Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

0

Page 2: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

1

Joseph A. Panora, DirectorEnterprise Information Services

Page 3: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

2

Agenda

Joseph A. Panora, EIS Director• Executive Team• Strategic Direction• CDCR and IT Facts• CDCR Facilities and Did You Know?• Historical  IT View and Current IT Environment• Realignment • IT Governance Process

Davood Ghods, EIS Deputy Director • Major IT Accomplishments• Major IT Efforts Underway• Future Activities/Considerations• Emerging Technologies

Paul Smith, Program Director• Business Information System

Russ Nichols, Project Director• Strategic Offender Management System 

Questions  and Answers

Page 4: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

3

IT Executive TeamJoseph A. Panora, EIS Director Caroline Bigelow, Chief 

Policy/Planning, Project Management and Acquisitions (PPPMA) Scott MacDonald, Chief 

Information Security and Change Management (ISCM) Russ Nichols, Project Director 

Strategic Offender Management System (SOMS) Paul Smith, Program Director

Business Information System (BIS)Davood Ghods, EIS Deputy Director  Sandra Chamberlin, Chief

Applications Maintenance and Support (AMS) Devin Holmes, Chief

IT Customer Support and Field Operations (IT CSFO) Elbert Lawrence, Chief

Infrastructure Services (IS)

Page 5: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

4

CDCR Strategic DirectionVision• A safer California through correctional excellenceMission• We protect the public by safely and securely supervising adult 

and juvenile offenders, providing effective rehabilitation and treatment, and integrating offenders successfully into the community

Goals• Protect Our Communities• Achieve Excellence in Infrastructure and Administration

o IT Objectives:  Department employees will have access to the IT 

collaborative tools they need to do their jobs. Replace 80 percent of mission‐critical legacy systems and 

improve access to data through the implementation of enterprise solutions.

Page 6: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

5

IT Strategic Direction2010‐2015 IT Strategic Goals• Manage IT as an Enterprise Asset to Improve the Delivery of Service to Customers

o Expand access to enterprise collaborative tools to facilitate communication and decision making

o Align technology to business and promote efficiencies and cost savings• Ensure Availability of IT Infrastructure and Systems

o Implement a robust infrastructure that is reliable, available, secure and scalableo Establish an enterprise approach to maintain IT asset investment

• Secure and Protect the Department’s IT Assetso Implement information security best practices to protect IT assetso Provide IT and Emergency Response Management

• Develop a Sustainable Customer‐focused IT Support Modelo Establish a support model and service management framework for IT operationso Implement Service Level Management  (SLM) to support mission critical systems

• Reduce IT Carbon Footprint and Improve Energy Efficiencieso Implement virtualization technologieso Reduce power consumption of computing technologies

• Develop a Robust IT Workforce to Meet the Existing and Future IT Needs of CDCRo Ensure workforce is prepared to support the technology needs of the businesso Align IT services with the Department and State’s strategic direction

Page 7: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

6

Summary*:• 53,240 CDCR Employees• 624 EIS Employees• $8.7 Billion CDCR Budget• $118 Million EIS Budget• $815 Million IT Projects

Implemented and In Progress• 29,404 Peace Officers• 124,806 Inmates• 59,266 Adult Parolees• 716 Juvenile Wards

*As of August  31, 2013

CDCR/IT FactsMajor Program Areas:

• Adult Institutions• Adult Parole• Juvenile Justice• Rehabilitative Programs• Correctional Safety• Victim Services• Board of Parole Hearings• Facilities, Planning and 

Construction Management

Page 8: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

7

CDCR Facilities• 34 Adult Prisons

o Prisons are like self‐contained small cities where you find the same types of services as within your own community (i.e. fire department, commercial laundry, recycling services, industries such as shoe factories, coffee roasting , etc.)

