8/8/2019 Make Up Water Calc.
1/3
MAKE UP WATER CALCULATION
PROJECT FACTORY UNITS OPERATE 1LOCATION CIBITUNG Water Rate Price IDR 4,000.00
TEMPERATUREFUNCTION
PERCENTAGE FACTOR
INLET WATER 37 C BLOWDOWN COOLING LOAD
OUTLET WATER 32 C COMMERCIAL USED 0.1 0.8
WET BULB TEMPERATURE 27 C INDUSTRY USED 0.3 1
24 Hours Operation 0.1 0.6
WATER FLOW RATE 1616.91 GPM
CONVERSIONOPERATION TIME 12 Hours 82 F to C 27.78
6,120 LPM to GPM 1616.91
COOLING FACTOR 1 700 3082.34
DRIFT LOSS DESIGN 0.01 %
BLOW DOWN FACTOR 0.1 %
M/H to GPM
ALCULATION
8/8/2019 Make Up Water Calc.
2/3
8/8/2019 Make Up Water Calc.
3/3