BSP JX-8 Small Driven Piling Rig.
Specification.
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected] Ransome 2017 Updated 06-10-17
1
JX PILING RIG
MAKING A GLOBAL IMPACT
2
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
BSP International Foundations and Colets Piling have collaborated on a British-designed and purpose-built piling rigWhen UK-based piling contractor Colets Piling became aware that its rental customers were in need of a piling rig to top-drive steel or precast concrete piles for small to medium-sized housing projects, it decided to approach BSP International Foundations and ask them to design and build a mast and piling hammer to fit on a JCB excavator.The main criteria for the rig were easy transportation without the need of movement orders; reduced cost of piling mats for the rig to run on, as this can significantly increase the cost of the housing development; and increased productivity with quicker set-up, faster drive times and reliability. Colets Piling appointed JCB to supply a number of base units from its JS range. These machines have already been introduced into the contract and rental fleet of Colets Piling in rotary versions, making this the first driven rig of its type.BSP, in turn, offered a JX25-8 fitted with a 2t dropweight hydraulic hammer and a 13m-long mast. Research showed a larger interest in a machine that could cope with 8m piles, so the JX25-8 was the final choice.
Key featuresOne key consideration in the design was the overall mass of the rig. The JX-8 exerts a ground pressure of only 82 (kN/m^2 which is further reduced once the hammer is in place and sitting on the pile - as the pile takes the weight of the hammer. The rig then only guides the pile into the ground while the hammer is driving. The JX track base is square for maximum stability. With a working radius of 3.1m, the mast can be spotted anywhere around the base. Five degrees of mast rotation left or right helps iron out un-level ground. The rig can self-erect its mast without the help of other plant. The JX also has two dedicated lift winches, one to lift the hammer and the other to lift the pile with a maximum weight of 1.5t. Moreover, hydraulic arms retain the bottom of the pile to guide it in place once the pile has been located into one of the dedicated helmets under the hammer. The hydraulic hammers driven by the base unit are from BSP’s DX range, designed to be versatile with a low power consumption (40KW). It is estimated that over 250 linear metres of pile can be driven in one shift using the JX rig. So whether it is more piles driven or piles driven in a shorter space of time, it can adds up to a cost-effective solution. The hammers are also capable of driving steel tubes, ‘H’ piles, wooden or precast concrete pile sections to an ultimate load-bearing capacity of over 1,000KN.The hammer retains a dedicated helmet or cap suited to the pile to be driven, keeping the centre line of the hammer in line with the pile. This ensures maximum transfer of energy from the hammer into the pile. A plastic dolly is used in the helmet to stop metal-to-metal contact of the drop weight on to the helmet. Shock absorbers built in to the hammer dampen the pile recoil, reducing vibration to the cage and hydraulic cylinder assembly. This can reduce any downtime of the hammer or the rig.Once a job is completed, the mast is lowered and the JX rig can be driven on to a low loader, without the need to remove the hammer from the mast.
The collaboration between Colets and BSP has resulted in a purpose-built rig, ready for work in less than six months.
Purpose-driven piling Introduction.
3
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
Basic Machine: JS200Under Carriage: SC typeTracks: 700mm wideCounterweight: 3700kg
Base Unit.
JCB EcoMax engine 128kw / 172hp: T4 Final
Weight as supplied 16,500 kg
Standard SC undercarriage 2870 overall width, fitted with 700mm Triple Grouser Tracks.
Fully glazed cabin with climate control, air suspension seat, radio and retractable seat belt
FOPS level 2 cab guard , travel alarm
Additional LED work lights, low level windscreen wiper, fire extinguisher
Flashing beacon , front roller blind , scavenge system (air filtration)
7” LCD monitor and rear view camera.
Upper structure safety rails
JCB Live-Link with 5 years airtime and JCB key pad immobilizer.
