 = 1.1960 yd2

1 hectare (ha) = 10,000 m2 = 2.4710 acres

1 sq km (km2)

VOLUME / CAPACITY

= 100 ha = 0.3861 mile2

i=1 cu cm (cm3) = 0.0610 in3

1 cu decimetre (dm3) = 1,000 cm3 = 0.0353 ft3

1 cu metre (m3) = 1,000 dm3 = 1.3080 yd3

1 litre (/) = 1 dm3 = 1.76 pt

1 hectolitre (h/) = 100 / = 21.997 gal

MASS (WEIGHT)1 milligram (mg) = 0.0154 grain

1 gram (g) = 1,000 mg = 0.0353 oz

1 kilogram (kg) = 1,000 g = 2.2046 lb

1 tonne (t) = 1,000 kg = 0.9842 ton

USA MEASURES AND EQUIVALENTS

USA Dry Measure Equivalents

1 pint = 0.9689 UK pint = 0.5506 /

USA Liquid Measure Equivalents

1 fluid ounce = 1.0408 UK fl oz = 29.574 m/

1 pint (16 fl oz) = 0.8327 UK pt = 0.4723 /

1 gallon = 0.8327 UK gal = 3.7854 /

96 OTHER INFORMATION

Page 98: Malaysia Handbook 2014

.c!//iO LangdonSeahAN MFIUATE OF RI MCADIS

Imperial Measures and Equivalents

1 inch (in) = 2.54 cm

1 foot (ft) = 12 in = 0.3048 m

1 yard (yd) = 3 ft = 0.9144 m

1 mile = 1,760 yd = 1.6093 km

1 int. nautical mile = 2,025.4 yd = 1.853 km

AREA

1 sq inch (in2) = 6.4516 cm2

1 sq foot (ft2) = 144 in2 = 0.0929 m2

1 sq yard (yd2) = 9 ft2 = 0.8361 m2

1 acre = 4,840 yd2 = 4,046.9 m2

1 sq mile (mile2) = 640 acres = 2.59 km2

VOLUME / CAPACITY

1 cu inch (in3) = 16.387 cm3

1 cu foot (ft3) = 1,728 in3 = 0.0283 m3

1 fluid ounce (f/ oz) = 28.413 m/

1 pint (pt) = 20 fl oz = 0.5683 /

1 gallon (gal) = 8 pt = 4.5461 /

MASS (WEIGHT)

1 ounce (oz) = 437.5 grains = 28.35 g

1 pound (lb) = 16 oz = 0.4536 kg

1 stone = 14 lb = 6.3503 kg

1 hundredweight (cwt) = 112 lb = 50.802 kg

1 ton = 20 cwt = 1.016 t

Temperature Conversion

°C = 5/9 (°F - 32) °F = (9/5 °C) + 32

.c-18 -10 0 10 20 30 40 50 N 70 BO 90 100

INWIVAthiMOV6MY441h0111INIMIIMII1010110IMIIPIMIC 10 20 32 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 10 200 212

°F

OTHER INFORMATION 97

Page 99: Malaysia Handbook 2014

Multiply by

25.4

25.4

2.54

0.0254

304.8

30.48

0.3048

0.9144

1.8288

20.1168

201.168

1.609344

1.852

Multiply by

16.387064

0.016387

0.0283168

28.316847

0.5682613

1.1365225

0.7645549

4.54609

0.0045461

28.413063

5 OTHER INFORMATION

CONVERSION GUIDE

Conversion Formulae

To use the conversion formulae simply multiply theImperial measurement by the factor beside the conver-sion you wish to make. For example 6 inches intomilimetres. 6 inches multiplied by 25.4 equals 152.4milimetres. Conversely if you wish to convert Metricmeasure into Imperial measure simply divide by thesame factor.

