17
Malabar Road (SR 514) PD&E Project Development & Environment Study Space Coast TPO Board Meeting May 14, 2015

Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Malabar Road (SR 514) PD&EProject Development & Environment Study

Space Coast TPO – Board Meeting May 14, 2015

Page 2: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Project Location Map

2

Page 3: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Purpose and Need

• Improve traffic flow and relieve congestion

3

Location Existing Traffic (2015)

Future Traffic (2045)

Malabar Road (SR 514) –East of Babcock Street

18,000 Average Annual Daily Traffic (AADT)

28,000 AADT

Malabar Road (SR 514) –East of Corey Road

15,000 AADT 22,000 AADT

Malabar Road (SR 514) –West of US 1

13,000 AADT 19,000 AADT

Page 4: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Engineering Analysis

• Traffic Projections

• Typical Sections

• Roadway Alternatives

– 4-laning

– Minimize right of way (ROW)

– Intersection improvements

• Access Management

• Traffic Operations/Safety

– Enhanced bike and pedestrian facilities

• Stormwater Management

4

Page 5: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Recommended Alternative

5

• Selected based on:

– Community and stakeholder input

– Engineering analysis

– Minimization of sensitive environmental

impacts

5

Page 6: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

6

Malabar Road Segments

Page 7: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Segment 1- 4 Lane Urban

7

Babcock Street to Weber Road

• Four-lane divided urban

• 11’ travel lanes

• 114 feet minimum width

• Best fit to minimize impacts

• 7’ bike lanes

7

Page 8: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Segment 2 - Suburban

8

8

Weber Road to east of Corey Road

• Four-lane divided suburban

• 55 mph design speed

• 150 feet minimum width

• 6’ Bicycle lanes

Page 9: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Segment 2 - No Build

9

Corey Road to Marie Street

• Partial no build east of Corey Road up to Marie Street

• 10’ multi-use path

• Meets future traffic demand

• Avoids environmental impacts

9

Page 10: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Segment 3 – Marie St. to US 1

10

Marie Street to US 1

• Three-lane with center turn lane

• 35 mph design speed

• 78’ feet minimum width

• Best fit to minimize impacts

• 7’ Bike lanes and sidewalks

10

Page 11: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Environmental Evaluations

• Wildlife – Recent wildlife surveys

• Parks – Section 4(f)

• Cultural and historic resources

• Wetlands and floodplains

• Noise impacts & air quality

• Contamination

11

Page 12: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Environmental – Section 4(f)

• Department of Transportation Act of 1966

• Cannot approve the use of land from

publicly owned parks, recreational areas

unless:

– There is no feasible and prudent alternative to

the use of land for the transportation facility.

– The action includes all possible planning to

minimize harm to the property resulting from

the use.

12

Page 13: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Environmental

13

Section 4(f) Lands

Page 14: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Preliminary Costs

14

• Design– Approximately $3.6M

– Funded in fiscal year 2019

• Right-of-Way– Preliminary ROW estimate - $22M

– Currently not funded

• Construction– Preliminary construction cost - $24.5M

– Currently not funded

Page 15: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Safety Improvement Project

15

• FDOT Project No. 413761-1-32-01

– Improve intersections of Weber and Corey Road

– Funded for design, right-of-way and construction

– Design scheduled to begin October 2014

– Project will Let for construction June 2019

– FDOT Design Contact Person:Name: Jerald Marks

Tel: 386-943-5161

Email: [email protected]

Page 16: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Next Steps

• Public Hearing (Summer of 2015)

• Complete environmental and engineering

reports

• Location Design Concept Approval (LDCA)

from Federal Highway (Fall of 2015)

16

Page 17: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road

Contact Information

Lance Decuir, PE

Atkins

Deputy Project Manager

482 South Keller Road

Orlando, FL 32810

407-806-4482

[email protected]

Vic Poteat, PE

Atkins

Project Manager

482 South Keller Road

Orlando, FL 32810

407-806-4129

[email protected]

Jazlyn Heywood, PE

Florida Department of Transportation

FDOT Project Manager

719 S Woodland Blvd., MS 501

Deland, FL 32720

386-943-5388

[email protected]

17www.sr514malabar.com