• CDCR facilities are designated level I through IV with level IV being the highest level in the systemo Facilities designated with a security level of I/II are designed as open dormitorieso Facilities designated with a security level of III/IV are designed to contain cells with 

one of two different types of housing units: A 180‐style housing unit allows an officer to see 180° of the housing unit from 

within the control booth A 270‐style housing unit allows an officer to see 270° of the housing unit from the 

control booth

• 124 Parole Units in more than 60 locations

• 3 Juvenile Facilitieso Ventura Youth Correctional Facility in Camarilloo N.A. Chaderjian Youth Correctional Facility in Stocktono O. H. Close Youth Correctional Facility in Stockton

Page 9: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

8

CDCR Facilities• 13 Adult Community Correctional Facilities (CCF)/Modified Community Correctional 

Facilities (MCCF) o Prepare inmates for a successful reintegration into their communities in order to 

reduce re‐victimization and recidivism.  Provide safe and secure environments for gender responsive, evidence‐based rehabilitative programs and services 

o Provide Substance Abuse Treatment, family reunification, anger management and higher education to incarcerated offenders and are vital components of California's ongoing efforts to assist offenders in their successful reentry into the community

o CCF’s house both male and female Inmates, while MCCF’s house male inmates only 

• 44 Fire Camps (2 Juvenile and 42 Adult) 

• CDCR Facilities include 44,422,878 sq. ft. or 25,584 acres. These facilities have a total amount of 56 million sq. ft. of roofing, and there are a total of 6,424 structures.

• CDCR  leases 101 facilities comprised of 1,862,521 sq. ft

• 3 Other States  (Arizona, Mississippi and Oklahoma) house 8,725 of CDCR’s inmates (as of August 31, 2013) for the purpose of temporarily alleviating overcrowding within existing institutions 

Page 10: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

9

Institutions &  Parole Regions

Page 11: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

10

Admissions to State PrisonThe total felon admission for calendar year 2012 was 33,990

Page 12: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

11

San Quentin State Prison

San Quentin State Prison – Opened in July 1852,  is the oldest prison in the state. It rests on 440 acres overlooking the bay (prison complex occupies 275 acres). The architectural design of the prison is representative of an old Military Fort from the 1800’s.

Page 13: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

12

Folsom State Prison

Folsom State Prison ‐ Opened in 1880 as one of the nation’s first maximum security prisons. Folsom is the second‐oldest prison in the State of California (after San Quentin) and was the first in the country to have hydroelectric power generation. The location was selected due to its proximity to an unlimited amount of native granite stone for building the prison, as well as next to the American River offering ample water supply and a natural boundary.

Page 14: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

13

Pelican Bay State Prison

Pelican Bay State Prison ‐ Opened in 1989 on 275 acres on the North Coast of California explicitly designed to accommodate the need for a growing population of maximum security inmates. Half of the prison houses maximum security inmates in a general population setting while the other half houses inmates in the Security Housing Unit (SHU). The design of CDCR’s SHU is based on the SHU design from an Arizona State Prison Complex in Florence. 

Page 15: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

14

Did You Know?TransportationOn any given day there are as many as 600inmates being transported throughout the stateon as many as 20 buses and 40 vans. TheTransportation Unit logged more than 1.3 millionmiles on buses and more than 1.8 million miles inall other vehicles in 2011/2012. The unit alsotraveled a significant distance by air.

Fire CampsCDCR supplies hundreds of inmate trainedfirefighters, helping protect Californians from thedanger of wildfires. There are 42 adult and twojuvenile conservation camps jointly managed withthe California Department of Forestry and FireProtection (CAL Fire) with approximately 200 firecrews. When they aren’t fighting fires, they areclearing brush, planting trees and repairing trails instate parks.

Page 16: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

15

Did You Know?

CDCR offers education opportunities. Adulteducation includes 88 academic and 48 careertechnical programs scattered across 34 institutions.College correspondence courses attract an averageof more than 3,500 inmates a month.

Graduation ceremonies encourage inmate graduatesto continue their education by participating in thecollege program, and to encourage other inmates toearn a vocational certificate, complete their HighSchool Diploma, or pass the GED.

Education

Page 17: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

16

Did You Know?Medical/Dental/Mental HealthCDCR has spent more than $2 billion in the last fiscal year for inmate medical, dental and mental health care. This places it among the top health care providers in the Western United States.

CDCR just opened a hospital unlike any other in the nation (the California Health Care Facility in Stockton). At full capacity, the nearly $1 billion complex will provide medical and mental health care for more than 1,700 inmates.

Page 18: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

17

Did You Know?Rehabilitation: CDCR evaluates offenders for theircriminogenic risks and needs to ensure that the rightindividuals are placed in the right programs at the righttime to provide programming that best meets theirneeds. The majority of prisons maintain fullyaccredited schools that offer academic classes,vocational training, courses in English as a SecondLanguage, and libraries. The Community and ReentryServices Unit provides evidence‐based rehabilitativeprogramming for individuals reentering theircommunities after a period of incarceration.

