13
2800 Repi Court Gastonia, North Carolina P.O. Box 2339, Gastonia, NC 28053-2339 Phone:704-825-4046 Fax: 704-825-4066 www.gaston.org Local Strengths. Global Success. Maistro Shell Building 50,000 SF Total Available 50,000 sf Ceiling height 28 ft Zoning I-2 Construction Precast Columns 50’ x 50’ BUILDING FEATURES Interstate 85 8.5 miles CLT Airport 22 miles Intermodal 23.5 miles Charleston Port 209 miles TRANSPORTATION

Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

2800 Repi Court Gastonia, North Carolina

P.O. Box 2339, Gastonia, NC 28053-2339 Phone:704-825-4046 Fax: 704-825-4066 www.gaston.org

Local Strengths. Global Success.

Maistro Shell Building 50,000 SF

Total Available 50,000 sf Ceiling height 28 ft Zoning I-2 Construction Precast Columns 50’ x 50’

BUILDING FEATURES

Interstate 85 8.5 miles CLT Airport 22 miles Intermodal 23.5 miles Charleston Port 209 miles

TRANSPORTATION

Page 2: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

SITE / LAYOUT NOTES:

1. DIMENSIONS AND COORDINATE POINTS ARE TO THE FACE OF CURB, EDGE OF PAVEMENT, OR CORNER OF

BUILDING UNLESS OTHERWISE NOTED.

2. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL STANDARDS.

3. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER OR ENGINEER

PRIOR TO PROCEEDING WITH WORK.

4. PRIOR TO BEGINNING CONSTRUCTION, THE GENERAL CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND

APPROVALS FROM ALL REGULATORY AUTHORITIES.

5. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT-OF-WAYS,

PUBLIC AND PRIVATE, PRIOR TO WORKING IN THESE AREAS.

6. GENERAL CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMAN AND THE PUBLIC SHALL

BE PROTECTED FROM INJURY.

7. DO NOT SCALE DRAWINGS FOR ACTUAL DIMENSIONS, AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION.

8. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL

ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009, OR LATEST EDITION, AS AMENDED.

9. ALL PAVEMENT MARKERS SHALL BE FOUR (4) INCHES WIDE UNLESS INDICATED OTHERWISE ON DRAWINGS.

10. CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKINGS AS SHOWN ON THE PLANS.

11. CONTRACTOR SHALL SAW-CUT EXISTING ASPHALT PAVEMENT AREAS TO TIE IN SMOOTHLY TO PROPOSED

PAVEMENT AT DRIVEWAY ENTRANCES.

12. N/A

13. REFER TO ARCHITECTURAL PLANS FOR ACTUAL BUILDING DIMENSIONS.

14. CONTRACTOR SHALL COORDINATE CONSTRUCTION AND LOCATION OF SIDEWALKS, STOOPS, STEPS, HANDRAIL,

AND ACCESS DOORS WITH ARCHITECTURAL PLANS.

15. COORDINATE SIDEWALK AND SCORING PATTERNS ADJACENT TO THE BUILDING WITH THE ARCHITECTURAL

PLANS.

16. THE ENGINEER WILL PROVIDE THE CONTRACTOR WITH AN ELECTRONIC FILE OF THESE DRAWINGS UPON

REQUEST.

17. TRASH WILL BE DISPOSED OF IN RECEPTACLES ON SITE, THE CONTRACTOR WILL COLLECT THE TRASH FROM THE

RECEPTACLES AND TAKE THEM TO A LEGALLY APPROVED LANDFILL.

18. CONTRACTOR SHALL COORDINATE RELOCATION/REMOVAL OF EXISTING UTILITIES WITH THE UTILITY OWNER AS

APPLICABLE.

19. A SOILS REPORT PAVEMENT RECOMMENDATIONS SHALL OVERRIDE THE PAVEMENT TYPES SPECIFIED ON THESE

PLANS.

20. PHASE II PARKING N.I.C. THIS CONTRACT, DOES NOT REQUIRE STONE AT THIS TIME.

21. STOP BEFORE YOU DIG. CALL NC ONE-CALL CENTER AT 1-800-632-4949, IT'S THE LAW.

Page 3: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

Elevation 715 ± Average Gently rolling terrain

Environmental studies available Zoned I-2

Electricity Provided by City of Gastonia 50,000 KW substation at site

Natural Gas

Provided by PSNC Energy 4” Line 60 psi A Scana Company

Water Provided by City of Gastonia 12” Line 100 psi static 14,365 gpd average daily demand

Sewer Provided by City of Gastonia 30” Line Gravity Main 7.7 mgd average daily demand 16 mgd sewage plant treatment capacity

Fiber Optics Digital Subscriber Carrier is in service, provided by AT&T, equipment housed in a controlled environment vault located within the park.

