    MAKE UP WATER CALCULATION

    PROJECT FACTORY UNITS OPERATE 1LOCATION CIBITUNG Water Rate Price IDR 4,000.00

    TEMPERATUREFUNCTION

    PERCENTAGE FACTOR

    INLET WATER 37 C BLOWDOWN COOLING LOAD

    OUTLET WATER 32 C COMMERCIAL USED 0.1 0.8

    WET BULB TEMPERATURE 27 C INDUSTRY USED 0.3 1

    24 Hours Operation 0.1 0.6

    WATER FLOW RATE 1616.91 GPM

    CONVERSIONOPERATION TIME 12 Hours 82 F to C 27.78

    6,120 LPM to GPM 1616.91

    COOLING FACTOR 1 700 3082.34

    DRIFT LOSS DESIGN 0.01 %

    BLOW DOWN FACTOR 0.1 %

    M/H to GPM

    ALCULATION