LENGT

To Convert

mili-inches into micrometres

inches into milimetres

inches into centimetres

inches into metres

feet into milimetres

feet into centimetres

feet into metres

yards into metres

fathoms into metres

chains into metres

furlongs into metres

miles, statute into kilometres

miles, nautical into kilometres

VOLUME & CAPACITY

To Convert

cubic inches into cubic centimetres

cubic inches into litres

cubic feet into cubic metres

cubic feet into litres

UK pints into litres

UK quarts into litres

cubic yards into cubic metres

UK gallons into litres

UK gallons into cubic metres

UK fluid ounces into cubic centimetres

98 OTHER INFORMATION

Page 100: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF RI MCADIS

AREA

To Convert

square inches into square milimetres

square inches into square centimetres

square feet into square centimetres

square feet into square metres

square yards into square metres

square yards into (0.01 hectare)

acres into square metres

acres into hectares

square miles into square kilometres

MASS

To Convert

grains into miligrams

grains into metric carats

grains into grams

pennyweights into grams

ounces into grams

ounces troy into grams

ounces into kilograms

pounds into kilograms

stones into kilograms

hundredweights into kilograms

tons into kilograms

tons into metric tonnes

tahils into grams

kati into kilograms

POWER

To Convert

foot pounds-force per second into watts

horsepower into watts

foot pounds-force per second into kilowatts

horsepower into kilowatts

horsepower into metric horsepower

Multiply by

645.16

6.4516

929.0304

0.092903

0.836127

0.0083613

4046.8564

0.4046856

2.589988

Multiply by

64.79891

0.323995

0.064799

1.555174

28.349523

31.103477

0.0283495

0.4535924

6.35023932

50.802345

1016.0469

1.01605

37.799

0.60479

Multiply by

1.35582

745.7

0.001356

0.7457

1.01387

Page 101: Malaysia Handbook 2014

5 OTHER INFORMATION

PUBLIC HOLIDAYS

2014

MALAYSIA

New Year's Day- 01 Jan

Prophet Muhammad's Birthday 14 Jan

Chinese New Year 31 Jan

01 Feb

Labour Day 01 May

Wesak Day 13 May

King/Agong's Birthday 07 Jun

Hari Raya Aidilfitri" 28 - 29 JulNational Day 31 Aug#

Malaysia Day 16 Sep

Hari Raya Qurban" 05 Oct#

Deepavali" 23 Oct

Awal Muharram 25 Oct

Christmas Day 25 Dec

" Subject to change

Except Johor, Kelantan, Kedah, Perlis & Terengganu

# The following day will be an additional Public Holiday

BRUNEI

New Year's Day

Prophet Muhammad's Birthday

Chinese New Year "

National Day

Israk Miraj

Royal Brunei Armed Forced Ann.^

First Day of Ramadhan"

His Majesty's Birthday

Ann. Revelation of the Holy Koran""

Hari Raya Aidilfitri"

Hari Raya Aidilfitri"" (2nd day)

Hari Raya Aidilfitri"" (3rd day)

Hari Raya Aidil Adha"

First Day of Hijrah"

Christmas Day

Fridays and Saturdays are government off days

" Subject to change^ Replacement for Fridays / Sundays

01 Jan

14 Jan

31 Jan

23 Feb

27 May

31 May

28 Ju n

15 Jul

15 Jul

28 Jul

29 Jul

30 Jul

05 Oct

25 Oct

25 Dec

100 OTHER INFORMATION

Page 102: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF RI MCADIS

2014

HONG KONG

The First day Of January 01 Jan

Lunar New Year's Day 31 - 03 Feb*

Ching Ming Festival 05 Apr

Good Friday 18 Apr

The day following Good Friday 19 Apr

Easter Monday 21 Apr

Labour Day 01 May

Buddha's Birthday 06 May

Tuen Ng Festival 02 Ju n

HKSAR Establishment Day 01 Jul

The day following Chinese Mid-Autumn Festival 09 Sep

National Day 01 Oct

Chung Yeung Festival 02 Oct

Christmas Day 25 Dec

The 1st week-day after Christmas Day 26 Dec

" As the 3rd day of the Lunar New Year's day falls on a Sunday,

the day following the 4th day of Lunar New Year will be

designated as an additional general holiday.

CHINA

New Year's Day

Chinese New Year"

Tomb-Sweeping Day$

Labour Day%

Dragon-Boat Festival+

Mid Autumn Festival"

National Day#

01 Jan

31 - 02 Feb05 Apr

01 May

02 Jun

08 Sep

01 - 03 Oct

" 3 - 6 February are holidays, 26 January and 8 February are

working days.

$ 7 April is a holiday% 2 & 3 May are holidays, 4 May is working day.

+ 31 May and 1 June are holidays.

