GREEN INITIATIVES OF MAHARASHTRA METRO RAIL CORPORATION LTD. (MAHA-METRO) INDIA By A B GUPTA GM RITES

MAHARASHTRA METRO RAIL CORPORATION LTD. …iricen.gov.in/iricen/iricen_day/2017/5_A_B_Gupta.pdf · generation from project planning and design ... Regenerative breaking System

Embed Size (px)

Citation preview

GREEN INITIATIVES OF

MAHARASHTRA METRO RAIL CORPORATION LTD.

(MAHA-METRO)INDIA

By

A B GUPTAGM RITES

GREEN INITIATIVES OF MAHA-METRO

Adopting and integrating Solar Energygeneration from project planning and designstage.

Installation of Bio-digester Technology.

India Green Building norms for environmentalprotection in building design and construction.

Other Green Initiatives.

ADOPTING AND INTEGRATING

SOLAR ENERGY GENERATION

FROM PROJECT PLANNING AND DESIGN STAGE

Metro-Rails are large consumers of

Electricity

Metro-Rail system create large rooftops

Prices of Solar PV modules are falling

Good Solar radiation of about

5 kWh/m2/day

Eco-friendly

Utility power cost is higher than Solar power

Cleaning system for Solar PVmountings on via-ducts & walls isdifficult.

Installation of Solar PV system ontrack walls, boundary walls andvia-duct is a rare phenomenon.

Solar system to be mounted onspecially designed clamps on non-pierced roofs to avoid waterleakages.

Maha-Metro is going to tap power at132 kV grid level and power is to beused at 25 kV for Traction and 33 kVfor Auxiliary requirement

Solar system connected at 415Vauxiliary side and after use forTraction & Auxiliary purpose, surplusenergy is to be fed back at 132 kVlevel with Net-metering.

Installation of Solar PV system isplanned from design stage.

SOLAR ENERGY

65% of Electrical

Energy requirement is to be met from

Solar Phase-II• 23 MWp• 34 Million Units

Phase-I• 14 MWp• 22 Million Units

SOLAR POWER INITIATIVES SOLAR POWER GENERATION RIGHT FROM INCEPTION

Maha-Metro will sign PPA for 25 years with the Private Party

In RESCO Model where investment is to be done by a

private party

Solar energy will lead to significant

saving in O&M cost (more than >20 %)

SOLAR PV PANELS AT VIADUCT & DEPOTS

AT VIADUCT

AT DEPOT

INSTALLATION OF BIO-DIGESTER TECHNOLOGY

BIO-DIGESTERBio digester: An apparatus in which organic waste material isdecomposed by microbial(an-aerobic bacteria) action with theproduction of biogas. The system is sustainable, totally eco-friendly, conserves water and produces fuel gas.

Why Bio digester?

MAHA-METRO wants 100% recycling of used water so that, not a drop of water is wasted.

No discharge to public drain leading to elimination of ground water contamination.

Less Space required.

No energy Requirement.

Maintenance Free.

Low material/ construction cost.

MoU was signed with Defence Research Development Organisation (DRDO) for transfer of technology.

Challenges:

New technology

Perceived Maintenance Issue

Costly due to New Technology

Instead of Bio-Digester, if we go in for septic tank then wastegeneration will be aerobic, involves periodic of sludge (incl.installation of sludge removal pump), bad smell, hazardouswaste, extra space is needed.

Opportunity:

Construction Phase : Labour Camp, Sites, Office Facilities

Operation Phase : Stations, Depots & Administrative buildings

BIO-DIGESTER

Bio-digester – Construction Phase

Implementation

Bio-digester

installation at Office

Bio-digester

installation at Depot

Bio-digester

installation Labor

Camp

Bio-digester

installation Labor

Camp

Bio-digester

installation at Office

Bio-digester

installation at Depot

Bio-digester – Operation Phase

Implementation at Elevated Station

INDIAN GREEN BUILDING COUNCIL -NORMS FOR ENVIRONMENTAL

PROTECTION DURING DESIGN & CONSTRUCTION

INDIAN GREEN BUILDING COUNCIL (IGBC) RATING SYSTEM……

MODULES CREDIT POINTS OF PROGRAM

Site Selection & Planning

24

-Site environment -Facilities for workers-Integration with other modes-Alternative fuel for vehicles-Preserve trees-Heat mitigation (roof & building)-EIRR-Green Education