Parole: A statewide network of community basedprograms for offenders, including substance abusetreatment and education, employment training, jobplacement, literacy programs, sober living, transitionalhousing, and outpatient treatment. Counseling, angermanagement, employment preparation, literacytraining, money management, domestic violence,cognitive life skills training, parenting and family re‐integration, education/GED studies, job‐readiness andjob search programs.

Page 19: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

18

Did You Know?Victim Services: CDCR is responsible for providinginformation, notification, restitution, outreach, training,referral and support services to crime victims and theirnext of kin whose offenders are committed to CDCRadult and juvenile institutions. They assist victims withrequests for special conditions of parole, “No contact”with a parolee, Out of County Placements, andrestrictions of a 35 mile radius against a parolee. Theyrespond to victim’s phone calls, attend parole hearingswith victims and locate victims that are due restitutionthat has been collected from inmates. Assistance isprovided to an average of 2,500 victims each month. Servicesinclude assistance with requests to receive automaticnotification of an inmate’s release via VINE, assistance withrequests for special conditions of parole and automaticnotifications about parolees, among many other issues.

RestitutionCDCR collects on average over $28 million in restitution for victims each fiscal year. Total victim restitution and fines collected by CDCR from 1992 through 2012 is $247,710,619. Direct orders are an offender’s debt to the victim, and fines are an offender’s debt to society. Every inmate has a fine assessed. If a victim suffers an economic loss, a direct order of restitution is assessed by the judge.

Page 20: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

19

Historical IT View – Early 2000’s• Network Connectivity

o There was no network connectivity to the prisons o Headquarters and Parole offices had network connectivity

• Applications ‐ Lack of Enterprise applicationso Distributed applications o Stand alone applications /servers at each site

• Most business functions depended upon paper‐based processes

• Limited access to Internet and email 

• The focus of security was based on network access and file permissions

• Beyond basic anti‐virus, access control lists, and policies, information security was a reactive approach

• Information security was an afterthought when implementing new systems and applications

Page 21: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

20

Current IT Environment• 45,000+ endpoint devices (workstations, printers, servers, routers, switches)

• 2,000+ Remote access users (Parole Agents, Support Staff, and Executive Staff)

• 190 Circuits 

• 138 IT systems/applications

• Enterprise applications containing confidential and sensitive data

• 38,000+ email users 

• Internet access• Data sharing with external organizations (DOJ, SCO, Department of State 

Hospitals, counties, local law enforcement, etc.)

• Data Warehouses (data classification) 

• Cloud technologies

• Enterprise Collaboration Tool ‐ SharePoint  

Page 22: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

21

Realignment• In 2011, Governor Edmund G. Brown Jr. signed Assembly Bills (AB) 109 and AB 117, historic 

legislation to enable California to close the revolving door of low‐level inmates cycling in and out of state prisons. This legislation is the cornerstone to California’s solution in reducing the state’s 34 prisons to 137.5 percent of original design capacity, per the U.S. Supreme Court order. 

• Prior to Realignment, more than 60,000 felon parole violators returned to state prison annually , with an average length of stay of 90 days. 

• Prior to Realignment, there were 55,000 to 65,000 new admissions from county courts to state prison.  Realignment has reduced the annual admissions to less than 35,000 a year.

• As of October 1, 2011, all parole revocations are served in county jail instead of state prison. 

Page 23: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

22

Inmate and Parolee PopulationsThe total inmate population dropped from 162,000 in 2006 to 123,727 during 2012.  

The parolee population dropped  almost 60 percent from December 2011 to December 2012

Page 24: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

23

IT Governance Process• Established an Information Technology Governance Council (ITGC) 

Ensures the Department makes sound IT investment decisions and allocates the appropriate amount of resources to support the technology. Each project is evaluated by rating its impact to CDCR’s strategic and blueprint goals and calculating its  financial value to the organization to:o Effectively manage CDCR’s IT expenditures by determining how the 

dollars should be invested in IT projects, infrastructure and staffingo Provide executive management and oversight for the department’s IT 

portfolioo Ensure IT directions and investments align with business needso Approve IT investment strategies, plans and 

prioritieso Review and recommend approval of IT policies 

Page 25: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

24

IT Governance Process (Cont.)• CDCR/EIS uses the CDCR Business Value and Prioritization and Selection 

toolkitso The CDCR Business Value provides a consistent method of defining the 

business value of a proposed project: Value includes contributions from cost, strategic, and blue print alignment Value includes both implementation (one time) costs and annual savings

o The Prioritization and Selection toolkit enables CDCR to consistently measure and prioritize IT projects

o This process allows the Department to evaluate and set the priorities and then allocate the necessary resources to support IT investment decisions

o The Prioritization and Selection criteria consists of three levels: Business Drivers (court orders, statutes, regulations, 

strategic plans, blueprints, etc.) Fiscal and Risk Impacts Other Considerations (technology, skill, business 

process alignment)

