44

 · The main Raw Material is cotton/cotton waste, ... lowering the cost so to achieve this target he company has changed its new preparatory machine e.g. Blowroom

  • Upload
    habao

  • View
    221

  • Download
    2

Embed Size (px)

Citation preview