A 6 & 7 September are holidays

# 4 - 7 October are holidays, 28 September and 11 Octoberare working days.

(Cont'd)

OTHER INFORMATION 101

Page 103: Malaysia Handbook 2014

5 OTHER INFORMATION(Cont'd)

PUBLIC HOLIDAYS

111111,111 2014

New Year's Day"# 01 Jan

Lunar New Year's eve (Afternoon)@ 30 Jan

Lunar New Year's Day"# 31 Jan

The 2nd day of Lunar New Year" 01 Feb

The 3rd day of Lunar New Year" 02 Feb

The 4th day of Lunar New Year@# 03 Feb

The 5th day of L unar New Year@# 04 Feb

Ching Ming Festival" 05 Apr

The first working day after Ching Ming Festival@ 07 Apr

Good Friday# 18 Apr

The day before Easter 19 Apr

The first working day after the Day before Easter@# 21 Apr

Labour Day"# 01 May

The Buddha's Birthday# 06 May

Tung Ng Frestival (Dragon Boat Festival)# 02 Jun

Bank's Holiday# 01 Jul

The day following Mid-Autumn Festival"# 09 Sep

National Day"# 01 Oct

The day following National Day"# 02 Oct

Chung Yeung Festival"# 02 Oct

The first working day after National Day@ 03 Oct

The first working day after Chung Yeung Festival@ 03 Oct

All Soul's Day 02 Nov

The first working day after All Soul's Day@ 03 Nov

Feast of the Immaculate Conception# 08 Dec

Macau SAR Establishment Day" 20 Dec

Winter Solstice 22 Dec

The first working day after Macau SAR 23 Dec

Establishment Day@

Christmas Eve# 24 Dec

Christmas Day# 25 Dec

Bank's Holiday# 26 Dec

New Year's Eve (Afternoon)@ 31 Dec

# Bank's Holiday" Obligatory Holiday

@ Special Holiday granted by Chief executive for staff in Public

Administration.

Page 104: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF IA ARCADIS

2014

INDIA

New Year's Day 01 Jan

San kranth i 14 Jan

Republic Day 26 Jan

Ugadi 11 Apr

May Day 01 May

Independence Day 15 Aug

Gandhi Jayanthi 02 Oct

Deepavali 23 Oct

Karnataka Formation Day 01 Nov

Christmas Day 25 Dec

INDONESIA

New Year's Day 01 Jan

Prophet Muhammad's Birthday 14 Jan

Chinese New Year (Imlek) 31 Jan

Hindu Day of Quiet (Nyepi) 31 Mar

Good Friday 18 Apr

International Labour Day 01 May

Waicak Day 15 May

Ascension Day of Jesus Christ 29 May

Ascension of Prophet Mohammad" 27 May

ldul Fitri" 28 - 29 Jul

National Independence Day 17 Aug

ldul Adha Day 05 Oct

Hijriyah New Year 25 Oct

Christmas Day 25 Dec

" Subject to changes

KOREA

New Year's Day

Lunar New Year (Seol)

Independent Movement Day

Children's Day

Buddha's Birthday

Memorial Day

Liberation Day

Full Moon Day (Chuseok)

National Foundation Day

Hangul Proclamation Day

Christmas Day

01 Jan

31 Jan

01 Mar

05 May

06 May

06 Ju n

15 Aug

08 Sep

03 Oct

09 Oct

25 Dec

(Cont'd)

OTHER INFORMATION 103

Page 105: Malaysia Handbook 2014

5 OTHER INFORMATION(Cont'd)

PUBLIC HOLIDAYS

LIPPINES

Regular HolidaysNew Year's Day

Araw ng Kagitingan

Maundy Thursday

Good Friday

Labour Day

Independence Day

End of Eid-ul-Fitre

National Heroes' Day

Eid-ul Adha

Bonifacio Day

Christmas Day

Rizal Day

Special Holidays(Non Working Holidays)Chinese New Year

Black Saturday (Additional)

Ninoy Aquino Day

All Saint's Day

All Souls Day (Additional)

Christmas Eve (Additional)

Last Day of the Year (Additional)

SINGAPORE

New Year's Day

Chinese New Year

Good Friday

Labour Day

Vesak Day

Hari Raya Puasa

National Day

Hari Raya Haji

Deepavali"

Christmas Day

"Subject to changes

" The following Monday will be a public holiday

2014

01 Jan

09 Apr17 Apr

18 Apr

01 May

12 Jun

30 Jul

25 Aug

05 Oct

30 Nov

25 Dec

30 Dec

31 Jan

19 Apr

21 Aug

01 Nov

02 Nov

24 Dec

31 Dec

01 Jan

31 - 01 Feb

18 Apr

01 May

13 May

28 Jul

09 Aug

05 Oct"

23 Oct

25 Dec

Page 106: Malaysia Handbook 2014

LangdonSeahAN MFIUATE OF RI MCADIS

THAILAND

New Year's Day

Chinese New Year"