Page 26: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

25

EA Goals Fiscal Year 2013/14

Actual MaturityJune 2010

Eight Maturity Categories• Involvement • Administration• Planning• Framework

Five FEA ArchitecturesB – BusinessA – ApplicationP – PerformanceD – DataT – Technical

• Establish a NIEM Corrections Domain – normalize data for reuse with all other correctional entities

• Identify CDCR’s master data and systems of record – improve data integrity / quality

• Automate data security classification (high, medium, low) process by understanding, documenting, and applying business rules and integrating into the Enterprise Identity Management process

• Build an enterprise portfolio which integrates / interfaces with multiple systems (projects, financials, acquisitions, architectures) into unified views for enhanced analysis, trending and executive IT governance decisions

• Develop a future state and road map to drive decisions leveraging CDCR’s blueprint facilitating future integration with CCHCS

Five NASCIO Maturity LevelsLevel 1 – Informal ProgramLevel 2 – Repeatable ProgramLevel 3 – Well-Defined ProgramLevel 4 – Managed ProgramLevel 5 – Vital Program

• Integration• Blueprint• Communication• Compliance

Mat

urity

Lev

el b

y Ca

tego

ry

Actual MaturityJune 2009

Actual MaturityJune 2012

Projected MaturityJune 2014

Page 27: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

26

Davood Ghods, Deputy DirectorEnterprise Information Services

Page 28: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

27

Core Services:

• Consolidated Information Technology Infrastructure Project (CITIP)o Upgraded the Wide Area Network, expanded the Local Area Network 

and improved environmental controls for IT systems in the institutions o Added 25,000 additional data drops and upgraded the fiber runs 

throughout the adult institutions • Tenant Managed Services‐Premium (previously Federated Data Center)

o Pursuant to AB 2408, facilitated the statewide effort to establish a shared virtual environment that is being used by multiple state departments (migrated/virtualized 75+ applications, 760 servers) 

o Closed the EIS Aerojet Computer Room facility in June 2013• Email Migration to Tier 3 Data Center

o Migrated over 38,000 users from our premise‐based email system to CaMail 

Major IT Accomplishments 

Page 29: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

28

IT Security:

• Security Policy and Process Controlso Security Compliance Checks – peer reviewso Established Configuration standards

• Technical Controlso Strong Boundary Defense 

Intrusion Detection Monitoring (both activity coming in or going out) 

Two‐factor authentication for remote users Security Information and Event Management (SIEM) – Log 

correlationo Data Loss Prevention Systemo Theft tracking and recovery tools

Major IT Accomplishments (Cont.)

Page 30: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

29

Major IT Accomplishments (Cont.)Business Administration:

• Business Information System (BIS)o Implemented final component of Enterprise Resource Planning (ERP) 

solution, a successful ERP implementation in state governmento Implemented Environmental Health and Safety for Tuberculosis Test 

Screening and Tracking for CDCR employees

• SharePoint Deploymento Deployed SharePoint to communicate, collaborate and share data and 

progress reports in real‐time environment

• Data Sharingo Data Sharing Agreements in place with all 58 countieso Collaborating with the Department of Justice (DOJ) on a system that will 

consume CDCR offender data

Page 31: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

30

Victims Services and Restitution:

• Trust Restitution Accounting Canteen System (TRACS)o Enterprise solution for the storage and processing of all information 

related to inmate banking, restitution collection on behalf of victims and inmate canteen services

• Victim Information and Notification Everyday (VINE)o An automated service that allows victims to track an offender’s 

custody status (release, death, escape, release) over the phone or internet

o Modifications were made to notify victims when an offender’s statuschanged for the Post Release Community Supervision (PRCS)

o Spanish and search enhancements madeo Expanded use across the state, connecting with nearly all California 

counties.  

Major IT Accomplishments (Cont.)

