1GENERAL NOTES
MAHARASHTRA JEEVAN PRADHIKARANKONKAN REGION
SCHEDULE OF RATES FOR THE YEAR 2012-13
GENERAL NOTES
1 These rates are applicable to all MJP works in the KONKAN REGION with effect from24-12-2012 .
2 Rates for all items are inclusive of all taxes, levied by Central, state govt. and local bodies (excludingocrtoi). Labour rates are inclusive of VAT & EPF 12.5 %.
3 For all completed items, initial lead of 5 kms. including loading, unloading is considered formaterials like sand, bricks, metal, stone, reinforcement. Following quantities shall be considered foradditional lead charges beyond 5 Km for material required for concrete and reinforcement for structures.
(A) ESR Staging (M) Concrete ReinforcementCapacity (Lit) Qty (Cum) Qty. (MT)
20,000 12 27.40 2.14
30,000 12 32.70 2.55
40,000 12 37.80 2.95
50,000 12 41.90 3.27
60,000 12 46.40 3.62
70,000 12 51.20 3.99
75,000 12 53.00 4.13
80,000 12 56.00 4.37
90,000 12 62.40 4.87
1,25,000 25 107.40 8.38
1,50,000 12 89.80 7.00
1,60,000 12 94.30 7.36
1,75,000 16 117.60 9.17
2,00,000 20 143.60 11.20
2,00,000 25 157.00 12.25
2,50,000 25 177.00 13.81
3,00,000 25 206.00 16.07
Note : Spiral staircase not considerd, SBC-5 MT / Sqm. Seismic Zone-IV is Considered
2GENERAL NOTES
(B) GSR Concrete Reinforcement
Capacity (Ltr) Qty. (Cum) Qty. (MT)
25000 13.58 0.9448
50000 18.45 1.5856
75000 30.45 2.0952
100000 39.31 2.7072
150000 54.699 3.7780
200000 73.313 11.9000
300000 95.092 6.5770
500000 143.277 9.8740
1000000 222.441 15.4180
(For WTP/STP works, quanities of cempleted/ongoing works shall be considerd)
4 These rates are applicable to water supply and sewerage schemes and
its allied works only. Items required for general construction, buildings, roads,
Irrigation Works etc. shall be adopted from the current schedule of rates of
P.W.D.
5 For works in Brihanmumbai Municipal Council Limit, the CSR of B. M. C. shall be
used.
6 For mechanical and electrical items related to water supply and sewerage
schemes, CSR for 2011-2012 prepared by Superintending Engineer (Mechanical
), Maharashtra Jeevan Pradhikaran shall be adopted.
3GENERAL NOTES
7 Following increase in % over normal schedule of rates of M.J.P. for 2011-2012
will be applicable. (Ref. PWD GR. No. DSR/1091/CR-6577/Planning-3,dated 08/
07/2003)
8. In case the area of work, lies under, the categories more than one mentioned at
Sr. No. 7, the higher percentage increase shall be made applicable. This additional
percentage is only on completed item of work and not applicable to items of
providing. If material to be supplied by departmentaly, then basic rate of such
material shall be incresed by above percentage accordingly.
9. The hilly inaccessible areas and Tribal areas shall be got confirmed from the
circular Nos.(1)1089/CR-66/Plan-19,DT.23/11/1990 and (2) 1094/P-36/K-1455
dt.02/09/1994,of Planning department of Govt. Of Mahatrashtra. ( and
ammendment thereof ).
Catagaries % Increase
a Works in Corporation area. 5%
b Works in Municipal areas. 2%
c Works in tribal area / hilly and inaccesible areas / MMRDA 10%
d Prison / Jail area. 15%
e Defence area. 20%
f Raj Bhavan / Malbar Hill (Mumbai) 20%
g Excavation for pipeline work along National Highway. 10%
h Excavation for Dist.system pipe lines,Sewerage system in towns. 10%
4GENERAL NOTES
This schedule of rates is based on following basic rates for important
materials.
Material Rate in Rs. Per MT.
a Cement 63,000/-
b Mild Steel 46,000/-
c Tor Steel 45,712/-
d Structural Steel 48,875/-
e M. S. Plate 49,000/-
10. Details of standard cement consumption and standard weight of various
pipes are incorporated in this CSR .
11. 10 % of cost of items of water retaining structures, such as GSR/ESR/
MBR shall be retained till satisfactory hydraulic testing as per IS code.
12. 10 % of cost of total sub-work of pipeline work shall be retained till
satisfactory hydraulic testing is given as per IS code.
13. In case of supply of pipes / valves etc. by contractor, only 85%
payment shall be released after supply and 15% after satisfactory
hydraulic testing.
5GENERAL NOTES
14. AC / PVC pipes shall not to be used in Urban Areas.
15. Provision for octroi charges for pipes,specials and valves is not considered in
the CSR 2010-2011. Provision of 4 % of cost of pipes ,specials and valves to
be used in corporation area shall be made while framing the estimate.
16. For use of ready mix cement concrete, prior permission of the Chief
Engineer must be obtained.
17. Provision for insurance of work is considered in Rate analysisn of CSR 2011-2012.
18. Rates given in this CSR are for estimation purpose only
19. The Sluice valves / Butterfly valves / Air valves and reflux valves (NRV) should be
of approved makes of M.J.P. only.
20. Excise duty is exempted for equipments (Gears, Motors, Tube Settles) used for W.
T. P.
21. As per notification no. 26/2009- central excisc dated 4/12/09
a) Pipes needed for delivery of water from its source to the plant (including the clear
treated water reservoir if any thereof) and from there to the first storage point.
b) Pipes of outer diameter exceeding 10 cm when such pipes are internal part of the
water supply projects.
c) All the items of machinery, including instruments, apparatus and appliances, auxiliary
equipment and their components / parts required for setting up of water treatment
plants.
6GENERAL NOTES
22. The detailed rate analysis shall be prepared for the work of Matheran Hill station,
Raigad Fort and Gharapuri Island the same shall be got approved form the concerned
superintending Engineer.
23. As per Govt. Circular No. DSR-1090/CR-6453/PLN-3 dated 14.7.1993 1% for
labour amenities is not considerd in the DSR except concrete item while arriving the
rates.
24. As per Govt. in industries & power G. R. No. BCA-2009/CR-108/Labour 7-A
dated 17.6.10 1% cess on labour welfare is not considered in the DSR while arriveing
the rates.
25. All rates are inclusive of Royalty charges as per circular No ieewKeefve 10/1009/ He´. ke´À. 309/
Ke / dt. 11.2.2010.
26. As per Government Notification No. 25/2012 Service tax dated 20 june 2012 point
no 12E Service tax exempted for pipeline, conduit or plant for i) Water supply. ii)
Water treatment or iii) Sewerage treatment or disposal. Hence service tax is not
considerd in rate analysis.
27. The rates of excavation for O & M works where limited working space is available
and work is required to be carried out on emergency basis, the rate should be
adopted as per the actual rate analysis which shall be approved by concerned S. E.
for that particular work only.
7
UnitDescriptionSr. No.
1 2 3 4 5
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
SECTION - A: MATERIALS
SECTION - A: MATERIALS
Alum Grade I Ex-factory M.T.
Binding Wire Kg.
Black enemal paint Anti corrosive Ltr
Bricks No
Bullies, Struts (125 mm dia 1.5 M long) rmt
CCTW planks (3” x 6”) rmt
Cement (Bags) Bag
Cement (M.T.) M.T.
Cement Sulphar Resistant M.T.
Charcoal Kg
Corrosion Resistant steel M.T.
Diesel Lit
Epoxy paint Kg
Fuse No
Gun Powder Kg
Liquid chlorine 100 kg Deptt Container . No.
Liquid chlorine 100 kg supplier Container No.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
8200.00
64.00
189.00
4.60
164.00
71500.00
315.00
6300.00
6840.00
33.00
51000.00
51.00
450.00
22.00
135.00
2300.00
2500.00
8
UnitDescriptionSr. No.
1 2 3 4 5
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
SECTION - A: MATERIALS
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
16000.00
249.55
50.60
46000.00
46.00
48.30
49.00
110000.00
70.00
70.00
217.00
260.00
74.00
100.00
375.00
20500.00
48875.00
1500.00
Liquid chlorine 900 kg Deptt Container at site No.
LubricantOil lit
M.S.angle(50x50x6mm) Kg
M.S.Bars M.T.
M.S.Bars Kg
M.S.Flats (40 mm x 3 mm) Kg
M.S.plate Kg
Maganafloc coagulant aid M.T.
Mild steelGrill ready Kg
Mildsteel grill railing Kg
Mobile oil Lit
Murum Cum
Nails Kg
Nutbolts Kg
Oxygen Gas (Refill) Cylinder
Polling board Cum
R.S.Joist channel etc M.T.
Rapid sand Gravity filter sand At Source Cum
9
UnitDescriptionSr. No.
1 2 3 4 5
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
SECTION - A: MATERIALS
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1500.00
231.00
231.00
226.00
154.00
154.00
99.00
1552.00
1400.00
110.00
931.00
908.00
874.00
48875.00
16.00
74800.00
45712.00
(Godhara, Gokak, Kanhan, Yesagi sand)
Rapid sand Gravity filter media At Source Cum
Ready mixed Alluminium paint Ltr
Ready mixed lead/zinc paint Ltr
Ready mix oil paint Ltr
Ready mix primer Ltr
Ready mix primer for steel Ltr
Rubber Gasket (8 mm thick) Kg
Sand at source cum
Kasarde sand (for mortar lining work) @ source Cum.
Spun Yarn Kg
Stone Aggregate 10 mm Cum
Stone Aggregate 20 mm Cum
Stone Aggregate 40 mm Cum
Structural Steel M.T.
T.C.L.(bleaching poweder Gr.I) (25kg pack) Kg
Teak wood Cum
Tor Steel M.T.
10
UnitDescriptionSr. No.
1 2 3 4 5
SECTION - A: MATERIALS
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
Walling ( 100x100mm) Cum
Welding Rod Having weight 5.25kg Box
White cement Kg
White lead Kg
Wire Kg
Plywood Commercial 12 mm thick Waterproof for
centering (Taken in analysis for RCC items only) Sqm
Coarse Sand Cum
Rubble Cum
54.
55.
56.
57.
58
59.
60.
61.
20350.00
1370.00
33.00
150.00
77.00
730.00
800.00
402.00
11
SECTION - B - LABOUR AND MACHINERY
UnitDescriptionSr. No.
1 2 3 4 5
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Assistant fitter
Bandhani
Bhisti (with pakhal)
Black smith (II) Class
Breaker
Carpenter (1st class)
Carpenter (IInd class)
Chiseller
Excavator
Fitter (1st class)
Glazier
Helper
Hole driller
Mason (I st class)
Mason (II nd class)
Mazdoor (female)
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
SECTION - B: LABOUR AND MACHINERY
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
333.00
333.00
273.00
333.00
333.00
433.00
333.00
333.00
333.00
399.00
333.00
290.00
333.00
433.00
363.00
290.00
12
UnitDescriptionSr. No.
SECTION - B: LABOUR AND MACHINERY
1 2 3 4 5
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
Mazdoor (heavy)
Mazdoor (light)
Mazdoor (male)
Maistry
Mukadam
Painter (for colouring)
Painter
Polisher
Pump driver
Stone cutter or dresser
Tile layer
Welder
Welder for Pipe-line
White washer
Tile turner
Vehicle Driver ( Light )
Electrcian
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
315.00
290.00
290.00
333.00
333.00
333.00
399.00
333.00
363.00
333.00
433.00
433.00
433.00
333.00
333.00
333.00
399.00
13SECTION - B: LABOUR AND MACHINERY
MACHINERY
UnitDescriptionSr. No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Day
Day
BHP/Day
Day
Day
Day
Day
Day
Day
Day
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
1 2 3 4 5
Rent for polishing machine with crew
Rent charges for Chain pulley block with tripod.
Rent charges for pump excluding operator & fuel.
Rent charges for Mechanical Mixer with fuel & Crew.
Rent charges for Vibrator with fuel & Crew.
Plate Bender.
Rent charges for welding set with electrical set.
Rent charges for welding set with generator.
Rent for Compressor with fuel
Rent for Concrete breaker & Compressor
Rent for poclain
Rent for Crane
Rent for JCB
Truck hire charges upto 20 km
Truck hire charges for 20 km to 50 km
Truck hire charges for 50 km & above
Jeep hire charges with driver (upto 300km)
Pipe cutter with operator
De sludging/De silting pump
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1017.00
510.00
190.00
2750.00
1000.00
1000.00
1100.00
2400.00
2550.00
2750.00
2500.00
1650.00
1100.00
2750.00
2500.00
2150.00
3000.00
1250.00
2400.00
14
SECTION - C - TRANSPORTATION
SECTION - C: TRANSPORTATION
STATEMENT – I
Sr.No.
Item of work. Unit Collecting the railway
receipt etc. & unloading the consignment from railway
wagon & keeping on
railway platform
consignment booked in.
Lifting the material
from railway
platform, loading
Unloading into truck.
Loading the
material into truck from
depart-mental store or site of work.
Unloading the material from truck including
stacking in departmental stores or site
of work.
1 2 3 4 5 6 7 (A) MANUAL HANDLING
(Weight upto & including 300 kg.)
1 C.I./D.I.M.S./H.D.P.E. pipes of all classes upto & including 200 mm dia. Pipes of any length.
M.T. 213.00 257.00 66.00 66.00
2. R.C.C.pipes of all classes upto & including 350 mm dia.
M.T. 214.00 277.00 66.00 66.00
3 A.C.pipes of all classes & dia. M.T. 110.00 154.00 40.00 40.00 4 P.V.C. pipes of all classes & dia. M.T. 110.00 154.00 40.00 40.00 5 All other material such as
C.I.Specials of individual weight upto 300 kg.
M.T. 214.00 277.00 66.00 66.00
6 Mild steel / tor steel / R.S.J. M.T. 137.00 178.00 101.00 101.00 7 Cement / bleaching powder/ Alum. M.T. 64.00 100.00 53.00 53.00
(B) CRANE HANDLING (Materials having individual weight above 300 kg.)
1 C.I./D.I./B.W.S.C./M.S./R.C.C. pipes of all classes having individual weight more than 300 kg. & also other heavy materials, valves, machinery having individual weight more than 300 kg
M.T. 147.00 211.00 155.00 155.00
1) The above rates in col. 1 to 5 are applicable only for Railway clearance purpose and not for other carting.2) The rates given in col.6 to 7 shall be adopted for estimate purpose only, however actual quotations/D-tender will
prevail.3) Irrespective of supply of C.I./D.I. Pipes as per rate contract when pipes are directly supplied by the firms by road
railway freight up to destination station and carting as per schedule from Railway Station to work site is allowed. In such cases rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading carting shall be allowed.
ll classes
more than 300
234.00 283.00 73.00 73.00
235.00 305.00 73.00 73.00
121.00 169.00 44.00 44.00121.00 169.00 44.00 44.00235.00 304.00 72.00 72.00
151.00 196.00 111.00 111.0070.00 110.00 58.00 58.00
162.00 232.00 170.00 170.00
26
UnitSr. No.
A.
1.
2.
3.
4.
5.
6.
B.
1.
2.
3.
4.
C.
1.
2.
3.
4.
5.
6.
P.C.C./R.C.C. Works
1 : 1/2 : 1 (M-300) with finishing in CM 1:3 proportion
1:1:2 (M-250) with finishing in CM 1:3 proportion
1:11/2:3 (M-200) with finishing in CM 1:3 proportion
1:11/2:3 (M-200) without finishing
1:2:4 (M-150) with finishing in CM 1:3 proportion
1:2:4 (M-150) without finishing
Brick Masonry Works
B.B. Masonry - IInd sort in CM 1:6 proportion
B.B. Masonry - IInd sort in CM 1:5 proportion
B.B. Masonry - IInd sort in CM 1:4 proportion
Half brick walls in CM 1:4 proportion
Stone Masonry Works
U. C. R. Masonry - IInd sort in CM 1:6 proportion
U. C. R. Masonry - IInd sort in CM 1:4 proportion
Random Rubble Masonry - IInd sort in CM 1:6 proportion
Random Rubble Masonry - IInd sort in CM 1:4 proportion
C. R. Masonry - IInd sort in CM 1:4 proportion
C. R. Masonry - IInd sort in CM 1:6 proportion
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
9.20 bags
8.50 bags
6.90 bags
6.80 bags
5.90 bags
5.80 bags
1.44 bags
1.62 bags
2.30 bags
0.22 bags
1.77 bags
2.65 bags
1.77 bags
2.65 bags
2.65 bags
1.50 bags
STANDARD CEMENT CONSUMPTION TO BE FOLLOWED FOR VARIOUS ITEMS OF WORKS
Standard CementConsumption
Item of Works
SECTION D - CEMENT CONSUMPTION
SECTION - D : CEMENT CONSUMPTION
27
UnitSr. No.
D.
1.
2.
3.
E.
F.
Water proofing Works
Damp-proof course 50mm thick in 1:2:4 proportion with bitumen layerW.P. compound.
Integral finishing to newly laid slab in CM 1:3 proportion withW.P. compound.
Water proofing treatment over old slab with W.P. cement slurry as tack coat12 mm thick, W. P. plaster in CM 1:3 proportion, brick bat coba average 9.50cm thick in CM 1:6 proportion and 20 mm thick W.P. cement plaster over itin CM 1:3 proportion and finishing with cement slurry with novelling.
Plastering and Pointing Works
i) 12mm thick plaster
a) CM 1:2 proportion
b) CM 1:3 proportion
c) CM 1:4 proportion
ii) 20 mm thick plaster
a) CM 1:2 proportion
b) CM 1:3 proportion
c) CM 1:4 proportion
iii) 25 mm thick plaster
a) CM 1:2 proportion
b) CM 1:3 proportion
c) CM 1:4 proportion
iv) Cement pointing in CM 1:3 proprotion
v) Tuck cement pointing in CM 1:3 proportion
vi) Sand faced plaster in CM 1:4 proportion including base coat 15 mm thick in CM 1:4 proportion with W.P. compound.
vii) Rough cast cement plaster in CM 1:4 proportion in two coats.
Flooring Works
i) I.P.S. flooring - 40 mm thick
ii) I.P.S. flooring - 50 mm thick
iii) Rough Shahabad - any other similar flooring in CM 1:4 proportion bedding.
iv) All types of cement / kadappa / polished / mosaic tiles flooring or skirting / dado set on CM 1:4 proporition bedding.
v) Glazed / ceramic tiles flooring or skirting / dado fixed with plain cement slurry.
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
0.35 bags
0.06 bags
0.37 bags
0.16 bags
0.12 bags
0.10 bags
0.27 bags
0.19 bags
0.15 bags
0.34 bags
0.25 bags
0.19 bags
0.03 bags
0.05 bags
0.22 bags
0.22 bags
0.30 bags
0.37 bags
0.15 bags
0.18 bags
0.22 bags
Standard CementConsumption
Item of Works
SECTION - D : CEMENT CONSUMPTION
28
STATEMENT SHOWING STANDARD WEIGHTS OF PIPES TO BE FOLLOWED FOR CARTING OFVARIOUS DIAMETERS AND TYPES OF PIPES
(I) C. I. Pipes (IS : 1536-1989)
SECTION - D : CEMENT CONSUMPTION
16.00
19.82
25.82
32.10
47.09
63.45
81.82
103.09
125.45
151.27
177.09
236.00
304.55
341.09
381.00
465.09
558.73
Class of pipes and its weight in Kg. per meter length
Diameter of Pipein mm
LA A B
1 2 3 4
80
100
125
150
200
250
300
350
400
450
500
600
700
750
800
900
1000
17.38
21.82
28.18
35.27
51.09
69.09
89.45
111.82
137.09
166.10
192.91
257.64
335.73
372.91
416.00
507.45
610.36
18.46
23.27
30.36
38.00
55.27
74.73
96.91
121.27
140.00
179.27
208.73
275.00
359.45
404.55
450.00
549.80
659.64
29
STATEMENT SHOWING THE TOTAL WEIGHTS OF VARIOUS DIA D. I. K-9 PIPES INCLUDING WEIGHT OF MORTAR LINING PER M LENGTH.
II) D. I. PIPES
Nominal dia meter WEIGHT / M LENGTH OF D. I. K-9 PIPES OF
4M 5M 5.50 M1 2 3 4
80 mm wt. of DI Pipe / Mweight morter/m
Total wt./M.
6 M5
100 mm wt. of DI Pipe /M weight of morter/m
Total wt./M.125 mm wt. of DI Pipe /
M weight morter/mTotal wt./M.
150 mm wt. of DI Pipe /M weight morter/m
Total wt./M.
200 mm wt. of DI Pipe /M weight morter/m
Total wt./M.250 mm wt. of DI Pipe /
M weight morter/mTotal wt./M.
300 mm wt. of DI Pipe /M weight morter/m
Total wt./M.
350 mm wt. of DI Pipe /M weight morter/m
Total wt./M.
400 mm wt. of DI Pipe /M weight morter/m
Total wt./M.450 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
500 mm wt. of DI Pipe /M weight morter/m
Total wt./M.600 mm wt. of DI Pipe /
M weight morter/mTotal wt./M.
700 mm wt. of DI Pipe /M weight morter/m
Total wt./M.
750 mm wt. of DI Pipe /M weight morter/m
Total wt./M.800 mm wt. of DI Pipe /
M weight morter/mTotal wt./M.