SSITEITE CCHARACTERISTICSHARACTERISTICS

TTRANSPORTATIONRANSPORTATION

UUTILITIESTILITIES

Highways

Gastonia Technology Parkway provides main access

US 321 less than a mile Interstate 85 one mile

422 Acres Total Pre-graded Sites Available 109.68 Acres Available $35,000 per acre/$55,000 graded sites

GGENERALENERAL

Airports

Charlotte Douglas International Airport — 15 miles

City of Gastonia Municipal Airport — 10 Miles

Page 4: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

15 miles Exit 17

Maistro Shell Bldg.

Site J +/-6.2 Acres

ElectriCities Property for Future Electricity

Generation

Gaston College Advanced

Manufacturing Center

Gastonia Dallas Hwy, N

C Hwy 321

AT&T Vault

Dedicated 100 Kv Substation

Future GTP Expansion 52 Acres

Page 5: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

2013 Total Population

30 minute drive time 575,885

45 minute drive time 1,815,148

Gastonia Technology Park Drivetime Analysis

CLT Airport

GTP

Page 6: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

Street Atlas USA® 2004 Plus

© 2003 DeLorme. Street Atlas USA® 2004 Plus.www.delorme.com

TN

MN (8.0°W)0 40 80 120 160 200

0 70 140 210 280 350

mikm

Scale 1 : 8,000,000

1" = 126.26 mi Data Zoom 4-6

Page 7: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

Expanded operations to

location in 2008

North American HQ

March 2012 investment of $4

million and 15 jobs

160 total workforce

165,000 sf facility

Leading supplier of

semi-finished and finished

plastic products

Supplies the material

handling, food processing,

chemical, and automotive

industries

Page 8: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

Feb. 2012 announcement of

$7 million

Nov. 2014 expansion of $3

million, 70,000 sf, 10-20 jobs

170,000 sf after expansion

150 current employees

Leading manufacturer of

hydraulic and pneumatic

quick disconnect couplings

used in the oil, natural gas,

agricultural, chemical, and

industrial sectors

Page 9: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

Announced first U.S. location

in August 2014

Based in Germany

$2 million investment

11,000 sf and 4 initial jobs

Worldwide recognition in

cutting, milling, and drilling

tools for the hygiene,

non-wovens, and paper

industries

Page 10: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

First facility outside of Italy

Announced March 2011

$7 million, 47,000 sf

15 current employees, 45 at

full production

Produces liquid colorants and

additives for polyurethane

used in automotive, footwear,

and furniture

Divisional corporate office,

manufacturing, R&D, and

distribution housed on site

Page 11: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

$58 million investment in

October 2011

147,000 sf

40 current employees, 130 at

full production

First production operation in

North America (Spain based)

Leader in innovation for

manufacturing tubes for

pharmaceutical and cosmetic

industries

Divisional corporate office,

R&D, and production housed

at GTP facility

Page 12: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

Announced $20 million,

30,000 sf facility in March

2011 (German based)

First new facility in 35 years

$15 million expansion to

double production in August

2014

35 current employees,

expected 10-20 additional

jobs with expansion

Global leader in plastic-metal

hybrid and composites

technologies that enable

engineers to reduce part

weight in automobiles

Page 13: Maistro Shell Building 50,000 SF - LoopNet...Maistro Shell Bldg. Site J +/-6.2 Acres ElectriCities Property for Future Electricity Generation Gaston College Advanced Manufacturing

P.O. Box 2339, Gastonia, NC 28053-2339

Phone:704-825-4046 Fax: 704-825-4066 Local Strengths. Global Success.

Gastonia Technology Park

Gastonia Technology Park

Project Information

$120 million investment in

October 2013

Fourth largest announced

economic development

project in N.C. in 2013

150,000 sf, 110 jobs

Operation by Summer 2015

Will produce a glass-fiber

tissue that is used to increase

strength while reducing

weight to other products in

the global buildings materials

market