External mounted emergency stops
4
JX PILING RIG
MAKING A GLOBAL IMPACT
Basic Rig SpecificationsHammer
SizeBasic
Weight*WorkingHeight
Max Pile Length
Typ. GroundPressure
Basic Excavator
Track Pads
Transport Length
TransportWidth
MODEL Kg m m Kg/cm² JCB m m m
JX25-8 DX25 26,000 12.0 8.0 0.79 JS200 SC 700 12.6 3.0
* Weight includes hammer, but not pile.
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
5
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
ENGINE: Model: JCB EcoMax Tier 4i.
Type: 4 Stroke 4 Cylinder in-line, direct injection, turbocharged diesel
Power: 129 kW (173hp)
Maximum Speed 1700 rpm.
24 Volt Electrical System.
SWING SYSTEM: Swing motor: Axial piston.
Swing brake Hydraulic brake plus automatic spring disc type parking brake
Swing speed reduction to approx. 1 RPM.
TRACKING: Type: Fully hydrostatic, swash axial piston type, fully guarded within undercarriage frame.
Track speed caped to 2.3km/h (1.4 mph)
HYDRAULIC SYSTEM: Pumps: two variable displacement axial piston type.
Maximum flow 2 x 224 L/m
Filtration: In tank, 150 micron, suction strainer. M
Main return line, 10 micron fiberform element.
Pilot line. 10 micron paper element.
Hammer return 10 micron. Reinforced microform element.
.
Rig Specification
6
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
UNDERCARRIGE: Standard length.
Track type, Sealed and greased.
WINCHES: Main winch: Pullmaster PL8 with external brake release
Hammer winch rope dia 16mm x 35 metres long.
Safe working load 4.6 Tonnes.
Auxiliary winch: Brevin BWF-1500-1
Pile winch rope dia 14mm x 28 metres long.
Safe working load 1.7 Tonnes.
SERVICE CAPACITIES: Fuel Tank: 343 litres.
Hydraulic tank: 120 litres.
TRANSPORT: JX-8 with DX 25 hammer 26,400kg.
DX 25 hammer 4500kg
Rig Specification
Hammer: ON for transport When on mast – needs to be positively pinned.
Transport in single length preferred
Without Fold-upLength = 12.5mHeight = 3.5m (top of hammer)With top section folded, Length = 10.2m
Rig Transport Dim’s.
7
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
Rig Specification
Calculation of the peak ground pressure at any slewing position of the rig fulfils the requirements of EN16228-1 Annex F by including the effects of wind and dynamic forces of slewing, traction, leader adjustment and lifting of hammer and pile.Alternative ground pressure data is provided, based upon the FPS Rig loading code for input into the BRE platform design method. (BRE report 470 – Working Platform for Tracked Plant 2004). This methodology does not however include provision for the effects of wind or dynamic forces as required by EN16228Pressures based on 3.370 m ctrs tumblers x 700mm track pads
Ground pressures in operation & travelling over jobsite
Pile mass EN16228-1 Annex F FPS / BRE Platform design code
Peak press during
360deg slew
Peak press
during 360deg
slew
Equivalent rectangular
distribution
Max pressure
Loaded
track
length
(kg) (kN/m^2) (kN/m^2) (kN/m^2) (m)
1700 205 153 115 2.294
1200 189 145 109 2.359
800 178 138 104 2.424
Travelling over jobsite without pile
0 139 104 82 2.763
8
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
TWO Hammer Winch Options:
[a] Rope Detachable – no need for pay out winch during piling
[b] Rope Attached – winch to have ‘pull-off’ mode engaged while piling
Rig Working Dim’s.
Operating Weight 26TMax Pile 8mWeight Includes Hammerbut NOT pile.