900 mm wt. of DI Pipe /M weight morter/m
Total wt./M.1000 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
13.001.56
14.56
16.251.93
18.18
20.502.42
22.92
24.752.90
27.65
33.253.88
37.13
43.754.84
88.59
55.505.80
61.30
69.2512.1281.37
82.7513.82
96.57
98.7515.53
114.28
115.0017.26
132.26
152.0020.75
172.75
193.7529.45
223.20
217.5031.56
249.06
240.7533.69
274.44
292.7537.89
330.64
349.7542.08
391.83
13.001.56
14.56
16.001.93
17.93
20.002.42
22.42
24.202.90
27.10
32.603.88
36.48
43.004.8447.84
54.605.80
60.40
68.0012.1280.12
81.4013.82
95.22
97.0015.53
112.53
112.8017.26
130.06
149.0020.75
169.75
189.8029.45
219.25
213.0031.56
244.56
235.8033.69
269.49
286.2037.89
324.09
341.6042.08
383.68
12.911.56
14.47
16.001.93
17.93
20.002.42
22.42
24.182.90
27.08
32.543.88
36.42
42.734.84
47.57
54.185.80
59.98
67.4512.12
79.57
80.9113.82
94.73
96.3615.53
111.89
112.0017.26
129.26
147.8220.75
168.57
188.36
29.45217.81
211.4531.56
243.01
233.8233.69
267.51
283.8237.89
321.71
338.5542.08
380.63
12.671.56
14.23
15.861.93
17.79
19.832.42
22.25
24.002.90
26.90
32.333.88
36.21
42.504.84
47.34
53.835.80
59.63
67.1712.1279.29
80.3313.82
94.15
95.8315.53
111.36
111.5017.26
128.76
147.0020.75
167.75
181.7029.45
211.15
210.0031.56
241.56
232.3333.69
266.02
281.8337.89
319.72
336.1742.08
378.25
Note : These weights are as per the Circular issued by Superintending Engineer (HQ) vide lt.No. MJP/10-2000 / SE (H/Q) / DI/15/AMDT/Stores/255 Dt. 26-6-2000.
1) Barrel Mass as per IS : 8329 - 19942) Socket Mass as per IS : 8329 - 19943) Cement Motar Lining Weight as per ISO : 4179 -1985.
SECTION - D : CEMENT CONSUMPTION
30
Diameter ofPipe in mm
1
80
100
125
150
200
250
300
350
400
450
500
600
STATEMENT SHOWING STANDARD WEIGHTS TO BE FOLLOWED FOR CARTING OFVARIOUS DIAMETERS AND TYPES OF PIPES
(III) M. S. Pipes
Note : Weight of M. S. Pipes is to be computed by considering density of steel as 7850 Kg./Cum consideringthe diameter and thickness of plate used for manufacturing of M. S. Pipes.
(IV) A. C. Pressure Pipes (ISO-160)
Class of pipes and its weight in Kg. per meter length
Class 5 Class - 10 Class - 15
2 3 5
6.00
7.60
9.57
11.87
15.57
19.25
24.97
39.77
49.20
56.92
72.84
102.50
6.20
7.70
9.80
12.20
19.30
25.20
32.30
47.52
60.20
70.27
89.54
137.32
6.40
8.20
11.00
15.30
25.60
32.70
45.10
55.27
71.36
83.63
104.25
148.35
Class - 20
4
6.80
10.30
13.30
19.00
32.70
41.50
58.10
71.42
93.10
111.37.
136.52
193.16
SECTION - D : CEMENT CONSUMPTION
31
(V) P.V.C. Pipes (IS :4985-1988)
Class of pipes and its weight in Kg. per meter lengthDiameter of Pipe inmm
4.00 Kg/Sq.cm
1 2 3
63
75
90
110
140
160
180
200
225
250
280
315
0.47
0.67
0.92
1.32
2.13
2.78
3.56
4.26
5.48
6.63
8.34
10.55
0.67
0.93
1.33
1.89
3.10
3.92
5.07
7.00
7.84
10.19
12.16
15.37
1.01
1.44
2.05
3.08
4.99
6.56
8.10
10.20
12.56
15.31
19.80
25.00
4
6.00 Kg/Sq.cm 10.00 Kg/Sq.cm
(VI) R. C. C. Pipes
Diameter of Pipe in
mm
1
100
150
200
250
300
350
400
450
500
600
700
800
900
1000
Class of pipes and its weight in Kg. per meter length
P-13 4 7
23.56
33.00
42.10
51.84
74..64
92.28
104.16
127.92
141.36
192.96
225.59
257.82
290.00
322.28
23.56
33.00
42.10
75.18
117.10
168.10
208.10
235.23
261.37
313.64
365.92
418.19
470.47
510.00
21.20
29.40
37.90
67.60
105.40
151.30
187.30
211.70
235.23
282.27
329.32
376.30
423.00
459.00
6
21.20
29.40
37.90
77.20
119.10
170.20
212.40
240.80
270.50
320.20
370.90
425.40
482.30
531.40
P-2 P-3 NP-2 NP-35
NP-42
21.20
29.40
37.90
57.10
92.25
120.80
152.60
169.90
206.90
275.10
293.20
310.60
350.60
399.80
23.56
33.00
42.10
63.40
102.50
134.30
169.60
188.70
229.90
305.70
325.80
345.19
389.58
443.98
SECTION - D : CEMENT CONSUMPTION
32
(VII) P.S.C. Pipes of all classes and B. W. S. C. pipes of all classes
SECTION - D : CEMENT CONSUMPTION
Diameter of Pipes in mm
100
150
200
225
250
300
8.70 Kg/Each
15.00 Kg/Each
20.85 Kg/Each
23.70 Kg/Each
27.57 Kg/Each
43.60 Kg/Each
Weight of 0.60 M long pipe in Kg per pipe
(VIII) Stoneware Pipes
Diameter of Pipes in mm
15
20253240506580
100
125
150
Class of Pipes and its weight in Kg. per meter length
(IX) G. I. Pipes
Light (Blue) Medium (Yellow) Heavy (Red)0.96
1.422.032.613.294.185.92
6.9810.20
-------
1.23
1.592.403.173.655.16
6.638.64
12.40
16.70
19.70
1.46
1.912.993.974.476.248.0210.30
14.70
18.30
21.80
Diameter of Pipes in mm350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
197.50 Kg/m
240.00 Kg/m
257.50 Kg/m
292.50 Kg/m
375.00 Kg/m
432.50 Kg/m
582.50 Kg/m
705.00 Kg/m
825.00 Kg/m
947.50 Kg/m
1115.00 Kg/m
1190.00Kg/m
1370.00 Kg/m
1560.00Kg/m
1767.50 Kg/m
1987.50 Kg/m
2205.50 Kg/m
Weight of pipe per meter length for all classes.
33
UnitDescriptionSr. No.
1 2 3 4 5
1.
2.
3.
4.
5.
6.
Excavation for foundation / pipe trenches in earth, soils of all types,sand, gravel and soft murum, including removing the excavated ma-terial upto a distance of 50 metres and lifts as below, stacking andspreading as directed, normal dewatering, preparing the bed for foun-dation and excluding backfilling, etc. complete.
Lift 0 to 1.5 M (Bd-A-1/259)Excavation for foundation / pipe trenches by all means in hardmurum including removing the excavated material upto a distance of50 M and lifts as below, stacking and spreading as directed by Engi-neer-in-charge, normal dewatering, preparing the bed for foundationand excluding backfilling, etc. complete.
Lift 0 to 1.5 M (Bd-A-2/259)Excavation for foundation / pipe trenches in hard murum and boul-ders, W.B.M. road including removing the excavated material upto adistance of 50 M beyond the area and lifts as below, stacking andspreading as directed by Engineer-in-charge, normal dewatering, pre-paring the bed for foundation and excluding backfilling, etc. com-plete.
Lift 0 to 1.5 M (Bd-A-3/259)Add for every additional lift of 1.5 M beyond initial lift of 1.50 M forItem Nos. 1 to 3
Excavation for foundation / pipe trenches by all means in soft rockand old cement and lime masonry foundation asphalt road includingremoving the excavated material upto a distance of 50 M beyond areaand lifts as below, stacking as directed by Engineer-in-charge, normaldewatering, preparing the bed for foundation and excluding backfill-ing, etc. complete.
Lift 0 to 1.5 M (Bd-A-4/259)
Excacation for foundation / pipe trenches in by blasting in soft rockand old masonry including removing the excavated material upto a dis-tance of 50 M beyond area and lifts as below, stacking as directed byEngineer-in-charge, normal dewatering, preparing the bed for foun-dation and excluding backfilling, etc. complete.
Cum
Cum
Cum
Cum
Cum
Cum
SECTION - E : EXCAVATION
SECTION - E : EXCAVATION
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
134.00
156.00
175.00
13.00
443.00
---
34
UnitDescriptionSr. No.
1 2 3 4 5
7.
8.
9.
10.
Excavation for foundation / pipe trenches in hard rock by controlledblasting, including trimming and levelling the bed by chiselling wherenecessary and removing the excavated material and stacking itin measurable heaps within a distance of 50 metres from the area andlifts as below, normal dewatering, excluding backfilling, etc. com-plete.
Lift 0 to 1.5 M (Bd-A-5/259)
Excavation for foundation / pipe trenches in hard rock and con-crete road by chiselling, wedging, line drilling, by mechanicalmeans or by all means other than blasting including trimming andlevelling the bed, removing the excavated material upto a dis-tance of 50 metres beyond the area and lifts as below, stacking asdirected by Engineer-in-charge, normal dewatering, excludingbackfilling, etc.complete by all means.
Lift 0 to 1.5 M (Bd-A-6/259)
Excavation in laterite rock masses mechanically including liftupto 1.5 M including trimming and levelling the bed, removingthe excavated material upto a distance of 50 M beyond the areaand lift as below, stacking as directed by Engineer-in charge, nor-mal dewatering, excluding backfilling, etc. complete.
Lift 0 to 1.5 M.
Cum
Cum
Cum
SECTION - E : EXCAVATION
Excavation for foundation /pipe trenches in slush Muddy/ Marshy /Slushy /Soil including use of poclain, labour for dewatering duringexecution including removing the excavated material upto a distanceof 50 metres and lifts as below, stacking and spreading as directed,preparing the bed by cleaning the mud, labour required for executionfor shutterng item but excluding backfilling etc. complete. Providingand fixing shuttering shall be paid separately.
Lift 0 to 1.5 M Cum
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
599.00
815.00
1019.00
301.00
35
UnitDescriptionSr. No.
1 2 3 4 5
11.
12.
13.
Add for every additional lift beyond initial lift of 1.5 M for item No. 5 to 10
HEAD WORKSExcavation in general in soft material comprising of soft soil, softmurum, sand, hard murum with boulders in wet or dry con-dition for Head Works i.e. Intake Well, Connecting Pipe, JackWell, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of150 M including baricading, guarding, disposing off surplus excavatedstuff within a radius of 0.5 km. as directed by Engineer-in- charge, etc.complete excluding refilling.
a) For Head Works on river or dam submergence for initial lift of 0 to 1.5 M
b) For Head Works on nalla or any other site of GSDA for initial lift of 0 to 1.5 M
c) Add for each additional lift of 1.5 M beyond initial lift of 1.5 M
Excavation in general in hard material comprising of soft rock,hard rock, Manjara rock, etc, by blasting / controlled blasting/ chiselling as required in wet or dry condition for Head Worksi.e. Intake Well, Connecting Pipe, Jack Well, Pump House, SupplyWell, etc. for lift 0 to 1.5 M and lead of 150 M including baricading,guarding, disposing off surplus excavated stuff within a radius of 0.5km. as directed by Engineer-in-charge, excluding refilling.
a) For Head Works on river or dam submergence for initial lift of
0 to 1.5 M
Cum
Cum
Cum
Cum
Cum
SECTION - E : EXCAVATION
20.00
408.00
228.00
20.00
806.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
36
UnitDescriptionSr. No.
1 2 3 4 5
14.
15.
16.
b) For Head Works on nalla or any other site of GSDA forinitial lift of 0 to 1.5 M
c) Add for each additional lift of 1.5 M beyond initial lift of1.5 M
Excavation in general in soft material comprising of soft soil, softmurum, sand, hard murum with boulders in wet or dry conditionfor Head Works and allied works by well sinking process for aver-age depth of 12 M and lead of 150 M including shoring, baricading,guarding, refilling, disposing of surplus excavated stuff as directed byEngineer-in-charge, etc. complete.
a) Diameter upto and including 3 Mb) Diameter more tham 3 M
Desilting the Supply Well, Intake Well / Head Works, sump of wa-ter supply/ sewerage works etc. in wet or dry condition includinglifts upto 9 M and lead upto 150 M as required beyond the worksite, stacking, spreading, including necessary guarding, etc. complete,as directed by Engineer-in-charge.
Add for every additional lift of 1.5 M. beyond initial lift of 9.0 M
Dewatering the excavated trenches and pools of water in the build-ing trenches / pipeline trenches, well works by using pumps and otherdevices including disposing off water to safe distance as directed byEngineer-in-charge (including cost of machinery, labour, fuel), etc.complete. (Bd-A-9/261)(i) The Contractor at his request may allowed to start construction ofmasonry steining so as not to allow silting of well in oncoming mon-soon and while paying masonry, 25% amount shall be withheldand released only when excavation to the full depth is com-pleted.
(ii) Dewatering : Total dewatering charges are to be proposed intender as lumpsum amount and 75% is payable for excavationand 25 % is payable for construction of well / gallery. Out of 75%excavation, break-up shall be as under :
Cum
Cum
Cum
Cum
Cum
Cum
BHP/Hr.
SECTION - E : EXCAVATION
556.00
20.00
756.00
613.00
587.00
20.00
60.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
37
UnitDescriptionSr. No.
1 2 3 4 5
17.
18.
19.
20.
21.
22.
25% for last 1M depth.20% for 2 M depth which just above last 1 M depth.15% for 2 M depth which just above last 3 M depth.15% for the rest of depth from water table level.
The above conditions will restrict the tendencies of agencies to avoiddeepening of wells, etc. to the required depth.
Refilling the trenches with available excavated stuff with softmaterial first over pipeline and then hard material in 15 cm layerswith all leads and lifts including consolidation, surcharging, etc.complete.
Filling in plinth and floors murum bedding in trenches with ap-proved murum from excavated materials from foundation 15cmto 20cm layers including watering and compaction etc.complete.(Bd-A-10/263)
Filling in plinth and floors / trenches with contractor’s murumfor bedding in 15cm to 20cm layers including watering and compac-tion royalty charges etc.complete.(Bd-A-11/263)
Providing dry trap/granite/quartzite/gneiss, rubble stone solingin 15cm to 20 cm thick layers including hand packing and com-pacting, royalty charges etc. complete.(Bd-A-12/264)
Providing and filling in sand boxing in pipeline or for foundationwith sand of approved quality including watering compac-tion, initial lead upto 5.0 km. etc. complete.(Bd-A-13/264)
Open timbering in trenches of depth more than 1.5 m for shor-ing and strutting including use of and waste of all necessary tim-ber works including walling, strutts, open polling boards/ hori-zontal sheeting, runners, etc. as may be necessary and fixing andremoval complete. (Measurements to be taken of the face/areatimbered) (N.B.O. Item No. 4.15, P. No. 59)
Cum
Cum
Cum
Cum
Cum
SECTION - E : EXCAVATION
60.00
60.00
641.00
899.00
887.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
38SECTION - E : EXCAVATION
UnitDescriptionSr. No.
1 2 3 4 5
A) Lift 0 to 1.5 M [for non-water logged area]
Additional per Sqm. for further lifts of 1.5M each.
B) Lift 0 to 1.5 M for water logged area.
Additional per Sqm. for further lifts of 1.5M each.
Note: For the Trenches with more than 1.5M depth shor-ing if required from GL is to be done and is payable from G.L.
Sqm.
Sqm.
Sqm.
Sqm.
218.00
20.00
246.00
20.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
39
UnitDescriptionSr. No.
1 2 3 4 5
Providing and fixing mild steel grill work for windows/venti-lators of 20 Kg./Sqm. as per drawings including necessarywelding and painting with one coat of anticorrosive paint andtwo coats of oil painting, etc. complete.(Bd-U-1/537)
Providing and fixing mild steel grill railing of 20 Kg./Sqm.with teak wood hand railing, still and newel posts for staircaseand including fabricating, fixtures, erecting, painting the grillwork with approved oil paint and polishing the hand rail andnewel posts with French polish two coats, etc. complete.(Bd-U-2/537)
Providing structural steel work in rolled stanchionsfixed with connecting plates or angle cleats as in main andcross beams, hip and jack rafters, purlins connecting to trussmembers and like as per detailed designs and drawings or asdirected by Engineer-in-charge including cutting, fabricating,hoisting, erecting, fixing in position, making riveted / bolted /welded connections and one coat of anticorrosive paintsand over it two coats of oil painting, etc. complete.(Bd-C-3/275)
Providing stuctural steel work in single stanchions composedof RSJ, channel, etc, with caps, bases, mild steel plates, angles,brackets, cleats, gusset plates, anchor bolts, etc. as per detaileddesign and drawing or as directed by Engineer-in-charge in-cluding cutting, fabrication, hoisting, erecting, fixing in posi-tion, making riveted/ bolted / welded connections and one coatsof anticorrosive paint and over it two coats of oil painting, etc.complete.(Bd-C-6/277)
1.
2.
3.
4.
Sqm
Sqm
MT
MT
SECTION -F: IRON AND STRUCTURALSTEEL WORK
SECTION -F : IRON AND STRUCTURAL STEEL WORK
1761.00
2596.00
61494.00
60351.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
40
UnitDescriptionSr. No.
1 2 3 4 5
Providing structural steel work in rolled sections like joists,channels, angles, tees, etc. as per detailed designs and draw-ings including fixing in position without connecting plates,braces, etc. and one coat of anticorrosive paint and over it twocoats of oil painting, of approved quality and shade, etc. com-plete.(Bd-C-2/275)
Providing structural steel work in trusses, other similar trussedpurlins and members with all bracing, gusset plates, etc. asper detailed design and drawing or as directed by Engineer-in-charge including cutting, fabricating, hoisting, erecting and fixing inposition, making riveted / bolted / welded connections and one coatof anticorrosive paint and over it two coat of oil painting, etc. com-plete.(Bd-C-8/278)
5.
6.
MT
MT
63141.00
75473.00
SECTION -F: IRON AND STRUCTURALSTEEL WORK
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
41
UnitDescriptionSr. No.
1 2 3 4 5
Providing and laying in situ, following grades of C.C. oftrap /granite / quartzite / gneiss metal for foundation andbedding including dewatering, formwork, compactingand curing, finishing, etc. complete.
a) M-100
b) M-150
1.
Cum
Cum
4014.00
4505.00
SECTION G - PLAIN CEMENT CONCRETE
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
42
UnitDescriptionSr. No.
1 2 3 4 5
Providing and laying in situ Cement concrete of trap/granite/quartzite/ gneiss metal for RCC work in foundation like raft, gril-lage, strip foundation and footing of RCC columns and steel stan-chions including normal dewatering, 'plywood form work, bully/steel propups, compaction, finishing and curing, etc, complete. (Byweigh batching and mix design for M-250 and M-300 only. Use ofL & T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc.cement is permitted.) (excluding M.S. or Tor reinforcement)
a) In RCC M-150
b) In RCC M-200
c) In RCC M- 250
d) In RCC M- 300
Providing and casting in situ Cement Concrete of trap/gran-ite/quartzite/ gneiss metal of approved quality for RCC workas per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, 'plywoodformwork, bully/steel prop-ups, compaction, finishing the formedsurfaces with CM 1:3 of sufficient minimum thickness if specialfinish is to be provided and curing, etc. complete. (By weigh batchingand mix design for M-250 and M-300 only. Use of L&T, A.C. C.,Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permit-ted) (excluding M.S, or Tor reinforcement)
a) For RCC M-200 grade - all types of columns
b) For RCC M-250 grade - all types of columns
c) For RCC M-300 grade - all types of columns
2.
3.
Cum
Cum
Cum
Cum
Cum
Cum
Cum
SECTION -G : REINFORCED CEMENT CONCRETE, READY MIX CONCRETE
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
5475.00
5533.00
6063.00
6357.00
7299.00
7887.00
8123.00
43
UnitDescriptionSr. No.
1 2 3 4 5
Providing and casting in situ C. C. of trap / granite / quartzite/gneiss metal of approved quality for RCC works as per detaileddrawings and designs or as directed by Engineer-in-charge includ-ing normal dewatering, centering, 'plywood formwork, bully/steelpropups, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and evensurface wherever nesessary or roughening if special finish is to beprovided and curing, etc. complete. (By weigh batching and mixdesign for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja,Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (ex-cluding M.S. or Tor reinforcement)
a) For RCC M-200 grade
Beams /Braces / Lintels
b) For RCC M-250grade
Beams /Braces / Lintels
c) For RCC M-300 grade
Beams /Braces / Lintels
Providing and casting in situ C. C. of trap/granite/quartzite/ gneissmetal of approved quality for RCC work as per detailed drawingsand designs or as directed by Engineer-in-charge including normaldewatering, centering, 'plywood formwork, bully/steel prop-ups,compaction, finishing the formed surfaces with CM 1:3 of suf-ficient minimum thickness to give a smooth and even surface wher-ever necessary or roughening if special finish is to be provided andcuring, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C. C., Ambuja, Birla Gold,Manikgad, Rajashree, etc. cement is permitted) (excluding M.S,or Tor reinforcement)
4.
5.
Cum
Cum
Cum
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
7240.00
7829.00
8111.00
44
UnitDescriptionSr. No.
1 2 3 4 5
a) For RCC M-200 gradeSlabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
b) For RCC M-250 gradeSlabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
c) For RCC M-300 gradeSlabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
Providing and casting in situ C. C. of trap/granite/quartzite/ gneissmetal of approved quality for RCC work as per detailed drawingsand designs or as directed by Engineer-in-charge including normaldewatering, centering, 'plywood formwork, bully/steel propups,compaction, finishing the formed surfaces with CM 1:3 of suf-ficient minimum thickness to give a smooth and even surfacewherever necessary or roughening if special finish is to be pro-vided and curing, etc. complete. (By weigh batching and mix de-sign for M-250 and M-300 only. Use fo L&T, A.C. C., Ambuja,Birla Gold, Manikgad, Rajashree, etc. cement is permitted) (ex-cluding M.S, or Tor reinforcement)
a) For RCC M-200 gradeChajjas / Parapets / Curtain Walls / Partition Walls/ Pardies
6.
Cum
Cum
Cum
Cum
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
7770.00
8358.00
8711.00
7887.00
45
UnitDescriptionSr. No.
