Make-to-Stock Production – Discrete Industry. SAP Best Practices. Purpose, Benefits, and Key Process Steps. Purpose This scenario describes a business process, which is typical for companies with lot-size oriented production. - PowerPoint PPT Presentation

Citation preview

Page 1: Make-to-Stock Production – Discrete Industry

Make-to-Stock Production – Discrete Industry

SAP Best Practices

Page 2: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 2

Purpose, Benefits, and Key Process Steps

Purpose This scenario describes a business process, which is typical for companies with lot-size oriented

production. The production scenario produces a finished good and all dependent components in make-to-

stock production (MTS). Furthermore, the scenario is supported by the main cost object controlling functions required,

such as preliminary costing and period-end closing.

Benefits Production triggered by a production plan Serial number and batch management included Optional with: quality management, consigned inventory, external processing

Key Process Steps Creating Planned Independent Requirements Material Requirements Planning at Plant Level In-House Production (subassembly) In-House final assembly (Finished Good) Capacity Leveling Confirming Assembly Activities

Page 3: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 3

Required SAP Applications and Company Roles

Required SAP Applications Enhancement package 5 for SAP ERP 6.0

Company Roles Production Planner Production Supervisor Shop Floor Specialist Warehouse Clerk Strategic Planner Engineering Specialist

Page 4: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 4

Detailed Process Description

Make-to-Stock Production – Discrete IndustryThis scenario describes a business process, which is typical for companies with lot size oriented production. The production scenarios consist of both goods movements (goods issues and receipts) and confirmation of completion of the production order. Furthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing

and period-end closing. The typical planning process starts with sales quantity planning. The previous period’s actual sales figures can be used

as a basis for future planning. In Sales and Operations Planning, you ensure that production stays in line with sales so that you may create the

production plan synchronously to sales. The planning data is transferred from Sales and Operations Planning to Demand Management. Demand Management generates independent requirements, which are used in the subsequent Material Requirements Planning (MRP) run.

In material requirements planning, the bill of materials (BOM) for the top-level material demand gets exploded and production is planned right down to procured component level. MRP results in planned orders being generated for the material to be produced.

If insufficient warehouse stock is available, purchase requisitions are created for the raw materials required. When the order is created, target costs are calculated for the order lot size (preliminary costing).

During the production process, costs incurred are updated on the order, which enables you to keep track of and compare target costs and actual costs at any time.

Period-end-closing activities are applied to the order. This includes Work In Progress calculation and variance calculation. After this, Work in Progress is settled to financial accounting and production variances are settled to management and

financial accounting.

Page 5: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 5

Process Flow DiagramMake-to-Stock Production – Discrete Industry

Man

ufa

ctu

rin

gE

ven

t

Pla

nt

Co

nt

rolle r

Period End Closing

“General” Plant(181)

Material Requirements

Planning at Plant Level & Evaluation of Stock / Requirement

List

Beginning of Planning

Cycle

Purchase Requisiti

on

MRP List

Inventory @ Standard. Cost

Pro

du

ctio

n P

lan

ner

Periodic Plan Revision

Release Production

OrderCapacity Leveling

Material Staging for

Planned Orders

Confirming Assembly Activities

/ Final Confirmation

Semi-Finished Goods Receipt

Goods Issue/ Back flush

Update Capacity

Goods Receipt Slip

Pick List

Order PrintPlanned Orders

Capacity

Leveling O.k.?

Material Availabl

e?

Bu

ye r

War

e-h

ou

se

Cle

rk Goods Receipt Slip

Procurement of Stock

Material with QM (127)

Procurement &

Consumption of Cosigned

Inventory (139)

Str

ateg

ic

Pla

nn

er Creating Planned

Independent Requirements

ConvertPlanned Order to Production

Order

Inventory Consumption @ Standard.

Cost

Procurement w/o QM

(130)

Finished Goods Receipt

MM Subcontractin

g (138)

PP-Subcontractin

g (External Processing)

(150)

No

Yes

No

Yes

Logistics Planning

(144)

1

Page 6: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 6

Process Flow DiagramMake-to-Stock Production – Discrete Industry

Pro

du

ctio

n

Su

per

viso

r

1 Review Operation List

Eve

nt

Page 7: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 7

Legend

Symbol Description Usage Comments

To next / From last Diagram: Leads to the next / previous page of the Diagram

Flow chart continues on the next / previous page

Hardcopy / Document: Identifies a printed document, report, or form

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Financial Actuals: Indicates a financial posting document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Budget Planning: Indicates a budget planning document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Manual Process: Covers a task that is manually done

Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.

Existing Version / Data: This block covers data that feeds in from an external process

Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines

System Pass / Fail Decision: This block covers an automatic decision made by the software

Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.

Ext

erna

l to

SA

P

Business Activity / Event

Unit Process

Process Reference

Sub-Process

Reference

Process Decision

Diagram Connection

Hardcopy / Document

Financial Actuals

Budget Planning

Manual Process

Existing Version /

Data

System Pass/Fail Decision

Symbol Description Usage Comments

Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role.

The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.

Role band contains tasks common to that role.

External Events: Contains events that start or end the scenario, or influence the course of events in the scenario.

Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the process flow.

Connects two tasks in a scenario process or a non-step event

Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario

Does not correspond to a task step in the document

Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario

Corresponds to a task step in the document

Process Reference: If the scenario references another scenario in total, put the scenario number and name here.