Page 32: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

31

Citizen Services:

• Public Inmate Locator System (PILS)o Online location lookup of inmates Eliminates wait time for calls requesting location information

• Discovery and Production of Electronically Stored Information (e‐Discovery)o Supports the litigation process to provide electronically stored documentso Includes activities such as records management, identification, 

preservation, collection, processing, review, analysis, production and presentation of electronically stored evidence

• Visitor Processing Appointment Scheduling System (VPASS)o Automated online visitation scheduling appointment system Reduces visitation wait time, the number of walk‐ins,  and 

overcrowding in the Visitation Centers Allows 80 percent of available visitation slots to be scheduled online Reduces frustration of prison staff, inmates, Inmate Family Council and 

visitors

Major IT Accomplishments (Cont.) 

Page 33: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

32

Major IT Accomplishments (Cont.) Offender Incarceration:

• Strategic Offender Management System (SOMS)o 2013 Best of California Award recipient – received award for Best Application Serving an 

Agency’s Business Needs and the Project Excellence Award at the 2013 GTCo Replaced  all  paper offender records with electronic files at the three women’s 

institutions, and completed 45 percent of the records at the men’s institutionso Implemented Intake, Movement, Counts, Holds/Warrants/Detainers (HWD), Visitation 

and Caseload Assignment functionality at all 34 institutionso Implemented  Shared Scheduling with Health Care at all 34 institutions

• Inmate/Ward Telephone System (IWTS)o Telephones and telephone services at lower rates that allow inmates/wards

to maintain communication with family and friendso Cost‐effective billing alternatives ‐ collect calls and prepaid options

Page 34: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

33

Major IT Accomplishments (Cont.) Offender Incarceration

• Food Nutrition Management System (FNMS) at the California Health Care Facility (CHCF)o Inmate nutritional information at CHCFo Captures inmate’s nutritional information based on their health conditions 

and creates labels for the food they consume

• Inmate Welfare Check Systemo Streamlines the required staggered welfare checks on inmates in the 

Administrative Segregation Unit (Ad Seg)o Electronically records the specific time of the cell front welfare check, the 

location and the inmate’s activity observed by staffo Eliminates the requirement to manually document cell front welfare checks

33

Page 35: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

34

Parole:

• Correctional Offender Management Profiling for Alternative Sanctions (COMPAS)o Assesses the risk and needs of adult offenders from reception to parole 

discharge

• Lifer Scheduling and Tracking System (LSTS)o Manages and tracks Life‐Term inmate parole suitability hearings

• Revocation Scheduling and Tracking System (RSTS)o Tracks Parole Revocation hearings

• Parole Violation Disposition Tracking System (PVDTS)o In support of AB 109, tracks the new DAPO/County Parole Revocation processo Delivers scanned/electronically created documents to DAPO and county 

personnelo Over 6,300 active cases since July 1, 2013

Major IT Accomplishments (Cont.) 

Page 36: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

35

Major IT Efforts UnderwayEnterprise Services:

• Video Conferencing Pilot Projecto An enterprise‐wide Video Conferencing solution with one 

end device for every adult and juvenile institution

• Managed Print Services (MPS) Statewideo With the success of the MPS pilot program 

leveraging the WSCA contract to implement statewide

• Service Managemento CDCR is currently utilizing an on‐premise system for Incident 

Management, Service Level Management and Service Request Management

o The entire platform will be migrated to Remedy On Demand (RoD)o Efficiencies will be achieved by hosting the hardware at OTech and 

migrating to RoD

Page 37: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

36

Major IT Efforts Underway (Cont.)Business Administration:

• Implementing Time and Shift Module in Business InformationSystem (BIS)o BIS Time/Shift – Custody and Nursing   o Standardizing the management of shift scheduling throughout the institutions 

for all posted positions

Data Sharing:

• COPLINKo A web‐based application available to law enforcement for criminal 

investigations  to locate and identify all criminal elementso Participating in data sharing agreement between law enforcement agencies 

using this web‐based  applicationo Incorporating with the LEADS parole data

Page 38: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

37

Major IT Efforts Underway (Cont.)Citizen Services:

• Mobile Applicationso Expanding applications to include mobile technologies for improved 

customer access

Adult Parole:

• Kioskso Division of Adult Parole Operations and Division of Rehabilitative Programs 

are exploring a kiosk‐type approach for servicing parolees. The vision is for parolees (and their families) to access geospatial information about local services.