1 2 3 4 5
c) For RCC M-250 gradeChajjas/Parapets/Curtain walls/ Partition walls/Pardies.
d) For RCC M-300 gradeChajjas/Parapets/Curtain walls/ Partition walls/Pardies.
Providing and laying in situ R. C. C. of trap/granite/quartz-ite/ gneiss metal of approved quality for RCC works ofdomes as per detailed drawings and designs approved byEngineer-in-charge including centering finishing, rougheningthe surfaces with special finish or plaster to be provided sepa-rately, curing, etc. complete. (By weigh batching and mix de-sign for M-250 and M-300 only. Use of L&T, A.C. C., Ambuja,Birla Gold, Manikgad, Rajashree, etc. cement is permitted) (ex-cluding M.S. or Tor reinforcement)
a) For RCC M-200 grade - Domes
b) For RCC M-250 grade - Bottom Domes only
c) For RCC M-300 grade - Bottom Domes only
Providing and fixing in position steel bar reinforcement ofvarious diameters for RCC piles, caps, footings, foundations,slabs, beams, columns, canopies, staircases. newels, chajjas,lintels, pardies, copings, fins, arches, etc. as per detailed de-signs, drawings and schedules; including cutting, bending, hook-ing the bars, binding with wires or tack welding and supportingas required, etc. complete.(including cost of binding wire).(Bd-F-17/306)
7.
8.
Cum
Cum
Cum
Cum
Cum
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
8418.00
8653.00
8240.00
8771.00
9064.00
46
UnitDescriptionSr. No.
1 2 3 4 5
a) Mild Steel
b) Tor Steel
c) Only fabrication (Labour) for all types of steel
Providing fusion bonded epoxy coating to reinforcementbars as per IS-13620-993 specificaion for a thickness of 175(+50) microns including extra cost on account of careful handling,extra cost on account of using PVC coated binding wire instead ofG. I. wire, extra cost on account of touch-up material supplied bycoating agency and repair work extra cost on account of trans-portation to and fro from steel yard at Kalamboli to plant at Damanand Plant at Daman to work site by trailer, loading, unloading, in-cluding all taxes (Central and Local), etc. complete.
a) For Reinforcement Diameterwise Rates
1) 8 mm dia.
2) 10 mm dia.
3) 12 mm dia.
4) 16 mm dia.
5) 20 mm dia.
6) 25 mm dia.
7) 28 mm dia.
8) 32 mm dia.
9.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
M. T.
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
58806.00
58806.00
7960.00
16932.00
15372.00
14332.00
13916.00
12980.00
12015.00
11469.00
10651.00
47
UnitDescriptionSr. No.
1 2 3 4 5
b) Average Rates (FOR ESTIMATION ONLY)
1) For 8 mm to 20 mm dia.
2) For above 20 mm dia.
Notes for Estimation :
1) All the rates of Reinforced Cement Concrete Items From1 to 6 shall be increased by 10% for each brace heightabove 1st brace for R.C.C. E. S. R.s.e.g. For a R.C.C.E.S. R. with 7 M staging and first brace at 3.50 Mabove ground, the concrete in columns above firstbrace, concrete of ring beam and bottom slab is entitledfor 10% increase, concrete of vertical wall, roof slaband roof beams, columns in container are entitled for20% increase.
2) All the rates of Reinforced Cement Concete Itemsfrom 1 to 6 shall be increased by 2% for every floorheight above ground floor for building works.
3) These rates are applicable for R. C. C. well worksalso.These rates shall be increased by 10% for every5 M depth below initial 5 M depth.
4) Rates for Item Nos. 7 and 8 shall be increased by 5%for each brace height above first brace forR.C.C.E.S.Rs. By 5% for every ring beam below firstring beam for R. C. C. wells. By 1% building worksfor every floor height.
5) Volumetric mix as per 1: 11/2 :3 shall be adopted with56.5 kg. of cement for RCC-250 and 59.5 kg. ofcement for RCC- 300, per load of mixer of 1bag capacity.
6) Fusion bonded epoxy coating to be proposed onlyin Coastal Area with pr ior approval of theChief Engineer.
7) For estimation purpose, average rates as per Item No.9bshall be considered wherever necessary.
M. T.
M. T.
SECTION -G : PLAIN CEMENT CONCRETE, REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
14706.00
11379.00
48
UnitDescriptionSr. No.
1 2 3 4 5
READY MIX CONCRETE
Providing and laying in situ Ready Mix Cement Concrete gradeof trap/granite/quartzite/ gneiss metal for RCC work in founda-tion like raft, grillage, strip foundation and footing of RCCcolumn and steel stanchions including normal dewatering, formwork, compaction, finishing and curing including transporting frommixing plant upto distance of 25 km., pouring the concrete at worksite for 1.5 M lift above G. L. and 5.0 M lift below G. L., etc.complete. (Excluding reinforcement and structural steel)
a) In RCC M-200
b) In RCC M-250
c) In RCC M-300
Providing and casting in situ Ready Mix Cement Concrete gradeof trap/granite/quartzite/ gneiss metal of approved quality for RCCwork as per detailed drawings and designs or as directed byEngineer-in-charge including normal dewatering centering, formwork, compaction, finishing the formed surfaces with CM 1:3of sufficient minimum thickness to give a smooth and even surfacewherever necessary or roughening if special finish is to beprovided and curing including transporting from mixing plant uptodistance of 25 km., pouring the concrete at work site for 1.5 M liftabove G. L. and 5.0 M lift below G. L., etc. complete.
(Excluding reinforcement and structural steel)
b) In RCC M-200 - all types of columns
c) In RCC M-250 - all types of columns
d) In RCC M-300 - all types of columns
Cum
Cum
Cum
10.
11.
SECTION -G : PLAIN CEMENT CONCRETE , REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Cum
Cum
Cum
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
6248.00
6540.00
6643.00
7760.00
8037.00
8141.00
49
UnitDescriptionSr. No.
1 2 3 4 5
Providing and casting in situ Ready Mix Cement Concretegrade of trap/granite/quartzite/ gneiss metal of approved qualityfor RCC work as per detailed drawings and designs or as di-rected by Engineer-in-charge including normal dewatering,centering, form work compaction, finishing the formed sur-faces with CM 1:3 of sufficient minimum thickness to give asmooth and even surface wherever nesessary or roughening ifspecial finish is to be provided and curing including transport-ing from mixing plant upto distance of 25 km., pouring the con-crete at work site for 1.5 M lift above G. L. and 5.0 M lift below G.L., etc. complete.(Excluding reinforcement and structural steel)
b) In RCC M-200 - Beams / Braces / Lintels
c) In RCC M-250 - Beams / Braces / Lintels
d) In RCC M-300 - Beams / Braces / Lintels
Providing and casting in situ Ready Mix Cement Concrete gradeof trap/granite/quartzite/ gneiss metal of approved quality forRCC work as per detailed drawings and designs or as directedby Engineer-in-charge including normal dewatering centering,form work, compaction, finishing the formed surfaces withCM 1:3 of sufficient minimum thickness to give a smooth andeven surface wherever necessary or roughening if special fin-ish is to be provided and curing including transporting frommixing plant upto distance of 30 km., pouring the concrete atwork site for 1.5 M lift above G. L. and 5.0 M lift below G. L.,etc. complete.
(Excluding reinforcement and structural steel)
b) In RCC M-200Slabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
Cum
Cum
Cum
12.
13.
SECTION -G : PLAIN CEMENT CONCRETE REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Cum
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
7731.00
8008.00
8112.00
8135.00
50
UnitDescriptionSr. No.
1 2 3 4 5
c) In RCC M-250Slabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
d) In RCC M-300Slabs / Landings / Vertical Walls / Waist Slabs /Steps for Staircase
Providing and casting in situ Ready Mix Cement Concrete gradeof trap/granite/quartzite/ gneiss metal of approved quality for RCCwork as per detailed drawings and designs or as directedby Engineer-in-charge including normal dewatering, centering, formwork compaction, finishing the formed surfaces with CM 1:3of sufficient minimum thickness to give a smooth and even surfacewherever nesessary or roughening if special finish is to beprovided and curing including transporting from mixing plant uptodistance of 25 km., pouring the concrete at work site for 1.5 M liftabove G. L. and 5.0 M lift below G. L., etc. complete.(Excluding reinforcement and structural steel)
b) For RCC M-200 Chajjas / Parapets / Curtain Walls /Partition Walls / Pardies
c) For RCC M-250 Chajjas / Parapets / Curtain Walls /Partition Walls / Pardies
d) For RCC M-300 Chajjas / Parapets / Curtain Walls /Partition Walls / Pardies
Cum
Cum
Cum
Cum
Cum
14.
SECTION -G : PLAIN CEMENT CONCRETE REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
8408.00
8505.00
8370.00
8642.00
8739.00
51
UnitDescriptionSr. No.
1 2 3 4 5
Providing and casting in situ Ready Mix Cement Concrete gradeof trap/granite/quartzite/ gneiss metal of approved quality for RCCwork as per detailed drawings and designs or as directed byEngineer-in-charge including normal dewatering, centering, formwork compaction, finishing the formed surfaces with CM 1:3of sufficient minimum thickness to give a smooth and even surfacewherever nesessary or roughening if special finish is to beprovided and curing including transporting from mixing plant uptodistance of 25 km., pouring the concrete at work site for 1.5 M liftabove G. L. and 5.0 M lift below G. L., etc. complete.(Excluding reinforcement and structural steel)
b) For RCC M-200 - Domes
c) For RCC M-250 - Domes
d) For RCC M-300 - Domes
Note : 1) Add Rs.10/- per Cum for transportation beyond 25 km. for every additional lead of 1 km.
2) Beyond 1.5 M above G.L. and 5.0 M below G. L., concreting is to be done by pumping by the Company.
3) Additional rate of pumping
a) Static pump
Rs. 175/- per Cum
b) Mobile pump
Rs. 250/- per Cum
4) For Ready Mix Concrete, prior permission from Chief Engineer shall be obtained.
Cum
Cum
Cum
15.
SECTION -G : PLAIN CEMENT CONCRETE REINFORCEDCEMENT CONCRETE, READY MIX CONCRETE,
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
8678.00
8946.00
9049.00
52SECTION - H : MISCELLANEOUS
UnitDescriptionSr. No.
1 2 3 4 5
Providing and fixing G.I. pipe railing having 1.0 M heightconsisting 50 x 50 x 6 mm thick M. S. angles as verticals at 1.5M c/c, and additional posts at every corner bends to curved shapewith 3 rows of 25 mm dia G.I. pipes of medium class variety ashorizontal and painting 3 coats of oil paint over 1 coat of anticorro-sive paint of approved colour and shade including cost of all labour,transporting bends to curved shape, etc. complete.
A) As above but with only 2 rows.
Dismantling of ESRs of various capacities and heights using crane(10 MT capacity) and handling over M.S./ C.I./ G.I. pipes, valves,bends, etc. to the Department. However taking steel reinforce-ment by the dismantling agency including removing dismantledmaterials from site and disposing them at suitable place as directed,etc.complete.
A) Capacity of E.S.R. upto 2 lakh litres and stagingupto 12.00 M height. i) Conjusted Area
ii) Open Area
B) Capacity of E.S.R. above 2 lakh litres andstaging upto 12.00 M height. i) Conjusted Area
ii) Open Area
Note :- Above 12 M staging height add 5% per Metres staging ofE.S. R. of any capacity.
Providing and fixing M.S. gate 2.5 M wide for compound with40 mm dia G.I. pipe, approved grill work, RCC M - 150 sidepillars of 25 cm x 40 cm x 2.5 M height, with foundation, finishing,painting etc. complete.
Proividing and fixing Wicket gate 1.0 M wide for compoundwith 40 mm dia G. I. pipe, approved grill work, RCC M-150side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finish-ing painting, etc. complete.
Taking Trial Bore (Core Bore Sampling) by Callyx machine withTCT/NX bits to gader undisturbed strata samples for investigationin all types of strata soft soil, murum, hard murum with boulders,soft rock hard rock & quartzite etc. The item includes all Hire &running cost of Callyx Machine conveying all materials to site ofwork excluding conveyance of callyx, machine and back sampling
RM
RM
LitreLitre
LitreLitre
No.
No.
927.00
737.00
2.001.00
1.611.00
27324.00
16106.00
1
2.
3.
4.
5.
SECTION - H : MISCELLANEOUS
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
53SECTION - H : MISCELLANEOUS
UnitDescriptionSr. No.
1 2 3 4 5
Litre
Sqm
all over burden strata in glass jar and core samples serially num-bered at site in a wooden Core Box, Samples to be taken at 1.0M interval and conveying to the place as directed by Engineer- in - charge, The diameter of bore in overburden shall be 100mm and of NX size (50mm) in other strata. The item shall alsoinclude M. S. casing pipe of 2.5 mm thick plate in overburdenonly and shall be 1.0 m above GL with cap over it.
a) In Overburden (Soft soil, murum)
b) In Weathered rock with boulders
c) In Weathered rock/soft rock
d) In Hard rock other than quartzite
6.
7.
RMT
RMT
RMT
RMT
Bag
Bag
RM
1192.00
4634.00
2378.00
3136.00
848.00858.00
677.00
4.00
292.00
Providing pressure grouting at a pressure of 0.56 kg./sqcmin required row/zigzag fashion as specified at 1.5 M interval asper site conditions to stop leakages through water retainingstructures to the entire satisfaction of the Engineer-in-chargeincluding material compound, hardening materials, compressorequipment including scaffolding smooth finishing, etc. complete.
i) For masonry structure
ii) For concrete structure
Drilling 40 mm dia holes in masonry or concrete structurewith providing and fixing 0.5 M long G. I. pipe line for pressuregrouting including all Material, labour cost and machinery charges, etc.complete.
Providing and casting ferrocrate water tank at site inculuding allcost of labour and material, etc, complete. upto 25,000 literes(for foundation and providing and fixing taps, etc. shall be consid-ered spearately).
Providing and applying one coat of Gamma coating or equiva-lent such as Dr.Bake, Krishna conchem ,Asian Paint, Atul Lim-ited, Burger Paint,epoxy primer 50 to 60 microns thick and cov-ering two Coats of Gamma Coatings or equivalent such asDr.Bake,Krishna Conchem, Asian Paint, Atul Limited, BurgerPaints 30 microns thick each to new M.S.pipes and structuralsteel or concrete surface including repainting the surface by fin-ishing by Solvent degreasing and de-rusting by applying chemi-cal method and scaffolding is necessary required etc.complete asper manufacturers specifications.
8.
9.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
54SECTION - H - MESCELLANEOUS
UnitDescriptionSr. No.
1 2 3 4 5
Making cross connection to existing distribution main of anytype including excavation, breaking and removing existing pipes, low-ering, laying of specials and pipes in their position, refilling, closingthe water supply in that area, dewatering and restarting the water sup-ply, etc. complete as directed by Engineer-in-charge for followingdiameters of existing pipeline, irrespective of diameter of branchline (the number of joints involved will be paid separately depend-ing upon the nature of joints and required pipes, valves and spe-cials will be supplied free of cost at stores).
i) 80 mm.ii) 100 mm.iii) 125 mm.iv) 150 mm.v) 200 mm.
vi) 250 mm.vii) 300 mm.viii) 350 mm.ix) 400 mm.x) 450 mm.
xi) 500 mm.xii) 600 mm.xiii) 700 mm.xiv) 750 mm.xv) 800 mm.
xvi) 900 mmxvii) 1000 mm
Note :Only 85 % rate shall be payable till satisfactoryhydraulic testing is given.
10.
No.No.No.No.No.
No.No.No.No.No.
No.No.No.No.No.
No.No.
1756.002028.002247.002375.002431.00
2874.003338.003846.004756.005215.00
6574.0012215.0015061.0019102.0024916.00
32934.0046383.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
55
Sr. No.
1
SECTION - H - MESCELLANEOUS
UnitDescription
2 3 4 5
Dismantling dead pipeline of M.S./R.C.C./ C.I./ P.S.C. andG.I./ A. C. / P. V. C. / S. W. / H. D. P. E. pipe including cost ofnecessary excavation and refilling of trenches, breaking the joints,lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc.complete.
A) For M.S./R. C. C./ C.I./ P. S. C.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
11.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
146.00
161.00
164.00
168.00
186.00
205.00
222.00
251.00
273.00
309.00
324.00
397.00
465.00
522.00
56
UnitDescriptionSr. No.
1 2 3 4 5
B) For G.I./AC/PVC/S. W. / H.D.P.E.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
Providing and constructing two taps standpost as per type de-sign with excavation 15 cm thick PCC 1:3:6 bedding 20 mm thickPCC 1:2:4 concrete for platform of 1.75 M dia. with side curb andbucket rest, 80 mm dia, heavy duty GI pipe central post duly filledtherein with C. C. 1:2:4, 5 M long, 20 mm dia. medium G.I. pipefrom point of tapping to standpost additional 20 mm dia G.I. pipefixed vertically upto 15 mm dia self closing water taps, one brassferrule etc. complete together with all labour and material chargesas per drawing and as directed by Engineer-in-charge when goodfoundation is available. Rate includes draining arrangemment byexcavating open gutters.
a) As above but when precast RCC platform or precaststandpost is issued free of cost at departmentalstores including cost of transportation and fixing etc.
complete.
12.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
No.
No.
SECTION - H - MESCELLANEOUS
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
87.00
96.00
99.00
101.00
111.00
123.00
133.00
150.00
164.00
186.00
194.00
238.00
279.00
313.00
7960.00
4752.00
57SECTION - H - MESCELLANEOUS
UnitDescriptionSr. No.
1 2 3 4 5
Providing and constructing two taps standpost as per type de-sign wih excavation 30 cm thick boulder filling 15 cm thick PCC in1:3:6, 20 mm thick RCC 1:2:4 platform of 1.75 M dia. with sidecurb and bucket rest, 80 mm dia, heavy duty GI pipe central postduly filled therein with C. C. 1:2:4, 5 M long, 20 mm dia. mediumG.I. pipe from point of tapping to stand post additional 20 mm diaG.I. pipe fixed horizontally and providing and fixing two 15 mm diaself closing water taps, one brass ferrule etc. complete together withall labour and material charges as per drawing and as directed byEngineer-in-charge, when B.C.Soil is available. Rate includesdraining arrangement by excavating open gutters.
a) As above but when precast RCC platform or precaststandpost is issued free of cost at departmental storesincluding cost of transportation and fixing etc. complete.
13.
No.
No.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
8197.00
4871.00
58
UnitDescriptionSr. No.
1 2 3 4 5
1. C.I. PIPESProviding and supplying ISI mark C.I. S/S pipe (pushon joints pressure pipes of D. I. of following class and diam-eters fonfirming to the I. S. specification inclusive cost ofjointing materials (Rubber gasket of EPDM Quality ) includ-ing all statutary duties and taxes levied by Gol and GoM inall respect, Education Cess, VAT, Third party inspectioncharges of TPI Agency approved by MJP including Transitinsurance, Railway Freight, Unloading from railway wagon,Loading into Truck, Transportation to departmental store/site of work, unloading, stacking etc. completed as directedby Engineer in charges (IS 1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/revision withamendments for Rubber Gaskets. (IS-1536 / 2001)(Suitable for Tyton / Pig lead joints)
a) Class ‘LA’
i) 80 mmii) 100 mmiii) 125 mm
iv) 150 mmv) 200 mm
vi) 250 mmvii) 300 mm
viii) 350 mmix) 400 mmx) 450 mm
xi) 500 mmxii) 600 mmxiii) 700 mm
xiv) 750 mmxv) 800 mm
xvi) 900 mmxvii) 1000 mm
1.
RMTRMTRMT
RMTRMT
RMTRMT
RMTRMTRMT
RMTRMTRMT
RMTRMT
RMTRMT
SECTION - I : C. I. / D. I. PIPES
SECTION - I : C. I. PIPES
With
E.D.
Without
E.D.
With
E.D.
Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
900.001128.001425.00
1831.002636.00
3555.004594.00
4537.005522.006658.00
7696.0010253.0013232.00
14820.0016589.00
20206.0024274.00
844.001058.001270.00
1718.002484.00
3348.004317.00
3948.004806.005794.00
6698.008921.00
11514.00
12897.0014435.00
17582.0021122.00
59
UnitDescriptionSr. No.
1 2 3 4 5
1. C.I. PIPES ‘A’ Class Continued
B) Class ‘A’
i) 80 mm
ii) 100 mm
iii) 125 mm
iv) 150 mm
v) 200 mm
vi) 250 mm
vii) 300 mm
viii) 350 mm
ix) 400 mm
x) 450 mm
xi) 500 mm
xii) 600 mm
xiii) 700 mm
xiv) 750 mm
xv) 800 mm
xvi) 900 mm
xvii) 1000 mm
WithED
SECTION - I : C. I. / D. I. PIPES
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithoutED
With
E.D.Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
956.00
1193.00
1552.00
1912.00
2763.00
3735.00
4833.00
6043.00
7410.00
8976.00
10292.00
13744.00
17911.00
19896.00
22241.00
27072.00
32562.00
852.00
1063.00
1383.00
1703.00
2461.00
3327.00
4306.00
5384.00
6602.00
7998.00
9170.00
12245.00
15958.00
17725.00
19815.00
24119.00
29010.00
60
UnitDescriptionSr. No.
1 2 3 4 5
c) Class ‘B’
i) 80 mm
ii) 100 mm
iii) 125 mm
iv) 150 mm
v) 200 mm
vi) 250 mm
vii) 300 mm
viii) 350 mm
xiv) 400 mm
x) 450 mm
xi) 500 mm
xii) 600 mm
xiii) 700 mm
xiv) 750 mm
xv) 800 mm
xvi) 900 mm
xvii) 1000 mm
WithED
SECTION - I : C. I. / D. I. PIPES
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithoutED
With
E.D.
Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1016.00
1272.00
1670.00
2058.00
2987.00
4039.00
5237.00
6554.00
7567.00
9689.00
11136.00
14671.00
19165.00
21583.00
24058.00
29330.00
35189.00
905.00
1134.00
1489.00
1834.00
2661.00
3598.00
4666.00
5840.00
6742.00
8631.00
9921.00
13070.00
17085.00
19229.00
21435.00
26132.00
31352.00
61SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Lowering laying and jointing with SBR ruber gasketsC.I. S/S pipes of various classes with CI / MS specials offollowing diameter in proper position, grade and alignmentas directed by Engineer-in-charge including conveyance ofmaterial from stores to site of work, including cost of joint-ing materials and rubber rings labour, giving hydrau-lic testing etc. complete.
Note : Only SBR Rubber gaskets to be used as perIS-5382 and IS-12820.a) C.I. ‘L.A.’ Class / Mortar inlined DI K-9/K-7i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
xv) 800 mm.
xvi) 900 mm.
xvii) 1000 mm.
B) C.I. ‘A’ Classi) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vii) 250 mm.
viii) 300 mm.
2.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithoutRubberRings
WithRubberRings
WithoutRubberRings
WithRubberRings
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
44.00
53.00
66.00
70.00
94.00
123.00
133.00
166.00
199.00
199.00
230.00
303.00
390.00
437.00
535.00
639.00
756.00
46.00
56.00
71.00
78.00
102.00
133.00
145.00
50.00
59.00
73.00
79.00
104.00
135.00
152.00
186.00
230.00
243.00
280.00
373.00
525.00
574.00
674.00
846.00
1026.00
56.00
66.00
79.00
86.00
110.00
146.00
163.00
62SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
viii) 350 mm.ix) 400 mm.x) 450 mm.xi) 500 mm.xii) 600 mm
xiii) 700 mm.xiv) 750 mm.xv) 800 mm.xvi) 900 mm.xvii) 1000 mm.
c) CI ‘B’ Classi) 80 mm.ii) 100 mm.iii) 125 mm.iv) 150 mm.v) 200 mm.
vi) 250 mm.vii) 300 mm.viii) 350 mm.ix) 400 mm.x) 450 mm.
xi) 500 mm.xii) 600 mm.xiii) 700 mm.xiv) 750 mm.xv) 800 mm.xvi) 900 mm.xvii) 1000 mm.
Note : Only 85% rate shall be payable tillsatisfactory hydraulic testing is given.
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMTRMTRMT
WithoutRubberRings
WithRubberRings
WithoutRubberRings
WithRubberRings
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
179.00201.00211.00249.00329.00
423.00475.00561.00676.00789.00
50.0060.0077.0087.00
110.00
144.00157.00193.00225.00228.00
268.00355.00457.00516.00602.00714.00814.00
200.00231.00245.00298.00398.00
556.00610.00698.00882.00
1058.00
59.0071.0086.0096.00
124.00
164.00175.00225.00255.00262.00
316.00423.00588.00650.00737.00918.00
1082.00
63SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Providing D.I. K-9 grade pipes (push onjoints pressure pipes of D. I. of following classand diameters fonfirming to the I. S. specifica-tion inclusive cost of jointing materials (Rubbergasket of EPDM Quality ) including all statutaryduties and taxes levied by Gol and GoM in allrespect, Education Cess, VAT, Third party in-spection charges of TPI Agency approved byMJP including Transit insurance, RailwayFreight, Unloading from railway wagon, Load-ing into Truck, Transportation to departmentalstore/site of work, unloading, stacking etc. com-pleted as directed by Engineer in charges (IS1536/2001 for pipes and IS 158/1969 and IS12820/1989 or latest edition/revision withamendments for Rubber Gaskets. (IS:8329-2000 Latest Version)
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
iv) 250 mm.
v) 300 mm.
vi) 350 mm.
vii) 400 mm.
viii) 450 mm.
ix) 500 mm.
x) 600 mm.
xi) 700 mm.
xii) 750 mm.
xiii) 800 mm.
xiv) 900 mm.
xv) 1000 mm.
3.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
With E.D.
WithoutE.D.
With
E.D.
Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1145.00
1670.00
2076.00
2768.00
3519.00
4405.00
5208.00
6288.00
7308.00
9664.00
12403.00
14102.00
15339.00
18933.00
22098.00
1041.00
1518.00
1888.00
2516.00
3200.00
4010.00
4730.00
5716.00
6644.00
8773.00
11276.00
12819.00
13949.00
17212.00
20089.00
64SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
D. I. K - 7
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
iv) 250 mm.
v) 300 mm.
vi) 350 mm.
vii) 400 mm.
viii) 450 mm.
ix) 500 mm.
x) 600 mm.
xi) 700 mm.
xii) 750 mm.
xiii) 800 mm.
xiv) 900 mm.
xv) 1000 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
With E.D.
WithoutE.D.
With
E.D.
Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
977.00
1434.00
1692.00
2242.00
2826.00
3480.00
4143.00
5000.00
5859.00
7717.00
10409.00
12097.00
13989.00
16779.00
19646.00
888.00
1304.00
1538.00
2038.00
2569.00
3164.00
3766.00
4545.00
5326.00
7015.00
9463.00
10997.00
12717.00
15264.00
17860.00
65SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Providing and making lead caulked joint with molten leadto Cast Iron pipes and / or specials of all classes and fittingof following dia including cost of lead and all jointing material,labour, hydraulic testing etc. complete.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viiii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
xv) 800 mm.
xvi) 900 mm.
xvii) 1000 mm.
Note :Only 85 % rate shall be payable till satisfactoryHydraulic testing is given.
Providing and supplying ISI standard CI doubleflanged pipes including all taxes (Central and local), railwayfreight, insurance, unloading from railway wagon, loading intotruck transport to stores / site, unloading etc. complete as di-rected by Engneer-in-charge.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
4.
5.
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
RMT
RMT
RMT
RMT
RMT
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
657.00
812.00
968.00
1200.00
1750.00
2126.00
2564.00
2906.00
3389.00
4707.00
5060.00
6501.00
7637.00
8675.00
9316.00
9936.00
10594.00
1419.00
1753.00
2284.00
2849.00
4371.00
66SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
vi) 250 mm.vii) 300 mm.viii) 350 mm.ix) 400 mm.x) 450 mm.xi) 500 mm.xii) 600 mm.xiii) 700 mm.xix) 750 mm.
Providing and supplying ISI standard CI flanged / S& Sspecials including all taxes (Central and local), railway freight,insurance, unloading from railway wagon, loading into trucktransport to departmental store /site, unloading stacking etc.complete.
a) D/F Specialsi) 80 to 300 mm diaii) 350 to 600 mm diaiii) Above 600 mm diab) S/S Specials / Socketed Branch Flanged Specialsi) 80 to 300 mm diaii) 350 to 600 mm diaiii) Above 600 mm diaC) Plain ended/ plain ended branch flanged specialsi) 80 to 300 mm diaii) 350 to 600 mm diaiii) Above 600 mm dia
Providing and supplying ISI standard MS specials ofrequired thickness with 3 coats of approved make epoxypaint (Shalimar, Ciba or Mahindra & Mahindra make) frominside and outside including all taxes (Central and local), oc-troi, inspection charges, transportation to stores / site, andstacking, etc. complete.
a) Machine ends suitable for PSC pipes of all diam-eters as per detailed drawing with 10 mm thick x 0.7 M longbarrel welded to it.
b) Only flanges with machining and drilling holes, etc. com-plete more than 40 mm thick.
6.
7.
KG.KG.KG.
KG.KG.KG.
KG.KG.KG.
KG.
KG.
RMTRMTRMTRMTRMTRMTRMTRMTRMT
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
5890.007573.009885.00
12053.0014473.0016986.0024162.0032371.0035221.00
73.6078.2083.90
71.3075.9080.50
69.0075.9080.50
76.50
74.30
67
UnitDescriptionSr. No.
1 2 3 4 5
c) Double flanged specials of all diameters
d) All socketed specials or socketed branch flangedspecials of all diameters.
e) Plain ended specials or plain ended branch flangedspecials of all diameters.
f) MS barrels (pipe pieces) locally manufactured(for small quantities)
Providing and making flanged joints to flanged C.I./M.S. pipes of all classes/specials etc. including cost of alljointing materials (rubber packing, nut bolts, etc.), labour,hydraulic testing etc. complete.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
xv) 800 mm.
xvi) 900 mm
xvii) 1000 mm
Note :Only 85 % rate shall be payable tillsatisfactory Hydraulic testing is given.
8.
KG.
KG.
KG.
KG.
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
SECTION - I : C. I. / D. I. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
72.10
72.10
72.10
70.00
174.00
301.00
314.00
603.00
626.00
897.00
931.00
1213.00
1511.00
1848.00
1912.00
2052.00
3093.00
3179.00
4398.00
4560.00
4721.00
68SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Erecting and hoisting in position and jointing, testingM.S./ C.I. D/F pipes and specials in vertical position includ-ing cost of all jointing materials (rubber packing, nut bolts,etc.) labour, scaffolding, hydraulic testing etc. complete.
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
xv) 800 mm.
xvi) 900 mm
xvii) 1000 mm
Note :Only 85 % rate shall be payable till satisfactory
hydraulic testing is given.
9.
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
193.00
326.00
344.00
640.00
680.00
970.00
1025.00
1331.00
1655.00
2022.00
2115.00
2323.00
3445.00
3576.00
4843.00
5098.00
5373.00
69SECTION - I : C. I. / D. I. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Providing and supplying ISI standard D. I. specials & fittingwith sealing rubber gasket of S.B.R,complete with cast ironfollower gland and M. S. nut bolts coated or otherwise pro-tected from rusting and suitable for D.I.pipes including costof labour ,materials, and transportation to stores / site, load-ing and unloading including all taxes etc. complete as per IS-9523.
For all types of specials, bends tees etc.
a) 80 to 300 mm dia.
b) 350 mm & above dia.
Providing and supplying ISI standard welded DI doubleflanged pipe including all taxes (central & local) railway freight,insurance, unloading from railway wagon, loading into trucktransport to store / site, unloading, stacking etc. complete asdirected by Engineer -in- cahrge. (for 2.75 m bare pipe)
i) 100 mm
ii) 150 mm
iii) 200 mm
iv) 250 mm
v) 300 mm
vi) 350 mm
vii) 400 mm
viii) 450 mm
ix) 500 mm
x) 600 mm
xi) 700 mm
xii) 800 mm
xiii) 900 mm
xiv) 1000 mm
Kg.
Kg.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
10.
11.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
107.00
130.00
1863.00
2530.00
3238.00
4394.00
5531.00
7203.00
8720.00
10419.00
12110.00
15946.00
21457.00
26228.00
32555.00
38225.00
70SECTION - I : A. C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
II. A.C. PIPE
Providing and supplying Asbestos Cement pres-sure pipes manufactured and tested as per ISO-160 stan-dards of following class and diameter in standard lengths in-cluding cost of all taxes (Central and local) insurance, railwayfright, inspection charges, unloading from railway wagon,loading into truck, transporting to departmental stores / site,unloading, stacking, etc. complete.
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
1.
RMT
RMT
RMT
RMT.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : A. C. PIPES
126.00
162.00
194.00
341.00
497.00
719.00
1052.00
139.00
208.00
244.00
431.00
612.00
906.00
1119.00
WithE.D.
WithE.D.
WithoutE.D.
WithoutE.D.
139.00
179.00
214.00
376.00
153.00
229.00
269.00
475.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
71
UnitDescriptionSr. No.
1 2 3 4 5
c) Class 25 (Test Pressure 2.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : A. C. PIPES
Providing and supplying C.I. detachable jointssuitable for A.C. pressure pipes manufactured asper IS-1538-1993 standards of following class anddiameter including cost of all taxes (Central and lo-cal), insurance, railway freight, inspectioncharges, unloading from railway wagon, loadinginto truck, transporting to departmental store / site,unloading, stacking and cost of rubber rings, nutbolts, etc. complete. ( IS-1538/1993)
a) Class 10 (Test Pressure 1.0MPa)
i) 80 mm.
ii) 100 mm.
No.
No.
2.
190.00
317.00
367.00
658.00
789.00
1184.00
1298.00
WithE.D.
WithE.D.
WithoutE.D.
WithoutE.D.
173.00
288.00
334.00
598.00
255.00
323.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
72SECTION - I : A. C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
vi) 350 mm.
vii) 400 mm.
vi) 450 mm.
vii) 500 mm.
vi) 600 mm.
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
With E.D
408.00
518.50
790.50
1079.50
1360.00
2337.50
2677.50
3655.00
5185.00
8840.00
300.00
380.00
510.00
636.00
960.00
1204.00
1650.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
73SECTION - I : A. C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
Providing and supplying A. C. pressure coupler suitablefor A.C. pressure pipes manufactured as per ISO-160 stan-dards of following class and diameter including cost of all taxes(Central and local) insurance, railway fright, inspection charges,and cost of rubber rings, nuts bolts, etc. complete. (supply atstores / site)
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
With E.D
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3.
325.00
425.00
550.00
659.00
886.00
1250.00
1790.00
39.00
50.00
69.00
84.00
74
Sr. No.
1
UnitDescription
2 3 4 5
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
Lowering, laying and jointing with C.I.D. joints, A. C.pressure pipes and C.I. or M. S. specials of following classand diameters including conveyance from stores to site ofworks, cost of labour and material, giving satisfactory hydraulictesting, etc. as per ISI code, etc. complete but excluding costof C. I. D. joints nut bolts, rubber rings.
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
4.
No.
No.
No.
No.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : A. C. PIPES
With E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
42.00
56.00
72.00
98.00
31.00
43.00
46.00
57.00
73.00
92.00
113.00
75
UnitDescriptionSr. No.
1 2 3 4 5
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
Lowering laying and jointing with C. I. D. jointing with A.C. coupler A.C. pressure pipes and C.I. or M.S. specials offollowing class and diameters including conveyance from storesto site of works, cost of labour and material, giving satisfactoryhydraulic testing, etc. as per ISI code, etc. complete but ex-cluding cost of A. C. couplers and rubber rings.
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : A. C. PIPES
5.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
32.00
46.00
50.00
63.00
83.00
104.00
129.00
21.00
28.00
33.00
42.00
76
UnitDescriptionSr. No.
1 2 3 4 5
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
SECTION - I : A. C. PIPES
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
58.00
74.00
96.00
22.00
33.00
37.00
48.00
69.00
86.00
113.00
77
UnitDescriptionSr. No.
1 2 3 4 5
Note :
1) 85 % payment for lowering, laying, jointing shallbe made till satisfactory hydraulic testing is given.
2) Without any extra cost every pipe in the factory shallbe hydraulically tested for one higher class i.e. when Class-15 pipe is ordered, every pipe shall be tested for 20 kg/cm2 at factory but pipe shall be branded and paid asClass 15. This foot note shall appear in tender condi-tions.
3) Whenever manufacturer is separate and contractor forlowering, laying, jointing and testing is separate, the prin-cipal contractor shall enter into an agreement with A.C.pipe manufacturer for satisfactory manufacturing, trans-porting, lowering, laying, jointing and testing of pipes. Thisfoot note shall appear in the tender con ditions.
SECTION - I : A. C. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
78SECTION - I : P. V. C. PIPES
UnitDescriptionSr.No.
1 2 3 4 5
III. P. V. C. PIPES
Providing and supplying in standard lengths ISI markrigid unplasticised PVC pipes suitable for potable waterwith solvent cement joints including cost of couplers, as perIS specification no. 4985 / 1988 including all local and centraltaxes, transportation, freight charges, inspection charges, load-ing, unloading, conveyance to the departmental stores / siteand stacking the same in closed shed duly protected from sunrays and rains including cost of jointing material i.e. solventcement, etc. complete (selffit type to be jointed with cementsolvent).
Note : 1) 10% of cost of pipes shall be consideredfor cost of PVC specials for estimate pur-pose only.
2) One coupler and required cement solvent shallbe provided with each full length pipe costof which is included in rates below.
a) Working Pressure 4 Kg./Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm.
1.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithED
WithoutED
41.00
58.00
81.00
110.00
184.00
243.00
331.00
408.00
522.00
638.00
847.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
WithED
WithoutED
46.00
65.00
91.00
124.00
208.00
274.00
372.00
460.00
589.00
719.00
953.00
79
1
xii) 315 mm.
xii) 355 mm.
xiv) 400 mm.
b) Working Pressure 6 Kg. / Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm.
xii) 315 mm.
xiii) 355 mm.
xiv) 400 mm.
5
UnitDescriptionSr. No.
2 3 4
With ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. V. C. PIPES
Without ED
1078.00
1445.00
1844.00
58.00
83.00
119.00
164.00
273.00
353.00
469.00
599.00
755.00
944.00
1244.00
1587.00
2118.00
2706.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With ED Without ED
1213.00
1626.00
2074.00
66.00
93.00
133.00
185.00
307.00
397.00
528.00
673.00
851.00
1061.00
1401.00
1786.00
2384.00
3046.00
80
5
UnitDescriptionSr. No.
1 2 3 4
With ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. V. C. PIPES
C) Working Pressure 8 Kg/Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm.
xii) 315 mm.
xiii) 355 mm.
xiv) 400 mm.
With ED Without EDWithoutED
80.00
114.00
162.00
229.00
379.00
496.00
658.00
827.00
1050.00
1313.00
1729.00
2191.00
2945.00
3814.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
91.00
129.00
183.00
257.00
427.00
557.00
740.00
931.00
1181.00
1478.00
1946.00
2464.00
3315.00
4293.00
81
5
UnitDescriptionSr. No.
2 3 4
With EDWithout ED Without EDd) Working Pressure 10 Kg./Sq.cm
ii) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm.
xii) 315 mm.
xiii) 355 mm.
xiv) 400 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
With ED
1
SECTION - I : P. V. C. PIPES
96.00
138.00
197.00
278.00
452.00
590.00
813.00
1005.00
1283.00
1621.00
2039.00
2590.00
3484.00
4442.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
108.00
154.00
223.00
315.00
508.00
666.00
915.00
1131.00
1445.00
1826.00
2294.00
2916.00
3920.00
4999.00
82
5
UnitDescriptionSr. No.
1 2 3 4
e) Working Pressure 12.50 Kg./Sq.cm
ii) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm.
xii) 315 mm.
xiii) 355 mm.
xiv) 400 mm.
With ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. V. C. PIPES
123.00
173.00
250.00
354.00
575.00
757.00
1035.00
1284.00
1632.00
2063.00
2596.00
3310.00
4423.00
5730.00
WithoutED
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
138.00
195.00
281.00
399.00
648.00
851.00
1164.00
1446.00
1837.00
2322.00
2920.00
3724.00
4977.00
6449.00
83
UnitDescriptionSr.No.
21 3 4 5
Providing and supplying in standard lengths ISImark rigid unplastised PVC for patable water withrubber ring joints including cost of rubber ring asper IS-4985-1998, all local and central taxes,transportation, freight charges, transit insurance,inspection charges, loading, unloading, convey-ance to store/site and stacking the same in closedshed duly protected from sun rays and rains, etc.complete ( with third party inspection ) (socketed)a) Working Pressure 4 Kg/Sq.cm
i) 63 mmii) 75 mmiii) 90 mmiv) 110 mmv) 125 mmvi) 140 mmvii) 160 mmviii) 180 mm
ix) 200 mmx) 225 mmxi) 250 mmxii) 280 mmxiii) 315 mm
RMTRMTRMTRMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
b) Working Pressure 6 Kg/Sq.cm
i) 63 mmii) 75 mmiii) 90 mmiv) 110 mmv) 125 mmvi) 140 mmvii) 160 mmviii) 180 mm
ix) 200 mmx) 225 mmxi) 250 mmxii) 280 mmxiii) 315 mm
RMTRMTRMTRMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
With
ED
Without
ED
2.
SECTION - I : P. V. C. PIPES
With
ED
Without
ED
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
48.0069.0096.00
131.00181.00219.00291.00395.00
487.00623.00763.00
1011.001287.00
69.0098.00
142.00197.00271.00325.00421.00560.00
714.00902.00
1126.001484.001892.00
43.0060.0085.00
117.00161.00195.00257.00350.00
434.00554.00678.00899.00
1142.00
61.0088.00
126.00173.00239.00290.00373.00498.00
634.00800.00
1001.001319.001682.00
84
5
UnitDescriptionSr. No.
1 2 3 4
c) Working Pressure 10 Kg./Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 125 mm
vi) 140 mm.
vii) 160 mm.
viii) 180 mm.
ix) 200 mm.
x) 225 mm.
xi) 250 mm.
xii) 280 mm.
xiii) 315 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WITH
ED
SECTION - I : P. V. C. PIPES
WITH ED WITHOUT
EDWITHOUT
ED
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
95.00
137.00
193.00
272.00
376.00
454.00
591.00
785.00
988.00
1252.00
1565.00
2063.00
2613.00
84.00
122.00
171.00
243.00
334.00
402.00
526.00
697.00
877.00
1113.00
1390.00
1834.00
2323.00
85
5
UnitDescriptionSr. No.
1 2 3 4
d) Working Pressure 10 Kg./Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 125 mm
vi) 140 mm.
vii) 160 mm.
viii) 180 mm.
ix) 200 mm.
x) 225 mm.
xi) 250 mm.
xii) 280 mm.
xiii) 315 mm
e)Working Pressure 12.5 Kg./Sq.cm
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 125 mm
vi) 140 mm.
vii) 160 mm.
viii) 180 mm.
ix) 200 mm.
x) 225 mm.
xi) 250 mm.
xii) 280 mm.
xiii) 315 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Without
ED
With
EDWith ED Without
ED
SECTION - I : P. V. C. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
114.00
165.00
236.00
333.00
460.00
538.00
705.00
969.00
1199.00
1531.00
1935.00
2432.00
3090.00
146.00
207.00
297.00
424.00
584.00
687.00
903.00
1235.00
1531.00
1946.00
2462.00
3096.00
3946.00
103.00
146.00
209.00
296.00
406.00
478.00
626.00
862.00
1065.00
1360.00
1720.00
2161.00
2746.00
129.00
183.00
265.00
376.00
518.00
611.00
801.00
1097.00
1361.00
1730.00
2186.00
2751.00
3507.00
86
UnitDescriptionSr. No.