Makha Bucha Day

Chakri Memorial day

Songkran Festival

National Labour Day

Coronation Day

Royal Ploughing Ceremony Day+

Visakha Bucha Day

Mid Year Bank Holiday#

Asarnha Bucha Day

Khao Phansa Day (Buddhist Lent)+

H.M. The Queen's Birthday

Chulalongkorn day

H.M. The King's Birthday

Constitution Day

New Year's Eve

"Unofficial Chinese Community Only

# Banks only

+ Government only

1 Substitute for 6 April (Sunday)

VIETNAM (Normal Scheduled Holidays)

Solar New Year

Lunar New Year

Hung Vuong King Celebration

Liberation Day of Saigon

International Labour Day

National Day

Christmas Day

2014

01 Jan

31 Jan

14 Feb

07 Apr1

13 - 15 Apr01 May

05 May

12 May

13 May

01 Jul

11 Ju I

17 Jul

12 Aug

23 Oct

05 Dec

10 Dec

31 Dec

01 Jan

30 - 04" Feb09 Apr

30 Apr

01 May

02 Sep

25 Dec

" Substitute for 1 & 2 February (Saturday & Sunday)

OTHER INFORMATION 105

Page 107: Malaysia Handbook 2014

5 OTHER INFORMATION

DIRECTORY OF OFFICES

SELANGORLANGDON & SEAH SDN BHDJURU UKUR BAHAN MALAYSIAJUBM SDN BHDDLSM PROJEKS SDN BHD2, Jalan PJU 5/15, Kota Damansara47810 Petaling JayaSelangor Darul Ehsan, MalaysiaGPS : 3.1527, 101.5918Tel/Fax : (60 3) 6156 9000 / (60 3) 6157 8660Email : [email protected] : Loo Ming Chee / Mohd Ali Abd Karim /Justin Teoh /

Syed Mahadzir Syed Ahmad / Mohamad Faiz Awang /Nur Aziz Abu Bakar

Our new officewith effective from April 2014Level 5, Menara TSR12 Jalan PJU 7/3Mufiara Damansara47800 Petaling JayaSelangor Darul Ehsan,MalaysiaTel: (60 3) 2106 8000

(60 3) 2106 9000

JOHORLANGDON & SEAH SDN BHDJURU UKUR BAHAN MALAYSIAJUBM SDN BHDDLSM PROJEKS SDN BHD47, Jalan Setia Tropika 1/30Taman Setia Tropika81200 Johor BahruJohor Darul Takzim, MalaysiaGPS : 1.5423, 103.7112Tel/Fax : (60 7) 232 8300 / (60 7) 232 8232Email : [email protected] : Syed Mahadzir Syed Ahmad

PENANGLANGDON & SEAH SDN BHDJURU UKUR BAHAN MALAYSIAJUBM SDN BHDDLSM PROJEKS SDN BHDSuite 3A-3, Level 3AWisma Great EasternNo.25, Lebuh Light10200 Penang, MalaysiaGPS : 5.4201, 100.3408Tel : (60 4) 264 2071 / 264 2072 / 264 2073Fax : (60 4) 264 2068Email : [email protected] : Mohamad Faiz Awang

SABAHLANGDON & SEAH SDN BHDJURU UKUR BAHAN MALAYSIAJUBM SDN BHDDLSM PROJEKS SDN BHDSuite 8A, 8th FloorWisma Pendidikan, Jalan PadangP.O.Box 11598, 88817 Kota KinabaluSabah, MalaysiaGPS : 5.9783, 116.0761Tel/Fax : (60 88) 223 369 / (60 88) 216 537Email : [email protected] : Ang Kun Eng

106 OTHER INFCHMATICN

Page 108: Malaysia Handbook 2014

.c!//iO LangdonSeahAN MFIUATE OF RI MCADIS

SARAWAKJUBM SDN BHDNo.2 (3rd Floor)Jalan Song Thian Cheok93100 KuchingSarawak, MalaysiaGPS : 1.5532, 110.3532Tel/Fax : (60 82) 232 212 / (60 82) 232 198Email : [email protected] : Nor Azman Bin Baharum