Water efficiency-Rain water harvesting-Efficient fixture-Water monitoring

11

Energy Efficiency-Energy efficiency traction & non traction-Eco-friendly refrigeration-On site renewable energy-Off site renewable energy-Green house gas mitigation

30

Certificate Level Credit Points

Gold Platinum

63-7172-90

INDIAN GREEN BUILDING COUNCIL (IGBC) NORMS

MODULES CREDIT POINTS

Material Conservation-Material with recycle context-Local material-Handling waste material

8

Indoor Environment Comfort-Fresh air ventilation-Indoor air quality-Low emitting materials-Isolation of polluting equipment-Eco-friendly house keeping chemical-Commuter facilitates

10

Innovation in Design & Construction 7

IGB

C/L

EED

Integrated modal Transport System with smart card access

Integration with other transport modes with smart card

Solar Operated Public Transport

Special Access/facilities for physically challenged, elderly and children

Afforestation, (5000 Native Trees)

Heat Resistant Construction Materials

Green Education through Media & Social Networks

Water Conservation through water efficient fixtures & Monitoring

Roof top Rain Water Harvesting

Insulation of Roof for indoor temperature control

Heat Resistant Construction Materials

Green Education through Media & Social Networks

Water Conservation through water efficient fixtures & Monitoring

Roof top Rain Water Harvesting

IGBC GREEN BUILDING NORMS…..

IGB

C/L

EED

Energy Efficient Illumination Fixtures, HVAC System,

Renewable Energy Usage, Regenerative breaking System

Use of innovative technology for sewage treatment (Bio-digester)

Comprehensive waste management plan for construction & Operation Phases

Construction Waste processing

Procurement of local materials

Air Ventilation ensured by louvers , industrial, exhaust fans

Exhaust Provided for Equipment Emitting pollution

Several Innovations like Exhaust panels like solar panels installed on roofs, viaducts, TOD,

IGBC GREEN BUILDING NORMS

Solar charging points provided in parking lot (35% oftotal) to encourage/facilitate low/zero emittingvehicles.

Heat island reduction – Complete roof covered with solar panels. Green cover / plant beds – 70% open area

Water conservation: Drip irrigation of plant beds Re-cycling of waste water through bio-digester. Minimisation of surface runoff through pervious

surface Energy Efficiency:

Occupancy and day-light sensors Energy metering for monitoring

GREEN BUILDING INITIATIVES AT CORPORATE OFFICE-MAHA METRO……

Building Materials: Sustainable, Low VOC emitting materials, Green certified materials Use of fly ash in cement and bricks

Indoor Air Quality testing and management. Innovation in design combining aesthetics with energy

efficient: Day lighting of maximum space inside building Double glazing of structure and windows, combining

maximum daylighting with minimum thermal radiation Aesthetic but efficient orientation of solar roof Underground parking minimizing requirement of

surfacing and permitting maximum ground water re-charge.

Bio-digester for waste water treatment

GREEN BUILDING INITIATIVES AT CORPORATE OFFICE-MAHA-METRO

OTHER GREEN INTIATIVES

ADOPTION OF REGENERATIVE BRAKING IN ROLLING STOCK

Adoption of AC traction for higher regeneration and lower energy consumption. Regenerative braking from 70 Kmphinstead of 50 Kmph overcoming the design issues resulting in additional regeneration of electricity going upto 35 %.

Dynamic calculation of train running parameters to reduce energy consumption.

Modern design & Light weight coaches.

POLLUTION REDUCTION MEASURES

CLEANER AIR

CARBON CREDITS

ANNUAL FUEL SAVED 18,170 TONS

177 t CO2 REDUCTION

PER DAY

REDUCTION IN TRAFFIC

NOISE REDUCTION

TRAFFIC NOISE

REDUCTION

USAGE OF RUBBER

PADS

NOISE BARRIER

• Return on Social benefits i.e. Economic IRR (EIRR) of the project is 17.7%. • Total investment will be recovered by the citizens of Nagpur in 5.6 years.