1 2 3 4 5
Lowering, laying and jointing with P.V.C. pipes andspecials of following class and diameter including cost ofconveyance from stores to site of works including cost ofall labour, material, except cement solvent, rubber ring, giv-ing satisfactory hydraulic testing as per IS code, etc. com-plete (with cement solvent joint / ring fit joint).
a) Working Pressure 4 Kg./Sq.cm.
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
vi) 160 mm.
vii) 180 mm.
viii) 200 mm
ix) 225 mm
x) 250 mm
xi) 280 mm
xii) 315 mm
xiii) 355 mm
xiv) 400 mm
b) Working Pressure 6 to 12.5 Kg./Sq.cm.
i) 63 mm.
ii) 75 mm.
iii) 90 mm.
iv) 110 mm.
v) 140 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. V. C. PIPES
3.
16.00
21.00
25.00
29.00
34.00
38.00
42.00
46.00
53.00
57.00
63.00
70.00
77.00
84.00
22.00
29.00
33.00
37.00
44.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
87
UnitDescriptionSr. No.
1 2 3 4 5
vi) 160 mm.
vii) 180 mm.
viii) 200 mm.
ix) 225 mm.
x) 250 mm.
xi) 280 mm
xii) 315 mm
xiii) 355 mm
xiv) 400 mm
3)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. V. C. PIPES
Only 85% rate shall be payable till satisfactoryhydraulic testing is given.
Third party inspecting agency shall invariablycarry out.
Specific Gravity Test.
Weight / Rmt.
Ash Content Test and confirm in writing thatthose are within prescribed limits. This con-dition shall appear in tender conditions.
After receipt of pipes at site, concerned DeputyEngineer shall confirm that weight of pipe forevery class and diameter is not less than the pre-scribed standard weight as per IS-4985/1998(Which is given in CSR), Under weight pipesshall be rejected. This condition shall appearin the tender conditions.
1)
2)
I)
II)
III)
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
47.00
53.00
58.00
63.00
69.00
78.00
87.00
96.00
106.00
88
UnitDescriptionSr. No.
1 2 3 4 5
IV. G. I. PIPES
Providing ISI mark G.I. pipe of following class and dia. in-cluding all local and central taxes, octroi, inspection charges, trans-portation to stores, etc. complete as per IS-1239/2004.
Note : One coupler shall be provided with each full lengthof pipe cost of which is included in rates below.
a) LIGHT
i) 15 mm. ( 0.96 kg./m )ii) 20 mm. ( 1.42 kg./m )iii) 25 mm. ( 2.03 kg./m )iv) 32 mm. ( 2.61 kg./m )v) 40 mm. ( 3.29 kg./m )
vi) 50 mm. ( 4.18 kg./m )vii) 65 mm. ( 5.92 kg./m )viii) 80 mm. ( 6.98 kg./m )ix) 100 mm. ( 10.20 kg./m )
b) MEDIUM
i) 15 mm. ( 1.23 kg./m )ii) 20 mm. ( 1.59 kg./m )iii) 25 mm. ( 2.40 kg./m )iv) 32 mm. ( 3.17 kg./m )v) 40 mm. ( 3.65 kg./m )
vi) 50 mm. ( 5.16 kg./m )vii) 65 mm. ( 6.63 kg./m )viii) 80 mm. ( 8.64 kg./m )ix) 100 mm. ( 12.40 kg./m )xx) 125 mm ( 16.70 kg/m )xxi) 150 mm.( 19.70 kg./m )
1.
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMTRMT
WithED
SECTION - I : G. I. PIPES
WithoutED
65.0095.00
131.00166.00208.00
255.00349.00420.00596.00
77.0098.00
150.00189.00218.00
301.00384.00503.00719.00978.00
1151.00
71.00106.00146.00183.00229.00
288.00397.00477.00680.00
85.00108.00165.00209.00240.00
342.00424.00556.00820.00
1097.00
1311.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
89
c) HEAVY
i) 15 mm. ( 1.46 kg./m )
ii) 20 mm. ( 1.91 kg./m )
iii) 25 mm. ( 2.99 kg./m )
iv) 32 mm. ( 3.97 kg./m )
v) 40 mm. ( 4.47 kg./m )
vi) 50 mm. ( 6.24 kg./m )
vii) 65 mm. ( 8.02 kg./m )
viii) 80 mm. ( 10.30 kg./m )
ix) 100 mm. ( 14.70 kg./m )
x) 125 mm ( 18.30 kg/m )
xi) 150 mm ( 21.80 kg./m )
Lowering, laying and jointing G. I. pipes and specials offollowing class and diameter including conveyance from storesto site of works, all labour, giving satisfactory hydraulic test,etc. complete either underground or in vertical posi-tion, as directed by Engineer-in-charge.
a) LIGHT
i) 15 mm.
ii) 20 mm.
iii) 25 mm.
iv) 32 mm.
v) 40 mm.
vi) 50 mm.
vii) 65 mm.
viii) 80 mm.
ix) 100 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithED
UnitDescriptionSr. No.
1 2 3 4 5
WithoutED
87.00
113.00
177.00
223.00
259.00
359.00
461.00
589.00
849.00
1052.00
1266.00
2.
SECTION - I : G. I. PIPES
96.00
125.00
196.00
246.00
285.00
395.00
508.00
649.00
936.00
1159.00
1396.00
23.00
26.00
32.00
37.00
46.00
55.00
80.00
89.00
106.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
90
UnitDescriptionSr. No.
1 2 3 4 5
b) MEDIUM
i) 15 mm.
ii) 20 mm.
iii) 25 mm.
iv) 32 mm.
v) 40 mm
vi) 50 mm
vii) 65 mm
viii) 80 mm
ix) 100 mm
x) 125 mm
xi) 150 mm
c) HEAVY
i) 15 mm.
ii) 20 mm.
iii) 25 mm.
iv) 32 mm.
v) 40 mm.
vi) 50 mm.
vii) 65 mm.
viii) 80 mm.
ix) 100 mm.
x) 125 mm
xi) 150 mm
Note : Only85% rate shall be payable tillsatisfactory hydraulic testing is given.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. I. PIPES
25.00
28.00
34.00
39.00
50.00
59.00
86.00
97.00
106.00
113.00
119.00
27.00
30.00
36.00
43.00
54.00
67.00
94.00
113.00
106.00
118.00
128.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
WithED
WithED
91
UnitDescriptionSr. No.
1 2 3 4 5
V. STONEWARE PIPES
Providing ISI standard Stoneware pipes including all taxes (Cen-tral and local), inspection charges, railway freight, unloading from rail-way wagons, loading into trucks, transport to departmentalstores, unloading, stacking etc. complete as per IS-651.
i) 100 mm
ii) 150 mm
iii) 200 mm.
iv) 225 mm.
v) 250 mm.
vi) 300 mm.
Lowering, laying and jointing in proper grade and align-ment Stoneware pipes with cement joints in C. M. (1:1) propor-tion of following diameters including cost of conveyance from storesto site of work jointing material, labour, giving satisfactory hydrau-lic testing etc. complete as per IS-1742.
i) 100 mm
ii) 150 mm
iii) 200 mm.
iv) 225 mm.
v) 250 mm.
vi) 300 mm.
Note : Only 85% rate shall be payable till satisfactoryhydraulic testing is given.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : STONEWARE PIPES
1.
2.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
122.00
167.00
223.00
269.00
300.00
352.00
64.00
105.00
131.00
143.00
156.00
183.00
92
UnitDescriptionSr. No.
1 2 3 4 5
VI. R.C.C. PIPES
Providing ISI standard R.C.C. pipes in stan-dard lengths of following class and diametersuitable for either collar joints or rubber ringjoints, including all taxes (Central and local),inspection charges, transport to departmentalstores/site, unloading and stacking etc. com-plete as per IS-458/1988.
Note : One collar should be supplied witheach full length plain ended RCCpipe, cost including in rates be-low. One rubber ring should be sup-plied with each full length of sock-eted pipe, cost included in rates be-low.
a) Class ‘P-I’
i) 80 mm.ii) 100 mm.iii) 150 mm.iv) 200 mm.v) 225 mm.
vi) 250 mm.vii) 300 mm.viii) 350 mm.ix) 400 mm.x) 450 mm.
xi) 500 mm.xii) 600 mm.xiii) 700 mm.xiv) 800 mm.xv) 900 mm.xvi) 1000 mm.xvii) 1100 mm.xviii) 1200 mm.
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMTRMTRMTRMT
309.00324.00339.00396.00452.00
494.00632.00681.00864.00
1064.00
1280.001615.002103.002428.003056.003580.004068.004887.00
SECTION - I : R.C.C. PIPES
281.00294.00309.00360.00411.00
449.00575.00619.00785.00966.00
1163.001466.001910.002205.002775.003252.003694.004438.00
273.00293.00304.00355.00407.00
443.00567.00613.00782.00962.00
1153.001456.001892.002184.002751.003225.003662.004402.00
247.00267.00275.00322.00369.00
403.00514.00556.00710.00873.00
1046.001322.001719.001983.002498.002928.003326.003998.00
1.
With
E. D.
Without E.D.
With
E. D.
Without
E. D.
CollarJoints
Rubber Ring Joints
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
93
b) Class ‘P-II’
i) 80 mm.ii) 100 mm.iii) 150 mm.
iv) 200 mm.v) 225 mm.vi) 250 mm.
vii) 300 mm.viii) 350 mm.ix) 400 mm.
x) 450 mm.xi) 500 mm.xii) 600 mm.
xiii) 700 mm.xiv) 800 mm.xv) 900 mm.xvi) 1000 mm.
c) Class ‘P-III’
i) 80 mm.ii) 100 mm.iii) 150 mm.
iv) 200 mm.v) 225 mm.vi) 250 mm.
RMTRMTRMT
RMTRMTRMT
RMTRMTRMT
RMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMT
RMTRMTRMT
UnitDescription
1 2 3 4 5
SECTION - I : R.C.C. PIPES
Sr. No.
With
E. D.Without
E. D.
Collar Joints Rubber RingJoints
With
E. D.Without
E. D.
329.00351.00420.00
566.00670.00725.00
956.001193.001332.00
1616.002256.002797.00
3811.004583.005163.006249.00
355.00383.00437.00
594.00709.00829.00
299.00319.00381.00
513.00608.00659.00
869.001084.001210.00
1467.002049.002541.00
3461.004163.004689.005675.00
322.00348.00397.00
540.00643.00753.00
293.00316.00379.00
513.00604.00658.00
914.001080.001213.00
1450.002056.002521.00
3466.004177.005202.005626.00
351.00379.00438.00
595.00709.00830.00
265.00286.00344.00
465.00547.00598.00
829.00981.00
1101.00
1317.001897.002290.00
3148.003794.004724.005109.00
318.00343.00397.00
540.00643.00752.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
94
vii) 300 mm.viii) 350 mm.ix) 400 mm.
x) 450 mm.xi) 500 mm.xii) 600 mm.
xiii) 700 mm.xiv) 800 mm.
d) Class ‘NP-II’( For 2.00 m. length )
i) 80 mm.ii) 100 mm.iii) 150 mm.iv) 200 mm.v) 225 mm.
vi) 250 mm.vii) 300 mm.
( For 2.50 m. length )viii) 350 mm.ix) 400 mm.x) 450 mm.
xi) 500 mm.xii) 600 mm.xiii) 700 mm.xiv) 800 mm.xv) 900 mm.
RMTRMTRMT
RMTRMTRMT
RMTRMT
RMTRMTRMTRMTRMT
RMTRMT
RMTRMTRMT
RMTRMTRMTRMTRMT
SECTION - I : R.C.C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
With
E. D.Without
E. D.
Collar Joints Rubber RingJoints
With
E. D.
Without
E. D.
1151.001502.002067.00
2372.002895.003719.00
5305.006738.00
290.00298.00348.00407.00454.00
488.00652.00
799.00928.00
1088.00
1272.001679.002422.002767.003545.00
1046.001364.001878.00
2155.002630.003378.00
4819.006119.00
293.00304.00354.00415.00463.00
498.00665.00
815.00947.00
1110.00
1297.001713.002470.002822.003616.00
1151.001502.002067.00
2373.002896.003720.00
5305.006738.00
1045.001364.001878.00
2156.002629.003378.00
4818.006119.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
Collar
Joints
Rubber
Ring Joints
95
DescriptionSr. No.
1 2 4 5
xvi) 1000 mm.
xvii) 1100 mm.
xviii) 1200 mm.
xix) 1400 mm.
xx) 1600 mm.
xxi) 1800 mm.
e) Class NP-III (For 2.00 m. length)
) 80 mm
ii) 100 mm
iii) 150 mm
iv) 200 mm
v) 225 mm
vi) 250 mm
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 800 mm.
xv) 900 mm.
xvi) 1000 mm.
xvii) 1100 mm.
xviii) 1200 mm.
xix) 1400 mm
xx) 1600 mm
xxi) 1800 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Collar
JointsRubber
RingJoints
CollarJoints
Rubber RingJoints
3
SECTION - I : R.C.C. PIPES
UnitRate
(in Rs.)2012-2013
Rate(in Rs.)
2013-2014
4243.00
5327.00
5703.00
6778.00
7782.00
10901.00
328.00
372.00
410.00
612.00
713.00
763.00
868.00
1537.00
1722.00
2047.00
2274.00
2996.00
4072.00
4851.00
5603.00
6855.00
7930.00
9304.00
11180.00
16292.00
21550.00
4328.00
5434.00
5817.00
6914.00
7938.00
11119.00
335.00
379.00
418.00
624.00
727.00
778.00
885.00
1568.00
1756.00
2088.00
2319.00
3056.00
4153.00
4948.00
5715.00
6992.00
8089.00
9490.00
11404.00
16618.00
21981.00
96SECTION - I : R.C.C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
f) Class ‘NP-IV’
i) 80 mm.
ii) 100 mm.
iii) 150 mm.
iv) 200 mm.
v) 225 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 800 mm.
xv) 900 mm.
xvi) 1000 mm.
xvii) 1100 mm.
xviii) 1200 mm.
xix) 1400 mm.
xx) 1600 mm.
xxi) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Collar
Joints
Rubber
RingJointsCollarJoints
RubberRingJoints
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
353.00
414.00
469.00
655.00
774.00
872.00
1111.00
1687.00
1807.00
2131.00
2604.00
3185.00
4767.00
5444.00
6376.00
9026.00
9792.00
9836.00
15359.00
19148.00
26249.00
360.00
422.00
478.00
668.00
789.00
889.00
1133.00
1721.00
1843.00
2174.00
2656.00
3249.00
4862.00
5553.00
6504.00
9207.00
9988.00
10033.00
15666.00
19531.00
26774.00
97SECTION - I : R.C.C. PIPES
UnitDescriptionSr. No.
1 2 3 4 5
Lowering, laying and jointing in proper gradeand alignment R.C.C. pipes with collar joints inC.M.1:1 proportion or socketed R.C.C. pipes withrubber joints (excluding cost of rubber ring orR.C.C. collar,) including cost of conveyance fromstores to site of work, cost of jointing material,labour, giving hydraulic testing etc. complete asdirected by Engineer-in-charge (For all classof pipes.) as per IS-783-1985.
i) 80 mm.ii) 100 mm.iii) 150 mm.iv) 200 mm.v) 225 mm.
vi) 250 mm.vii) 300 mm.viii) 350 mm.ix) 400 mm.x) 450 mm.
xi) 500 mm.xii) 600 mm.xiii) 700 mm.xiv) 800 mm.xv) 900 mm.
xvi) 1000 mm.xvii) 1100 mm.xviii) 1200 mm.xix) 1400 mm.xx) 1600 mm.xxi) 1800 mm.
Note : Only 85% rate is payable tillsatisfactory hydraulic testing is given.
2.
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMTRMT
CollarJoints
RubberRing
Joints
Collar
Joints
Rubber
Ring Joints
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
44.0053.0080.00
106.00124.00
140.00168.00173.00220.00266.00
290.00367.00416.00482.00530.00
580.00806.00856.00954.00
1052.001150.00
31.0037.0056.0075.0088.00
98.00118.00121.00155.00185.00
203.00254.00289.00334.00369.00
404.00547.00582.00652.00722.00792.00
98
UnitDescriptionSr. No.
1 2 3 4 5
VII. P. S. C. PIPESProviding ISI standard Pre - stressed Cement con-crete pipes of following class and diameter including cost ofall meterial and labour required, cost of all taxes(Central andlocal) , inspection charges, transportaion to stores/ site, un-loading and stacking etc. complete as per IS-784-2001.i) Factory test pressurea) Site test pressure + 01N/mm2, For working pressure upto 1N/mm2b) Site test pressure + 02N/mm2, For working pressure upto 1N/mm2ii) Site test pressure - 1.5 times working pressure pertainingto the section or 1.1 times static pressure, which ever is more(such pressure is to be control within 25% of pumphead incaseof pumping main)iii) Working pessure - The maximum sustained internal pres-sure excluding surge to which each portion of pipeline my besubjected when installed.
Note : One rubber ring should be supplied witheach pipe, cost included in rates below.
a) Factory Test Pressure 2 kg/Sqcm
i) 350 mm.ii) 400 mm.iii) 450 mm.iv) 500 mm.v) 600 mm.
vi) 700 mm.vii) 800 mm.viii) 900 mm.ix) 1000 mm.x) 1100 mm.
xi) 1200 mm.xii) 1300 mm.xiii) 1400 mm.xiv) 1500 mm.xv) 1600 mm.xvi) 1700 mm.xvii) 1800 mm.
1.
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMTRMTRMTRMT
3400.003657.003837.004225.005078.00
5654.006983.008684.00
10121.0011560.00
13358.0015447.0016996.0019452.0021575.0023699.0025823.00
SECTION - I : P. S. C. PIPES
With
ED
3085.003318.003481.003833.004608.00
5130.006335.007878.009184.00
10488.00
12119.0014014.0015419.0017648.0019574.0021501.0023427.00
Without
ED
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
99
UnitSr. No.
1 2 3 4 5
b) Factory Test Pressure 4 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
c) Factory Test Pressure 6 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. S. C. PIPES
3400.00
3658.00
3837.00
4225.00
5080.00
5656.00
6984.00
8685.00
10124.00
11562.00
13358.00
15451.00
16998.00
19455.00
21578.00
23703.00
25825.00
3404.00
3678.00
3847.00
4255.00
5148.00
3085.00
3319.00
3481.00
3833.00
4609.00
5131.00
6336.00
7879.00
9186.00
10490.00
12120.00
14017.00
15420.00
17651.00
19577.00
21504.00
23430.00
3089.00
3338.00
3490.00
3861.00
4670.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
100
3 4 5
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
d) Factory Test Pressure 8 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. S. C. PIPES
5851.00
7242.00
9027.00
10529.00
11988.00
13888.00
16044.00
17652.00
20220.00
22456.00
24693.00
26929.00
3411.00
3705.00
3871.00
4315.00
5321.00
6146.00
7548.00
9409.00
11004.00
12590.00
14576.00
16861.00
18637.00
21355.00
24097.00
26838.00
29579.00
5310.00
6570.00
8189.00
9552.00
10877.00
12599.00
14555.00
16014.00
18344.00
20373.00
22402.00
24432.00
3094.00
3362.00
3513.00
3915.00
4827.00
5577.00
6848.00
8537.00
9983.00
11423.00
13226.00
15299.00
16909.00
19376.00
21861.00
24348.00
26836.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
101
UnitDescriptionSr. No.
1 2 3 4 5
e) Factory Test Pressure 10 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
f) Factory Test Pressure 12 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. S. C. PIPES
3428.00
3757.00
4007.00
4489.00
5550.00
6396.00
7933.00
9886.00
11577.00
13285.00
15392.00
17821.00
20144.00
23092.00
25733.00
28372.00
31012.00
3512.00
3855.00
4134.00
4642.00
5771.00
3110.00
3407.00
3635.00
4071.00
5035.00
5802.00
7197.00
8969.00
10505.00
12053.00
13964.00
16168.00
18275.00
20951.00
23347.00
25742.00
28138.00
3185.00
3498.00
3750.00
4211.00
5235.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
With
ED
Without
ED
102
UnitDescriptionSr. No.
1 2 3 4 5
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
g) Factory Test Pressure 14 kg./Sqcm.
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. S. C. PIPES
6683.00
8309.00
10333.00
12105.00
13879.00
16357.00
18944.00
20960.00
24004.00
26746.00
29490.00
32232.00
3598.00
3957.00
4262.00
4792.00
5993.00
6972.00
8688.00
10827.00
12915.00
14840.00
17205.00
19860.00
22633.00
6064.00
7539.00
9375.00
10984.00
12592.00
14842.00
17089.00
19017.00
21777.00
24266.00
26754.00
29243.00
3263.00
3591.00
3866.00
4348.00
5437.00
6326.00
7882.00
9823.00
11717.00
13464.00
15610.00
18018.00
20534.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
With
ED
Without
ED
103
UnitDescriptionSr. No.
1 2 5
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
h) Factory Test Pressure 16 kg./Sqcm.
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. S. C. PIPES
25936.00
29004.00
32072.00
35141.00
3675.00
4064.00
4391.00
4950.00
6213.00
7266.00
9063.00
12030.00
13539.00
16249.00
18754.00
21585.00
23826.00
28302.00
31744.00
35186.00
38627.00
23531.00
26315.00
29099.00
31883.00
3335.00
3687.00
3985.00
4492.00
5637.00
6592.00
8222.00
10915.00
12283.00
14740.00
17015.00
19584.00
21617.00
25677.00
28800.00
31923.00
35044.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
With
ED
Without
ED
104
UnitDescriptionSr. No.
i) Factory Test Pressure 18 kg/Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
3 4 51 2
SECTION - I : P. S. C. PIPES
3761.00
4176.00
4518.00
5105.00
6434.00
7946.00
9916.00
12542.00
14738.00
17008.00
19658.00
22642.00
29877.00
33689.00
37971.00
42252.00
46533.00
3412.00
3788.00
4099.00
4631.00
5837.00
7210.00
8996.00
11378.00
13371.00
15430.00
17835.00
20542.00
27107.00
30564.00
34450.00
38334.00
42218.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
With
ED
Without
ED
With
ED
Without
ED
105
UnitDescriptionSr. No.
