7/21/2019 Maintenance Instructions on DC Track Circuit (Non RE Area).pdf
1/2
Maharajpur, Gwalior
vPNs cSykLV izfrjks/k gsrq vPNh
ukyh dh O;oLFkk djsaA
bUlqysku TokbZaV dh foolfu;rk gsrq
nksuks rjQ rhu Lyhijksa rd mfpriSfdax dh O;oLFkk djsaA
bUlqysku TokbZaV o jsy rygVh
ds chp dh nwjh 50 ,e ,e dhgks tkap djsaA
dkahV Lyhij esa NwVs gq;s o VwVs
ykbZujksa ,oa jcj iSMksa dh tkapdjsaA
Ukkbyksu bYlwysku TokbZaV dh vis{kk
XywM TokbZaV dk vf/kd iz;ksx djsaA
jsy Vsfcy ij bUlwysku TokbZaV
dh cj dks dkVsaA
Vh-,y-ts-ch- esa taij la;kstu dhlkIrkfgd tkap djsaA
QhM fljs rFkk fjysa ds fljs ij VsdyhMks dh tkap gj lIrkg djsaA
lqfufpr djsa fd Vsd lfdZVJs.kh la;kstu esa gSA
Vsu 'kUV izfrjks/k dk eku ,lh Vsd lfdZV gsrq 0-15 vkse o Mhlh Vsd lfdZV gsrq 0-5 vkse vkSj ;fn dkahVLyhij gksa rks 0-25 vkse ls de ugha gksuk pkfg;sA
fdlh Hkh [k.M esa fdlh Hkh izdkj ds Lyhij yxs gksus ij cSykLV izfrjks/k 2 vkse izfr fdeh ls de ugha gksukpkfg;sA
fdlh Hkh yEckbZ ds Vsd lfdZV ds fy;s jsy izfrjks/k 1 vkse izfr fdeh ls vf/kd ugha gksuk pkfg;sA
Jss.kh
la;kstu
fjys ij fy[ks vuqlkj Vsd fjys dk oksYVst bldsfidvi eku ds 300 izfrkr ls vf/kd ugh gksukpkfg;sA
cSVh pktZj] pkftZax /kkjk o Vsd cSVjh dhLisfLQd xzsfofV lkIrkfgd tkapuh pkfg;sA
ukbZyksu cqkksa dks Mkyus@cnyus ds fy;s vkSj cksYVksa ds lgh lajs[k.k ds fy;s fQk IYksV vkSj jsy ds gksy,d lh/k esa gksuk pkfg;sA
fQk IySV ls jsy] fQk IySV ls uV cksYV o fQk IySV ls fQk IySV ds izfrjks/k dh tkap gj lIrkg djsaA
cj
ldr o njpakj funkky;] m-v-ikS-dU] Xokfy;j
50 e e
ukyh
7/21/2019 Maintenance Instructions on DC Track Circuit (Non RE Area).pdf
2/2
Maharajpur, Gwalior
Maintain better drainage for
better ballast resistance.
Check proper packing up to 3
sleepers either side improves thereliability of insulation joint.
Check 50mm clearance
between ballast and bottom
of the rail.
Check for missing worn out
liners and rubber pads in
concrete sleepers.
Preferred Glued joint over nylon
insulation joint.
Cut burr at the rail table at
insulation joint.
Check jumper connections in
TLJB weekly. Check track leads at feed end
and relay end weekly. Ensure that series track
circuit connections.
Train shunt resistance value should not be less than 0.15 ohm for AC track circuit and 0.5 ohm
for DC track circuit and 0.25 ohm provided with concrete sleepers.
Ballast resistance should not be less than 2 ohm per km in any section irrespective of sleeper
provided.
Rail resistance should not be more than 1 ohm per km irrespective of length of track circuit.
Voltage on track relay should be checked weekly.
Signal & Telecommunication Directorate, IRCAMTECH, Gwalior
Series
Connection
TR voltage should not be more than 300% of
its pick up value as written on the relays
Battery charger, charging current and sp.gr.
of track battery shall be checked weekly.
Fish plate holes /rail holes should not be in staggered way for smooth alignment to replace/
install nylon bushes.
Check the resistance between fish plate-rail, fish plate bolt, fish plate-fish plate weekly.
Burr
50 mm
Drainage