Fiur El

BANDAR SERI BE:711LANGDON & SEAHJURUUKUR BAHAN dan PENGURUSAN UTAMACONUnit 25, BT ComplexKg. Jaya Setia, Mukim Berakas 'A' BB2713P.O.Box 313, Bandar Seri Begawan B58670Negara Brunei DarussalamGPS : 4.9394, 114.9377Tel/Fax : (00 673) 233 2833 / (00 673) 233 2933Email : [email protected] : Shafie Yusof /Justin Teoh

KUALA BELAITJBPU (B) SDN BHDUnit 1, 1st Floor, Tang Ching Yng (TCY) BuildingLot 118, Jalan SungaiKuala Belait, KA 2331Negara Brunei DarussalamTel/Fax : (00 673) 334 7641Email : [email protected] : Shafie Yusof / Shahril Othman

KUALA BELAITPETROKON UTAMASDN BHDLot 7219, Jalan Jaya Negara, Kg. PandanP.O.Box 811, Kuala Belait KA1189Negara Brunei DarussalamGPS : 4.5843, 114.2087Tel/Fax : (00 673) 334 7878 / (00 673) 334 7788Email : [email protected] : Shafie Yusof

BEIJINGLANGDON & SEAH (BEIJING) CONSTRUCTION

CONSULTANTS CO LTDSuite 1225 - 1242, South WingCentral Tower, Junefield Plaza10 Xuan Wu Men Wai StreetBeijing 100052, ChinaGPS : 39.8967, 116.3757Tel/Fax : (00 86 10) 6310 1136 / (00 86 10) 6310 1143Email : [email protected] : Chan Chi Keung, Andrew

(Cont'd)

OTHER INFCRIATICN 107

Page 109: Malaysia Handbook 2014

5 OTHER INFORMATION(Cont'd)

DIRECTORY OF OFFICES

CHANGSHALANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.

CHANGSHA BRANCHRoom 11051, Zhong Tian Plaza766 Wu Yi Avenue, Furong DistrictChangsha, Hunan Province, 410005, ChinaGPS : 28.1952, 112.9831Tel/Fax : (00 86 731) 8971 1860 / (00 86 731) 8971 6736Email : [email protected] : Chen Yong

CHENGDULANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD.Room 807, Block A, Times PlazaNo.2 Zongfu Road, ChengduSichuan Province, 610016, ChinaGPS : 30.6567, 104.0806Tel/Fax : (00 86 28) 8671 8373 / (00 86 28) 8671 8535Email : [email protected] : Chan Hoi Or, Joe

CHONGQINGLANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD.

CHONGQING BRANCHRoom 3408, International Trade Centre38 Qing Nian Road, Central DistrictChongqing 400010, ChinaGPS : 29.5563, 106.5743Tel/Fax : (00 86 23) 8655 1333 / (00 86 23) 8655 1616Email : [email protected] : Lin Wai Yip, Gary

DALIANLANGDON & SEAH (BEIJING) CONSTRUCTION

CONSULTANTS CO LTD DALIAN BRANCHUnit 07, 32F, Xiwang Tower136 Zhongshan Road, Zhongshan DistrictDalian, Liaoning Province, 116001, ChinaGPS : 38.9149, 121.6312Tel/Fax : (00 86 411) 8800 8018 / (00 86 411) 8800 8823Email : [email protected] : Ng Hin Kan, Kenn

FOSHANLANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD.

FOSHAN BRANCH3/F, Foshan Ling Nan Tian DiZu Miao Road Shop Nos. Z01-Z11Zu Miao Road, FoshanGuangdong Province, 528000, ChinaGPS : 23.0312, 113.1128Tel/Fax : (00 86 757) 8203 0028 / (00 86 757) 8203 0029Email : [email protected] : Lee Kwok Wing, Dickey

108 OTHER INFCHMATICN

Page 110: Malaysia Handbook 2014

.c!//iO LangdonSeahAN MFIUATE OF RI MCADIS

GUANGZHOULANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD.

GUANGZHOU BRANCHUnit 2711 - 2713 & 2718, Bank of America Plaza555 Ren Min Zhong Road, GuangzhouGuangdong Province, 510145, ChinaGPS : 23.1231, 113.2536Tel/Fax : (00 86 20) 8130 3813 / (00 86 20) 8130 3812Email : [email protected] : Wong Wing Cheung, Jack

HAIKOULANGDON & SEAH CONSULTANCY (SHENZHEN) CO.LTD.