Hyd Schematic Simplified
Pile
Reduced Max Speed
Reduced Max Speed
Reduce Max Speed
ExcavatorMain Valves
DX
Gate
Plumb
(E/W)
Rake (F/A)
Support (U/D)
Hammer
Danfoss 32+cetop
Winches controlledFrom existing pilot operated joysticks
Geometry logic and interlockControl from BSP PLC
Direct To Tank
x
Hammer ControlSee Next Page
x
Track LH
Stick (Hi-Flo disabled)
Boom (Hi-Flo disabled)
Tool (Hammer)
Bucket
Slew
Track RH
9
JX PILING RIG
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
Track LH
Stick
Boom
Tool (Hammer)
Bucket
Slew
Track RH
ExcavatorMain Valves
DX
Gate
Plumb
(E/W)
Rake (F/A)
Support (U/D)
Danfoss 32+cetop
Geometry logic and interlockControl from BSP PLC
x
Existing pilot hoses on RH joystick for ‘bucket function to be disconnected
Only one direction needed for these two sections
Standard Option control valveJCB ref. 332/J86639(Kawasaki 2KWE-5A)With Deutsch 2-way DT connector
x
10
Hammer & Geometry Control
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
JX PILING RIG
MAKING A GLOBAL IMPACT
Cab Layout – BSP Functions
Geometry logic, safety interlocks and Hammer Control operated from BSP PLC in conjunction with buttons on top of new joystick handless
JCB joystick replaced
CR1080 colour display
CR2530 PLC in rear house
11
MAKING A GLOBAL IMPACT
JX PILING RIG
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
Cab Layout – BSP Functions
R.H Side:[5] retain JCB function – engine idle [6] spare
[2] Back Stay Cyl – Rake fore-aft[3] Back Stay Cyl – Side plumbing E/W
[1] Hammer Start/Stop pushbutton ?
[8] spare
L.H Side:[5] retain JCB function – Horn[6] spare
[4] Support Frame - Up[2] Pile Gate open[3] Pile Gate Close[1] Support Frame – Down
[9] spare[8] spare[7] spare
22 1 1
Spare Spare
Not used
JX25-8
Not used
Not used
Not used
Spare
Spare
Spare Spare
Spare
12
MAKING A GLOBAL IMPACT
JX PILING RIG
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
13
BSP JX PILING RIG HAMMER.
MAKING A GLOBAL IMPACT
BSP International Foundations Limited. Tel +44 (0)1473 830 431. e-mail [email protected]
DX Hammer Specification
Performance Data. Ram Mass Max Impact Energy
Blow Rate @ Rated Energy
Operating Pressure
Hydraulic Oil flow Required
Hammer Mass
MODEL Kg KNm BPM Bar L/Min Kg
DX 25 2000 25 60 160 150 4500
THE HAMMERS HAVE THE FOLLOWING IMPORTANT FEACHERS:
Total control of hammer. Allows precise matching of energy to suit pile driving requirements. Double acting cylinder produces high impact energy and fast blow rate. Economical – Low Hydraulic power requirements. Will drive piles to an ultimate load bearing capacity up to 1800kN. Range of helmets for Concrete, Steel, Plastic or Wooden piles.
BSP Hydraulic hammer Input data for GRL- Weap Programme
Model
Ram
DetailsEquivalent Stroke Cap Mass Cushion Cushion Details
Max Min C/W Cushion Material Area Thickness E modulusC Of
RMass
KNM M KN CM2 mm MPA
DX 25 19.62 1.25 0.1 1.72Nylon MC
904804 200 2250
0.92
BSP International Foundations Ltd.Claydon Ind. Park, Gt. Blakenham
Ipswich, Suffolk, UK, IP6 0JD
Tel. +44 (0)1473 830431
Fax. +44 (0)1473 832019
E-mail. Sales @bspif.co.uk
WWW.BSP-IF.COM
14
MAKING A GLOBAL IMPACT
Registered address as above: Company Reg. No. in UK 194713: Tax No. GB 434 727543All goods and services are sold and supplied according to the company's 'Conditions of Sale'. Copies of which can be found online at the above link.Any advice ans suggestions whether verbal or in writing are given with the utmost care, but the company cannot accept legal liability for any errors or inaccuracies thereinBSP is a member of Tex Holdings PLC
Colets Piling Ltd.Church Field House,
Church Field Road,
Sudbury, Suffolk CO10 2YA
Tel: 01787 882 888
Fax: 01787 313142
E-mail. [email protected]
www.coletspiling.com