AIR POLLUTANTS REDUCTION

INITIATIVES FOR AIR POLLUTION CONTROL CONSTRUCTION PHASE

Dust Collector @ hopper and mixer

Dedicated Water Sprinkling Arrangements

Bag filters for controlling silo borne

dust

Water Sprinkling using hose pipes

Physical barriers to

separate sensitive locations from site

DG Maintainace *

Cover for conveyor belt at Batching

plant * Internet Picture

NOISE LEVEL MANAGEMENT

Impact piling not allowed in general

circumstances;

Acoustic enclosures for DG sets;

Height of barricade as per standard;

and

Regular maintenance of DGs, IC

engines, onsite equipment,

compressors etc.

Planning – Noise prone activities

during daytime

Protection of Sensitive receptors by

physical barriers

AFFORESTATION DRIVE

Tree plantation

• As against statutory requirement of plantation of 5 trees for every tree cut, 8 trees are planted.

• 5000 trees are planted against 639 trees cut.

GLIMPSE OF NAGPURNAGPUR

IS TRANSFORMING!

THANK YOU

Unique Station Designs

Proposed Elevation of Sitabuldi Interchange Metro Station

Unique Station Designs

Proposed Elevation of Sitabuldi Interchange Metro Station

THE NEW SITABURDI INTERCHANGE METRO STATION AND PROPOSED DEVELOPMENT OF TTMC AREA enia architects m ahendra raj worxpaceTHE NEW ZERO MILE STATON WITH PROPOSED DEVELOPMENT

Unique Station Designs

Proposed Elevation of Zero Mile Metro Station

Proposed Elevation of Nagpur Metro Station at Kapri

Proposed Elevation of Nagpur Metro Station at New Airport

Unique Station Designs

Proposed Elevation of Nagpur Metro Station at Ajni Square

Unique Station Designs

THE FIRST GIRDER OF ELEVATED VIADUCT ON N-S CORRIDOR OF NAGPURMETRO PROJECT WAS LAUNCHED SUCCESSFULLY. THE GRADE OF GIRDER ISM50 OF LENGTH 25M. WIDTH OF SEGMENT AT TOP IS 8.5M WHILE THEBOTTOM WIDTH IS 3.6M. HEIGHT (DEPTH) IS 2M & TOTAL WEIGHT OF ONEGIRDER IS APPROX 400MT.

REACH-1

PHYSICAL PROGRESS

Overall Progress -- 32%

Land Acquisition -- 87%

ERP-SAP system for Finance & HR module made live from

23.02.2017.

EXTERNAL FUNDING

500m Euro (Rs. 3750 crs) from KfW Germany loan agreement

signed on 01/04/2016 .

130m Euro (Rs. 975 crs) from AFD, France loan agreement signed

on 17/11/2016. Fund flow via PTA route started.

FINANCIAL PROGRESS – 20% w.r.t estimated cost.

Maharashtra Metro Rail Corporation Limited (MAHA-METRO)

Nagpur Metro Rail Project

Sr. No. Funding Agency Funds Received

(Rs./crores)

1. GOI 237.97

2. GOM 221.45

3. NIT 48.25

4. PTA (GOI) 397.50

5. Value of Land taken 728.55

6. Total 1633.72

Sr.

No.

Expenses Incurred Expenses

(Rs./crores)

1. Project Expenses 579.21

2. Land (Possession with

MAHA-METRO)728.55

3. Total 1307.76

Maharashtra Metro Rail Corporation Limited (MAHA-METRO)

Nagpur Metro Rail Project

ROUTE LENGTH TO BE MADE OPERATIONAL BY DEC-2019

SR.

NO.

CORRIDOR LENGTH PHYSICAL PROGRESS

AS ON 28.02.2017

TIMELINE

1. Priority Section- (At Grade) Khapri to

Airport South.

5.8 km 73% Nov-2017

2. Lokmanya Nagar to Subhash Nagar 5.0 km 3% June-2018

3. Airport South to Sitabuldi* 6.7 km 16% Nov-2018

4. Subhash Nagar to Sitabuldi 5.5 km 2% June-2019

5. Automotive Sq to Sitabuldi** 6.9 km - Sept-2019

6. Prajapati Sq to Sitabuldi 8.1 km - Dec-2019

Total 38

*Incl. 3 km elevated National Highway of NHAI.**Incl. 4 km elevated National Highway of NHAI.

(Entrusted to Nagpur Metro to execute on common piers to achieve economy & saving in time)