3 4 51 2
SECTION - I : P. S. C. PIPES
J) Factory Test pressure 20 kg/Sqcm.
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
3491.00
3881.00
4219.00
4776.00
6044.00
7986.00
10624.00
12559.00
15109.00
17961.00
22588.00
24853.00
29033.00
32915.00
36812.00
40708.00
44605.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3849.00
4277.00
4649.00
5265.00
6661.00
8803.00
11711.00
13843.00
16654.00
19796.00
24895.00
27394.00
32000.00
36169.00
40452.00
44734.00
49015.00
With
ED
Without
ED
With
ED
Without
ED
106
UnitDescriptionSr. No.
Lowering, laying and jointing in proper grade and alignmentPre-Stressed Cement Concrete Pipes with rubber ring jointsincluding cost of conveyance from stores to site of works, alllabour involved, giving hydraulic testing, etc. complete butexcluding cost of rubber rings (for all class of pipes)
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm
xi) 1200 mm
xii) 1300 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
105.00
148.00
179.00
203.00
270.00
297.00
334.00
345.00
445.00
585.00
626.00
743.00
31 2
2.
54
SECTION - I : P. S. C. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
107
UnitDescriptionSr. No.
SECTION - I : P. S. C. PIPES
31 2 54
784.00
989.00
1112.00
1239.00
1310.00
xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm
xvi) 1700 mm.
xvii) 1800 mm.
Only 85% rate is payable till satisfactoryhydraulic testing is given.
Whenever manufacturer is separated antcontractor for lowering, laying, jointing andtsting is separate, the principal contractorshall enter into an agreement with P.S.C.pipe manufacturer foar satisfactory manu-facturing, transporting, lowering, layingjointing and testing of pipes. This foot noteshall appear into the tender conditions.
Note :
2)
1)
RMT
RMT
RMT
RMT
RMT
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
108
1.
VIII. BAR WRAPPED STEEL CYLINDER PIPES (BWSC)Providing and supplying European StandardEN 639/1994 and EN 641/1994 or AWWAC-303 standard and reinforced concrete pres-sure pipes cylinder type or IS-15155-2002(Bar wrapped steel cylinder pipes suitable foroverlaping steel welded joint or butt welded steeljoints) of following class and diameter includingcost of all material and labour required, cost ofall taxes (Central and State Govt.), inspectioncharges, transportation to stores/ site, transit in-surance, loading and unloding and stacking etc.complete.
i) Factory test pressurea) Site test pressure + 01N/mm2, For workingpressure upto 1 N/mm2b) Site test pressure + 02N/mm2, For workingpressure upto 1 N/mm2ii) Site test pressure - 1.5 times working pres-sure pertaining to the section or 1.1 times staticpressure, which ever is more (such pressure is tobe control within 25% of pumphead incase ofpumping main)iii) Working pessure - The maximum sustainedinternal pressure excluding surge to which eachportion of pipeline my be subjected when in-stalled.
Note : 1) Class mentioned below represents the working pressure of pipe.2) For external coating at site to the joints, necessary polythene wrap ping for pouring cement slurry shall also be given free with each pipe.
DescriptionSr. No.
1 2
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
Unit
3 4 5
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
109
a) Factory Test Pressure 4 kg / Sqcm
i) 350 mm.
ii) 400 mm.
ii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
DescriptionSr. No.
1 2
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
Unit
3 4 5
3706.00
4064.00
4499.00
5006.00
6510.00
7522.00
8168.00
11414.00
13155.00
18907.00
21085.00
24621.00
26410.00
28184.00
30364.00
32213.00
34393.00
WithE.D.
3366.00
3691.00
4086.00
4546.00
5912.00
6831.00
7418.00
10367.00
11947.00
17171.00
19149.00
22362.00
23986.00
25598.00
27577.00
29256.00
31237.00
WithoutE.D.
WithE.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
110
b) Factory Test Pressure 6 kg / Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
DescriptionSr. No. Unit
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
1 2 3 4 5
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
3369.00
3694.00
4089.00
4554.00
5920.00
6838.00
7425.00
10373.00
11953.00
17179.00
19157.00
22367.00
23992.00
25604.00
27584.00
29262.00
31243.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3710.00
4068.00
4501.00
5013.00
6517.00
7528.00
8175.00
11421.00
13160.00
18913.00
21090.00
24627.00
26416.00
28192.00
30370.00
32219.00
34399.00
111
DescriptionSr. No.
1 2
Unit
3 4 5
c) Factory Test Pressure 8 kg / Sqcm
.
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
vii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
d) Factory Test Pressure 10 kg / Sqcm
i) 350 mm.
ii) 400 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
3373.00
3698.00
4092.00
4564.00
5928.00
6847.00
7434.00
10383.00
11964.00
17187.00
19165.00
22378.00
24002.00
25614.00
27594.00
29272.00
31253.00
3375.00
3702.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3713.00
4071.00
4506.00
5025.00
6528.00
7540.00
8186.00
11432.00
13172.00
18925.00
21102.00
24638.00
26427.00
28203.00
30382.00
32230.00
34411.00
3717.00
4075.00
112
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
DescriptionSr. No. Unit
WithoutE.D.
2 5431
WithE.D.
WithoutE.D.
WithE.D.
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
4509.00
5040.00
6544.00
7555.00
8202.00
11437.00
13187.00
18941.00
21117.00
24653.00
26443.00
28218.00
30397.00
32245.00
34426.00
4095.00
4577.00
5943.00
6862.00
7449.00
10398.00
11978.00
17202.00
19180.00
22392.00
24016.00
25629.00
27608.00
29286.00
31268.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
113
e) Factory Test Pressure 12 kg / Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
DescriptionSr. No. Unit
WithoutE.D.
2 5431
WithE.D.
WithoutE.D.
WithE.D.
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3720.00
4079.00
4513.00
5059.00
6564.00
7575.00
9368.00
11448.00
14231.00
18960.00
21138.00
24675.00
26464.00
28538.00
31570.00
34171.00
38004.00
3379.00
3704.00
4099.00
4597.00
5961.00
6880.00
8507.00
10398.00
12925.00
17221.00
19200.00
22411.00
24036.00
25921.00
28673.00
31036.00
34516.00
114
DescriptionSr. No.
1 2
Unit
3 4 5
f) Factory Test Pressure 14 kg / Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
3724.00
4083.00
4526.00
5152.00
6683.00
8695.00
10196.00
12574.00
15138.00
19037.00
21130.00
25286.00
28572.00
31792.00
35451.00
38923.00
42585.00
3383.00
3707.00
4110.00
4679.00
6069.00
7898.00
9259.00
11420.00
13750.00
17291.00
19191.00
22965.00
25951.00
28874.00
32197.00
35351.00
38678.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
115
UnitSr. No. Description
g) Factory Test Pressure 16 kg / Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
h) Factory Test Pressure 18 kg / Sqcm
i) 350 mm.
ii) 400 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1 2 3 4 5
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
3386.00
3712.00
4255.00
5018.00
6515.00
8407.00
10073.00
12458.00
15143.00
18238.00
21269.00
25337.00
28601.00
31896.00
35470.00
39371.00
43932.00
3391.00
3767.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
3728.00
4087.00
4684.00
5525.00
7173.00
9254.00
11090.00
13717.00
16673.00
20080.00
23418.00
27896.00
31490.00
35119.00
39052.00
43349.00
48369.00
3732.00
4148.00
116
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
i) Factory Test Pressure 20 kg / Sqcm
i) 350 mm.
ii) 400 mm.
iii) 450 mm.
iv) 500 mm.
v) 600 mm.
vi) 700 mm.
vii) 800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
DescriptionSr. No.
1 2
Unit
3 4 5
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
4833.00
5691.00
7444.00
9785.00
11550.00
14275.00
17415.00
20957.00
24417.00
28992.00
33132.00
36595.00
41512.00
46039.00
50958.00
3719.00
4380.00
5004.00
6065.00
7935.00
10317.00
12595.00
4389.00
5168.00
6761.00
8888.00
10491.00
12966.00
15817.00
19033.00
22177.00
26333.00
30092.00
33237.00
37703.00
41816.00
46283.00
3379.00
3979.00
4544.00
5509.00
7207.00
9371.00
11439.00
117
viii) 900 mm.
ix) 1000 mm.
x) 1100 mm.
xi) 1200 mm.
xii) 1300 mm.
xiii) 1400 mm.
xiv) 1500 mm.
xv) 1600 mm.
xvi) 1700 mm.
xvii) 1800 mm.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Notes :
1) For lowering, laying & pouring of cement mortar in the field on joints ( after laying and welding ), rates asper P. S. C. pipes lowering, laying and jointing shall be adopted.
2) For field welding rates applicable for similar welding in M. S. pipes given in that section shall be abopted.
3) Whenever manufacturer is separate and contractor for lowering laying, jointing and testing is separate, thepricipal contractor shall be enter into an agreement with B. W. S. C. pipe manufacturer for satisfactorymanufacturing transporting, lowering, laying, jointing and testing of pipes.
This footnote shall appear into the tender condition.
4) No negative tolerance shall be accepted for the M. S. Shell thickness of B. W. S. C. pipes over thethickness mentioned in E. N. 641 of AWWA AC 303.
UnitSr. No. Description
3 4 521
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
SECTION - I : BAR WRAPPED STEELCYLINDER PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
14125.00
17282.00
20741.00
24114.00
28644.00
33012.00
37179.00
41525.00
46389.00
51351.00
15551.00
19029.00
22835.00
26549.00
31538.00
36348.00
40934.00
45721.00
51075.00
56537.00
118
UnitDescriptionSr. No.
1 2 3 4 5
IX. GLASS REINPORCED PLASTIC PIPES (GRP)
Providing and supplying Glass fibre reinforced polyester pipes conforming to BIS -12709 / BIS 14402 with double bell REKAGRP coupling EPDM rubber gaskets for seal-ing of following pressure diameter and stiff-ness class including cost of all material andlabour required cost of all taxes (Central andState Govt.), insurance, transportation to siteof work / store unloading and stacking etc.complete.
A. Class (SN) 2500
a) 3 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
1.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
1371.00
1586.00
1745.00
1965.00
2222.00
2855.00
3548.00
4357.00
5324.00
6315.00
7677.00
8938.00
1229.00
1422.00
1565.00
1761.00
1992.00
2559.00
3181.00
3906.00
4773.00
5662.00
6883.00
8013.00
With E.D.
With outE.D.
WithE.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
119
UnitDescriptionSr. No.
1 2 3 4 5
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xiii) 1700 mm
xiv) 1800 mm
xv) 1900 mm
xvi) 2000 mm
xiii) 2100 mm
xiv) 2200 mm
xiv) 2300 mm
xv) 2400 mm
b) 6 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
10121.00
11685.00
13280.00
15466.00
18269.00
19935.00
22284.00
24092.00
26923.00
28899.00
31232.00
33384.00
1422.00
1626.00
1827.00
2029.00
2307.00
2988.00
3715.00
4552.00
9074.00
10477.00
11907.00
13867.00
16573.00
18085.00
20216.00
21856.00
24424.00
26217.00
28333.00
30286.00
1275.00
1458.00
1638.00
1819.00
2068.00
2679.00
3331.00
4081.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
120
DescriptionSr. No.
1 2
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
ix) 1700 mm
x) 1800 mm
xi) 1900 mm
xii) 2000 mm
xiii) 2100 mm
xiv) 2200 mm
xv) 2300 mm
xvi) 2400 mm
Unit
3 4 5
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
5545.00
6595.00
7992.00
9249.00
10583.00
12109.00
13814.00
16111.00
19038.00
20715.00
23181.00
25033.00
27987.00
30159.00
32504.00
34710.00
4972.00
5913.00
7166.00
8293.00
9489.00
10857.00
12385.00
14445.00
17271.00
18793.00
21029.00
22710.00
25389.00
27360.00
29488.00
31489.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
121
c) 9 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1468.00
1706.00
1902.00
2157.00
2445.00
3171.00
3949.00
4919.00
6009.00
7114.00
1316.00
1530.00
1705.00
1933.00
2192.00
2843.00
3541.00
4410.00
5387.00
6378.00
DescriptionSr. No.
1 2
Unit
3 4 5
SECTION - I : G. R. P. PIPES
WithoutE.D.
WithE.D.
WithoutE.D.
WithE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
122
DescriptionSr. No.
1 2
xi) 1100 mm
xii) 1200 mm
ix) 1300 mm
x) 1400 mm
xi) 1500 mm
xii) 1600 mm
ix) 1700 mm
x) 1800 mm
xi) 1900 mm
xii) 2000 mm
ix) 2100 mm
x) 2200 mm
xi) 2300 mm
xii) 2400 mm
Unit
3 4 5
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
WithE.D.
WithoutE.D.
WithE.D.
WithoutE.D.
8598.00
9983.00
11527.00
13245.00
15044.00
17564.00
20797.00
22744.00
25266.00
27416.00
30510.00
32799.00
35415.00
38193.00
7708.00
8950.00
10335.00
11875.00
13488.00
15747.00
18867.00
20633.00
22921.00
24872.00
27678.00
29755.00
32129.00
34649.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
123
DescriptionSr. No.
1 2
Unit
3 4 5
d) 12 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xiii) 1700 mm
xiv) 1800 mm
xv) 1900 mm
xvi) 2000 mm
xiii) 2100 mm
xiv) 2200 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1556.00
1796.00
2000.00
2613.00
2264.00
3407.00
4225.00
5234.00
6418.00
7650.00
9377.00
10936.00
12378.00
14246.00
16289.00
18892.00
22414.00
24573.00
27200.00
29580.00
32976.00
35587.00
1395.00
1610.00
1793.00
2342.00
2029.00
3054.00
3788.00
4693.00
5754.00
6859.00
8406.00
9805.00
11097.00
12772.00
14604.00
16938.00
20334.00
22293.00
24676.00
26835.00
29916.00
32284.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
124
DescriptionSr. No.
1 2
Unit
3 4 5
e) 16 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xiii) 1700 mm
xiv) 1800 mm
xv) 1900 mm
xvi) 2000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
WithE.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1620.00
1871.00
2080.00
2398.00
2756.00
3642.00
4543.00
5669.00
6987.00
8292.00
10173.00
11804.00
13549.00
15595.00
17692.00
20527.00
24695.00
26988.00
30134.00
32796.00
1452.00
1677.00
1865.00
2150.00
2471.00
3265.00
4073.00
5082.00
6264.00
7434.00
9121.00
10583.00
12147.00
13982.00
15862.00
18404.00
22403.00
24483.00
27338.00
29752.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
125
DescriptionSr. No.
1 2
Unit
3 4 5
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
B. Class (SN) 5000
a) 3 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xvii) 1700 mm
xviii) 1800 mm
xix) 1900 mm
xx) 2000 mm
xx) 2100 mm
xx) 2200 mm
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1470.00
1724.00
1965.00
2234.00
2472.00
3222.00
4033.00
4999.00
6155.00
7321.00
8874.00
10401.00
11843.00
13612.00
15533.00
18058.00
21385.00
23454.00
26105.00
28394.00
31611.00
34120.00
1317.00
1546.00
1761.00
2004.00
2216.00
2889.00
3616.00
4482.00
5519.00
6564.00
7956.00
9325.00
10618.00
12204.00
13926.00
16190.00
19400.00
21277.00
23682.00
25758.00
28677.00
30954.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
126
DescriptionSr. No.
1 2
Unit
3 4 5
b) 6 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xvii) 1700 mm
xviii) 1800 mm
xix) 1900 mm
xx) 2000 mm
xx) 2100 mm
xx) 2200 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1492.00
1753.00
1938.00
2209.00
2545.00
3292.00
4136.00
5119.00
6305.00
7485.00
9154.00
10641.00
12160.00
13952.00
15896.00
18502.00
21907.00
24020.00
26757.00
29152.00
32429.00
35057.00
1338.00
1572.00
1737.00
1980.00
2282.00
2952.00
3708.00
4589.00
5653.00
6711.00
8208.00
9540.00
10902.00
12509.00
14252.00
16589.00
19874.00
21791.00
24274.00
26446.00
29420.00
31804.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
127
DescriptionSr. No.
1 2
Unit
3 4 5
c) 9 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xvii) 1700 mm
xviii) 1800 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1547.00
1813.00
2040.00
2323.00
2657.00
3650.00
4334.00
5582.00
6590.00
7861.00
12694.00
14442.00
16271.00
18213.00
20866.00
23703.00
28204.00
30732.00
1387.00
1625.00
1829.00
2082.00
2382.00
3273.00
3886.00
5005.00
5909.00
7049.00
11381.00
12948.00
14588.00
16330.00
18707.00
21252.00
25586.00
27880.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
128
DescriptionSr. No.
1 2
Unit
3 4 5
d) 12 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xvii) 1700 mm
xviii) 1800 mm
xix) 1900 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1591.00
1887.00
2086.00
2415.00
2758.00
3642.00
4591.00
5666.00
7076.00
8322.00
10229.00
11886.00
13623.00
15698.00
17831.00
20607.00
24516.00
26951.00
29866.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1426.00
1692.00
1870.00
2165.00
2473.00
3265.00
4116.00
5080.00
6344.00
7461.00
9170.00
10657.00
12214.00
14074.00
15986.00
18476.00
22241.00
24450.00
27095.00
129
DescriptionSr. No.
1 2
Unit
3 4 5
e) 15 Kg/Sq. cm :
i) 300 mm
ii) 350 mm
iii) 400 mm
iv) 450 mm
v) 500 mm
vi) 600 mm
vii) 700 mm
viii) 800 mm
ix) 900 mm
x) 1000 mm
xi) 1100 mm
xii) 1200 mm
xiii) 1300 mm
xiv) 1400 mm
xv) 1500 mm
xvi) 1600 mm
xvii) 1700 mm
xviii) 1800 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
Note : 1) For lowering, laying & jointing rates of GRP pipes 50 % rates for lowering, laying & jointing of PSC pipes of corresponding diameter shall be adopted.2) Where manufacturer is seperate & contractor for lowering,laying jointing &testing is seperate the principal controctor shall enter into an aggrement with G.R.P. pipe manufacture for safisfactory manufacturing, transporting, lowering, laying, jointing & testing of pipe.This foot Note shall appear in tender conditions.3) Only 85 % Payment shall be payable till satisfactory hydraulic testing is given.
SECTION - I : G. R. P. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
1647.00
1962.00
2193.00
2533.00
2890.00
3836.00
4827.00
6040.00
7450.00
8882.00
10802.00
12657.00
14463.00
16688.00
18981.00
21975.00
26079.00
28722.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
1477.00
1758.00
1966.00
2271.00
2591.00
3439.00
4328.00
5415.00
6679.00
7963.00
9685.00
11348.00
12967.00
14962.00
17018.00
19703.00
23659.00
26057.00
130
DescriptionSr. No.
1 2
1.
SECTION - I : H. D. P. E. PIPES
Unit
3 4 5
X. H. D. P. E. PIPES
Providing and supplying in standard lengthsPolyethelene Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with nesessary joint-ing material like mechanical connector i. e.thread / insert joint / quick release coupler joint/ compression fitting joint or flanged joint,including all local & central taxes, transportationand fright charges inspection charges, loading /unloading charges, conveyance to the departmen-tal stores / site & stacking the same in closedshade duly protecting from sunrays & rains, etc.complete.
PE-100a) 6 Kg/Sq. cm :
i) 63 mm
ii) 75 mm
iii) 90 mm
iv) 110 mm
v) 125 mm
vi) 140 mm
vii) 160 mm
viii) 180 mm
ix) 200 mm
x) 225 mm
xi) 250 mm
xii) 280 mm
xiii) 315 mm
xiv) 355 mm
xv) 400 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
WithE.D.
WithoutE.D.
91.00
132.00
184.00
267.00
364.00
457.00
592.00
746.00
876.00
1129.00
1385.00
1737.00
2201.00
2790.00
3654.00
A.)WithE.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
84.00
119.00
167.00
242.00
330.00
415.00
538.00
678.00
794.00
1024.00
1257.00
1576.00
1997.00
2531.00
3315.00
131
DescriptionSr. No.
1 2
Unit
3 4 5
xvi) 450 mm
xvii) 500 mm
xviii) 560 mm
xix) 630 mm
xx) 710 mm
xxi) 800 mm
xxii) 900 mm
xxxiii) 1000 mm
b) 8 Kg/Sq. cm :
i) 63 mm
ii) 75 mm
iii) 90 mm
iv) 110 mm
v) 125 mm
vi) 140 mm
vii) 160 mm
viii) 180 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : H. D. P. E. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
4814.00
5953.00
7451.00
9385.00
11891.00
14336.00
18161.00
22394.00
116.00
172.00
231.00
340.00
461.00
576.00
750.00
945.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
4368.00
5400.00
6760.00
8509.00
10986.00
13244.00
16778.00
20690.00
105.00
156.00
209.00
308.00
418.00
524.00
680.00
857.00
132
ix) 200 mm
x) 225 mm
xi) 250 mm
xii) 280 mm
xiii) 315 mm
xiv) 355 mm
xv) 400 mm
xvi) 450 mm
xvii) 500 mm
xviii) 560 mm
xix) 630 mm
xx) 710 mm
xxi) 800 mm
xxii) 900 mm
xxxiii) 1000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1113.00
1430.00
1762.00
2210.00
2794.00
3537.00
4645.00
6212.00
7663.00
9618.00
12109.00
15344.00
18509.00
23430.00
22868.00
1010.00
1297.00
1598.00
2004.00
2536.00
3209.00
4215.00
5635.00
6951.00
8725.00
10978.00
14176.00
17100.00
21646.00
21127.00
DescriptionSr. No.
1 2
Unit
3 4 5
SECTION - I : H. D. P. E. PIPES
With E.D.
WithoutE.D.
WithE.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
133
Description
1 2
Unit
3 4 5
SECTION - I : H. D. P. E. PIPES
With E.D. WithoutE.D.
