Major construction projects –

current and upcoming

March 19, 2018

Page 2: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project Management unit

Page 3: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

McTavish Gate

Project 15-058

Page 4: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Existing conditions

▪ Gate deterioration

▪ Water drainage issues

▪ Redpath Hall stairs

deterioration

▪ Underground water

mains need to be

upgraded.

Page 5: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

▪Restoration of the gate itself.

▪Resurfacing of the roadway/sidewalk.

▪Addition of bike racks, hydraulic bollards.

▪ Improve lighting.

▪ Improve connection with University Centre ‘terrace’.

▪Waterproof Redpath Hall foundation (north side only).

▪Redpath Hall stairs reconstruction.

▪Replacement of 2 water mains and addition of a meter

chamber.

Page 6: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design

By EKM

Page 7: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Leacock Amphitheatre

Project 15-056

Page 8: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Existing conditions

➢Leacock Building (1965) façades and foundation

show varying degrees of damages and

deterioration.

➢Concrete structure west and south of Leacock has

deteriorated over time due to water infiltration and

insufficient drainage capacity.

Page 9: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

Phase I – Leacock Building:

▪Repairs to façades and exterior glass walls (“curtain walls”)

▪ Improvements to vestibules to make them universally accessible

▪Waterproofing of the foundation

Phase II - Areas south and west of Leacock Building:

▪Will be demolished, rebuilt and redesigned

▪Will be transformed into a multi-purpose exterior amphitheatre.

Page 10: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design

Page 11: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design

Page 12: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Schedule

PROJECT PHASE START DATE END DATE

Phase I (Leacock Building) March 2018 Oct. 2018

Phase II (Amphitheatre) April 2019 Sept. 2019

Page 13: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

McIntyre/LSC garageRepair damaged structure

Project 11-099

Page 14: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

▪ Repair or rebuild deteriorated sections

of concrete slabs

▪ Replace existing HVAC systems

▪ Replace existing drainage systems

▪ Code upgrades

Page 15: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description (cont’d)

▪ Exterior: envelope repairs to south portion of parking

Page 16: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Schedule

PROJECT PHASE START DATE END DATE

Construction June 2018 Aug. 2020

Substantial Completion /

CommissioningAug. 2020 Oct. 2020

Occupancy / Delivery Oct. 2020

Page 17: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

University CentreReplacement of HVAC system & electrical distribution

Project 12-231

Page 18: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Existing conditions

➢ Ventilation system and

perimeter heating systems

are obsolete (1965);

replacement parts are no

longer available.

➢ Electrical distribution

system also needs to be

replaced.

Page 19: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

▪ Replace entire existing HVAC system.

▪ Build new mechanical room for kitchen HVAC system in basement of the

building.

▪ Replace the building’s electrical distribution systems.

▪ Addition of a new washroom given high building occupancy.

▪ Bring building up to the most recent building codes with respect to the

electromechanical systems.

Page 20: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Schedule

PROJECT PHASE START DATE END DATE

Construction April 2018 Winter 2019

Occupants relocation March/April 2018 Progressive return

Full occupancy Jan. 2019

Page 21: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Bensadoun School of Retail Management

Project 17-141

Page 22: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

▪ Phase 1: Renovation of the east façade and part of the south façade of

the Bronfman Building for the Bensadoun School of Retail Management

(part of the Desautels Faculty of Management).

▪ Phase 2: Renovation of a section of the main and second floors of the

Bronfman Building for the Bensadoun School of Retail Management.

Page 23: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project description

Main floor 2nd floor

Sherbrooke façade McTavish façade

Page 24: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design

Page 25: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Schedule

PROJECT PHASE DATE

Phase I Summer 2018

Phase II Fall 2018

Page 26: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Stewart-Biology BuildingWest wing redevelopment

Project 14-125

Page 27: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project update

▪ Work completed:

• Lot 0: users moved out in September 2017

• Lot 1: selective demolition and partial asbestos decontamination

in January 2018

▪ Work to come:

• Lot 2: complete demolition and asbestos decontamination

by July 2018

• Lot 3: tender process by May and June 2018 for fit-out

▪ Tentative end date:

• by Winter 2020 (Lot 3/fit-out - substantial completion)

Page 28: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design (south-east façade)

Page 29: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Proposed design (lab, W2 level)

Page 30: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Macdonald-Harrington BuildingEnvelope renovation

Project 11-041

Page 31: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project update

▪ Work completed

• Excavation, installation of drainage system, soil decontamination and

backfilling

• Foundation: Repairs and waterproofing

• Masonry: South façade and south chimney

• Windows: All wooden windows removed, restoration in progress.

• Roof: Annex roof completed

▪ Work to come (& tentative end dates):

• Masonry: North, east, and west façades masonry repair (by Oct. 2018)

• Windows: Wooden windows restoration and installation, aluminum windows replacement (by Jan. 2019)

• Roof: Main roof (by Oct. 2018)

▪ Tentative project completion date: March 2019

Page 32: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Macdonald EngineeringMasonry restoration

Project 13-064

Page 33: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project update

▪ Work completed:

• North and south sections of Macdonald wing: reconstruction of masonry

walls to be completed by end of April 2018

▪ Work to come:

• Central section of the Macdonald wing: masonry restoration and rain

water management interventions

• Electrical wing: masonry restoration and roof replacement.

▪ Tentative end date:

• Full project completion by spring of 2019.

Page 34: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Roddick GatesRestoration and redesign

Project 15-057

Page 35: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Project update

▪ Work completed:

• Rehabilitation of monument – incl. foundation, two center columns and

stonework

• Improvement of drainage system

• Renovation of half-moon by the city

• Installation of paving stones and landscaping on east side

▪ Work to come:

• Complete the replacement of underground electrical cables and conduit

infrastructure.

• Installation of granite benches, hydraulic and fixed bollards, new lighting and

interactive wayfinding tactile screen.

• Landscaping and furniture installation on the west side

▪ Tentative completion date: May 2018

Page 36: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Other projects

▪ Replacement of HVAC systems

(to be completed between March and December 2018)

• Lyman Duff

• Rutherford

• Burnside

• Ferrier

• Education

• Macdonald-Stewart Library

Page 37: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Other projects (cont’d)

▪ Other current projects (funded by SIF program):

• Wong: upgrades to the high-temperature metals laboratory

(“foundry”) – August 2018

• Rutherford: upgrades to the Nanotools Microfabrication

Laboratory – August 2018

• Construction of new emergency power facility (to house two

generators) – November 2018

Page 38: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals

Other projects (cont’d)

https://www.mcgill.ca/construction/