2
Maintenance of mosaic background wall 1. Check the details After finishing paving all the wall,the bonding layer drying and finishing the pointing,then check it again.Use the wet and clean soft brush to bring out the floating sand that are left in the crack.And the cement mortar should be pointed smoothly,then clean it with cloth.Finally,make a deep cleaning when the adhesive layer and filling mortar are all dried. 2. Keep air-dry After the completion of paving mosaics,we should pay attention to protect the finished product,that is keep properly air-dry. The surface of the paving should be avoided sun exposure,keep air-dry of the room beyond 24 hours.Generally the day of late maintenance is not less than one week. 3. Clean

Maintenance of mosaic background wall cp mosaic

Embed Size (px)

DESCRIPTION

1.Check the details 2.Keep air-dry 3.Clean 4.Install the switch socket CP Mosaic www.cpmosaic.com

Citation preview

Maintenance of mosaic background wall

1. Check the details

After finishing paving all the wall,the bonding layer drying and finishing the pointing,then check it again.Use the wet and clean soft brush to bring out the floating sand that are left in the crack.And the cement mortar should be pointed smoothly,then clean it with cloth.Finally,make a deep cleaning when the adhesive layer and filling mortar are all dried.

2. Keep air-dry

After the completion of paving mosaics,we should pay attention to protect the finished product,that is keep properly air-dry. The surface of the paving should be avoided sun exposure,keep air-dry of the room beyond 24 hours.Generally the day of late maintenance is not less than one week.

3. Clean

After the solidification of adhesive layer and filling mortar,then begin to clean the surface of the mosaic.Firstly, preparing two barrels,one is for new cleaning agent,and another is for clean water.Secondly,soaking the cloth in the barrel with cleaning agent ,and then wipe the surface of the mosaic with the wet cloth.Thirdly,soaking the sponge in the clean barrel,and then wipe the mosaic with the wet sponge.Finally,wipe the surface of the mosaic again with the sponge until it is clean.

4. Install the switch socket

After paving and keeping air-dry, it needs to install the socket and the switch that removed before.In this way, the process of paving mosaics is completed then.

CP Mosaicwww.cpmosaic.com