With E.D. WithoutE.D.
c) 10 Kg/Sq. cm :
i) 63 mm
ii) 75 mm
iii) 90 mm
iv) 110 mm
v) 125 mm
vi) 140 mm
vii) 160 mm
viii) 180 mm
ix) 200 mm
x) 225 mm
xi) 250 mm
xii) 280 mm
xiii) 315 mm
xiv) 355 mm
xv) 400 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
145.00
204.00
290.00
428.00
552.00
690.00
895.00
1136.00
1331.00
1704.00
2129.00
2628.00
3376.00
4236.00
5643.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
131.00
185.00
264.00
389.00
501.00
625.00
813.00
1031.00
1208.00
1547.00
1931.00
2385.00
3062.00
3843.00
5118.00
134
xvi) 450 mm
xvii) 500 mm
xviii) 560 mm
xix) 630 mm
xx) 710 mm
xxi) 800 mm
xxii) 900 mm
xxiii) 1000 mm
d) 12.5 Kg/Sq. cm :
i) 63 mm
ii) 75 mm
iii) 90 mm
iv) 110 mm
v) 125 mm
vi) 140 mm
vii) 160 mm
viii) 180 mm
ix) 200 mm
x) 225 mm
xi) 250 mm
xii) 280 mm
xiii) 315 mm
xiv) 355 mm
xv) 400 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
7509.00
9280.00
11161.00
14659.00
18618.00
22441.00
22710.00
28067.00
169.00
239.00
345.00
508.00
656.00
822.00
1070.00
1354.00
1591.00
2053.00
2525.00
3166.00
4007.00
5089.00
6688.00
6811.00
8418.00
10124.00
13289.00
16880.00
20346.00
20589.00
25445.00
154.00
217.00
314.00
461.00
595.00
746.00
971.00
1228.00
1443.00
1862.00
2290.00
2872.00
3636.00
4617.00
6068.00
Sr. No. Unit
With E.D. With E.D. With out E.D.With out E.D.
1 2 3 4 5
Description
SECTION - I : H. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
135
Sr. No. Unit
With E.D. With E.D. With out E.D.With out E.D.
1 2 3 4 5
Description
SECTION - I : H. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
xvi) 450 mm
xvii) 500 mm
xviii) 560 mm
xix) 630 mm
xx) 710 mm
xxi) 800 mm
xxii) 900 mm
xxiii) 1000 mm
e) 16 Kg/Sq. cm :
i) 63 mm
ii) 75 mm
iii) 90 mm
iv) 110 mm
v) 125 mm
vi) 140 mm
vii) 160 mm
viii) 180 mm
ix) 200 mm
x) 225 mm
xi) 250 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
8938.00
11015.00
13808.00
17623.00
18175.00
21902.00
27748.00
33795.00
205.00
288.00
414.00
612.00
790.00
986.00
1293.00
1627.00
2808.00
3550.00
4379.00
8108.00
9994.00
12528.00
15978.00
16478.00
19857.00
25156.00
30639.00
185.00
262.00
375.00
554.00
717.00
894.00
1173.00
1476.00
2549.00
3221.00
3973.00
136
Sr. No. Unit
With E.D. With E.D. With out E.D.With out E.D.
1 2 3 4 5
Description
SECTION - I : H. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
xii) 280 mm
xiii) 315 mm
xiv) 355 mm
xv) 400 mm
xvi) 450 mm
xvii) 500 mm
xviii) 560 mm
xix) 630 mm
xx) 710 mm
xxi) 800 mm
xxii) 900 mm
xxiii) 1000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
5493.00
6943.00
8809.00
11410.00
14463.00
17835.00
13650.00
17294.00
22006.00
26511.00
33558.00
41199.00
4983.00
6300.00
7990.00
10352.00
13120.00
16180.00
12375.00
15679.00
19951.00
24035.00
30424.00
37353.00
137
DescriptionSr. No.
1 2
2.
SECTION - I : H. D. P. E. PIPES
Unit
3 4 5
Lowering, Laying and Jointing H. D. P. E.pipes by heating to the ends of pipes withthe help of tefflon coated electric mirror / heaterto the required temparature and then pressingthe ends together against each other, to form amonolithic & leak proof joint by thermosettingprocess. The pressing may be required to bedone with Jacks/ Hydraulic Jacks/Butt fusionmachine etc. complete with all materials laboursas directed by Engineer - in - charge, including,given satisfactory hydraulic test.
For all classes.
i) 63 mmii) 75 mmiii) 90 mmiv) 110 mm
v) 125 mmvi) 140 mmvii) 160 mmviii) 180 mm
ix) 200 mmx) 225 mmxi) 250 mmxii) 280 mm
xiii) 315 mmxiv) 355 mmxv) 400 mmxvi) 450 mm
xvii) 500 mmxviii) 560 mmxix) 630 mm
Rmt.Rmt.Rmt.Rmt.
Rmt.Rmt.Rmt.Rmt.
Rmt.Rmt.Rmt.Rmt.
Rmt.Rmt.Rmt.Rmt.
Rmt.Rmt.Rmt.
WithED
WithoutED
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
37.0040.0055.0058.00
66.0089.0095.0095.00
106.00136.00141.00174.00
191.00209.00211.00238.00
308.00345.00388.00
138
DescriptionSr. No.
1 2
1.
Unit
3 4 5
WithE.D.
WithoutE.D.
XI. M. D. P. E. PIPESProviding and Supplying Blue MDPE pipesconforming to ISO 4427:1996 manufacturedfrom virgin resin PE 80 Food grade compoundedRaw Material having Blue Colour only withquality assurance certificate from qualityagencies like WRC / CIPET (India) / DVGM /KIWA / SPGN etc. for usage in Drinking Watersystem The cost shall include testing of allmaterials, all taxes such as, Sate, Municipal,Inspection charges, transportation up to site,transitinsurance, loading, as specified anddirected.unloading, stacking etc. complete asspecified and directed.
a) PN 16 (SDR 9)
i) 20 mmii) 25 mmiii) 32 mmiv) 40 mm
vii) 50 mmviii) 63 mmix) 75 mmx) 90 mm
xi) 110 mmvii) 125 mmxiii) 140 mmxiv) 160 mm
xv) 180 mmxvi) 200 mmxvii) 225 mmxviii) 250 mm
xix) 280 mmxx) 315 mm
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMT
28.0040.0066.0097.00
148.00218.00295.00426.00
633.00817.00
1027.001361.00
1722.002129.002697.003316.00
4169.005362.00
26.0036.0059.0087.00
132.00194.00262.00379.00
563.00727.00914.00
1211.00
1533.001895.002400.002952.00
3711.004772.00
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
139
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.b) PN 12.5 (SDR 11)
i) 25 mmiii) 32 mmiv) 40 mm
vii) 50 mmviii) 63 mmix) 75 mmx) 90 mm
xi) 110 mmvii) 125 mmxiii) 140 mmxiv) 160 mm
xv) 180 mmxvi) 200 mmxvii) 225 mmxviii) 250 mm
xix) 280 mmxx) 315 mm
c) PN 10 (SDR 13.6)
viii) 63 mmix) 75 mmx) 90 mm
xi) 110 mmvii) 125 mmxiii) 140 mmxiv) 160 mm
xv) 180 mmxvi) 200 mmxvii) 225 mmxviii) 250 mm
RMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMT
RMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
WithE.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
37.0062.0090.00
130.00175.00245.00359.00
526.00684.00854.00
1118.00
1439.001778.002248.002770.00
3471.004400.00
150.00212.00305.00
450.00579.00727.00951.00
1205.001483.001881.002315.00
33.0055.0084.00
116.00158.00219.00316.00
468.00609.00760.00995.00
1291.001581.002001.002479.00
3089.003916.00
134.00189.00272.00
401.00516.00647.00846.00
1072.001320.001673.002060.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
140
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
xix) 280 mmxx) 315 mm
d) PN 8 (SDR 17)
x) 63 mm.ix) 75 mmx) 90 mmxi) 110 mmvii) 125 mmxiii) 140 mmxiv) 160 mm
xv) 180 mmxvi) 200 mmxvii) 225 mmxviii) 250 mm
xix) 280 mmxx) 315 mm
e) PN 6 (SDR 21)
ix) 63 mm.xi) 75 mm.x) 90 mm
xi) 110 mmvii) 125 mmxiii) 140 mmxiv) 160 mm
xv) 180 mmxvi) 200 mmxvii) 225 mmxviii) 250 mmxix) 280 mmxx) 315 mm
RMTRMT
RMTRMTRMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMT
RMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMTRMT
WithE.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
2900.003662.00
122.00171.00247.00367.00470.00589.00771.00
977.001203.001528.001875.00
2399.003040.00
94.00136.00190.00
284.00374.00460.00602.00
756.00939.00
1189.001452.001836.002309.00
2581.003259.00
108.00152.00220.00327.00418.00524.00686.00
870.001071.001360.001705.00
2135.002705.00
84.00121.00169.00
258.00326.00410.00536.00
672.00836.00
1058.001293.001634.002055.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
141
DescriptionSr. No.
1 2
2.
Unit
3 4
WithE.D.
WithoutE.D.Providing & Supply of Electro Fusion Fittings
in accordance with BS EN12201: Part-3suitable for drinking water with in black/ bluecolour manufactured from compounded PE80/PE100 virgin polymer and compatible withPE80/PE100 pipes, in pressure rating SDR11with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,all taxes related to central, state & municipal,inspection charges, transportation up to site,transit insurance, loading, unloading, stackingetc. complete.
Couplers 20Couplers 25Couplers 32Couplers 40
Couplers 50Couplers 63Couplers 75Couplers 90
Couplers 110Couplers 125Couplers 140Couplers 160
Couplers 180Couplers 200Couplers 225Couplers 250
Couplers 280Couplers 315
No.No.No.No.
No.No.No.No.
No.No.No.No.
No.No.No.No.
No.No.
100.00100.00100.00173.00
217.00257.00435.00476.00
664.00675.00
1446.001569.00
2254.002530.003189.004973.00
5600.006116.00
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
142
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
Equal Tee 20Equal Tee 25Equal Tee 32Equal Tee 40
Equal Tee 50Equal Tee 63Equal Tee 75Equal Tee 90
Equal Tee 110Equal Tee 125
Equal Tee 160Equal Tee 180Equal Tee 200Equal Tee 225Equal Tee 250
Elbow 90 Deg. 20Elbow 90 Deg. 25Elbow 90 Deg. 32Elbow 90 Deg. 40
Elbow 90 Deg. 50Elbow 90 Deg. 63Elbow 90 Deg. 75Elbow 90 Deg. 90
Elbow 90 Deg. 110Elbow 90 Deg. 125
Elbow 90 Deg. 160Elbow 90 Deg. 180Elbow 90 Deg. 200Elbow 90 Deg. 225Elbow 90 Deg. 250
No.No.No.No.
No.No.No.No.
No.No.
No.No.No.No.No.
No.No.No.No.
No.No.No.No.
No.No.
No.No.No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
210.00210.00210.00463.00
473.00775.00
1135.001620.00
2250.003104.00
5380.006758.0010832.0012215.0017895.00
112.00112.00113.00153.00
181.00252.00394.00465.00
641.00816.00
1786.002070.002679.005840.0010943.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
143
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
Elbow 45 Deg. 32Elbow 45 Deg. 40
Elbow 45 Deg. 50Elbow 45 Deg. 63Elbow 45 Deg. 75Elbow 45 Deg. 90
Elbow 45 Deg. 110Elbow 45 Deg. 125
Elbow 45 Deg. 160Elbow 45 Deg. 180Elbow 45 Deg. 200Elbow 45 Deg. 225Elbow 45 Deg. 250
Reducer 25 x 20Reducer 32 x 20Reducer 32 x 25Reducer 40 x 32
Reducer 50 x 32Reducer 50 x 40Reducer 63 x 32Reducer 63 x 40Reducer 63 x 50Reducer 90 x 63Reducer 110 x 75Reducer 110 x 90Reducer 125 x 90Reducer 160 x 110
Reducer 180 x 125Reducer 200 x 160Reducer 225 x 160Reducer 250 x 160Reducer 250 x 200
No.No.
No.No.No.No.
No.No.
No.No.No.No.No.
No.No.No.No.
No.No.No.No.No.No.No.No.No.No.
No.No.No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
120.00145.00
172.00240.00374.00442.00
641.00816.00
1503.001970.002070.002679.005840.00
150.00158.00165.00179.00
179.00179.00217.00217.00217.00536.00697.00697.00774.00
1369.00
1705.002020.002955.004082.004465.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
144
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
End Cap 20End Cap 25End Cap 32End Cap 40
End Cap 50End Cap 63End Cap 75End Cap 90
End Cap 110End Cap 125End Cap 140End Cap 160
End Cap 180End Cap 200End Cap 225End Cap 250End Cap 315
Ferrule tapping tee 63 x 1/2"Ferrule tapping tee 63 x 3/4"Ferrule tapping tee 63 x 1"
Ferrule tapping tee 75 x 1/2"Ferrule tapping tee 75 x 3/4"Ferrule tapping tee 75 x 1"
Ferrule tapping tee 90 x 1/2"Ferrule tapping tee 90 x 3/4"Ferrule tapping tee 90 x 1"
Ferrule tapping tee 90 x 1¼"Ferrule tapping tee 90 x 1½"Ferrule tapping tee 90 x 2"
No.No.No.No.
No.No.No.No.
No.No.No.No.
No.No.No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
40.0040.0055.0060.00
64.0084.00
308.00351.00
493.00624.00
1021.001106.00
1286.002055.003530.004550.007527.00
757.00757.00757.00
757.00757.00757.00
757.00757.00757.00
982.00982.00982.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
145
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
Ferrule tapping tee 110 x 1/2"Ferrule tapping tee 110 x 3/4"Ferrule tapping tee 110 x 1"
Ferrule tapping tee 110 x 1¼"Ferrule tapping tee 100 x 1½"Ferrule tapping tee 110 x 2"
Ferrule tapping tee 160 x 1/2"Ferrule tapping tee 160 x 3/4"Ferrule tapping tee 160 x 1"
Ferrule tapping tee 160 x 1¼"Ferrule tapping tee 160 x 1½"Ferrule tapping tee 160 x 2"
Ferrule tapping tee 200 x 1/2"Ferrule tapping tee 200 x 3/4"Ferrule tapping tee 200 x 1"
Ferrule tapping tee 200 x 1¼"Ferrule tapping tee 200 x 1½"Ferrule tapping tee 200 x 2"
Ferrule tapping tee 250 x 1/2"Ferrule tapping tee 250 x 3/4"Ferrule tapping tee 250 x 1"
Ferrule tapping tee 250 x 1¼"Ferrule tapping tee 250 x 1½"Ferrule tapping tee 250 x 2"
Ferrule tapping tee 315 x 1/2"Ferrule tapping tee 315 x 3/4"Ferrule tapping tee 315 x 1"
Ferrule tapping tee 315 x 1¼"Ferrule tapping tee 315 x 1½"Ferrule tapping tee 315 x 2"
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
757.00757.00757.00
982.00982.00982.00
757.00757.00757.00
1070.001070.001070.00
1068.001068.001068.00
1540.001540.001540.00
1068.001068.001068.00
1540.001540.001540.00
1271.001271.001271.00
1726.001726.001726.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
146
DescriptionSr. No.
1 2
3.
Unit
3 4 5
WithE.D.
WithoutE.D.
Providing & Supply of Compression fittings,PN16 rated in conformation to ISO:14236-2000 and shall be tested as per ISO:3459,ISO:3501 & ISO:3503, suitable for drinkingwater & approved by WRAS, UK/ KIWA etc,in food grade polypropylene and shall beinclusive of all cost such as testing, all taxesrelated to central, state & unicipal, inspectioncharges, transportation up to site, transitinsurance, loading, unloading, stacking etc.complete.
Male Adaptor 20 x 1/2"Male Adaptor 25 x 3/4"Male Adaptor 32 x 1"Male Adaptor 40 x 1¼"Male Adaptor 50 x 1½"Male Adaptor 63 x 2"
Female Adaptor 20 x 1/2"Female Adaptor 25 x 3/4"Female Adaptor 32 x 1"Female Adaptor 40 x 1¼"Female Adaptor 50 x 1½"Female Adaptor 63 x 2"
Coupling 20 x 20Coupling 25 x 25Coupling 32 x 32Coupling 40 x 40Coupling 50 x 50Coupling 63 x 63
Reducing Coupling 25 x 20Reducing Coupling 32 x 20Reducing Coupling 32 x 25Reducing Coupling 40 x 25Reducing Coupling 40 x 32Reducing Coupling 50 x 32Reducing Coupling 50 x 40Reducing Coupling 63 x 50
No.No.No.No.No.No.
No.No.No.No.No.No.
No.No.No.No.No.No.
No.No.No.No.No.No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
68.0078.00
100.00184.00241.00344.00
73.0086.00
108.00202.00259.00365.00
70.0077.0098.00
187.00240.00347.00
128.00169.00169.00289.00289.00374.00374.00530.00
147
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
WithoutE.D.
90 Deg. Elbow 2090 Deg. Elbow 2590 Deg. Elbow 3290 Deg. Elbow 4090 Deg. Elbow 5090 Deg. Elbow 63
90 Deg. Elbow threaded male off take 20 x 1/2"90 Deg. Elbow threaded male off take 25 x 3/4"90 Deg. Elbow threaded male off take 32 x 1"90 Deg. Elbow threaded male off take 40 x 1/4"90 Deg. Elbow threaded male off take 50 x 1/2"90 Deg. Elbow threaded male off take 63 x 2"
90 Deg. Elbow threaded Female male off take 20 x 1/2"90 Deg. Elbow threaded Female male off take 25 x 3/4"90 Deg. Elbow threaded Female male off take 32 x 1"90 Deg. Elbow threaded Female male off take 40 x 1¼"90 Deg. Elbow threaded Female male off take 50 x 1½"90 Deg. Elbow threaded Female male off take 63 x 2"
Equal Tee 20 x 20 x 20Equal Tee 25 x 25 x 25Equal Tee 32 x 32 x 32Equal Tee 40 x 40 x 40Equal Tee 50 x 50 x 50Equal Tee 63 x 63 x 63
End Cap 20End Cap 25End Cap 32End Cap 40End Cap 50End Cap 63
No.No.No.No.No.No.
No.No.No.No.No.No.
No.No.No.No.No.No.
No.No.No.No.No.No.
No.No.No.No.No.No.
With E.D.
WithoutE.D.
SECTION - I : M. D. P. E. PIPES
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
130.00155.00190.00312.00443.00600.00
78.0095.00
123.00197.00269.00374.00
89.00110.00132.00257.00337.00443.00
155.00204.00264.00436.00590.00839.00
40.0040.0055.0060.0064.0084.00
148
DescriptionSr. No.
1 2
1.
SECTION - I : P. C. C. PIPES
Unit
3 4 5
With E.D.
WithoutE.D.
XII. P. C. C. PIPES
Providing and Supplying Prestressed Con-crete Cylinder Pipes suitable for sliding ovrelapweld joint or confined rubber ring joint withnecessary rubber ring of following class and di-ameter including cost of all taxes (central & lo-cal) transportation, inspection charges to siteof work / store, transit insurance, unloading andstacking etc. complete.
i) Factory test pressure
a) Site test pressure + 01N/mm2, For workingpressure upto 1 N/mm2
b) Site test pressure + 02N/mm2, For workingpressure upto 1 N/mm2
ii) Site test pressure - 1.5 times working pres-sure pertaining to the section or 1.1 times staticpressure, which ever is more (such pressure isto be control within 25% of pumphead incaseof pumping main)
iii) Working pessure - The maximum sustainedinternal pressure excluding surge to which eachportion of pipeline my be subjected when in-stalled.
As Per 784 : 2001
a) F T P - 4 Kg/Sq. cm
i) 350 mm
ii) 400 mm
iii) 450 mm
iv) 500 mm
RMT
RMT
RMT
RMT
4464.00
4909.00
5390.00
5965.00
4054.00
4457.00
4896.00
5417.00
With E.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
149
DescriptionSr. No.
1 2
SECTION - I : P. C. C. PIPES
Unit
3 4 5
With E.D.
WithoutE.D.
v) 600 mm
vi) 700 mm
vii) 800 mm
viii) 900 mm
ix) 1000 mm
x) 1100 mm
xi) 1200 mm
xii) 1300 mm
xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm
xvi) 1700 mm.
xvii) 1800 mm.
b) F T P - 5.5 Kg/Sq. cm
i) 350 mm
ii) 400 mm
iii) 450 mm
iv) 500 mm
With E.D.
WithoutE.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
7213.00
8334.00
9382.00
11499.00
13280.00
14870.00
16349.00
18890.00
20511.00
21993.00
23476.00
24958.00
26440.00
4464.00
4930.00
5417.00
6000.00
6551.00
7569.00
8522.00
10445.00
12062.00
13505.00
14849.00
17156.00
18628.00
19975.00
21321.00
22668.00
24014.00
4054.00
4479.00
4923.00
5449.00
150
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
v) 600 mm
vi) 700 mm
vii) 800 mm
viii) 900 mm
ix) 1000 mm
x) 1100 mm
xi) 1200 mm
xii) 1300 mm
xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm
xvi) 1700 mm.
xvii) 1800 mm.
c) F T P - 7 Kg/Sq. cm
i) 350 mm
ii) 400 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. C. C. PIPES
Without E.D. With
E.D.Without
E.D.
7262.00
8400.00
9493.00
11606.00
13412.00
15040.00
17157.00
19169.00
20866.00
22350.00
23832.00
25315.00
26797.00
4475.00
4951.00
6596.00
7629.00
8621.00
10542.00
12181.00
13661.00
15584.00
17409.00
18952.00
20298.00
21646.00
22992.00
24339.00
4063.00
4496.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
151
iii) 450 mm
iv) 500 mm
v) 600 mm
vi) 700 mm
vii) 800 mm
viii) 900 mm
ix) 1000 mm
x) 1100 mm
xi) 1200 mm
xii) 1300 mm
xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm
xvi) 1700 mm.
xvii) 1800 mm.