Page 39: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

38

Major IT Efforts Underway (Cont.)Adult Institutions:

• Private Branch Exchange (PBX) Upgradeo Upgrade each CDCR institution hardware and software versions so they are current 

and supportedo Provision and install an IP‐enabled “core” network that will deliver enterprise 

applications to support CDCR facilities and locations o Create a platform to migrate to emerging‐market voice and data applicationso Solicitation document to be released soon

• ION Scanners ‐ Enhanced Drug and Contraband Interdictiono In an effort to stop drugs and contraband from entering prisons and reduce drug 

use by inmates, focus is on providing access to rehabilitative programs/health care

• Managed Access System (MAS)o Designed to allow CDCR to effectively control contraband cell phones without 

impacting legitimate wireless communications at all  34 adult institutionso Currently in various stages of deployment

Page 40: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

39

Major IT Efforts Underway (Cont.)Offender Incarceration:

• Positive Offender Mobile Identification (POMI)o A mobile identification solution which will allow CDCR adult 

institutions staff to accurately identify inmates during critical situations such as a riot, at parole, and discharge from our custody

o Targeted to begin activation at the first institution January 2014, and complete statewide rollout by June 2014

o Each adult institution will receive a mobile, hand‐held wireless device to capture inmate fingerprints, transmit through a designated laptop and ultimately to the CA DOJ Automated Fingerprint Identification System

Page 41: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

40

Offender Incarceration:

• Volunteer Management System o Track the Department’s volunteers working in the adult institutions, providing 

services to the inmate population while in our custody  o Reduce the time associated with prison personnel hours required to process 

volunteers by at least 10 percento Increase the usefulness and availability of CDCR volunteer population by 15 

percento Reduce costs of multiple Live Scans by at least 30 percento Eliminate the need for clearances at multiple institutions by sharing the 

information statewide

Major IT Efforts Underway (Cont.)

Page 42: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

41

Major IT Efforts Underway (Cont.)Adult Rehabilitation:

• GED Online Testing Serviceso An online solution for inmates to take the GED Test o Effective January  2014, the GED test only available onlineo All 34 institutions need to be able to proctor the exam online

• Online Education Networko A secure network allowing CDCR inmates access to online educational 

resourceso Protected by multiple firewalls, data loss and intrusion prevention systemso CDCR teachers have the ability to monitor and control all activity occurring on 

the inmate computerso Targeted to Go‐live October 2013 at Ironwood State Prison

Page 43: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

42

Major IT Efforts Underway (Cont.)Adult Rehabilitation

• Big Data/Analytics:o A data and information discovery platform for CDCR Division of Rehabilitative 

Programs (DRP) to:  Provide a listing of training and educational programs to the current 

incarcerated offenders Provide enrollment and capacity of each program at the institution and 

facility Separate enrolled offenders with the identified program needs versus 

without o Will save time in data consolidation from various data sources, modeling and 

query/report development. o First phase to be completed in October 2013. 

Page 44: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

43

Future Activities/ConsiderationsEnterprise Services:

Business Administration:

• Bar Code Technology and Near Field Communications (NFC)o Bar coding will enhance our ability to track both inventory and assets through 

the use of hand held devices

Business Administration:

• Electronic Data Interchange (EDI)o Transfer data between BIS and external entitieso Provide a mechanism to speed processing of vendor payments and reduce 

Late Payment penalties

Page 45: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

44

Future Activities/Considerations (Cont.)Adult Institutions:

• Radio and Microwave Communications upgradeo Replace and enhance the Department’s existing public safety radio systemo Solicitation document to be released soon

Adult Rehabilitation:

• Tablets (Reader Devices for Correctional Education)o Devices are being considered as replacement for hard copy 

curriculum. Legislation mandates that California will “go green” for textbook materials and curriculum will be electronically disbursed by 2016

Page 46: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

45

Emerging Technologies• Big Data and Analytics  • Social Media Collaboration• Sensors and Surveillance• Voice Verification and Biometrics• Virtual Assistants (Augmented Reality)• Smart Asset Management Technologies• Inmate Mobile Applications and Devices• Intelligence Systems• Robotics

Page 47: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

46

Paul Smith, Program DirectorBusiness Information Systems (BIS)

Presentation

Page 48: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

47

Russ Nichols, Project DirectorStrategic Offender Management System (SOMS)

Presentation

Page 49: Major IT Accomplishments - Techwire Presentation [Read-Only]€¦ · • Executive Team • Strategic Direction ... • $815 Million IT Projects Implemented and In Progress • 29,404

48

Questions?