Corresponds to a task step in the document

Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here

Corresponds to a task step in the document

Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.

Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution

<F

unct

ion>

Page 8: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 8

Convert

Planned Order

Dependent Reqmts

Reservations

Warehouse

Material ReqmtsPlanning

Materials Requirement Planning - MRP

Planned Ind. Requirements

ProductionOrder

Page 9: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 9

Alternative Planning Strategies for Finished Product

Strategy Net Requirements Planning (10) Planning with Final Assembly (40)

Customer requirements passed on to production No Yes

This means . . . ... sales orders do not influence production ... sales orders that exceed planned independent requirements can influence production

... the main objective is to ensure smooth production

... the most important factor here is the ability to react flexibly to customer demand

Planned independent requirements allocated and reduced during sales order processing No Yes

Planned independent requirements reduced at goods issue for delivery Yes No

Page 10: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 10

Work Center

Work Center: Assembly

Routings Costing Scheduling& Capacity

1010,-2150,-3160,-

Default valuesRoutings

Costing Data Sched. DataCapacity Data

Page 11: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 11

Routing Work Center / Operation

Routing Header

Operation 10: Final Assembly

Material Components

Work centerControl keyStandard valuesActivity typesDescription....

Page 12: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 12

Individual ConversionIndividual Conversion

Plannedorders

Productionorders

Collective ConversionCollective Conversion

Planned Order Conversion

Productionorder

Plannedorders

Page 13: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 13

Specify order typeSpecify order type

Define order itemDefine order item

Copy routingCopy routing

Lead time schedulingLead time scheduling

Copy bill of materialCopy bill of material

Optional changesOptional changes

Save production orderSave production order

FridayJanuary28 2011

TuesdayJuly12 2011

Requirements planningRequirements planningRequirements planningRequirements planningManuallyManuallyManuallyManually

Availability checkAvailability check

AutomaticallyAutomaticallyAutomaticallyAutomatically

Optional (Customizing)

Production Order Creation

Page 14: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 14

Order proposal (planned order)

Order creation

Availability check

Order release and batch determination

for components

Order settlement Order headerOrder header

OperationsOperations

ComponentsComponents

CostsCosts 2050

100

Material withdrawal

Goods receipt

Production Order Processing

Production Order

Confirmations

Page 15: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 15

Material

Goods movementGoods movement

Material document

Accountingdocument

Warehouse Warehouse

OperationOperation

Mat. comp.Mat. comp.

Prod.Prod. orderorder

CostsCosts

Update of stock quantitiesUpdate of stock quantities Update of stock valuesUpdate of stock values materials can be batch controlledmaterials can be batch controlled

Goods Movement

Page 16: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 16

Goods issue posting

Materialdocument

Acctg.document

Goods Issue

Updating stock quantitiesUpdating stock quantities Updating stock valuesUpdating stock values Reducing reservationsReducing reservations Calculating actual costs and up-Calculating actual costs and up-

dating the order dating the order

Page 17: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 17

Order confirmationOrder confirmation ...

Manual entry

Production Order Confirmations

Productionorder

Operation 0010

Operation 0020

Operation 0030

Operation . . . .

Page 18: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 18

Costing variant

Display planned/actual costs

Cost elementsCost itemizationCost component split

Planned costsPlanned costs

Material costs

Costs for externalprocurement

Production costs

Material overheadcosts

Production overheadcosts

Costs for externalprocessing

Cost elementsCost elements:: PhasesPhases

Gen. operation values

Standard valuesControl key “costing

indicator”

ResourcesResources

Formula key forcosting

Cost center

Activity type

Formula constants

Cost calculationlog

Ind. "Rel. to costing"

Price

MaterialMaterial components components

OrderOrder type type / Plant / Plant

Production Order - Preliminary Costing

Page 19: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 19

Production order cost Production order cost

Overhead calculationsOverhead calculations

- Work center- Standard value- Quantities

- Cost center- Activity types- Formulas

- Activity types

Operation

Internal activities costsMaterial costs

Cost of Production Order

- Quantities- Prices

Work center Cost centerMaterialcomponents

- Periods

Activity cost

Page 20: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 20

Order Status

Pre-Released or Released Partially Delivered Finally Delivered or Technically Completed

Variances

DeliveryValue

Actual Costs

WIP atActual Costs

=WIP atActual Costs

=

-DeliveryValue

=

-

PREL

REL PDLVDLV

TECO

WIP and Variance Calculation in Lot-Based Cost Object Controlling

Actual Costs Actual Costs

Page 21: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 21

Material600

Product cost planningLotsize 1 PC

CO-CO-PCPC

Production Order Mat. F126

8001.200

4002.400

-2.000

400

MaterialProductionSurcharge

GR

Variances

Actual Cost

CO-PC

Material MasterStandard Price = 2000

Target Version 0

Price 150 Qty 150 Structure 100 Scrap 0 Lotsize 0

Production1100

Surcharge300

Warehouse Price difference

Financial Accounting

2000 400

SettlementFI

CO-PA

Settlement of Order (Example)

Page 22: Make-to-Stock Production – Discrete Industry

© 2011 SAP AG. All rights reserved. 22

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

© 2011 SAP AG. All rights reserved

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company.

Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase, Inc. Sybase is an SAP company.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG.

This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.

SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.