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
SECTION - I : P. C. C. PIPES
Without E.D. With
E.D.Without
E.D.
5445.00
6032.00
7312.00
8479.00
9629.00
11756.00
13613.00
15289.00
17455.00
19518.00
21450.00
22384.00
23867.00
25349.00
26831.00
4945.00
5478.00
6641.00
7701.00
8745.00
10677.00
12366.00
13886.00
15853.00
17728.00
19483.00
20329.00
21676.00
23023.00
24369.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
152
d) F T P - 8.5 Kg/Sq. cm
i) 350 mm
ii) 400 mm
iii) 450 mm
iv) 500 mm
v) 600 mm
vi) 700 mm
vii) 800 mm
viii) 900 mm
ix) 1000 mm
x) 1100 mm
xi) 1200 mm
xii) 1300 mm
xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm
xvi) 1700 mm.
xvii) 1800 mm.
DescriptionSr. No.
1 2
Unit
3 4 5
WithE.D.
SECTION - I : P. C. C. PIPES
Without E.D. With
E.D.Without
E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4492.00
4976.00
5473.00
6067.00
7376.00
8578.00
9765.00
11923.00
13819.00
15537.00
17903.00
20032.00
21859.00
22789.00
24273.00
25755.00
27237.00
4080.00
4520.00
4970.00
5510.00
6700.00
7790.00
8869.00
10828.00
12550.00
14112.00
16261.00
18194.00
19853.00
20699.00
22045.00
23392.00
24738.00
153
DescriptionSr. No.
1 2
Unit
3 4 5
e) F T P - 10 Kg/Sq. cm
i) 350 mmii) 400 mm
iii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mm
vii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mm
xi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mm
xv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
f) F T P - 11.5 Kg/Sq. cm
i) 350 mmii) 400 mm
iii) 450 mmiv) 500 mm
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMTRMT
RMTRMT
RMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
4508.004995.00
5506.006117.00
7449.008677.00
9913.0012087.00
14024.0015926.00
18207.0020390.00
22276.0023209.00
24692.0026175.0027657.00
4527.005027.00
5550.006169.00
4095.004539.00
5002.005555.00
6764.007880.00
9003.0010978.00
12736.0014465.00
16536.0018520.00
20233.0021079.00
22427.0023773.0025120.00
4111.004567.00
5039.005602.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
154
DescriptionSr. No.
1 2
Unit
3 4 5
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
g) F T P - 13 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
7523.008774.00
10188.0012254.00
14228.0016181.0018513.0020751.00
22699.0023631.0025113.0026596.0028078.00
4562.005069.005594.006220.00
7595.008874.00
10356.0012421.00
14526.0016438.0018823.0021120.00
23116.0024047.0025530.0027012.0028494.00
6833.007968.009254.00
11131.00
12922.0014696.0016814.0018848.00
20617.0021462.0022809.0024155.0025502.00
4143.004604.005081.005649.00
6898.008058.009407.00
11281.00
13193.0014930.0017095.0019181.00
20995.0021841.0023188.0024534.0025871.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
155
DescriptionSr. No.
1 2
Unit
3 4 5
h) F T P - 14.5 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
i) F T P - 17 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
4601.005116.005649.006279.00
7672.009456.00
10525.0012706.00
14739.0016696.0019130.0021479.00
24161.0025092.0026575.0028057.0029539.00
4636.005162.005707.006347.00
7771.009076.00
10728.0012889.00
14955.0016964.0019440.0021844.00
4179.004646.005131.005703.00
6968.008588.009559.00
11541.00
13386.0015163.0017374.0019507.00
21944.0022789.0024137.0025483.0026830.00
4212.004689.005183.005765.00
7057.008244.009745.00
11705.00
13581.0015408.0017656.0019840.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
156
DescriptionSr. No.
1 2
Unit
3 4 5
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
j) F T P - 18.5 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
k) F T P - 20 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mm
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
24628.0025558.0027041.0028524.0030006.00
4674.005209.005765.006417.00
7870.009189.00
11082.0013113.00
15211.0017231.0019752.0022892.00
25266.0025671.0027153.0028635.0030119.00
4711.005257.005822.006489.00
7968.009416.00
22367.0023214.0024560.0025907.0027253.00
4245.004731.005236.005828.00
7148.008347.0010064.0011910.00
13814.0015649.0017940.0020793.00
22948.0023314.0024662.0026009.0027355.00
4278.004775.005288.005894.00
7237.008552.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
157
DescriptionSr. No.
1 2
Unit
3 4 5
vii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
l) F T P - 21.5 Kg/Sq. cm
i) 350 mmii) 400 mmiii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
RMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
11349.0013415.00
15564.0017638.0020785.0023387.00
25824.0026227.0027710.0029192.0030674.00
4750.005302.005880.006559.00
8084.009879.00
11528.0013711.00
15918.0018527.0021302.0023929.00
27241.0027647.0029129.0030611.0032094.00
10306.0012182.00
14135.0016019.0018878.0021241.00
23453.0023821.0025168.0026514.0027861.00
4316.004817.005340.005957.00
7342.008973.00
10469.0012453.00
14457.0016827.0019347.0021733.00
24741.0025109.0026457.0027803.0029150.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
158
m) F T P - 23 Kg/Sq. cm
i) 350 mmii) 400 mm
ii) 450 mmiv) 500 mm
v) 600 mmvi) 700 mm
vii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mm
xi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mm
xv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
n) F T P - 24.5 Kg/Sq. cm
i) 350 mmii) 400 mm
iii) 450 mmiv) 500 mm
DescriptionSr. No.
1 2
Unit
3 4 5
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMT
RMTRMTRMT
RMTRMT
RMTRMT
SECTION - I : P. C. C. PIPES
WithE.D.
Without E.D.
WithE.D.
Without E.D.
4787.005350.00
5939.006628.00
8254.0010190.00
11880.0014008.00
16270.0019017.00
21825.0024612.00
27747.0028150.00
29632.0031116.0032598.00
4825.005398.00
5997.006699.00
4349.004859.00
5394.006020.00
7497.009256.00
10790.0012723.00
14778.0017272.00
19823.0022353.00
25200.0025567.00
26915.0028261.0029607.00
4382.004902.00
5447.006084.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
159
DescriptionSr. No.
1 2
Unit
3 4 5
SECTION - I : P. C. C. PIPES
v) 600 mmvi) 700 mmvii) 800 mmviii) 900 mm
ix) 1000 mmx) 1100 mmxi) 1200 mmxii) 1300 mm
xiii) 1400 mmxiv) 1500 mmxv) 1600 mmxvi) 1700 mm.xvii) 1800 mm.
Note :1) For PCCP pipes lowering, laying, and
pouring of cement mortar in the field onjoints (after laying and welding), ratesas per PSC pipes lowering, laying andjointing shall be adopted.
2) For field welding rates applicable forsimilar welding in MS pipes given in thatsection shall be adopted.
3) Whenever manufacturer is separate andcontractor for lowering, laying, jointingand testing is separate the principal con-tractor shall enter into an agreement withPCCP pipe manufacturer for satisfac-tory manufacturing transporting, lower-ing, laying, jointing and testing of pipes.
This foot notes shall appear in the tenderconditions.
RMTRMTRMTRMT
RMTRMTRMTRMT
RMTRMTRMTRMTRMT
WithE.D.
Without E.D.
WithE.D.
Without E.D.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
7798.009383.00
10986.0012938.00
15472.0017718.0020305.0024122.00
25682.0026045.0027392.0028738.0030085.00
8586.0010331.0012097.0014244.00
17036.0019508.0022354.0026559.00
28276.0028677.0030159.0031642.0033124.00
160SECTION - I : PIPES APPURTENANCES
XIII. PIPESAPPURTENANCES
Providing and supplying ISI mark CI D/F refluxvalves (non-return valves ) of following dia including alltaxes (Central and Local), railway freight, inspectioncharges unloding from railway wagon, loading into truck,transportation upto departmental stroes/ site, unloading,stacking etc. complete.
Reflux valves as per I.S.5312 Part I (1984)
a) Without by passarrangement -PN -1
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
1.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
3308.00
3873.00
4078.00
5694.00
8130.00
9844.00
17694.00
30194.00
41374.00
68478.00
94273.00
111059.00
181880.00
266900.00
468495.00
UnitDescriptionSr. No.
1 2 3 4 5
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
161SECTION - I : PIPES APPURTENANCES
b) With by pass
arrangement - PN -1
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vi) 250 mm.
vii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm.
xiii) 700 mm.
xiv) 750 mm.
xv) 800 mm.
xvi) 900 mm.
xvii) 1000 mm.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
UnitDescriptionSr. No.
1 2 3 4 5
4709.00
6708.00
9134.00
10848.00
20224.00
33057.00
44373.00
72752.00
97627.00
114222.00
185408.00
270477.00
709220.00
776307.00
843396.00
920068.00
1073413.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
162SECTION - I : PIPES APPURTENANCES
c) Without by pass
arrangement - PN -1.6
i) 50 mm.
ii) 65 mm
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
UnitDescriptionSr. No.
1 2 3 4 5
3227.00
3486.00
5718.00
7323.00
10203.00
11419.00
24284.00
38986.00
54474.00
93820.00
108424.00
127927.00
207834.00
305384.00
369010.00
423608.00
481972.00
609995.00
753081.00
911227.00
1084436.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
163SECTION - I : PIPES APPURTENANCES
d) With by pass
arrangement - PN -1.6
i) 50 mm.
ii) 65 mm
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
UnitDescriptionSr. No.
1 2 3 4 5
3312.00
3727.00
5484.00
7092.00
9911.00
12030.00
24298.00
36715.00
51028.00
85713.00
112272.00
131355.00
213216.00
311049.00
375853.00
431463.00
490910.00
621308.00
767046.00
928125.00
1104545.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
164SECTION - I : PIPES APPURTENANCES
UnitDescriptionSr. No.
1 2 3 4 5
2. Providing double flange sluice valve confirming for IS-2906/14846 including worn gear arrangements as pertest pressure stainless steel spindle, caps including alltaxes transportation etc. complete.
a) Sluice valves - PN -1 (Without by pass)
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
4391.00
4985.00
5116.00
6812.00
8521.00
10217.00
19333.00
29913.00
37695.00
53477.00
72101.00
88187.00
113477.00
167606.00
300430.00
342603.00
427239.00
550860.00
814189.00
1078533.00
1280269.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
165
UnitDescriptionSr. No.
1 2 3 4 5
b) Sluice valves - PN -1.0 (With by pass arrangement)
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
SECTION - I : PIPES APPURTENANCES
4391.00
4985.00
5116.00
6812.00
8521.00
12374.00
21854.00
33263.00
40982.00
58087.00
77248.00
93275.00
120104.00
174198.00
310617.00
351996.00
437316.00
561585.00
826615.00
1093680.00
1293675.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
166
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
c) Sluice valve - PN - 1.6
(Without by pass arrangement)
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm.
UnitDescriptionSr. No.
54321
SECTION - I : PIPES APPURTENANCES
5803.00
6371.00
7265.00
9636.00
12024.00
11893.00
24101.00
37382.00
49699.00
72811.00
99720.00
123737.00
160146.00
243982.00
524772.00
579078.00
672599.00
813137.00
1183325.00
1285723.00
1721030.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
167
UnitDescriptionSr. No.
54321
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
d) Sluice valve - PN - 1.6
(With by pass arrangement)
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xiii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm
xxi) 1200 mm.
SECTION - I : PIPES APPURTENANCES
5803.00
6371.00
7265.00
9636.00
12024.00
14014.00
26755.00
40969.00
53299.00
77866.00
105441.00
129463.00
167602.00
251533.00
538550.00
589319.00
682470.00
823468.00
1195568.00
1297614.00
1734270.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
168
4 5
SECTION - I : PIPES APPURTENANCES
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
a) Butterfly valve - PN - 1(With by pass arrangement)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vii) 250 mm.
viii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm
xiii) 700 mm
xiv) 750 mm
xv) 800 mm
xvi) 900 mm
xvii) 1000 mm
xviii) 1100 mm
xix) 1200 mm
xx) 1400 mm
xxi) 1500 mm
UnitDescriptionSr. No.
1 2 3
Providing, double flanged short body pattern type manuallyoperated Butterfly Valve having body, disc and end cover ingraded cast iron to IS-210 Gr.CF 200 generally confirming into IS-13095-1991, Synthetic rubber faced ring secured on discby retaining ring with stainless steel screw stub shaft of stain-less steel riding in teflon bearing excluding C.C. foundation /structural steel support.
3
5808.00
7424.00
8467.00
10944.00
14586.00
18230.00
28844.00
58665.00
63023.00
72811.00
79947.00
98727.00
159784.00
198334.00
218214.00
301378.00
358723.00
581758.00
550499.00
839367.00
1042954.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
169
4 5
SECTION - I : PIPES APPURTENANCES
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
b) Butterfly valve - PN - 1.6
(With by pass arrangement)
i) 80 mm.
ii) 100 mm.
iii) 125 mm.
iv) 150 mm.
v) 200 mm.
vii) 250 mm.
viii) 300 mm.
viii) 350 mm.
ix) 400 mm.
x) 450 mm.
xi) 500 mm.
xii) 600 mm
xiii) 700 mm
xiv) 750 mm
xv) 800 mm
xvi) 900 mm
xvii) 1000 mm
xviii) 1100 mm
xix) 1200 mm
xx) 1400 mm
xxi) 1500 mm
UnitDescriptionSr. No.
1 2 3
6444.00
8537.00
9317.00
12585.00
16776.00
20965.00
33171.00
67464.00
72476.00
83733.00
91939.00
113537.00
183751.00
228084.00
249867.00
346586.00
448404.00
727199.00
688125.00
1049209.00
1294878.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
170
Lowering, laying and jointing in position followingC.I.D/F Reflex valves, Butterfly valves and Sluicevalves including cost of all labour jointing material, includ-ing nut bolts and giving satisfactory hydraulic testing etc.complete. (Rate for all class of valves.)
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
iv) 100 mm.
v) 125 mm.
vi) 150 mm.
vii) 200 mm.
viii) 250 mm.
ix) 300 mm.
x) 350 mm.
xi) 400 mm.
xii) 450 mm.
xii) 500 mm.
xiv) 600 mm.
xv) 700 mm.
xvi) 750 mm.
xvii) 800 mm.
xviii) 900 mm.
xix) 1000 mm.
xx) 1100 mm.
xxi) 1200 mm.
Sr. No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
4.
2
Unit
3
Description
1 4 5
SECTION - I : PIPES APPURTENANCES
689.00
1036.00
1440.00
1881.00
2342.00
2957.00
3076.00
4008.00
4158.00
5124.00
6182.00
7354.00
7616.00
8083.00
8714.00
9598.00
11438.00
12136.00
14307.00
16521.00
18153.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
171SECTION - I : PIPES APPURTENANCES
UnitDescriptionSr. No.
1 2 3 4 5
Providing and supplying Air Valves as per IS-14845-2000 and MJP’s standard specifications of ap-proved make and quality of following diameters includingall taxes (Central and local), railway freight, inspectioncharges, unloding from railway wagons, loadinginto truck, transportation upto departmental stores / site,unloding and stacking etc. complete.
a) Air Valve SingleBall Flanged / ScrewedType - PN -1
i) 12/15 mm.
ii) 20 mm.
iii) 25 mm.
iv) 32 mm.
v) 40 mm.
vi) 50 mm.
b) Air Valve Single Ball Flanged / ScrewedType - PN -1.6
i) 12/15 mm.
ii) 20 mm.
iii) 25 mm.
iv) 32 mm.
v) 40 mm.
vi) 50 mm.
5.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
615.00
741.00
1022.00
1116.00
1228.00
1349.00
719.00
1022.00
1228.00
1324.00
1418.00
1851.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
172SECTION - I : PIPES APPURTENANCES
Providing and supplying Air Valves as per IS-10845 and MJP’s standard specifications double ori-fice type combined with screw down isolating valve,small orifice elastic ball resting on a gun metal orifice nipple,large orifice vulcanite ball seating on moulded seat ring,inlet face and drilled, including all taxes (Central and lo-cal), insurance, third party inspection charges, loading,unloding, transportation upto departmental stores / site, etc.complete.
a) Air Valve Double Ball Flanged
Type - PN -1
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
b) Air Valve Double Ball Flanged
Type - PN -1.6
i) 50 mm.
ii) 65 mm.
iii) 80 mm.
6.
No.
No.
No.
No.
No.
No.
UnitDescriptionSr. No.
1 2 3 4 5
5673.00
6619.00
7561.00
7515.00
8509.00
10530.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
173SECTION - I : PIPES APPURTENANCES
Providing and supplying Air Valves as per IS-14845-2000 and MJP’s standard specifications doubleorifice type combined with isolating sluice valve, mounted inhorizontal position and operated by wheel gearing, small ori-fice elastic ball resting on a gun metal orifice nipple, largeorifice vulcanite ball seating on moulded seat ring, inlet faceand drilled, including all taxes (Central and local), insur-ance, third party inspection charges, loading, unload-ing, transportation upto departmental store / site, etc.complete.
a) Air Valve Double Ball Flanged
Type - PN -1
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
b) Air Valve Double Ball Flanged
Type - PN -1.6
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
No.
No.
No.
No.
No.
No.
7.
UnitDescriptionSr. No.
1 2 3 4 5
9561.00
17425.00
29304.00
14617.00
20593.00
34633.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
174
No.
No.
No.
No.
No.
No.
DescriptionSr. No.
Providing and supplying Kinetic Double Orifice typeAir Valves as per MJP’s standard specifications com-bined with screw down isolating valve, small orificeelastic ball resting on a gun metal orifice nipple, largeorifice vulcanite ball seating on moulded seat ring, inlet faceand drilled, including all taxes (Central and local), insurance,third party inspection charges, loading, unloading, trans-portation upto departmental stores / site, etc. complete.
a) Kinetic Air Valve Flanged
Type - PN -1
i) 40 mm.
ii) 50 mm.
iii) 80 mm.
b) Kinetic Air Valve Flanged
Type - PN -1.6
i) 40 mm.
ii) 50 mm.
iii) 80 mm.
8.
Unit
1 2 3 4 5
SECTION - I : PIPES APPURTENANCES
9516.00
11729.00
15304.00
11280.00
13903.00
18176.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
175SECTION - I : PIPES APPURTENANCES
Providing and supplying Kinetic Double Orifice typeAir Valves as per MJP’s standard specifications havingsmall orifice elastic ball resting on a gun metal orifice nipple,large orifice vulcanite ball seating on moulded seat ring,withbuilt-in Kinetic features, isolating sluice valve mounted inhorizontal position and operated by wheel gearing, inlet faceand drilled, including all taxes (Central and local),insurance, third party inspection charges, loading,unloding, transportation upto departmental stores / site,etc. complete.
a) Kinetic Air Valve Flanged
Type - PN -1
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
b) Kinetic Air Valve Flanged
Type - PN -1.6
i) 100 mm.
ii) 150 mm.
iii) 200 mm.
9.
No.
No.
No.
No.
No.
No.
UnitDescriptionSr. No.
1 2 3 4 5
20610.00
38804.00
56659.00
24427.00
45993.00
67161.00
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
176
UnitDescriptionSr. No.
1 2 3 4 5
SECTION -I : PIPES APPURTENANCES
Lowering, laying and fixing in proper alignment and positionall types of C.I. air valves as directed by Engineer-in-chargeincluding cost of conveyance from stores to site of work, cost of allmaterial and giving satisfactory hydraulic testing, etc. complete. (forall class of valves).
a) Air Valve Single Ball (PN-1 and PN - 1.6)
i) 15 mm.ii) 20 mm.iii) 25 mm.iv) 32 mm.v) 40 mm.
vi) 50 mm.vii) 65 mm.viii) 80 mm.ix) 100 mm.x) 125 mm.
xi) 150 mm.xii) 200 mm.
b) Air Valve Double Ball (PN-1 and PN - 1.6)
i) 15 mm.ii) 20 mm.iii) 25 mm.iv) 32 mm.v) 40 mm.
vi) 50 mm.vii) 65 mm.viii) 80 mm.ix) 100 mm.x) 125 mm.
xi) 150 mm.xii) 200 mm.
10.
No.No.No.No.No.
No.No.No.No.No.
No.No.
No.No.No.No.No.
No.No.No.No.No.
No.No.
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
110.00140.00180.00199.00213.00
231.00243.00255.00285.00345.00
383.00421.00
120.00149.00180.00205.00238.00
275.00317.00379.00400.00441.00
603.00664.00
177
UnitDescriptionSr. No.
1 2 3 4 5
SECTION - I : PIPES APPURTENANCES
c) Kinetic Air Valve (PN-1 and PN - 1.6)
i) 40 mm.ii) 50 mm.iii) 65 mm.iv) 80 mm.v) 100 mm.
vi) 125 mm.vii) 150 mm.viii) 200 mm.
Providing erecting Cast Steel/ Spheroidal Graphite(S.G) Iron D/F Sluice Valves / Butterfly Valves withjointing to pipe work (including all hardware and pack-ing) water works quality, having non-rising spindle withhand wheel and without bypass arrangement, spindle ofstainless steel as per requirement, excluding C. C. foun-dation / structural steel support.
For Rating Class 150 (Working Pressure 20 kg/cm2
and Test Pressure 30 kg/cm2)
a) Sluice Valves
i) 80 mm dia.ii) 100 mm dia.iii) 150 mm dia.iv) 200 mm dia.
v) 250 mm dia.vi) 300 mm dia.vii) 350 mm dia.viii) 400 mm dia.
ix) 450 mm dia.x) 500 mm dia.xi) 600 mm dia.
11.
No.No.No.No.No.
No.No.No.
No.No.No.No.
No.No.No.No.
No.No.No.
A)
Rate(in Rs.)
2012-2013
Rate(in Rs.)
2013-2014
273.00315.00345.00379.00417.00
455.00652.00711.00
14656.0019540.0029311.0045713.00
65786.0084173.00
112230.00187281.00
255524.00300616.00343203.00