HAIKOU BRANCHUnit B 27/F Times Square2 GuomaoRoad, HaikouHainan Province, 570100, ChinaGPS : 20.0295, 110.3262Tel/Fax : (00 86 898) 6652 7818 / (00 86 898) 6652 7809Email : [email protected] : Yi Zheng Gang

HANGZHOULANGDON & SEAH CONSULTANCY (SHANGHAI) CO.LTD.

HANGZHOU BRANCHRoom 2305 WinNing International100 Min Xin Road, HangzhouZhejiang Province, 310016, ChinaGPS : 30.2518, 120.2189Tel/Fax : (00 86 571) 2829 7766 / (00 86 571) 2829 7622Email : [email protected] : Lu Wei

HONG KONGLANGDON & SEAH HONG KONG LIMITEDLANGDON & SEAH CHINA LIMITEDLANGDON & SEAH MANAGEMENT LIMITED38/F, AIA Kowloon TowerLandmark East, 100 How Ming StreetKwun Tong, Kowloon, Hong KongGPS : 22.3125, 114.2223Tel/Fax : (00 852) 2830 3500 / (00 852) 2576 0416Email : [email protected] : Poon Kan Young, Kenneth

MACAULANGDON & SEAH MACAU LIMITED14 Andar B, Edifacio Commercial Rodrigues599 Avenida da Praia Grande, MacauGPS : 22.1927, 113.5411Tel/Fax : (00 853) 2833 1710 / (00 853) 2833 1532Email : [email protected] : Chan Yuk Sim, Katherine

(Cont'd)

OTHER INFORM-RCN 109

Page 111: Malaysia Handbook 2014

5 OTHER INFORMATION(Cont'd)

DIRECTORY OF OFFICES

QINGDAOLANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.

QINGDAO BRANCHRoom 08B, 16F, HNA Center234 Yan An San Road, Shinan DistrictQingdao, Shangdong Province, 266071, ChinaGPS : 36.0609, 120.3754Tel/Fax : (00 86 532) 8280 1818 / (00 86 532) 8280 1881Email : [email protected] : Feng Shi En, Andy

SHANGHAILANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.6/F, City Point666 Huaihai Road WestShanghai 200052, ChinaGPS : 31.1972, 121.4224Tel/Fax : (00 86 21) 6091 2800 / (00 86 21) 6091 2999Email : [email protected] : Lai Pak Hung

SHENYANGLANGDON & SEAH (BEIJING) CONSTRUCTION

CONSULTANTS CO. LTD. SHENYANG BRANCHRoom 1801, 1806-1809, 6-9, 18/FE Tower of Fortune Plaza, 59 Beizhan RoadShenhe District, Shenyang CityLiaoning Province, 110013, ChinaGPS : 41.8143, 123.4355Tel/Fax : (00 86 24) 3128 6678 / (00 86 24) 3128 6983Email : [email protected] : Chow Hau Ming, Simon

SHENZHENLANGDON & SEAH CONSULTANCY (SHENZHEN) CO LTDRoom E & F, 42/FWorld Finance Centre, Block A4003 East Shen Nan Road, ShenzhenGuangdong Province, 518001, ChinaGPS : 22.5424, 114.1146Tel/Fax : (00 86 755) 2598 1841 / (00 86 755) 2598 1854Email : [email protected] : Lo Kwok Chu, Kenneth

SUZHOULANGDON & SEAH CONSULTANCY (SHANGHAI) CO LTD

SUZHOU BRANCHRoom 906 Century Financial Tower1 Suhua Road, Industrial Park, SuzhouJiangsu Province, 215021 ChinaGPS : 31.3159, 120.6749Tel/Fax : (00 86 512) 8777 5599 / (00 86 512) 8777 5600Email : [email protected] : Lai Pak Hung / Zhang Rui

110 OTHER INFCHMATICN

Page 112: Malaysia Handbook 2014

.c!//iO LangdonSeahAN MFIUATE OF RI MCADIS

TIANJINLANGDON & SEAH (BEIJING) CONSTRUCTION CONSULTANTS

CO LTD TIANJIN BRANCH4002, 40/F, Tianjin World Financial Centre Office TowerNo.2 Dagubei Road, He Ping DistrictTianjin, 300020, ChinaGPS : 39.1296, 117.2028Tel/Fax : (00 86 22) 2329 8611 / (00 86 22) 2319 3186Email : [email protected] : Wong Chin Ying

WUHANLANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD.

WUHAN BRANCHRoom 1008, 10/F, Corporate Centre 5Wuhan Tiandi, 1628 Zhongshan RoadWuhan, Hubei Province 430010, ChinaGPS : 30.6082, 114.3103Tel/Fax : (00 86 27) 5920 9299 / (00 86 27) 5920 9298Email : [email protected] : Guang Rong

Xl'ANLANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD.

Xl'AN BRANCHUnit 06-07, 16/F, Capita Mall Office Building64 South Second Ring WesternXi'an, Shaanxi Province, 710065, ChinaGPS : 34.2304, 108.9349Tel/Fax : (00 86 29) 8523 9186 / (00 86 29) 8866Email : [email protected] : Lum Ka Wai, Andy

9760

BANGALOKLANGDON & SEAH CONSULTING INDIA PVT LTD(with effective 11 April 2014)No.9 Esquire Center, M G RoadUlsoor, BangaloreGPS

560 008, India12.974, 77.617

Tel/FaxEmail

(00 91 80) 4123 9141 / (00 91 80) [email protected]

8922

Contact : Gary Miles / Velan Murali / Biju AK

CHENNAILANGDON & SEAH CONSULTING INDIA PVT. LTDNew No.125 (Old No.63), Jammi Building1st Floor, Royapettah High RoadMylapore, ChennaiGPS

600 004, India. 13.055, 80.265

Tel/FaxEmail

(00 91 44) 2498 8141 / (00 91 44) [email protected]

8137

Contact Gary Miles / Sankar Ramakrishnan

DELHILANGDON & SEAH CONSULTING INDIA PVT. LTDThe Elements, 2nd Floor, Unit No.465, Udyog ViharPhase-V, GurgaonHaryana 122 016 IndiaGPS 28.5012, 77.085Tel/FaxEmail

(00 91 124) 430 8790 / (00 91 124) [email protected]

8793

Contact : Gary Miles / Arun Basu (Cont'd)

OTHER INFCRMATICN 111

Page 113: Malaysia Handbook 2014

5 OTHER INFORMATION(Cont'd)

DIRECTORY OF OFFICES

HYDERABADLANGDON & SEAH CONSULTING INDIA PVT LTD2nd Floor, Trade Fair OfficeHitex Exhibition Center, Izzat NagarHyderabad 500 084, IndiaGPS : 17.475, 78.375Tel/Fax : (00 91 40) 2311 4942 / (00 91 40) 2311 2942Email : [email protected] : Gary Miles / Bhoomeshwar Rao

PUNELANGDON & SEAH CONSULTING INDIA PVT LTDCity Survey No 804/B, Bhandarkar Institute RoadLane No.14, Pune 411004 (Near Skoda Show Room)Maharashtra, IndiaTel : (00 91 20) 2565 04171 / 2565 0419Email : [email protected] : Gary Miles / Darshan Joshi

MUMBAILANGDON & SEAH CONSULTING INDIA PVT LTDUnit No.103, First Floor Akruti SMCKhopat Junction, Near Khopat Bus Depot, Thane (West)400601, Maharashtra, IndiaGPS : 19.1988, 72.9756Tel/Fax : (00 91 22) 3933 5555 / (00 91 22) 3933 3956Email : [email protected] : Gary Miles / Darshan Joshi

INDONESIBALIP.T. LANGDON & SEAH INDONESIAJalan Sunset Road No.8CLingkungan Abian BaseBali 80361, IndonesiaGPS : 8.7046, 115.1520Tel/Fax : (00 62 361) 894 7517 / (00 62 361) 894 7392Email : [email protected] : Ir. Putu Arya Canti

JAKARTAP.T. LANGDON & SEAH INDONESIALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] : Peter Robinson / Stephen Osborne

KOREASEOULLANGDON & SEAH KOREA CO LTD#429, 27, Seochojungang-ro 24-gilSeocho-Gu, SeoulKorea 137-882GPS : 37.4953, 127.0164Tel/Fax : (00 82 2) 543 3888 / (00 82 2) 543 3898Email : [email protected] : Victor Stanger

112 OTHER INFCHMATICN

Page 114: Malaysia Handbook 2014

.c!//iO LangdonSeahAN MFIUATE OF RI MCADIS

PHILIPPINESMANILALANGDON & SEAH PHILIPPINES INC4th & 7th Floor, Kings Court 12129 Pasong TamoMakati City 1231, PhilippinesGPS : 14.5576, 121.0135Tel/Fax : (00 63 2) 811 2971 / (00 63 2) 811 2071Email : [email protected] : Alan Philip Hearn

'ORELANGDON & SEAH SINGAPORE PTE LTDLANGDON & SEAH PROJECT MANAGEMENT PTE LTDL&S CONTRACT ADVISORY & DISPUTE MANAGEMENT

SERVICES PTE LTD1 Magazine Road#05-01 Central MallSingapore 059567GPS : 1.2885, 103.8421Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Eugene Seah / Goh Chok Sin / Ho Kong Mo

BANGKOKLANGDON & SEAH (THAILAND) LTDLECE (THAILAND) CO LTD10th Floor, Kian Gwan ll Building140/1 Wireless Road, LumpiniPratumwanBangkok 10330, ThailandGPS : 13.7350, 100.5454Tel/Fax : (00 66 2) 253 1438-9 / (00 66 2) 253 4977Email : [email protected] : Ang Yen Kooi / Wong Soon Bin

VIETNAMHANOILANGDON & SEAH VIETNAM CO LTD4th Level Thanh Dong Building132-138 Kim Ma StreetBa Dinh DistrictHanoi, VietnamGPS : 21.0320, 105.8263Tel/Fax : (00 844) 3942 7525 / (00 844) 3942 7526Email : [email protected] : Mark Olive

HO CHI MINH CITYLANGDON & SEAH VIETNAM CO LTD9th Level, Unit E-VTP Building08 Nguyen Hue, District 1Ho Chi Minh City, VietnamGPS : 10.7727, 106.7051Tel/Fax : (00 848) 3823 8297 / (00 848) 3823 8197Email : [email protected] : Mark Olive

OTHER INFORM-MN 113

Page 115: Malaysia Handbook 2014

5 OTHER INFORMATION

TELEPHONE DIRECTORY (MALAYSIA)

Ministries/DepartmentsDepartment of Statistics Malaysia 03-8885 7000Department of Town and Country Planning 03-2698 9211

Ministry of Dom. Trade, Co-operatives &Consumerism 03-8000 8000

Ministry of Housing and Local Government 03-8000 8000Ministry of Works Malaysia 03-8000 8000Kuala Lumpur City Hall (DBKL) 03-2617 9000Perbadanan Putrajaya 03-8000 8000Petaling Jaya City Council (MBPJ) 03-7954 2020Shah Alam City Council (MBSA) 03-5510 5133Subang Jaya Municipal Council (MPSJ) 03-8024 7700Kajang Municipal Council (MPK) 03-8737 7899Selayang Municipal Council (MPS) 03-6126 5800Ampang Jaya Municipal Council (MPAJ) 03-4296 8000Penang Island Municipal Council 04- 259 2020SI RIM Berhad 03-5544 6000The Malaysia Highway Authority 03-8737 3000Contractor's AssociationMaster Builders Association Malaysia 03-7984 8636Contractor's Registration BoardConstruction Industry Development Board (CIDB) 03-4047 7000Professional Registration Boards A 1Board of Architects Malaysia 03-2698 2878Board of Engineers Malaysia 03-2691 2090Board of Quantity Surveyors Malaysia 03-2610 8140Professional Bodies rAssoc. of Consulting Engineers Malaysia (ACEM) 03-2095 0031

Malaysia Institute of Architects (PAM) 03-2693 4182Malaysia Institute of Planners (MIP) 03-7877 0636The Institution of Engineers Malaysia (IEM) 03-7968 4001

Royal Institution of Surveyors Malaysia (RISM) 03-7955 1773

Other Important NumbersAmbulance & Police 999

Civil Defence (Rescue) 999Fire Fighter 999General Hospital KL 03-2615 5555SYABAS Sdn Bhd 1800 88 5252Tenaga Nasional (KL) 03-2296 5566

114 OTHER INFORVIATICN

Page 116: Malaysia Handbook 2014

2, Jalan PJU 5/15Kota Damansara

47810 Petaling JayaSelangor, Malaysia

Tel: (603) 6156 9000 Fax: (603) 6157 8660

With effective from April 2014Level 5, Menara TSR

12 Jalan PJU7/3Mutiara Damansara47800 Petaling JayaSelangor, Malaysia

Tel: (603) 2106 8000 / 2106 9000 www.LangdonSeah.com